CN216828772U - Perforating device is used in processing of PE pipeline - Google Patents
Perforating device is used in processing of PE pipeline Download PDFInfo
- Publication number
- CN216828772U CN216828772U CN202123434447.4U CN202123434447U CN216828772U CN 216828772 U CN216828772 U CN 216828772U CN 202123434447 U CN202123434447 U CN 202123434447U CN 216828772 U CN216828772 U CN 216828772U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- pipeline
- processing
- clamping
- workstation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Drilling And Boring (AREA)
Abstract
The utility model relates to a PE pipeline trompil technical field specifically is a trompil device is used in PE pipeline processing, comprises a workbench, elevating gear is connected with to the last fixed surface of workstation, perforator of one side fixedly connected with of elevating gear, fixture of one side fixedly connected with of workstation, fixture includes two steadying plates, two steadying plate is the symmetry and arranges. The utility model has the advantages that: the utility model discloses a fixture that sets up can carry out the centre gripping to not unidimensional PE pipeline, has solved artifical fixed relatively extravagant manpower and inefficiency, installs additional when anchor clamps are fixed and dismantle all slower problem, and the PE pipe is conveniently placed and takes out to the slot of setting, and the commentaries on classics of setting can carry out the centre gripping to the PE pipe, and can the different size of centre gripping, and the practicality is strong, has practiced thrift a large amount of costs, and fixed stable, improves drilling effect.
Description
Technical Field
The utility model relates to a PE pipeline trompil technical field, especially a trompil device is used in PE pipeline processing.
Background
The PE pipeline opening is characterized in that the PE pipeline is perforated, namely non-stop perforation and processing perforation are distinguished, and the perforation during processing is realized by closing the PE pipeline by using a drilling machine.
The drilling machine is generally adopted to punch the holes in the conventional hole opening, but the PE pipeline is basically circular in shape, so that the PE pipeline is very important to be fixed in the hole opening process, the prior art generally adopts manual hand-held fixation, manpower is wasted in manual fixation, efficiency is low, the fixture can be used for fixation, and the conventional fixture is slow to install and disassemble when the fixture is complex to operate.
Therefore, a hole drilling device for processing a PE pipe is needed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a trompil device is used in PE pipeline processing.
The purpose of the utility model is realized through the following technical scheme: the utility model provides a trompil device is used in PE pipeline processing, includes the workstation, elevating gear is connected with to the last fixed surface of workstation, drilling ware of one side fixedly connected with of elevating gear, fixture of one side fixedly connected with of workstation, fixture includes two steadying plates, two steadying plate is the symmetry and arranges, two equal fixed connection in the upper surface of workstation in one side of steadying plate.
Optionally, one side of the workbench is fixedly connected with four supporting columns, the four supporting columns are distributed at four corners of the workbench, one side of the workbench is provided with a scrap collecting tank, and one side of the workbench is fixedly connected with a scrap collecting box.
Optionally, the lifting device comprises a stand column, one side of the stand column is fixedly connected to the upper surface of the workbench, a first clamping groove is formed in one side of the stand column, a second clamping groove is formed in one side of the first clamping groove, a first clamping block is arranged in the inner clamping of the first clamping groove, a second clamping block is fixedly connected to one side of the first clamping block, a limiting block is fixedly connected to one side of the second clamping block, a telescopic cylinder is fixedly connected to one side of the stand column, an output end of the telescopic cylinder is fixedly connected to one side of the limiting block, and one side of the first clamping block is fixedly connected to the outer surface of the drilling device.
Optionally, the size of the first clamping block is matched with the size of the first clamping groove, the outer surface of the first clamping block is slidably connected inside the first clamping groove, the size of the second clamping block is matched with the size of the second clamping groove, the outer surface of the second clamping block is slidably connected inside the second clamping groove, and one side of the limiting block is slidably connected to one side of the upright post.
Optionally, a slot is formed in one side of each of the two stabilizing plates, a first annular clamping plate is fixedly connected to one side of each of the two stabilizing plates, an extending plate is fixedly connected to one side of each of the two stabilizing plates, a threaded hole is formed in one side of each of the two extending plates, a rotating handle is connected to the inner portion of each threaded hole in a threaded manner, and a second annular clamping plate is connected to one side of each rotating handle in a rotating manner.
Optionally, one side of the first annular clamping plate and one side of the second annular clamping plate are both fixedly connected with an anti-slip layer.
Optionally, two limiting holes are formed in one side of each extending plate, two limiting columns are fixedly connected to one side of each second annular clamping plate, and the outer surfaces of the four limiting columns are connected with the corresponding limiting holes in a sliding mode.
Optionally, the reamer is located above the scrap collecting chute.
The utility model has the advantages of it is following:
1. the utility model discloses a elevating gear who sets up can drill not unidimensional PE pipeline, and the motion is stable, has improved the accurate nature of drilling, when needs remove the perforator, opens telescopic cylinder, and telescopic cylinder's output drives the upwards or downstream of stopper, can reach the effect to PE pipeline trompil.
2. The utility model discloses a fixture that sets up can carry out the centre gripping to not unidimensional PE pipeline, has solved artifical fixed relatively extravagant manpower and inefficiency, installs additional when anchor clamps are fixed and dismantle all slower problem, and the PE pipe is conveniently placed and takes out to the slot of setting, and the commentaries on classics of setting can carry out the centre gripping to the PE pipe, and can the different size of centre gripping, and the practicality is strong, has practiced thrift a large amount of costs, and fixed stable, improves drilling effect.
3. The utility model discloses a sweeps in the drilling process can be collected to the sweeps collecting vat that sets up, keeps the clean and tidy of workstation, keeps totally to collect easily, practiced thrift a large amount of times.
Drawings
Fig. 1 is a schematic view of a first view structure of the present invention;
fig. 2 is a schematic view of a second perspective structure of the present invention;
FIG. 3 is a schematic structural view of the workbench of the present invention;
FIG. 4 is a schematic structural view of the pillar of the present invention;
fig. 5 is a schematic view of a connection structure of the first clamping block of the present invention;
fig. 6 is a schematic view of the connection structure of the stabilizing plate of the present invention.
In the figure: 1-workbench, 101-waste collecting tank, 102-waste collecting tank, 2-lifting device, 201-upright column, 202-first clamping groove, 203-second clamping groove, 204-first clamping block, 205-second clamping block, 206-limiting block, 207-telescopic cylinder, 3-drilling device, 4-clamping mechanism, 401-stabilizing plate, 402-first annular clamping plate, 403-extending plate, 404-rotating handle, 405-second annular clamping plate and 406-limiting column.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1 to 6, a hole opening device for processing a PE pipeline includes a workbench 1, a lifting device 2 is fixedly connected to the upper surface of the workbench 1, a drilling device 3 is fixedly connected to one side of the lifting device 2, a clamping mechanism 4 is fixedly connected to one side of the workbench 1, the clamping mechanism 4 includes two stabilizing plates 401, the two stabilizing plates 401 are symmetrically arranged, and one sides of the two stabilizing plates 401 are fixedly connected to the upper surface of the workbench 1.
As an optimal technical solution of the utility model: four support columns of one side fixedly connected with of workstation 1, four support columns distribute in workstation 1's four corners department, and a sweeps collecting vat 101 has been seted up to one side of workstation 1, sweeps collecting vat 102 of one side fixedly connected with of workstation 1, the utility model discloses a sweeps collecting vat 101 that sets up can be collected the sweeps in the drilling process, keeps workstation 1 clean and tidy, keeps totally to collect easily, practiced thrift a large amount of times.
As an optimal technical solution of the utility model: the lifting device 2 comprises a vertical column 201, one side of the vertical column 201 is fixedly connected with the upper surface of the workbench 1, one side of the vertical column 201 is provided with a first clamping groove 202, one side of the first clamping groove 202 is provided with a second clamping groove 203, a first clamping block 204 is clamped inside the first clamping groove 202, one side of the first clamping block 204 is fixedly connected with a second clamping block 205, one side of the second clamping block 205 is fixedly connected with a limiting block 206, one side of the vertical column 201 is fixedly connected with a telescopic cylinder 207, the output end of the telescopic cylinder 207 is fixedly connected with one side of the limiting block 206, one side of the first clamping block 204 is fixedly connected with the outer surface of the drilling device 3, the lifting device 2 can be used for drilling PE pipelines with different sizes, the movement is stable, the drilling accuracy is improved, when the drilling device 3 needs to be moved, the telescopic cylinder 207 is opened, the output end of the telescopic cylinder 207 drives the limiting block 206 to move upwards or downwards, so that the effect of opening the PE pipeline can be achieved.
As an optimal technical solution of the utility model: the size of the first fixture block 204 is matched with the size of the first clamping groove 202, the outer surface of the first fixture block 204 is slidably connected to the inside of the first clamping groove 202, the first fixture block 204 slides in the inside of the first sliding groove 202, the movement is stable, the size of the second fixture block 205 is matched with the size of the second clamping groove 202, the outer surface of the second fixture block 205 is slidably connected to the inside of the second clamping groove 203, and one side of the limiting block 206 is slidably connected to one side of the upright column 201.
As an optimal technical solution of the utility model: one side of each of the two stabilizing plates 401 is provided with a slot, one side of each of the two stabilizing plates 401 is fixedly connected with a first annular clamping plate 402, one side of each of the two stabilizing plates 401 is fixedly connected with an extending plate 403, one side of each of the two extending plates 403 is provided with a threaded hole, the inner parts of the two threaded holes are in threaded connection with a rotating handle 404, and one side of each of the two rotating handles 404 is in rotating connection with a second annular clamping plate 405. the utility model can clamp PE pipes with different sizes by the arranged clamping mechanism 4, solves the problems of manpower waste and low efficiency caused by manual fixation, and is slow to assemble and disassemble when the clamp is fixed, the arranged slots are convenient for placing and taking out the PE pipes, the arranged rotating handles 404 can clamp the PE pipes, and can clamp different sizes, therefore, the PE pipe clamping device is strong in practicability, saves a large amount of cost, and is stable in fixation, the drilling effect is improved.
As an optimal technical solution of the utility model: the skid resistant course of the equal fixedly connected with in one side of first annular cardboard 402 and second annular cardboard 405, the skid resistant course of setting can increase the frictional force with the PE pipe, prevents that the PE pipe from rotating.
As an optimal technical solution of the utility model: two spacing holes have all been seted up to one side of two extension boards 403, two spacing posts 406 of the equal fixedly connected with in one side of two second annular cardboard 405, the surface of four spacing posts 406 all with the inside sliding connection in corresponding spacing hole, through four spacing posts 406 that set up, can prevent that second annular cardboard 405 from rotating, has also played the effect of second annular cardboard 405 motion stability simultaneously.
As a preferred technical solution of the utility model: the reamer 3 is located above the scrap collecting tank 101.
In summary, the following steps: the utility model discloses a PE pipeline of different sizes can be drilled through the elevating gear 2 that sets up, and the motion is stable, has improved the precision of drilling, when needs move perforator 3, opens telescopic cylinder 207, and telescopic cylinder 207's output drives stopper 206's upward or downward motion, can reach the effect of trompil to the PE pipeline; the utility model discloses a fixture 4 that sets up can carry out the centre gripping to the PE pipeline of not unidimensional, has solved artifical fixed relatively extravagant manpower and inefficiency, installs additional and dismantles all slower problem when anchor clamps are fixed, the slot of setting conveniently places and takes out the PE pipe, the commentaries on classics handle 404 that sets up can carry out the centre gripping to the PE pipe, and can centre gripping different sizes, and the practicality is strong, has practiced thrift a large amount of costs, and fixed stable, improves drilling effect; the utility model discloses a sweeps among the drilling process can be collected to the sweeps collecting vat 101 that sets up, keeps the clean and tidy of workstation 1, keeps totally to collect easily, practiced thrift a large amount of times.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a PE is trompil device for pipe processing which characterized in that: including workstation (1), last fixed surface of workstation (1) is connected with elevating gear (2), drilling ware (3) of one side fixedly connected with of elevating gear (2), fixture (4) of one side fixedly connected with of workstation (1), fixture (4) include two steadying plate (401), two steadying plate (401) are the symmetry and arrange, two the equal fixed connection in the upper surface of workstation (1) in one side of steadying plate (401).
2. The hole opening device for processing the PE pipeline as claimed in claim 1, wherein: four support columns are fixedly connected to one side of the workbench (1), the four support columns are distributed at four corners of the workbench (1), a scrap collecting tank (101) is arranged on one side of the workbench (1), and a scrap collecting box (102) is fixedly connected to one side of the workbench (1).
3. The hole opening device for processing the PE pipeline as claimed in claim 1, wherein: elevating gear (2) includes a stand (201), one side fixed connection of stand (201) is in the upper surface of workstation (1), a first draw-in groove (202) has been seted up to one side of stand (201), a second draw-in groove (203) has been seted up to one side of first draw-in groove (202), the inside joint of first draw-in groove (202) has one first fixture block (204), one side fixedly connected with one second fixture block (205) of first fixture block (204), one side fixedly connected with one stopper (206) of second fixture block (205), one side fixedly connected with one telescopic cylinder (207) of stand (201), the output fixed connection of telescopic cylinder (207) is in one side of stopper (206), one side of first fixture block (204) and the outer fixed surface of perforator (3) are connected.
4. The hole opening device for processing the PE pipeline as claimed in claim 3, wherein: the size of the first clamping block (204) is matched with that of the first clamping groove (202), the outer surface of the first clamping block (204) is connected to the inside of the first clamping groove (202) in a sliding mode, the size of the second clamping block (205) is matched with that of the second clamping groove, the outer surface of the second clamping block (205) is connected to the inside of the second clamping groove (203) in a sliding mode, and one side of the limiting block (206) is connected to one side of the upright post (201) in a sliding mode.
5. The hole opening device for processing the PE pipeline as claimed in claim 1, wherein: two a slot has all been seted up to one side of stabilizer plate (401), two first annular cardboard (402) of the equal fixedly connected with in one side of stabilizer plate (401), two extension board (403) of the equal fixedly connected with in one side of stabilizer plate (401), two a screw hole has all been seted up to one side of extension board (403), two the equal threaded connection in inside of screw hole has one to change handle (404), two it all rotates one side of (404) and is connected with a second annular cardboard (405).
6. The hole opening device for processing the PE pipeline as claimed in claim 5, wherein: one side of the first annular clamping plate (402) and one side of the second annular clamping plate (405) are both fixedly connected with an anti-slip layer.
7. The hole opening device for processing the PE pipeline as claimed in claim 5, wherein: two spacing holes have all been seted up to one side of two extension board (403), two one side of second annular cardboard (405) all fixedly connected with two spacing posts (406), four the surface of spacing post (406) all with the inside sliding connection in corresponding spacing hole.
8. The hole opening device for processing the PE pipeline as claimed in claim 1, wherein: the drill (3) is positioned above the scrap collecting tank (101).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123434447.4U CN216828772U (en) | 2021-12-30 | 2021-12-30 | Perforating device is used in processing of PE pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123434447.4U CN216828772U (en) | 2021-12-30 | 2021-12-30 | Perforating device is used in processing of PE pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216828772U true CN216828772U (en) | 2022-06-28 |
Family
ID=82113535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123434447.4U Active CN216828772U (en) | 2021-12-30 | 2021-12-30 | Perforating device is used in processing of PE pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216828772U (en) |
-
2021
- 2021-12-30 CN CN202123434447.4U patent/CN216828772U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107367400B (en) | A drilling coring device for road engineering quality inspection | |
CN205057654U (en) | Recovery unit of bench drill drill chip | |
CN201930803U (en) | Novel experiment frame | |
CN216828772U (en) | Perforating device is used in processing of PE pipeline | |
CN206373394U (en) | A kind of convenient steel tube drilling device of feeding | |
CN210788817U (en) | Hydraulic single-row punching machine | |
CN219336052U (en) | Panel drilling equipment | |
CN106001677A (en) | Full-automatic aluminum alloy perforating machine | |
CN115628932A (en) | Soil and groundwater sample acquisition and detection integrated operation platform | |
CN213197239U (en) | High-toughness corrosion-resistant automobile inspection tool clamping device | |
CN205929082U (en) | Stone material board perforating device convenient to move panel | |
CN108500330A (en) | A kind of fitness equipment part drilling device | |
CN216870056U (en) | Sampling drill bit for municipal road engineering detection | |
CN218639015U (en) | Pin machine convenient to centre gripping location | |
CN221612394U (en) | Soil collecting device for soil detection | |
CN206274292U (en) | The horizontal tube sample boring device of rafifinal segregation ingot | |
CN218584389U (en) | Soil sampler for soil mass test detection | |
CN221287931U (en) | Workbench | |
CN215702973U (en) | Hole machining device for ceramic artware | |
CN219684006U (en) | Stainless steel perforator | |
CN221516162U (en) | Pipeline wall perforating device | |
CN216421746U (en) | Positioning device for drilling machine | |
CN211413751U (en) | Mechanical drilling equipment | |
CN214350926U (en) | Drilling tool with automatic positioning function | |
CN219252675U (en) | Test tube positioning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A Hole Opening Device for PE Pipeline Processing Effective date of registration: 20230914 Granted publication date: 20220628 Pledgee: Beijing finance Company limited by guarantee Pledgor: BEIJING ZHONGCAIWANXIN SCIENCE & TECHNOLOGY Co.,Ltd. Registration number: Y2023990000452 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |