CN216741367U - A drilling device for construction engineering survey - Google Patents

A drilling device for construction engineering survey Download PDF

Info

Publication number
CN216741367U
CN216741367U CN202122732205.7U CN202122732205U CN216741367U CN 216741367 U CN216741367 U CN 216741367U CN 202122732205 U CN202122732205 U CN 202122732205U CN 216741367 U CN216741367 U CN 216741367U
Authority
CN
China
Prior art keywords
base
rod
drill rod
mounting frame
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122732205.7U
Other languages
Chinese (zh)
Inventor
刘金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Lizhou Construction Engineering Co ltd
Original Assignee
Jilin Lizhou Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Lizhou Construction Engineering Co ltd filed Critical Jilin Lizhou Construction Engineering Co ltd
Priority to CN202122732205.7U priority Critical patent/CN216741367U/en
Application granted granted Critical
Publication of CN216741367U publication Critical patent/CN216741367U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A drilling device for constructional engineering investigation comprises a mounting frame, wherein struts are arranged on two sides below the mounting frame, a base is arranged at the bottom end of each strut, a fixed anchor rod is arranged on the base, a drill rod control device is arranged above the mounting frame and comprises a rotating shaft, the rotating shaft is fixedly connected with a drill rod through a coupler, a drill bit is arranged at the bottom end of the drill rod, the rotating shaft is fixedly connected with an output shaft of a motor, the motor is fixed on a pressure plate, a hydraulic telescopic rod is arranged between the pressure plate and the mounting frame, a guide gear disc is fixedly arranged in the middle of the drill rod, limiting gear shafts are arranged on two sides of the guide gear disc, the base is fixed on the ground through the fixed anchor rod, the guide gear disc in the middle of the drill rod is matched with the limiting gear shafts on two sides to limit the transverse displacement of the drill rod, the drill rod is prevented from shifting.

Description

一种用于建筑工程勘察的钻探装置A drilling device for construction engineering survey

技术领域technical field

本实用新型涉及钻探设备技术领域,特别涉及一种用于建筑工程勘察的钻探装置。The utility model relates to the technical field of drilling equipment, in particular to a drilling device used for construction engineering investigation.

背景技术Background technique

建设工程勘察是指为满足工程建设的规划、设计、施工、运营及综合治理等的需要,对地形、地质及水文等状况进行测绘、勘探测试,并提供相应成果和资料的活动,使用钻探设备对地下土层的结构进行勘探,在钻探装置中的钻杆在钻探过程中会发生偏移,使用坚固的底座对钻探设备进行固定十分必要,现有设备多采用定位销栓加强底座与地面安装,但是销栓安装过程中会对底座及其上的设备产生较大的震动,而且需要对钻杆的偏移进行导向限制,现有设备多采用简单的导向套对钻杆的平移进行限制,在钻杆偏移过程中导向套与钻杆的受力点单一,容易损坏,使用寿命短。Construction engineering survey refers to the activities of surveying, mapping, surveying and testing terrain, geology and hydrology, and providing corresponding results and data to meet the needs of planning, design, construction, operation and comprehensive management of engineering construction, using drilling equipment To explore the structure of the underground soil layer, the drill pipe in the drilling device will be offset during the drilling process. It is necessary to use a solid base to fix the drilling equipment. Most of the existing equipment uses positioning pins to strengthen the base and ground installation. However, during the installation of the pin bolt, it will cause great vibration to the base and the equipment on it, and it is necessary to guide and limit the deviation of the drill pipe. The existing equipment mostly uses a simple guide sleeve to limit the translation of the drill pipe. During the excursion of the drill pipe, the force point between the guide sleeve and the drill pipe is single, which is easy to be damaged and has a short service life.

实用新型内容Utility model content

为了解决上述背景技术提到的技术问题,本实用新型实施例提供了一种用于建筑工程勘察的钻探装置,包括安装架,所述安装架下方两侧设置有支柱,所述支柱的底端设置有底座,所述底座上设置有固定锚杆,所述固定锚杆与底座螺纹配合,所述安装架上方设置钻杆控制装置,所述钻杆控制装置包括旋转轴,所述旋转轴通过连轴器与钻杆固定连接,所述钻杆的底端设置有钻头,所述旋转轴设置在电机的输出轴固定连接,所述电机固定在压力板上,所述压力板与安装架之间设置有液压伸缩杆,所述钻杆的中部固定设置有导向齿轮盘,所述导向齿轮盘的两侧设置有限位齿轮轴,两侧的限位齿轮轴分别与导向齿轮盘两侧相配合。In order to solve the technical problems mentioned in the above-mentioned background art, an embodiment of the present utility model provides a drilling device for construction engineering investigation, including an installation frame, and two sides below the installation frame are provided with pillars, and the bottom ends of the pillars are A base is provided, a fixed anchor rod is arranged on the base, the fixed anchor rod is threadedly matched with the base, and a drill rod control device is arranged above the mounting frame, and the drill rod control device includes a rotating shaft, and the rotating shaft passes through the base. The coupling is fixedly connected with the drill pipe, the bottom end of the drill pipe is provided with a drill bit, the rotating shaft is fixedly connected to the output shaft of the motor, the motor is fixed on the pressure plate, and the pressure plate and the mounting frame are connected. A hydraulic telescopic rod is arranged between the drill rods, a guide gear plate is fixed in the middle of the drill rod, limit gear shafts are arranged on both sides of the guide gear plate, and the limit gear shafts on both sides are respectively matched with both sides of the guide gear plate. .

优选的是,所述限位齿轮轴设置在安装架的下方。Preferably, the limit gear shaft is arranged below the mounting frame.

优选的是,所述限位齿轮轴顶端通过第一转轴与安装架下表面可转动安装,所述限位齿轮轴的底端通过第二转轴与承接板的一端可转动连接,所述承接板的另一端与支柱固定连接。Preferably, the top end of the limit gear shaft is rotatably mounted on the lower surface of the mounting frame through a first rotating shaft, and the bottom end of the limit gear shaft is rotatably connected to one end of a bearing plate through a second rotating shaft, and the bearing plate The other end is fixedly connected to the pillar.

优选的是,每组底座上设置有多组固定锚杆,所述底座内部设置有螺纹套,所述固定锚杆侧壁设置有与螺纹套相配合的外螺纹。Preferably, each group of bases is provided with a plurality of sets of fixed anchor rods, the base is provided with a threaded sleeve inside, and the side wall of the fixed anchor rod is provided with an external thread matched with the threaded sleeve.

本实用新型实施例提供的技术方案带来的有益效果至少包括:The beneficial effects brought by the technical solutions provided by the embodiments of the present utility model include at least:

1、本实用新型采用固定锚杆将底座固定在地面上,所述固定锚杆通过与螺纹套配合逐渐向地下螺旋钻进,在固定锚杆安装过程中是逐渐旋转下移,对底座的震动较小,从而较小对底座之上的支架的干扰。1. The utility model adopts a fixed anchor rod to fix the base on the ground. The fixed anchor rod is gradually augered into the ground by cooperating with the threaded sleeve. During the installation process of the fixed anchor rod, it gradually rotates and moves down, and the vibration of the base is affected. Smaller, and thus less interference with the stand above the base.

2、本实用新型采用钻杆中部的导向齿轮盘和两侧的限位齿轮轴相配合对钻杆的横向位移进行限制,防止钻杆发生偏移,所述限位齿轮轴在钻杆转动过程中也会跟随转动,使钻杆的移动旋转更加稳定,所述导向齿轮盘与限位齿轮轴的受力点可不断变化,较小单一受力点的损耗,增加使用寿命。2. The utility model uses the guide gear plate in the middle of the drill rod and the limit gear shafts on both sides to limit the lateral displacement of the drill rod to prevent the drill rod from shifting. The limit gear shaft is in the process of rotation of the drill rod. It will also follow the rotation in the middle, making the movement and rotation of the drill pipe more stable, and the force point of the guide gear plate and the limit gear shaft can be constantly changed, reducing the loss of a single force point and increasing the service life.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the drawings in the following description are only some implementations of the present invention. For example, for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.

图1是本实用新型整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present utility model;

图2是所述导向齿轮盘与限位齿轮轴安装结构示意图。FIG. 2 is a schematic diagram of the installation structure of the guide gear plate and the limit gear shaft.

所示附图中,安装架1,支柱2,底座3,固定锚杆4,螺纹套5,旋转轴6,钻杆7,钻头8,电机9,压力板10,液压伸缩杆11,导向齿轮盘12,限位齿轮轴13,第一转轴14,第二转轴15,承接板16。In the drawings shown, the mounting frame 1, the pillar 2, the base 3, the fixed anchor rod 4, the threaded sleeve 5, the rotating shaft 6, the drill rod 7, the drill bit 8, the motor 9, the pressure plate 10, the hydraulic telescopic rod 11, the guide gear Disk 12 , limit gear shaft 13 , first rotating shaft 14 , second rotating shaft 15 , bearing plate 16 .

具体实施方式Detailed ways

为使本实用新型的目的、技术方案和优点更加清楚,下面将结合附图对本实用新型实施方式作进一步地详细描述。In order to make the objectives, technical solutions and advantages of the present utility model clearer, the embodiments of the present utility model will be further described in detail below with reference to the accompanying drawings.

需要说明的是,当元件被称为“设置于”另一个元件,它可以直接在另一个元件上或者可能同时存在居中元件。当一个元件被称为是“固定于”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件。It should be noted that when an element is referred to as being "disposed on" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "fixed to" another element, it can be directly connected to the other element or intervening elements may also be present.

在本实用新型中,在未作相反说明的情况下,使用的方位词如“上、下、左、右”通常是指如图1所述的上下左右。“内、外”是指具体轮廓上的内与外。“远、近”是指相对于某个部件的远与近。In the present invention, unless otherwise stated, the directional words used such as "up, down, left and right" generally refer to up, down, left and right as shown in FIG. 1 . "Inside and outside" means inside and outside on a specific profile. "Far and near" means far and near relative to a component.

如图1-2所示,本实用新型实施例提供的一种用于建筑工程勘察的钻探装置,包括安装架1,所述安装架1下方两侧设置有支柱2,所述支柱2的底端设置有底座3,所述底座3上设置有固定锚杆4,所述固定锚杆4与底座3螺纹配合,每组底座3上设置有多组固定锚杆4,所述底座3内部设置有螺纹套5,所述固定锚杆4侧壁设置有与螺纹套5相配合的外螺纹,所述安装架1上方设置钻杆7控制装置,所述钻杆7控制装置包括旋转轴6,所述旋转轴6通过连轴器与钻杆7固定连接,所述钻杆7的底端设置有钻头8,所述旋转轴6设置在电机9的输出轴固定连接,所述电机9固定在压力板10上,所述压力板10与安装架1之间设置有液压伸缩杆11,所述钻杆7的中部固定设置有导向齿轮盘12,所述导向齿轮盘12的两侧设置有限位齿轮轴13,两侧的限位齿轮轴13分别与导向齿轮盘12两侧相配合,所述限位齿轮轴13设置在安装架1的下方,所述限位齿轮轴13顶端通过第一转轴14与安装架1下表面可转动安装,所述限位齿轮轴13的底端通过第二转轴15与承接板16的一端可转动连接,所述承接板16的另一端与支柱2固定连接。As shown in FIGS. 1-2 , a drilling device for construction engineering survey provided by an embodiment of the present invention includes an installation frame 1 , and pillars 2 are arranged on both sides of the lower part of the installation frame 1 , and the bottom of the pillar 2 is The end is provided with a base 3, the base 3 is provided with a fixed anchor rod 4, the fixed anchor rod 4 is threadedly matched with the base 3, each group of bases 3 is provided with a plurality of sets of fixed anchor rods 4, and the base 3 is internally provided There is a threaded sleeve 5, the side wall of the fixed anchor rod 4 is provided with an external thread matched with the threaded sleeve 5, a drill rod 7 control device is provided above the mounting frame 1, and the drill rod 7 control device includes a rotating shaft 6, The rotary shaft 6 is fixedly connected with the drill rod 7 through a coupling, the bottom end of the drill rod 7 is provided with a drill bit 8, the rotary shaft 6 is fixedly connected to the output shaft of the motor 9, and the motor 9 is fixed on the On the pressure plate 10, a hydraulic telescopic rod 11 is arranged between the pressure plate 10 and the mounting frame 1, a guide gear plate 12 is fixedly arranged in the middle of the drill pipe 7, and limit positions are arranged on both sides of the guide gear plate 12 The gear shaft 13, the limit gear shafts 13 on both sides are respectively matched with the two sides of the guide gear plate 12, the limit gear shaft 13 is arranged under the mounting frame 1, and the top of the limit gear shaft 13 passes through the first rotating shaft 14 is rotatably mounted on the lower surface of the mounting frame 1 , the bottom end of the limit gear shaft 13 is rotatably connected to one end of the bearing plate 16 through the second rotating shaft 15 , and the other end of the bearing plate 16 is fixedly connected to the pillar 2 .

在底座3放置在安装位置后,对其上的安装架1进行初步固定,使用固定锚杆4将底座3固定在地面上,所述固定锚杆4通过与螺纹套5配合逐渐向地下螺旋钻进,多个固定锚杆4将底座3固定在地面上,在固定锚杆4安装过程中是逐渐旋转下移,对底座3的震动较小,从而较小对底座3之上的支架的干扰,所述固定锚杆4可将底座3牢固的固定在在地面上,防止底座3上的设备在钻头8下钻过程中因抖动发生偏移。所述液压伸缩杆11可控制压力板10在竖直方向上移动,从而带动钻杆7和钻头8下下移动进行钻探工作,所述旋转轴6带动钻杆7和钻头8转动,所述钻杆7控制装置中的旋转轴6在电机9和液压伸缩杆11的控制下带动钻杆7向下移动过程中旋转,完成钻杆7和钻头8的钻探工作,所述钻杆7中部的导向齿轮盘12和两侧的限位齿轮轴13相配合对钻杆7的横向位移进行限制,防止钻杆7发生偏移,所述限位齿轮轴13在钻杆7转动过程中也会跟随转动,使钻杆7的移动旋转更加稳定,所述导向齿轮盘12与限位齿轮轴13的受力点可不断变化,较小单一受力点的损耗,增加使用寿命。After the base 3 is placed in the installation position, the mounting frame 1 on it is preliminarily fixed, and the base 3 is fixed on the ground by using the fixed anchor rod 4, and the fixed anchor rod 4 is gradually augered underground by cooperating with the threaded sleeve 5 In addition, a plurality of fixed anchor rods 4 fix the base 3 on the ground. During the installation process of the fixed anchor rods 4, it gradually rotates and moves downward, and the vibration to the base 3 is small, so that the interference to the bracket on the base 3 is small. , the fixed anchor rod 4 can firmly fix the base 3 on the ground, so as to prevent the equipment on the base 3 from shifting due to shaking during the drilling process of the drill bit 8 . The hydraulic telescopic rod 11 can control the pressure plate 10 to move in the vertical direction, thereby driving the drill rod 7 and the drill bit 8 to move down and down to perform drilling work. The rotating shaft 6 drives the drill rod 7 and the drill bit 8 to rotate. The rotary shaft 6 in the control device of the rod 7 drives the drill rod 7 to rotate during the downward movement under the control of the motor 9 and the hydraulic telescopic rod 11 to complete the drilling work of the drill rod 7 and the drill bit 8. The gear plate 12 cooperates with the limit gear shafts 13 on both sides to limit the lateral displacement of the drill rod 7 to prevent the drill rod 7 from shifting. The limit gear shaft 13 will also follow the rotation of the drill rod 7 during the rotation. , so that the movement and rotation of the drill rod 7 is more stable, the force point of the guide gear plate 12 and the limit gear shaft 13 can be changed continuously, the loss of a single force point is reduced, and the service life is increased.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device comprising a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.

本领域普通技术人员可以理解实现上述实施例的全部或部分步骤可以通过硬件来完成,也可以通过程序来指令相关的硬件完成,所述的程序可以存储于一种计算机可读存储介质中,上述提到的存储介质可以是只读存储器,磁盘或光盘等。Those of ordinary skill in the art can understand that all or part of the steps of implementing the above embodiments can be completed by hardware, or can be completed by instructing relevant hardware through a program, and the program can be stored in a computer-readable storage medium. The storage medium mentioned may be a read-only memory, a magnetic disk or an optical disk, etc.

以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the present invention. within the scope of protection of the utility model.

Claims (4)

1. A drilling device for constructional engineering investigation is characterized by comprising a mounting frame, wherein two sides below the mounting frame are provided with pillars, the bottom end of the pillar is provided with a base, the base is provided with a fixed anchor rod, the fixed anchor rod is in threaded fit with the base, a drill rod control device is arranged above the mounting frame and comprises a rotating shaft which is fixedly connected with a drill rod through a coupling, the bottom end of the drill rod is provided with a drill bit, the rotating shaft is arranged on an output shaft of the motor and fixedly connected with the motor, the motor is fixed on the pressure plate, a hydraulic telescopic rod is arranged between the pressure plate and the mounting frame, the middle part of drilling rod is fixed and is provided with the leading gear dish, the both sides of leading gear dish are provided with spacing gear shaft, and the spacing gear shaft of both sides cooperatees with leading gear dish both sides respectively.
2. A drilling apparatus for constructional engineering investigations as claimed in claim 1, wherein said limit gear shaft is disposed below the mounting bracket.
3. The drilling rig for the constructional engineering investigation of claim 2, wherein the top end of the limit gear shaft is rotatably mounted with the lower surface of the mounting bracket through a first rotating shaft, the bottom end of the limit gear shaft is rotatably connected with one end of the bearing plate through a second rotating shaft, and the other end of the bearing plate is fixedly connected with the pillar.
4. A drilling apparatus for constructional engineering investigation as claimed in claim 1, wherein a plurality of sets of anchor rods are provided on each set of base, a threaded sleeve is provided within the base, and the side walls of the anchor rods are provided with external threads for mating with the threaded sleeve.
CN202122732205.7U 2021-11-09 2021-11-09 A drilling device for construction engineering survey Expired - Fee Related CN216741367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122732205.7U CN216741367U (en) 2021-11-09 2021-11-09 A drilling device for construction engineering survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122732205.7U CN216741367U (en) 2021-11-09 2021-11-09 A drilling device for construction engineering survey

Publications (1)

Publication Number Publication Date
CN216741367U true CN216741367U (en) 2022-06-14

Family

ID=81925088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122732205.7U Expired - Fee Related CN216741367U (en) 2021-11-09 2021-11-09 A drilling device for construction engineering survey

Country Status (1)

Country Link
CN (1) CN216741367U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749623A (en) * 2022-12-09 2023-03-07 国网上海市电力公司浦东供电公司 Drilling device for constructional engineering investigation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115749623A (en) * 2022-12-09 2023-03-07 国网上海市电力公司浦东供电公司 Drilling device for constructional engineering investigation
CN115749623B (en) * 2022-12-09 2024-03-22 国网上海市电力公司浦东供电公司 Drilling device for construction engineering investigation

Similar Documents

Publication Publication Date Title
WO2023142542A1 (en) Drilling apparatus for geotechnical engineering investigation
CN103046866B (en) Universal rotating drilling machine
CN115235812A (en) Soil layer sampling device for building construction foundation detection
CN218762397U (en) A horizontal fixing device for land development surveying and mapping
CN115839437A (en) Construction method for pipe jacking of underground rainwater and sewage pipeline
CN109056687B (en) A deep soil multi-sensor embedding device and embedding method thereof
CN117108197A (en) Drilling device for geotechnical engineering investigation
CN103590747B (en) Mast anti-deflection device for rotary drilling rig and rotary drilling rig with same
CN213710986U (en) Geological prospecting drill bit
CN205477366U (en) A complete set of pipe vice clamping device of wedge for full -rotating drill
CN112049101A (en) A kind of geological survey sampling equipment for civil construction
CN211228470U (en) A mud-free bored pile construction device
CN217872695U (en) Geological drilling device
CN218973868U (en) Highway engineering bridge foundation rock soil test detects device that fetches earth
CN113982514B (en) An installation device and installation method for an underground side wall sensor
CN216381204U (en) A drilling rig for geotechnical engineering investigation
US11585174B2 (en) Hydraulic propulsion horizontal directional coring device
CN210798862U (en) Mining hydraulic tunnel drilling machine with accurate punching position
CN211950310U (en) A multifunctional geological drilling rig
CN204591142U (en) A kind of anchor pole multi-section reaming facility
CN218562311U (en) Drilling and filling device for unfavorable geological conditions
CN115749623A (en) Drilling device for constructional engineering investigation
CN114295416A (en) Geotechnical engineering reconnaissance deep mass sampling device
Fernandes et al. A Test Rig for Jetted Conductors in Soft Clays
CN219714803U (en) Core drilling sampling device for rock-soil geological investigation detection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220614

CF01 Termination of patent right due to non-payment of annual fee