CN216768019U - Flood prevention staple - Google Patents

Flood prevention staple Download PDF

Info

Publication number
CN216768019U
CN216768019U CN202220287174.0U CN202220287174U CN216768019U CN 216768019 U CN216768019 U CN 216768019U CN 202220287174 U CN202220287174 U CN 202220287174U CN 216768019 U CN216768019 U CN 216768019U
Authority
CN
China
Prior art keywords
flood prevention
plate
nail
fixedly connected
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220287174.0U
Other languages
Chinese (zh)
Inventor
王浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chongming Water Conservancy Engineering Co ltd
Original Assignee
Shanghai Chongming Water Conservancy Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Chongming Water Conservancy Engineering Co ltd filed Critical Shanghai Chongming Water Conservancy Engineering Co ltd
Priority to CN202220287174.0U priority Critical patent/CN216768019U/en
Application granted granted Critical
Publication of CN216768019U publication Critical patent/CN216768019U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application discloses flood prevention staple relates to flood prevention fixed equipment technical field, including the nail pole, nail pole top cover is equipped with the slide pipe, slide pipe and nail pole sliding connection, and slide pipe top cover is equipped with the go-between, go-between and slide pipe fixed connection, the outside fixedly connected with connecting plate of go-between, the inside connecting axle that is equipped with of connecting plate, the connecting axle runs through the connecting plate, and the connecting axle rotates with the connecting plate to be connected, and the connecting axle is located the fixedly connected with depression bar on the lateral wall of connecting plate bottom one end. This application can increase the contact surface of staple top and vegetation blanket to the fixity ability of staple has been improved.

Description

Flood prevention staple
Technical Field
The application relates to the technical field of flood prevention fixing equipment, in particular to a flood prevention fixing nail.
Background
The flood prevention fixing nail is a device for nailing the fixing nail into a grass wood blanket during the flood prevention period to achieve the purpose of flood prevention and sand fixation.
Current flood prevention staple generally sets up to the L form, and inside the vertical section nail of staple gone into the vegetation blanket, the horizontal segment through the staple fixed the vegetation blanket, current staple simple structure, flood prevention effect is poor, consequently needs the improvement urgently.
SUMMERY OF THE UTILITY MODEL
In order to improve current flood prevention staple and generally set up to the L form, with the vertical section nail of staple inside the vegetation blanket, fix the vegetation blanket through the horizontal segment of staple, current staple simple structure, flood prevention effect is poor, consequently needs the modified problem urgently, the application provides a flood prevention staple.
The application provides a flood prevention staple adopts following technical scheme:
the utility model provides a flood prevention staple, includes the nail pole, nail pole top cover is equipped with the slide tube, slide tube and nail pole sliding connection, slide tube top cover is equipped with the go-between, the go-between with slide tube fixed connection, the outside fixedly connected with connecting plate of go-between, the inside connecting axle that is equipped with of connecting plate, the connecting axle runs through the connecting plate, the connecting axle with the connecting plate rotates to be connected, the connecting axle is located fixedly connected with depression bar on the lateral wall of connecting plate bottom one end.
Optionally, the nail pole is cylindric structure, the bottom of nail pole is equipped with the tip, the cover is equipped with the helmet on the tip of nail pole bottom, the helmet with the connection can be dismantled to the nail pole.
Optionally, a fixed wrench is arranged at the joint of the sliding tube and the nail rod, the fixed wrench penetrates through the outer wall of the sliding tube, and the fixed wrench is in threaded connection with the sliding tube.
Optionally, the connecting ring is of a circular ring-shaped structure, the inner diameter of the connecting ring is equal to the diameter of the top of the sliding pipe, and the inner wall of the connecting ring is fixedly connected with the outer surface of the sliding pipe.
Optionally, the number of the connecting plates is four, the four connecting plates are distributed around the outer surface of the connecting ring at equal intervals, and through holes are formed in the four connecting plates.
Optionally, an arc-shaped plate is arranged on one side, close to the connection ring, of the connection plate, the arc-shaped plate is arc-shaped, a screw is arranged on the outer surface of the arc-shaped plate, the screw penetrates through the arc-shaped plate, and the screw is in threaded connection with the connection ring.
Optionally, a circular plate is arranged at the top of the connecting shaft, the circular plate is fixedly connected with the connecting shaft, and the diameter of the circular plate is larger than the aperture of the through hole formed in the connecting plate.
Optionally, a pedal is arranged at the top of the connecting ring, the bottom of the pedal is fixedly connected with the connecting ring, and a fixing ring is fixedly connected to the top of the pedal.
In conclusion, the beneficial effects of the application are as follows:
this application passes through the go-between, the connecting plate, cooperation setting between connecting axle and clamp plate isotructure, establish the go-between through the cover at slide tube top, and it is fixed to encircle to set up four pressure bars at the go-between surface and carry out the pressfitting in step to a plurality of directions of vegetation blanket, greatly increased the contact surface of staple top with the vegetation blanket, thereby improved the fixity ability of staple, current flood prevention staple simple structure has been avoided as far as possible, fixed effect is poor, consequently need urgently to improve the problem.
Drawings
FIG. 1 is a schematic view of the overall connection structure of the present application;
FIG. 2 is a schematic view of the connection structure of the connection plate and the connection ring according to the present application;
FIG. 3 is a schematic view of the connection structure of the pedal and the fixing ring according to the present application;
description of reference numerals: 1. a nail rod; 2. a protective cap; 3. a slide pipe; 4. fixing a screw driver; 5. a connecting ring; 6. a connecting plate; 7. an arc-shaped plate; 8. a screw; 9. a connecting shaft; 10. a circular plate; 11. a pressure lever; 12. a pedal; 13. and (4) fixing the ring.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1-3, a flood prevention fixing nail comprises a nail rod 1 for nailing into a vegetation blanket, wherein the nail rod 1 is of a cylindrical structure, a pointed end is arranged at the bottom of the nail rod 1, a protective cap 2 for protection is sleeved on the pointed end at the bottom of the nail rod 1, and the protective cap 2 is detachably connected with the nail rod 1. The top of the nail rod 1 is sleeved with a sliding tube 3, the sliding tube 3 is in sliding connection with the nail rod 1, a fixed twisting handle 4 is arranged at the joint of the sliding tube 3 and the nail rod 1, the fixed twisting handle 4 penetrates through the outer wall of the sliding tube 3, and the fixed twisting handle 4 is in threaded connection with the sliding tube 3.
The top cover of 3 tops of slide tube is equipped with go-between 5, go-between 5 and 3 fixed connection of slide tube, and the outside fixedly connected with connecting plate 6 of go-between 5, the quantity of connecting plate 6 are four, and four connecting plates 6 encircle the surface equidistance distribution of go-between 5. Through holes are formed in the four connecting plates 6, connecting shafts 9 are arranged inside the connecting plates 6, the connecting shafts 9 penetrate through the connecting plates 6 through the through holes formed in the connecting plates 6, and the connecting shafts 9 are rotatably connected with the connecting plates 6. The outer side wall of the connecting shaft 9 at one end of the bottom of the connecting plate 6 is fixedly connected with a pressing rod 11, the pressing rod 11 is perpendicular to the connecting shaft 9 and the nail rod 1, the pressing rod 11 is divided into two sections, and the two sections of pressing rods 11 are connected with each other in a sliding mode.
During the use, two sections depression bars 11 are drawn up to the longest, then extract behind the helmet 2 of nail pole 1 bottom, the nail pole 1 slides downwards, slide nail pole 1 to the bottom of slide pipe 3 after, the fixed twisting hand 4 of spiral shell moves, make nail pole 1 and slide pipe 3 relatively fixed, then move the top and press down slide pipe 3, thereby inside inserting slide pipe 3 and the nail pole 1 of slide pipe 3 bottom the vegetation blanket completely, rotate depression bar 11 at last, adjust depression bar 11 to suitable angle according to the topography, can accomplish the fixed work to the vegetation blanket, through setting up the contact surface of four depression bars 11 greatly increased staple top and vegetation blanket, thereby the fixity ability of staple has been improved, current staple simple structure has been avoided as far as possible, flood prevention effect is poor, therefore need improved problem urgently.
Referring to fig. 1, the connecting ring 5 is of a circular structure, the inner diameter of the connecting ring 5 is equal to the diameter of the top of the sliding pipe 3, the inner wall of the connecting ring 5 is fixedly connected with the outer surface of the sliding pipe 3, and the connecting ring 5 is arranged to connect the connecting plate 6 with the top of the sliding pipe 3 through the connecting ring 5, so that the contact surface between the connecting plate 6 and the sliding pipe 3 is greatly improved, and the stability of the connection position is improved.
Refer to fig. 2, one side that connecting plate 6 is close to go-between 5 is equipped with arc 7, arc 7 is circular-arcly, be equipped with screw 8 on the surface of arc 7, screw 8 runs through arc 7, screw 8 and go-between 5 looks spiro union, the inner wall of arc 7 laminates with the surface of go-between 5 each other, thereby improve the contact surface between connecting plate and the go-between 5, improve the stability of junction, adopt the connected mode of 8 spiro unions of screw, not only connect more firmly, and make things convenient for the staff to install and dismantle work.
Referring to fig. 2, a circular plate 10 is disposed on the top of the connecting shaft 9, the circular plate 10 is fixedly connected to the connecting shaft 9, the circular plate 10 has a diameter larger than the diameter of the through hole formed in the connecting plate 6, the circular plate 10 is disposed to limit the connecting shaft 9, and the circular plate 10 has a diameter larger than the diameter of the through hole formed in the connecting plate 6, so that the problem that the connecting shaft 9 is separated from the bottom of the connecting plate 6 can be avoided as much as possible.
Referring to fig. 3, the top of the connecting ring 5 is provided with a pedal 12, the bottom of the pedal 12 is fixedly connected with the connecting ring 5, the top of the pedal 12 is fixedly connected with a fixing ring 13, the pedal 12 is arranged to increase the area of the top of the connecting ring 5, a user can conveniently tread, and the nail rod 1 and the sliding tube 3 at the bottom are nailed into the grass and wood blanket, so that the user can use the grass and wood blanket more easily.
The implementation principle of the application is as follows: when using, at first, two sections depression bars 11 are drawn up to the longest, then extract behind the helmet 2 of nail pole 1 bottom, the nail pole 1 slides downwards, slide nail pole 1 to the bottom of slide tube 3 after, the fixed twisting hand 4 of spiral shell moving, make nail pole 1 and slide tube 3 relatively fixed, then move the top and press down slide tube 3, thereby inside inserting slide tube 3 and the nail pole 1 of slide tube 3 bottom the vegetation blanket completely, rotate depression bar 11 at last, adjust depression bar 11 to suitable angle according to the topography, can accomplish the fixed work to the vegetation blanket, through setting up the contact surface of four depression bars 11 greatly increased staple top and vegetation blanket, thereby the fixity of staple has been improved, current staple simple structure has been avoided as far as possible, the fixed effect is poor, therefore need for the modified problem urgently.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a flood prevention staple, includes nail pole (1), its characterized in that: nail pole (1) top cover is equipped with slide tube (3), slide tube (3) with nail pole (1) sliding connection, slide tube (3) top cover is equipped with go-between (5), go-between (5) with slide tube (3) fixed connection, the outside fixedly connected with connecting plate (6) of go-between (5), connecting plate (6) inside is equipped with connecting axle (9), connecting axle (9) run through connecting plate (6), connecting axle (9) with connecting plate (6) rotate and connect, connecting axle (9) are located fixedly connected with depression bar (11) on the lateral wall of connecting plate (6) bottom one end.
2. The flood prevention fixing nail according to claim 1, characterized in that: the nail rod (1) is of a cylindrical structure, the bottom of the nail rod (1) is provided with a tip, a protective cap (2) is sleeved on the tip of the bottom of the nail rod (1), and the protective cap (2) is detachably connected with the nail rod (1).
3. The flood prevention fixing nail according to claim 2, characterized in that: the connecting part of the sliding tube (3) and the nail rod (1) is provided with a fixed screwing handle (4), the fixed screwing handle (4) penetrates through the outer wall of the sliding tube (3), and the fixed screwing handle (4) is in threaded connection with the sliding tube (3).
4. The flood prevention fixing nail according to claim 1, characterized in that: the connecting ring (5) is of a circular ring-shaped structure, the inner diameter of the connecting ring (5) is equal to the diameter of the top of the sliding pipe (3), and the inner wall of the connecting ring (5) is fixedly connected with the outer surface of the sliding pipe (3).
5. The flood prevention fixing nail according to claim 1, characterized in that: the number of the connecting plates (6) is four, the connecting plates (6) surround the outer surface of the connecting ring (5) and are distributed at equal intervals, and through holes are formed in the four connecting plates (6).
6. The flood prevention fixing nail according to claim 5, characterized in that: an arc-shaped plate (7) is arranged on one side, close to the connecting ring (5), of the connecting plate (6), the arc-shaped plate (7) is arc-shaped, a screw (8) is arranged on the outer surface of the arc-shaped plate (7), the screw (8) penetrates through the arc-shaped plate (7), and the screw (8) is in threaded connection with the connecting ring (5).
7. The flood prevention fixing nail according to claim 5, characterized in that: a circular plate (10) is arranged at the top of the connecting shaft (9), the circular plate (10) is fixedly connected with the connecting shaft (9), and the diameter of the circular plate (10) is larger than the aperture of a through hole formed in the connecting plate (6).
8. The flood prevention fixing nail according to claim 1, characterized in that: the top of the connecting ring (5) is provided with a pedal (12), the bottom of the pedal (12) is fixedly connected with the connecting ring (5), and the top of the pedal (12) is fixedly connected with a fixing ring (13).
CN202220287174.0U 2022-02-10 2022-02-10 Flood prevention staple Active CN216768019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220287174.0U CN216768019U (en) 2022-02-10 2022-02-10 Flood prevention staple

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220287174.0U CN216768019U (en) 2022-02-10 2022-02-10 Flood prevention staple

Publications (1)

Publication Number Publication Date
CN216768019U true CN216768019U (en) 2022-06-17

Family

ID=81955532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220287174.0U Active CN216768019U (en) 2022-02-10 2022-02-10 Flood prevention staple

Country Status (1)

Country Link
CN (1) CN216768019U (en)

Similar Documents

Publication Publication Date Title
CN100577975C (en) Rotating telescopic anchoring type tent pull wire grounding nail
CN209902144U (en) Novel positioning device for main reinforcement of steel reinforcement cage
US20230144401A1 (en) Assembled device aerating the lawn by perforating
CN216768019U (en) Flood prevention staple
CN214091340U (en) Noise reduction isolation device for greening construction
CN208310267U (en) A kind of protective fence for the horizontal hole in construction building site
CN204947109U (en) Spiral earth electrode and erecting device
CN201202303Y (en) Rotating telescopic anchoring type tent pull wire grounding nail
CN215367330U (en) Highway side slope construction equipment
CN206873887U (en) A kind of adjustable construction scaffold
CN210007289U (en) Support frame suitable for electric power capital construction job site interim cable supports
CN107791187A (en) Manual impact screwdriver
CN107251811A (en) Support frame for fixing trees
CN210978764U (en) But height-adjusting formula natural gas exploitation pipeline support frame
CN210959716U (en) City planning trees protection device
CN205699141U (en) A kind of abdominal muscle wheel doing abdominal crunch
CN110448858B (en) Improved generation divides formula to turn round waist ware
CN206026913U (en) Fire striking grip
CN206560620U (en) A kind of adjustable for height horizontal bar
CN216722028U (en) Soil filling compactor for forestry afforestation
CN207469890U (en) A kind of foundation pit guardrail of construction
CN207138589U (en) Bracing wire is up and down producing device
CN214127331U (en) Portable alpenstock
CN214393984U (en) Portable equipment loop bar
CN205434887U (en) Multi -functional wushu whip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant