CN216766975U - Modularization hedgerow of quick construction - Google Patents

Modularization hedgerow of quick construction Download PDF

Info

Publication number
CN216766975U
CN216766975U CN202122751400.4U CN202122751400U CN216766975U CN 216766975 U CN216766975 U CN 216766975U CN 202122751400 U CN202122751400 U CN 202122751400U CN 216766975 U CN216766975 U CN 216766975U
Authority
CN
China
Prior art keywords
guide rail
bolt
slider
threaded connection
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122751400.4U
Other languages
Chinese (zh)
Inventor
王彦堃
李凯
李晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Yuancheng Landscape Construction Development Co ltd
Original Assignee
Tianjin Yuancheng Landscape Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Yuancheng Landscape Construction Development Co ltd filed Critical Tianjin Yuancheng Landscape Construction Development Co ltd
Priority to CN202122751400.4U priority Critical patent/CN216766975U/en
Application granted granted Critical
Publication of CN216766975U publication Critical patent/CN216766975U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Plants (AREA)

Abstract

The utility model relates to a hedgerow technical field discloses a modularization hedgerow of quick construction, include the guide rail and be located the connecting plate of guide rail one side, sliding connection has the slider on the guide rail, first mounting groove has been seted up to one side of slider, the slider be provided with first mounting groove threaded connection's first bolt, the surface threaded connection of first bolt has the mounting panel, one side fixedly connected with bracing piece of mounting panel, be provided with the joint structure on the bracing piece, the mounting hole has been seted up on the guide rail. This modularization hedgerow of quick construction fixes a plurality of mounting panels on a plurality of sliders through first bolt, then installs the slider and slides on the guide rail to through the slider of installing different quantity, and then install the bracing piece of different quantity, can be according to the size of the device installation environment medium wind-force, in order to ensure that the device has the ability of resisting wind-force, the frame that looses under the device wind-force of avoiding as far as possible.

Description

Modularization hedgerow of quick construction
Technical Field
The application relates to the technical field of hedgerow, in particular to a modular hedgerow capable of being constructed quickly.
Background
In the regular planting form, namely hedgerows, hedgerows and the like, in which shrubs or small trees are densely planted in a close row spacing and are planted in a single row or double rows and are tightly combined, the hedgerows are widely applied to parks, roads, districts and other areas at present.
The existing hedgerow has good urban greening effect and makes remarkable contribution to urban greening, but the existing hedgerow is transplanted to a specified place in a large area and cannot protect the whole according to the intensity of daily wind in the environment, so that the existing hedgerow is easy to fall apart under the condition that the wind resistance of the existing hedgerow exceeds the self-wind resistance.
SUMMERY OF THE UTILITY MODEL
The present application aims to provide a modular hedgerow for rapid construction, so as to solve the problem that the existing hedgerow proposed in the above background art is transplanted in a specified place in a large area, and the whole hedgerow cannot be protected according to the intensity of the daily wind in the environment, so that the existing hedgerow is easily broken when the wind resistance of the existing hedgerow exceeds the self-wind resistance.
In order to achieve the above purpose, the present application provides the following technical solutions: the utility model provides a modularization hedgerow of quick construction, includes the guide rail and is located the connecting plate of guide rail one side, sliding connection has the slider on the guide rail, first mounting groove has been seted up to one side of slider, the slider be provided with first mounting groove threaded connection's first bolt, the surface threaded connection of first bolt has the mounting panel, one side fixedly connected with bracing piece of mounting panel, be provided with the joint structure on the bracing piece, the mounting hole has been seted up on the guide rail, the guide rail has the third bolt through mounting hole threaded connection, the jack has been seted up on the slider, the third bolt passes through jack and slider threaded connection.
Preferably, the clamping structure includes the arc, first ring channel has been seted up on the bracing piece, the arc is through first ring channel and bracing piece laminating, one side fixedly connected with square board of arc, threaded hole has been seted up on the square board, the square board be provided with threaded hole threaded connection's second bolt.
Preferably, the movable sleeve is equipped with the annular piece on the bracing piece, fixedly connected with places the pole on the annular piece, it is equipped with the rope to place around going up the pole, it plants to prick fixedly connected with green on the rope.
Preferably, a second annular groove is formed in the placing rod, and the tying rope is clamped with the placing rod through the second annular groove.
Preferably, the guide rail is provided with a limiting hole, the guide rail is in threaded connection with a fourth bolt through the limiting hole, and the bottom end of the fourth bolt is fixedly connected with a ground nail.
Preferably, the guide rail is provided with a connecting groove, the connecting plate is clamped with the guide rail through the connecting groove, and the guide rail is provided with a fixed module.
Preferably, the fixing module comprises a fifth bolt, fixing holes are formed in the connecting plate and the guide rail, and the fifth bolt is in threaded connection with the connecting plate and the guide rail through the two fixing holes.
To sum up, the technical effect and the advantage of this application: according to the modularized hedgerow for rapid construction, the mounting plates are fixed on the sliding blocks through the first bolts, then the sliding blocks are mounted on the guide rails to slide, so that the device is ensured to have the capability of resisting wind power according to the wind power in the mounting environment of the device by mounting the sliding blocks in different numbers and mounting the supporting rods in different numbers, and the frame scattering of the device under the wind power is avoided as much as possible; in addition, in the assembly process of the device, two ends of the connecting plate can be inserted into the connecting grooves on the opposite sides of the two guide rails, and then the guide rails and the connecting plate can be fixed by the fifth bolts, so that the guide rails and the guide rails are connected, the integral extension of the device is realized, and the length of the modularized hedgerow is ensured.
Drawings
Fig. 1 is a schematic front perspective view of the structure of the present application.
Fig. 2 is an enlarged view of a portion a in the structural diagram 1 of the present application.
Fig. 3 is a perspective view of the guide rail structure of the present application.
Fig. 4 is an enlarged view of B in the structural diagram 3 of the present application.
Fig. 5 is a perspective view of the connection plate structure of the present application.
Fig. 6 is an enlarged view of the structure of the present application at C in fig. 5.
Description of reference numerals:
1. a guide rail; 2. a slider; 3. mounting a plate; 4. a first bolt; 5. a support bar; 6. a first annular groove; 7. an arc-shaped plate; 8. a square plate; 9. a second bolt; 10. a threaded hole; 11. mounting holes; 12. a third bolt; 13. a ring block; 14. placing a rod; 15. a second annular groove; 16. tying a rope; 17. planting green; 18. a limiting hole; 19. a fourth bolt; 20. a ground nail; 21. connecting grooves; 22. a connecting plate; 23. a fixing hole; 24. and a fifth bolt.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Referring to fig. 1 and 2, a modular hedge for rapid construction includes a guide rail 1 and a connection plate 22 located at one side of the guide rail 1, a slider 2 is slidably connected to the guide rail 1, and the slider 2 is located at the inner side of the guide rail 1 and is used for sliding in the guide rail 1. First mounting groove has been seted up to one side of slider 2, and first mounting groove is provided with two, and two first mounting groove evenly distributed are on slider 2. Slider 2 is provided with the first bolt 4 with first mounting groove threaded connection, and first bolt 4 is provided with two, and two first bolts 4 distribute on slider 2 through two first mounting grooves. The outer surface threaded connection of first bolt 4 has mounting panel 3, and mounting panel 3 specifically is the circular slab, and one side fixedly connected with bracing piece 5 of mounting panel 3, bracing piece 5 specifically are the column pole. Be provided with the joint structure on bracing piece 5, the joint structure includes arc 7, and arc 7 is provided with two, has seted up first ring channel 6 on the bracing piece 5, and first ring channel 6 is provided with a plurality ofly, and 6 evenly distributed of a plurality of first ring channels are on bracing piece 5. The arc plates 7 are attached to the support rod 5 through the first annular grooves 6, and the opposite sides of the two arc plates 7 are attached to the support rod 5 through the first annular grooves 6. One side of arc 7 is fixedly connected with square board 8, and square board 8 is provided with two, and two square boards 8 distribute respectively on two arcs 7. Threaded holes 10 are formed in the square plates 8, the number of the threaded holes 10 is two, and the two threaded holes 10 are respectively distributed in the two square plates 8. The square plate 8 is provided with a second bolt 9 in threaded connection with the threaded holes 10, and the second bolt 9 fixes the two square plates 8 through the two threaded holes 10. The guide rail 1 is provided with a plurality of mounting holes 11, and the mounting holes 11 are uniformly distributed on the guide rail 1. The guide rail 1 is connected with a third bolt 12 through a mounting hole 11 in a threaded manner, a jack is formed in the slider 2, the third bolt 12 is connected with the slider 2 in a threaded manner through the jack, and the slider 2 and the guide rail 1 can be fixed through the jack by the third bolt 12.
Referring to fig. 1, the support rod 5 is movably sleeved with an annular block 13, and the height of the annular block 13 is equal to the distance between the two first annular grooves 6. So that the arc plates 7 conveniently installed at adjacent two first annular grooves 6 can fix the position of the annular block 13. The ring block 13 is fixedly connected with a placing rod 14, the placing rod 14 can be of different types according to the distance between the two support rods 5, and the placing rods 14 of different types can be used according to the types with different lengths. The placing rod 14 is wound with a binding rope 16, the binding rope 16 is fixedly connected with green plants 17, and the binding rope 16 is used for fixing the green plants 17 on the placing rod 14 one by one. Place and seted up second annular groove 15 on the pole 14, prick rope 16 through second annular groove 15 with place pole 14 looks joint, prick rope 16 and be located the inside of second annular groove 15 to make prick rope 16 after fixed green planting 17, prick rope 16 can not be placing the removal of pole 14.
Referring to fig. 1, 3 and 4, the guide rail 1 is provided with four limiting holes 18, and the four limiting holes 18 are distributed at two ends of the guide rail 1 in pairs. The guide rail 1 is connected with four bolts 19 through the limiting holes 18 in a threaded manner, the number of the fourth bolts 19 is four, and the four fourth bolts 19 are distributed at two ends of the guide rail 1 through the four limiting holes 18. The bottom end of the fourth bolt 19 is fixedly connected with a ground nail 20, and the ground nail 20 facilitates the fourth bolt 19 to be inserted into the ground, so that the whole position of the device is fixed.
Referring to fig. 4-6, the guide rail 1 is provided with two connecting grooves 21, and the two connecting grooves 21 are respectively distributed at two ends of the guide rail 1. The connecting plate 22 is clamped with the guide rails 1 through the connecting grooves 21, and two ends of the connecting plate 22 are inserted into the connecting grooves 21 on the opposite sides of the two guide rails 1, so that the two guide rails 1 are connected. Be provided with fixed module on the guide rail 1, fixed module includes fifth bolt 24, has all seted up fixed orifices 23 on connecting plate 22 and the guide rail 1, and fifth bolt 24 can be fixed with guide rail 1 and connecting plate 22 through two fixed orifices 23 and connecting plate 22 and guide rail 1 threaded connection, utilizes fifth bolt 24 to be connected between guide rail 1 and the guide rail 1.
The working principle of the fast-construction modular hedge is that the guide rail 1 is fixed on the ground through the fourth bolt 19, then the mounting plate 3 is placed at the bottom of the slide block 2, then the slide block 2 and the mounting plate 3 are fixed by the first bolt 4, then, a plurality of sliders 2 mounted with the mounting plate 3 are placed inside the guide rail 1, and then the plurality of sliders 2 are fixed by the third bolts 12, and, by means of assembly, different numbers of the support rods 5 are installed according to the wind intensity of the installation site, so as to ensure that the device has the capability of resisting external force as a whole, then the annular blocks 13 are sleeved on the support rods 5, then the arc-shaped plates 7 are fixed on two adjacent first annular grooves 6 for fixing the positions of the annular blocks 13, the green plants 17 are then secured to the placement rod 14 by a tie 16 to effect placement of the green plants 17.
In the assembly process of the device, two ends of the connecting plate 22 can be inserted into the connecting grooves 21 on the opposite sides of the two guide rails 1, so that the connection between the two guide rails 1 is realized, and then the guide rails 1 and the connecting plate 22 can be fixed by using the fifth bolts 24, so that the connection between the guide rails 1 and the guide rails 1 is realized, and the whole extension of the device is realized.
Finally, it should be noted that: although the present application has been described in detail with reference to the foregoing embodiments, those skilled in the art can still make modifications on the technical solutions described in the foregoing embodiments, or make equivalent substitutions on some technical features, and any modifications, equivalents, improvements and the like made within the spirit and principle of the present application should be included in the protection scope of the present application.

Claims (7)

1. The utility model provides a quick construction's modularization hedgerow, includes guide rail (1) and is located connecting plate (22) of guide rail (1) one side, its characterized in that: sliding connection has slider (2) on guide rail (1), first mounting groove has been seted up to one side of slider (2), slider (2) be provided with first mounting groove threaded connection's first bolt (4), the surface threaded connection of first bolt (4) has mounting panel (3), one side fixedly connected with bracing piece (5) of mounting panel (3), be provided with the joint structure on bracing piece (5), mounting hole (11) have been seted up on guide rail (1), guide rail (1) have third bolt (12) through mounting hole (11) threaded connection, the jack has been seted up on slider (2), third bolt (12) are through jack and slider (2) threaded connection.
2. A rapid construction modular hedge of claim 1, wherein: the clamping structure comprises an arc-shaped plate (7), a first annular groove (6) is formed in the supporting rod (5), the arc-shaped plate (7) is attached to the supporting rod (5) through the first annular groove (6), a square plate (8) is fixedly connected to one side of the arc-shaped plate (7), a threaded hole (10) is formed in the square plate (8), and the square plate (8) is provided with a second bolt (9) in threaded connection with the threaded hole (10).
3. A rapid construction modular hedge of claim 1, wherein: the utility model discloses a green plant cultivation device, including bracing piece (5), movable sleeve is equipped with annular piece (13) on bracing piece (5), fixedly connected with places pole (14) on annular piece (13), place around being equipped with on pole (14) and prick rope (16), prick green plant (17) of fixedly connected with on rope (16).
4. A rapid construction modular hedge of claim 3, wherein: the placing rod (14) is provided with a second annular groove (15), and the binding rope (16) is clamped with the placing rod (14) through the second annular groove (15).
5. A rapid construction modular hedge of claim 1 wherein: the guide rail (1) is provided with a limiting hole (18), the guide rail (1) is in threaded connection with a fourth bolt (19) through the limiting hole (18), and the bottom end of the fourth bolt (19) is fixedly connected with a ground nail (20).
6. A rapid construction modular hedge of claim 1, wherein: the connecting structure is characterized in that a connecting groove (21) is formed in the guide rail (1), the connecting plate (22) is connected with the guide rail (1) in a clamped mode through the connecting groove (21), and a fixing module is arranged on the guide rail (1).
7. A rapid construction modular hedge of claim 6, wherein: the fixing module comprises a fifth bolt (24), fixing holes (23) are formed in the connecting plate (22) and the guide rail (1), and the fifth bolt (24) is in threaded connection with the connecting plate (22) and the guide rail (1) through the two fixing holes (23).
CN202122751400.4U 2021-11-10 2021-11-10 Modularization hedgerow of quick construction Active CN216766975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122751400.4U CN216766975U (en) 2021-11-10 2021-11-10 Modularization hedgerow of quick construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122751400.4U CN216766975U (en) 2021-11-10 2021-11-10 Modularization hedgerow of quick construction

Publications (1)

Publication Number Publication Date
CN216766975U true CN216766975U (en) 2022-06-17

Family

ID=81962864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122751400.4U Active CN216766975U (en) 2021-11-10 2021-11-10 Modularization hedgerow of quick construction

Country Status (1)

Country Link
CN (1) CN216766975U (en)

Similar Documents

Publication Publication Date Title
KR102038530B1 (en) Agro photo voltaic system which includes agro photo voltaic structure
CN216766975U (en) Modularization hedgerow of quick construction
CN214035087U (en) House building afforestation protective structure
CN202773579U (en) Protective fence
CN210470401U (en) Domatic afforestation structure of garden engineering
CN214996591U (en) Guardrail is used in gardens that practical effect is good
CN216821011U (en) Anti-falling fixing and supporting device for seedling transplantation for greening construction
CN215530453U (en) Afforestation view tree fixing device
CN212176790U (en) Forestry is with protection rail
CN213329066U (en) A side slope supporting construction for side slope ecological management
CN217608667U (en) Tree protection frame for landscaping engineering
CN219108327U (en) Forestry is planted with holding up tree device
CN220383790U (en) Supportable tree protection isolation structure
CN213073816U (en) Rape breeding net room
CN219033047U (en) Assembled protective fence
CN215122697U (en) Trees protective cradle is used in gardens
CN111357598A (en) Quick detachable protection chassis of usefulness is transplanted to nursery stock
CN112252831A (en) House building afforestation protective structure
CN216146842U (en) Grass slope shaping structure
CN210808997U (en) Gardens anti-bird device
CN215976659U (en) Municipal works concrete road subgrade
CN219919863U (en) Novel tree supporting device
CN217363990U (en) Multi-functional main supporting structure of horticulture greenhouse
CN218680600U (en) Forest ecological remediation device
CN219182268U (en) Sunshade net for special rare plant in-situ protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant