CN216810502U - Anti-cracking high-rise green stone curtain wall - Google Patents

Anti-cracking high-rise green stone curtain wall Download PDF

Info

Publication number
CN216810502U
CN216810502U CN202220400027.XU CN202220400027U CN216810502U CN 216810502 U CN216810502 U CN 216810502U CN 202220400027 U CN202220400027 U CN 202220400027U CN 216810502 U CN216810502 U CN 216810502U
Authority
CN
China
Prior art keywords
pull rod
stone
stone material
groove
material panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220400027.XU
Other languages
Chinese (zh)
Inventor
王清
王武
尤伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Jincheng Dongsheng Decoration Engineering Co ltd
Original Assignee
Wuhan Jincheng Dongsheng Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Jincheng Dongsheng Decoration Engineering Co ltd filed Critical Wuhan Jincheng Dongsheng Decoration Engineering Co ltd
Priority to CN202220400027.XU priority Critical patent/CN216810502U/en
Application granted granted Critical
Publication of CN216810502U publication Critical patent/CN216810502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The application discloses prevent cracked high-rise green stone curtain to relate to curtain building field, it includes stone material panel and connecting piece, and the last one side of being close to the wall of stone material panel is provided with the back up coat, and one side that the stone material panel was kept away from to the back up coat is provided with the firm mechanism that is used for avoiding the stone material panel phenomenon of droing to appear. This application has stabilizes the stone material panel through firm mechanism, avoids the stone material panel to appear becoming flexible and lead to the phenomenon that drops as far as possible, helps improving the effect of the stability of stone material curtain installation.

Description

Anti-cracking high-rise green stone curtain wall
Technical Field
The application relates to the field of curtain wall buildings, in particular to an anti-cracking high-rise green stone curtain wall.
Background
At present, the stone curtain wall is generally composed of stone panels and a supporting structure (a beam, a column, a steel structure, a connecting piece and the like), does not bear the load of a main structure and does not bear a building envelope structure, and the stone panels are generally connected through keels and the connecting piece to form the stone curtain wall.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: fix the stone material panel on keel bracket through the connecting piece, fix through the bolt, along with the extension of time, the bolt can progressively take place ageing for connecting piece and stone material panel and keel bracket appear becoming flexible, thereby probably make the unstable phenomenon appear in the stone material panel.
SUMMERY OF THE UTILITY MODEL
Thereby can gradually take place ageing make connecting piece and stone material panel and fossil fragments support appear becoming flexible and probably make the stone material panel appear the problem of unstable phenomenon in order to improve the extension bolt along with time, this application provides a high-rise green stone curtain of anticracking.
The application provides a pair of prevent cracked high-rise green stone curtain adopts following technical scheme:
the utility model provides a high-rise green stone curtain of anti-fragmentation, includes stone material panel and connecting piece, the last one side of being close to the wall of stone material panel is provided with the back up coat, the back up coat is kept away from one side of stone material panel is provided with the firm mechanism that is used for avoiding the stone material panel phenomenon of droing to appear.
Through adopting above-mentioned technical scheme, the connecting piece is fixed stone panels on the wall body, further consolidate stone panels through the back up coat simultaneously, stabilize stone panels through stabilizing mean again simultaneously, when the extension along with the time makes stone panels and connecting piece take place not hard up, stabilize stone panels through stabilizing mean, avoid stone panels to appear becoming flexible and lead to the phenomenon that drops as far as possible, help improving the stability of stone material curtain installation.
Optionally, the stabilizing mechanism includes the dead lever, the wall body with all be provided with the prefabricated groove on the back up coat, two are arranged in respectively at the both ends of dead lever in the prefabricated groove, the both ends of dead lever be provided with be used for with the dead lever chucking is in the chucking subassembly in the prefabricated groove, be provided with on the dead lever be used for with the taut subassembly on the wall body of stone material panel.
Through adopting above-mentioned technical scheme, through in inserting into two pregrooves with the both ends of dead lever, fix the dead lever in two pregrooves through the chucking subassembly, make the stone material panel take-up on the wall body through taut subassembly again simultaneously, avoid the stone material panel phenomenon of becoming flexible to appear as far as possible, help improving the stability of stone material panel installation.
Optionally, the clamping assembly comprises a clamping block and an elastic piece, a first clamping groove is formed in the fixed rod, the elastic piece is arranged on the bottom wall of the first clamping groove, the elastic piece is far away from the clamping block fixedly connected with one end of the first clamping groove, a second clamping groove is formed in the side wall of the prefabricated groove, and the clamping block is matched with the second clamping groove in a clamped mode.
By adopting the technical scheme, when the two ends of the fixed rod are inserted into the prefabricated groove, the fixture block and the elastic piece extend into the prefabricated groove along with the fixed rod, and when the fixed rod moves to the position of the second clamping groove in the prefabricated groove, the fixture block is pushed into the second clamping groove through the elastic deformation force of the elastic piece, so that the fixed rod is fastened in the prefabricated groove, and the stone panel is stably installed.
Optionally, the tensioning assembly includes a first pull rod and a second pull rod, the fixing rod is configured as an inner screw tube, one end of each of the first pull rod and the second pull rod, which is close to the inner screw tube, is embedded in the inner screw tube through a screw thread, one end of the first pull rod, which is far away from the inner screw tube, points at the reinforcing layer, one end of the second pull rod, which is far away from the inner screw tube, points at a wall body direction, a plurality of tensioning members are provided on the first pull rod and the second pull rod, which are used for stably clamping the first pull rod and the second pull rod in the prefabricated grooves, and one ends of the first pull rod and the second pull rod, which are far away from the inner screw tube, correspond to the prefabricated grooves on the reinforcing layer and the wall body, respectively.
Through adopting above-mentioned technical scheme, when pegging graft into corresponding prefabricated groove in stone material face and the wall body respectively with first pull rod and second pull rod, screw cylinder adjusts the length of first pull rod and second pull rod in the prefabricated groove in rotating, make first pull rod and second pull rod stabilize and connect in the prefabricated groove, take-up on the wall body with stone material panel jointly, the firm joint of rethread tensioning piece makes first pull rod and second pull rod in the prefabricated groove simultaneously, help the installation of firm stone material panel, avoid stone material panel to appear not hard up phenomenon after forming stone material curtain as far as possible.
Optionally, a limiting member for limiting the first pull rod and the second pull rod in the inner screw cylinder is arranged in the inner screw cylinder.
Through adopting above-mentioned technical scheme, make first pull rod and second pull rod anticreep set up including the screw section of thick bamboo through the locating part, help connecting first pull rod and second pull rod steadily including in the screw section of thick bamboo.
Optionally, the limiting member is provided with a limiting block, and the limiting block is respectively and fixedly connected with one end of the first pull rod and one end of the second pull rod close to the inner screw barrel.
Through adopting above-mentioned technical scheme, the stopper carries on spacingly to first pull rod and second pull rod, avoids appearing the phenomenon that first pull rod and second pull rod drop from interior spiral shell section of thick bamboo as far as possible.
Optionally, the reinforcing layer includes wire net and buffer layer, wire net and buffer layer laminating link together, the buffer layer is kept away from one side of wire net with stone material panel fixed joint is connected.
Through adopting above-mentioned technical scheme, have certain reinforcing effect to the stone material panel through wire net and buffer layer, when the stone material panel received the strong striking of foreign object, have certain buffering protection's effect to the stone material panel through wire net and buffer layer simultaneously, avoid the phenomenon that the stone material panel appears damaging as far as possible.
Optionally, the stone panel is close to one side of buffer layer is provided with the adhesive linkage, the adhesive linkage is kept away from one side of stone panel is provided with the fine layer of glass, the fine layer of glass is kept away from one side of adhesive linkage with the buffer layer is connected.
Through adopting above-mentioned technical scheme, do not influence whole cracked of curtain when guaranteeing the stone material layer cracked, guarantee safety.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the reinforcing layer and the stabilizing mechanism, the stone panel is further reinforced through the reinforcing layer, and is stabilized through the stabilizing mechanism, when the stone panel and the connecting piece are loosened along with the prolonging of time, the stone panel is stabilized through the stabilizing mechanism, the phenomenon that the stone panel is loosened to cause falling off is avoided as much as possible, and the improvement of the mounting stability of the stone curtain wall is facilitated;
2. by arranging the fixing rod, the prefabricated grooves, the clamping assembly and the tensioning assembly, two ends of the fixing rod are inserted into the two prefabricated grooves, the fixing rod is fixed in the two prefabricated grooves through the clamping assembly, and meanwhile, the stone panel is tensioned on the wall body through the tensioning assembly, so that the phenomenon that the stone panel is loosened is avoided as much as possible, and the stone panel is beneficial to improving the mounting stability;
3. through setting up first pull rod, the second pull rod, interior spiral shell section of thick bamboo and taut piece, when pegging graft into corresponding prefabricated groove in stone material face and the wall body respectively with first pull rod and second pull rod, adjust the length of first pull rod and second pull rod in the prefabricated groove through rotating interior spiral shell section of thick bamboo, make first pull rod and second pull rod stabilize and connect in the prefabricated groove, with jointly with the stone material panel taut up the wall body, the firm joint of rethread taut piece makes first pull rod and second pull rod in the prefabricated groove simultaneously, help the installation of firm stone material panel, avoid stone material panel to appear not hard up phenomenon after forming stone material curtain as far as possible.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a schematic partial sectional structure view mainly hiding a steel wire mesh in an embodiment of the present application.
Fig. 3 is a partially enlarged schematic view of a portion a in fig. 2.
Reference numerals: 1. a stone panel; 2. a connecting member; 3. an inner barrel; 4. prefabricating a groove; 5. a clamping assembly; 51. a clamping block; 52. an elastic member; 6. a first card slot; 7. a second card slot; 8. a tension assembly; 81. a first pull rod; 82. a second pull rod; 9. a limiting block; 10. steel wire mesh; 11. a buffer layer; 12. an adhesive layer; 13. a glass fiber layer; 14. a tension member.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses high-rise green stone curtain wall of anti-fragmentation. Referring to fig. 1, the anti-cracking high-rise green stone curtain wall comprises a stone panel 1 and a connecting piece 2, wherein an adhesive layer 12 is fixedly connected to one side of the stone panel 1 close to a buffer layer 11, and a glass fiber layer 13 is arranged on one side of the adhesive layer 12 far away from the stone panel 1, so that the whole cracking of the curtain wall is not influenced when the stone layer is cracked, and the safety is ensured; a reinforcing layer is arranged on one side of the stone panel 1 close to the wall surface, and a stabilizing mechanism for preventing the stone panel 1 from falling off is arranged on one side of the reinforcing layer far away from the stone panel 1; the back up coat includes wire net 10 and buffer layer 11, wire net 10 links together with the 11 laminating of buffer layer, one side and the fixed laminating of stone material panel 1 that wire net 10 was kept away from to buffer layer 11 are connected, the one side that adhesive linkage 12 was kept away from on fine layer 13 of glass is connected with buffer layer 11, wire net 10 and buffer layer 11 have certain buffering protection's effect to stone material panel 1, help improving stone material panel 1's steadiness, avoid stone material panel 1 as far as possible appear cracked phenomenon when receiving the strong striking of foreign object.
Referring to fig. 1 and 2, the fixing mechanism includes a fixing rod, the wall body and the reinforcing layer are both provided with prefabricated grooves 4, two ends of the fixing rod are respectively arranged in the two prefabricated grooves 4, and the fixing rod is provided with a tensioning assembly 8 for tensioning the stone panel 1 on the wall body.
In the embodiment of the present application, the tensioning assembly 8 includes a first pull rod 81 and a second pull rod 82, the fixing rod is configured as an inner barrel 3, one end of the first pull rod 81 and one end of the second pull rod 82 close to the inner barrel 3 are respectively embedded at two ends of the inner barrel 3 in a threaded manner, one end of the first pull rod 81 far away from the inner barrel 3 points to the reinforcing layer, one end of the second pull rod 82 far away from the inner barrel 3 points to the wall direction, one ends of the first pull rod 81 and the second pull rod 82 far away from the inner barrel 3 respectively correspond to the prefabricated grooves 4 on the reinforcing layer and the wall, and a limiting member for limiting the first pull rod 81 and the second pull rod 82 in the sleeve of the inner barrel 3 is arranged in the inner barrel 3; the limiting pieces are provided with two limiting pieces 9, the two limiting pieces 9 are respectively welded with one ends, close to the inner screw barrel 3, of the first pull rod 81 and one end, close to the inner screw barrel 82, of the second pull rod 82, so that the first pull rod 81 and the second pull rod 82 are arranged in the inner screw barrel 3 in an anti-disengaging mode;
the first pull rod 81 and the second pull rod 82 are both welded with connecting blocks, the side wall of the prefabricated groove 4 is provided with a limiting groove, the sliding direction of the limiting groove and the sliding direction of the prefabricated groove 4 are arranged in the same direction, and when the first pull rod 81 and the second pull rod 82 extend into the prefabricated groove 4, the connecting blocks slide in the limiting groove, so that the first pull rod 81 and the second pull rod 82 cannot rotate in the prefabricated groove 4; when the stone panel 1 is installed, the ends of the first pull rod 81 and the second pull rod 82 far away from the fixing rod are respectively arranged in the prefabricated groove 4.
In order to facilitate the first pull rod 81 and the second pull rod 82 to be fixedly clamped in the pre-groove 4, in the embodiment of the present application, referring to fig. 2 and 3, the first pull rod 81 and the second pull rod 82 are both provided with a clamping assembly 5 for clamping the fixed rod in the pre-groove 4; the clamping assembly 5 comprises a clamping block 51 and an elastic part 52, the elastic part 52 is arranged as a return spring, a first clamping groove 6 is formed in each of the first pull rod 81 and the second pull rod 82, the bottom wall of the first clamping groove 6 is welded with the return spring, the clamping block 51 is welded at one end, away from the first clamping groove 6, of the return spring, a second clamping groove 7 is formed in the side wall of the prefabricated groove 4, and the clamping block 51 is connected with the second clamping groove 7 in a clamping mode.
In this embodiment, when the stone panel 1 is installed, the first pull rod 81 and the second pull rod 82 are inserted into the opposite prefabricated groove 4, the first pull rod 81 and the second pull rod 82 are moved in the direction away from the inner screw barrel 3 by rotating the inner screw barrel 3, so that one ends of the first pull rod 81 and the second pull rod 82 away from the inner screw barrel 3 gradually extend into the prefabricated groove 4 respectively, meanwhile, the fixture block 51 slides along the side wall of the prefabricated groove 4, the return spring is in a compressed state, when the first pull rod 81 and the second pull rod 82 slide to the position of the second clamping groove 7, the return spring pushes the fixture block 51 into the second clamping groove 7 through the elastic deformation force of the return spring, so that the first pull rod 81 and the second pull rod 82 are stably clamped in the prefabricated groove 4, and further, the stone panel 1 is stably connected to a wall body.
In order to further stabilize the connection of the first tie rod 81 with the pregroove 4 and the second tie rod 82 with the pregroove 4, in the present embodiment, referring to fig. 2, a plurality of tension members 14 for firmly clamping the first tie rod 81 and the second tie rod 82 in the pregroove 4 are disposed on the first tie rod 81 and the second tie rod 82; in one possible embodiment, the tension element 14 is provided as a rubber ring; in another possible embodiment, the tension member 14 may also be provided as a protrusion and fixedly disposed on the outer surface of the first pull rod 81 and the second pull rod 82;
in the embodiment of the present application, a plurality of rubber rings are provided, and the rubber rings are respectively and fixedly sleeved on the first pull rod 81 and the second pull rod 82, so that when the first pull rod 81 and the second pull rod 82 extend into the two prefabricated grooves 4, the first pull rod 81 and the second pull rod 82 can be more tightly attached and inserted into the prefabricated grooves 4 through the rubber rings, which is helpful for the stable connection of the stone panel 1.
The implementation principle of the anti-fragmentation high-rise green stone curtain wall in the embodiment of the application is as follows: connecting piece 2 fixes stone panel 1 on the wall body, further consolidate stone panel 1 through the back up coat simultaneously, simultaneously again through stretching into corresponding prefabricated groove 4 respectively with first pull rod 81 and second pull rod 82, simultaneously through rotating interior barrel 3 make first pull rod 81 and second pull rod 82 toward prefabricated groove 4 in remove, when making fixture block 51 joint in second draw-in groove 7, make first pull rod 81 and second pull rod 82 fix in the prefabricated groove 4 of reply, help realizing stabilizing stone panel 1, avoid stone panel 1 to appear becoming flexible and lead to the phenomenon that drops as far as possible, help improving the stability of stone curtain installation.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a high-rise green stone curtain of anti-fragmentation, includes stone material panel (1) and connecting piece (2), its characterized in that: one side that is close to the wall on stone material panel (1) is provided with the back up coat, the back up coat is kept away from one side of stone material panel (1) is provided with the firm mechanism that is used for avoiding stone material panel (1) the obscission to appear.
2. The anti-fragmentation high-rise green stone curtain wall as claimed in claim 1, wherein: the stabilizing mechanism comprises a fixing rod, the wall body and the reinforcing layer are provided with prefabricated grooves (4), the two ends of the fixing rod are arranged in the prefabricated grooves (4) respectively, the two ends of the fixing rod are provided with clamping assemblies (5) used for clamping the fixing rod in the prefabricated grooves (4), and the fixing rod is provided with tensioning assemblies (8) used for tensioning the stone panel (1) on the wall body.
3. The anti-fragmentation high-rise green stone curtain wall as claimed in claim 2, wherein: chucking subassembly (5) include fixture block (51) and elastic component (52), first draw-in groove (6) have been seted up on the dead lever, be provided with elastic component (52) on the diapire of first draw-in groove (6), elastic component (52) are kept away from the one end fixedly connected with fixture block (51) of first draw-in groove (6), second draw-in groove (7) have been seted up on the lateral wall of prefabricated groove (4), fixture block (51) with second draw-in groove (7) joint adaptation.
4. The anti-fragmentation high-rise green stone curtain wall as claimed in claim 2, wherein: the tensioning assembly (8) comprises a first pull rod (81) and a second pull rod (82), the fixing rod is arranged as an inner screw cylinder (3), one end of the first pull rod (81) and one end of the second pull rod (82) close to the inner screw cylinder (3) are embedded in the inner screw cylinder (3) in a threaded manner, one end of the first pull rod (81) far away from the inner screw cylinder (3) points to the reinforcing layer, one end of the second pull rod (82) far away from the inner screw cylinder (3) points to the direction of the wall body, the first pull rod (81) and the second pull rod (82) are provided with a plurality of tension pieces (14) for firmly clamping the first pull rod (81) and the second pull rod (82) in the prefabricated groove (4), one ends of the first pull rod (81) and the second pull rod (82) far away from the inner screw cylinder (3) respectively correspond to the prefabricated grooves (4) on the reinforcing layer and the wall body.
5. The anti-fragmentation high-rise green stone curtain wall as claimed in claim 4, wherein: the inner screw cylinder (3) is internally provided with a limiting piece used for limiting the first pull rod (81) and the second pull rod (82) in the inner screw cylinder (3).
6. The anti-fragmentation high-rise green stone curtain wall as claimed in claim 5, wherein: the limiting part is provided with a limiting block (9), and the limiting block (9) is fixedly connected with one end of the inner screw cylinder (3) close to the first pull rod (81) and the second pull rod (82) respectively.
7. The anti-fragmentation high-rise green stone curtain wall as claimed in claim 1, wherein: the reinforcing layer comprises a steel wire mesh (10) and a buffer layer (11), the steel wire mesh (10) is attached to the buffer layer (11), the buffer layer (11) is far away from one side of the steel wire mesh (10) and fixedly attached to the stone panel (1).
8. The anti-fragmentation high-rise green stone curtain wall as claimed in claim 7, wherein: stone material panel (1) is close to one side of buffer layer (11) is provided with adhesive linkage (12), adhesive linkage (12) are kept away from one side of stone material panel (1) is provided with fine layer of glass (13), fine layer of glass (13) are kept away from one side of adhesive linkage (12) with buffer layer (11) are connected.
CN202220400027.XU 2022-02-24 2022-02-24 Anti-cracking high-rise green stone curtain wall Active CN216810502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220400027.XU CN216810502U (en) 2022-02-24 2022-02-24 Anti-cracking high-rise green stone curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220400027.XU CN216810502U (en) 2022-02-24 2022-02-24 Anti-cracking high-rise green stone curtain wall

Publications (1)

Publication Number Publication Date
CN216810502U true CN216810502U (en) 2022-06-24

Family

ID=82044242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220400027.XU Active CN216810502U (en) 2022-02-24 2022-02-24 Anti-cracking high-rise green stone curtain wall

Country Status (1)

Country Link
CN (1) CN216810502U (en)

Similar Documents

Publication Publication Date Title
CN217400102U (en) Steel-wood combined beam string structure
AU2016204282B2 (en) Device For Introducing A Force Into Tension Members Made Of Fiber-Reinforced Plastic Flat Strip Lamella
CN216810502U (en) Anti-cracking high-rise green stone curtain wall
CN215889446U (en) Ancient building timber structure tenon fourth of twelve earthly branches node reinforced structure
KR101778002B1 (en) Sleeve compressing apparatus for near surface mounted fiber reinforced polymer reinforcement and concrete structure reinforcing method for increasing ductility of concrete structure therewith
US20190085884A1 (en) Method for creating a high Tensile Strength Joint for Connecting Rods and Fittings
CN210828422U (en) Shear force wall glues shaped steel reinforced structure outward
JP2018197418A (en) Flame stave and heald frame
CN215055546U (en) Independent support system for assembly type building construction
CN214117149U (en) Stone dry hanging hanger
CN219909603U (en) Glass curtain wall beam structure
CN214532509U (en) Fixed type frame of aluminum alloy casement window
CN112502308A (en) High-ductility wood support structure and construction method thereof
CN208563861U (en) A kind of bone-free dry-hung plate pendant
CN218149981U (en) Ancient building timber structure forked tail not hard up node reinforced structure
CN214996272U (en) Steel structure reinforcing device
CN210105481U (en) Building wall adapter and wall
CN213353771U (en) Composite light marble slab
CN217518275U (en) Civil engineering frame roof beam reinforcing apparatus that suitability is strong
CN218028948U (en) High strength aluminum mould board for building
CN219411923U (en) Building structure reinforcing assembly
CN220247704U (en) Reinforcing and connecting device for building structure
CN219690842U (en) Large cantilever steel separation frame floor structure
CN213710029U (en) High strength stone material curtain
CN213807256U (en) Titanium magnesium alloy door frame convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant