CN216743167U - Bottom support device for pipeline engineering construction - Google Patents

Bottom support device for pipeline engineering construction Download PDF

Info

Publication number
CN216743167U
CN216743167U CN202220138887.0U CN202220138887U CN216743167U CN 216743167 U CN216743167 U CN 216743167U CN 202220138887 U CN202220138887 U CN 202220138887U CN 216743167 U CN216743167 U CN 216743167U
Authority
CN
China
Prior art keywords
pipeline
lower ring
fixedly connected
guide rail
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220138887.0U
Other languages
Chinese (zh)
Inventor
胡俊霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220138887.0U priority Critical patent/CN216743167U/en
Application granted granted Critical
Publication of CN216743167U publication Critical patent/CN216743167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a pipeline construction technical field specifically is a bottom sprag device is used in pipeline engineering construction, including portable platform, portable platform's top fixedly connected with fixed column, one side fixedly connected with guide rail of fixed column, swing joint has the lower ring on the guide rail. The utility model has the advantages of: one side of the fixed column is fixedly connected with a guide rail, a lower ring is movably connected to the guide rail, when the pipeline is clamped, the pipeline is placed on the upper ring and the lower ring, the electric push rod is started, the upper ring is pressed down to be matched with the lower ring to clamp the pipeline, the upper ring and the lower ring are not required to be manually connected in the process, the workload is small, and the construction efficiency of the pipeline is improved; this device is mobilizable to it is whole with the lower ring to utilize the guide rail is portable, and utilize spacing hole and bolt structure can be spacing to the position of going up the ring and the lower ring on the guide rail, thereby can the different section length's of adaptation pipeline installation fix, thereby improved pipeline strutting arrangement's suitability.

Description

Bottom support device for pipeline engineering construction
Technical Field
The utility model relates to a pipeline construction technical field, especially a bottom sprag device is used in pipeline engineering construction.
Background
Piping is a device for transporting gases, liquids or fluids with solid particles, connected by pipes, pipe couplings, valves, etc. Generally, a fluid is pressurized by a blower, a compressor, a pump, a boiler, etc., and then flows from a high pressure point to a low pressure point of a pipeline, or is transported by the pressure or gravity of the fluid itself. The pipelines have a wide range of applications, mainly in water supply, drainage, heat supply, gas supply, long-distance petroleum and natural gas transportation, agricultural irrigation, hydraulic engineering and various industrial devices. In pipeline construction, often will use pipeline strutting arrangement, current strutting arrangement be exactly with the frame ring of pipeline looks adaptation, divide into upper and lower two parts, utilize bolted connection integrative when needing to press from both sides tight pipeline, demolish after the piping erection is good, nevertheless pipeline laying efficiency is lower like this, and work load is great.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a bottom sprag device is used in pipeline engineering construction.
The purpose of the utility model is realized through the following technical scheme: a bottom supporting device for pipeline engineering construction comprises a movable platform, wherein the top of the movable platform is fixedly connected with a fixed column, one side of the fixed column is fixedly connected with a guide rail, and a lower ring is movably connected onto the guide rail;
one side of the lower ring is fixedly connected with a fixing frame, one side of the fixing frame is fixedly connected with an electric push rod, and the output end of the electric push rod is fixedly connected with an upper ring;
the movable platform is characterized in that a plurality of limiting holes are formed in the top of the movable platform, a spring and a telescopic rod are fixedly connected to the bottom of the fixing frame, a bolt is fixedly connected to the bottom ends of the telescopic rod and the spring, the bolt is inserted into the limiting holes, and a handle is fixedly connected to one side of the bolt.
Optionally, the length of the guide rail is smaller than that of the movable platform, the movable wheels and the universal wheels are integrated at the bottom of the movable platform, the device is movable, the guide rail is used for moving the upper ring and the lower ring to be integral, the position of the upper ring and the position of the lower ring on the guide rail can be limited by using the limiting hole and the bolt structure, and therefore the device can be fixed in the pipeline installation mode in different section lengths in a matched mode, and the adaptability of the pipeline supporting device is improved.
Optionally, the lower ring is adapted to the shape of the upper ring.
Optionally, the lower ring, the fixing frame and the electric push rod are of an integrated structure, and the electric push rod is located right above the lower ring.
Optionally, the upper ring is located right above the lower ring, and the limiting hole is matched with the bolt in shape.
Optionally, the telescopic rod is located inside the spring.
Optionally, the bolt and the handle structure as an organic whole, the interval accessible of lower ring is adjusted after extracting the bolt, uses the handle to extract the bolt from spacing hole, and spring and telescopic link shrink this moment.
The utility model has the advantages of it is following:
1. this bottom sprag device is used in pipeline engineering construction, one side fixedly connected with guide rail of fixed column, swing joint has the lower ring on the guide rail, when pressing from both sides tight the pipeline, only needs put the lower ring on the pipeline, starts electric putter, pushes down to fit with a contraceptive ring and cooperate the lower ring centre gripping pipeline, and this process need not manually be connected and fits with a contraceptive ring and the lower ring, and work load is little, has improved the efficiency of construction of pipeline.
2. This bottom sprag device is used in pipeline engineering construction, this device is mobilizable to it is whole with the lower ring to utilize the guide rail is portable, and utilize spacing hole and bolt structure can be spacing to the position of fitting with a contraceptive ring and lower ring on the guide rail, thereby can the different section length's of adaptation pipeline installation fixed, thereby improved pipeline sprag device's suitability.
Drawings
Fig. 1 is a schematic structural view of a first viewing angle of the present invention;
fig. 2 is a schematic structural view of a second viewing angle of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 1 according to the present invention.
In the figure: 1-a movable platform, 2-a fixed column, 3-a guide rail, 4-a lower ring, 5-a fixed frame, 6-an electric push rod, 7-an upper ring, 8-a limiting hole, 9-a spring, 10-a telescopic rod, 11-a bolt and 12-a handle.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-3, a bottom support device for pipeline engineering construction comprises a movable platform 1, a fixed column 2 is fixedly connected to the top of the movable platform 1, a guide rail 3 is fixedly connected to one side of the fixed column 2, and a lower ring 4 is movably connected to the guide rail 3;
one side of the lower ring 4 is fixedly connected with a fixing frame 5, one side of the fixing frame 5 is fixedly connected with an electric push rod 6, and the output end of the electric push rod 6 is fixedly connected with an upper ring 7;
a plurality of limiting holes 8 are formed in the top of the movable platform 1, a spring 9 and a telescopic rod 10 are fixedly connected to the bottom of the fixing frame 5, a bolt 11 is fixedly connected to the bottom ends of the telescopic rod 10 and the spring 9, the bolt 11 is inserted into the limiting holes 8, and a handle 12 is fixedly connected to one side of the bolt 11.
As an optimal technical solution of the utility model: the length of the guide rail 3 is smaller than that of the movable platform 1, the movable wheels and the universal wheels are integrated at the bottom of the movable platform 1, the device is movable, the guide rail 3 can move the upper ring 4 and the lower ring 7 integrally, and the positions of the upper ring 4 and the lower ring 7 on the guide rail 3 can be limited by using the structures of the limiting hole 8 and the bolt 11, so that the device can be adapted to the installation and fixation of pipelines with different section lengths, and the adaptability of the pipeline supporting device is improved;
lower ring 4 and the shape looks adaptation of last ring 7, lower ring 4 and mount 5 and electric putter 6 structure as an organic whole, electric putter 6 is located directly over lower ring 4, it is located directly over lower ring 4 to go up ring 7, spacing hole 8 and bolt 11 shape looks adaptation, telescopic link 10 is located spring 9's inboard, bolt 11 and handle 12 structure as an organic whole, adjust after bolt 11 is extracted to the interval accessible of lower ring 4, use handle 12 to extract the bolt from spacing hole 8, spring 9 and telescopic link 10 shrink this moment.
The working process of the utility model is as follows:
s1, the moving device is integrated, the distance between the two lower rings 4 is adjusted through the guide rail 3, the pipeline is placed on the upper and lower rings 4, the electric push rod 6 is started, and the lower upper ring 7 is matched with the lower ring 4 to clamp the pipeline;
s2, the positions of the lower ring 4 and the upper ring 7 on the guide rail 3 can be limited by utilizing the limiting hole 8 and the bolt 11 structure, so that the pipeline installation with different section lengths can be adapted to be fixed, after the pipeline installation is completed, the output end of the electric push rod 6 returns, the clamping of the pipeline is cancelled, the moving device is integral, and the distance between the lower ring 4 can be adjusted after the bolt 11 is pulled out.
In summary, when the bottom supporting device for pipeline engineering construction is used, one side of the fixed column 2 is fixedly connected with the guide rail 3, the guide rail 3 is movably connected with the lower ring 4, when a pipeline is clamped, the pipeline is placed on the upper ring 4, the electric push rod 6 is started, the upper pressing ring 7 is matched with the lower ring 4 to clamp the pipeline, the upper ring 4 and the lower ring 7 are not required to be manually connected in the process, the workload is small, and the construction efficiency of the pipeline is improved; the device is movable, the upper ring 4 and the lower ring 7 can be moved integrally by using the guide rail 3, and the positions of the upper ring 4 and the lower ring 7 on the guide rail 3 can be limited by using the structures of the limiting holes 8 and the bolts 11, so that the device can be fixed by being matched with pipelines with different section lengths, and the adaptability of the pipeline supporting device is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a bottom sprag device is used in pipeline engineering construction which characterized in that: the movable type lifting device comprises a movable platform (1), wherein the top of the movable platform (1) is fixedly connected with a fixed column (2), one side of the fixed column (2) is fixedly connected with a guide rail (3), and a lower ring (4) is movably connected onto the guide rail (3);
one side of the lower ring (4) is fixedly connected with a fixing frame (5), one side of the fixing frame (5) is fixedly connected with an electric push rod (6), and the output end of the electric push rod (6) is fixedly connected with an upper ring (7);
a plurality of limiting holes (8) are formed in the top of the movable platform (1), the bottom of the fixing frame (5) is fixedly connected with a spring (9) and a telescopic rod (10), the bottom of the telescopic rod (10) and the bottom of the spring (9) are fixedly connected with a bolt (11), the bolt (11) is inserted into the limiting holes (8), and a handle (12) is fixedly connected to one side of the bolt (11).
2. The bottom bracing device for pipe engineering construction according to claim 1, wherein: the length of the guide rail (3) is smaller than that of the movable platform (1), and movable wheels and universal wheels are integrated at the bottom of the movable platform (1).
3. The bottom bracing device for pipe engineering construction according to claim 1, wherein: the lower ring (4) is matched with the upper ring (7) in shape.
4. The bottom bracing device for pipe engineering construction according to claim 1, wherein: the lower ring (4), the fixing frame (5) and the electric push rod (6) are of an integral structure, and the electric push rod (6) is located right above the lower ring (4).
5. The bottom bracing device for pipe engineering construction according to claim 1, wherein: the upper ring (7) is positioned right above the lower ring (4), and the limiting hole (8) is matched with the bolt (11) in shape.
6. The bottom bracing device for pipe engineering construction according to claim 1, wherein: the telescopic rod (10) is positioned on the inner side of the spring (9).
7. The bottom bracing device for pipe engineering construction according to claim 1, wherein: the bolt (11) and the handle (12) are of an integral structure.
CN202220138887.0U 2022-01-19 2022-01-19 Bottom support device for pipeline engineering construction Active CN216743167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220138887.0U CN216743167U (en) 2022-01-19 2022-01-19 Bottom support device for pipeline engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220138887.0U CN216743167U (en) 2022-01-19 2022-01-19 Bottom support device for pipeline engineering construction

Publications (1)

Publication Number Publication Date
CN216743167U true CN216743167U (en) 2022-06-14

Family

ID=81913494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220138887.0U Active CN216743167U (en) 2022-01-19 2022-01-19 Bottom support device for pipeline engineering construction

Country Status (1)

Country Link
CN (1) CN216743167U (en)

Similar Documents

Publication Publication Date Title
CN216743167U (en) Bottom support device for pipeline engineering construction
CN212096104U (en) Pipeline mounting bracket
CN218188230U (en) Filtering pipeline
CN212044399U (en) Quick mounting structure for sewer line connection
CN215806988U (en) Pipeline connecting device for hydraulic engineering construction
CN215635728U (en) Factory high-position pipeline leak repairing device
CN215487992U (en) HDPE double-wall corrugated winding pipe
CN212526695U (en) Pipeline erection welding steel frame for building construction
CN207961770U (en) A kind of novel drainage pipe
CN211465336U (en) Positioning device for welding pressure pipeline
CN212840130U (en) Oil gas warehousing and transportation pipeline anticorrosion structure
CN213685607U (en) Pipeline supporting device for maintaining outer net of heat exchange station
CN214425328U (en) Novel pipeline sealing connector
CN212685674U (en) Pipeline transportation device for water conservancy construction
CN216519993U (en) Reinforcing apparatus for pipeline engineering
CN217815393U (en) High-efficient pipeline gallows that prevent wind performance is good
CN217194986U (en) Butt joint hoisting mechanism for pipeline installation
CN219623371U (en) Auxiliary connection fixing device for pipeline interface
CN210890385U (en) Auxiliary tool is consolidated to junction that building piping was laid and is used
CN217301875U (en) Intelligent auxiliary device for pipeline installation
CN218698180U (en) Auxiliary connecting and fixing device for pipeline connector
CN217683895U (en) Pipeline cold insulation pipe bracket suitable for eminence installation
CN212455920U (en) Portable pipeline universal joint for pipeline connection
CN211901838U (en) Pipeline strutting arrangement convenient to use
CN220374573U (en) Large-scale pipeline transportation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant