- CN216740612U CN216740612U CN202122913231.XU CN202122913231U CN216740612U CN 216740612 U CN216740612 U CN 216740612U CN 202122913231 U CN202122913231 U CN 202122913231U CN 216740612 U CN216740612 U CN 216740612U
- Authority
- CN
- China
- Prior art keywords
- wall
- civil engineering
- telescopic link
- engineering construction
- mount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 230000009471 action Effects 0.000 claims abstract description 4
- 230000000694 effects Effects 0.000 claims description 5
- 239000000725 suspension Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 claims 3
- 238000000034 method Methods 0.000 description 3
- 230000001681 protective effect Effects 0.000 description 3
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009993 protective function Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to a civil engineering technical field just discloses a transformer substation's civil engineering construction device, the arc wall of seting up including first mount top, the inner wall joint of arc wall has the telescopic link, the inner wall threaded connection of telescopic link has adjustable adjusting bolt, the top joint of telescopic link has the guard plate that has the guard action, the gliding spout of slider of can being convenient for is seted up to the surface of guard plate, makes the inner wall of tight spout is supported to the surface of slider, the go-between that the safety buckle hung can be convenient for to one side fixedly connected with of slider. This civil engineering construction equipment of transformer substation sets up through the cooperation of first mount, arc wall, telescopic link, adjusting bolt and guard plate, and operating personnel can be the inner wall of telescopic link bottom joint at the arc wall, then makes the telescopic link fixable on first mount, then can adjust the height of telescopic link according to operating personnel's height, makes the guard plate can play the guard action to operating personnel.
Description
Technical Field
The utility model relates to a civil engineering technical field specifically is a transformer substation's civil engineering construction device.
Background
China is a strong country of capital construction, and is at the advanced level in the world in many fields of capital construction. Need build the mounting bracket in the civil engineering field and carry out the level and the vertical transportation of civil engineering in-process material, make things convenient for constructor to construct, in the actual civil engineering, we often need carry out the concatenation of mounting bracket according to the requirement of building as required and build, and also can consider the transportation, build, topography, height, a great deal of factors such as width, in the building work progress, no matter build the building, the workshop, or build the road, the bridge, all leave not to open the construction mounting bracket, need build some mounting brackets that are used for pouring reinforced concrete at the job site.
However, in the process of using the traditional mounting frame, the protection measures of constructors during construction at the top are poor, the top lacks an area which can be conveniently supported by hands of the constructors, so that certain risks exist, and the constructors lack an area for fixing safety belts during construction of the traditional mounting frame, so that irreparable loss can be caused if the constructors fall off during construction.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a civil engineering construction equipment of transformer substation has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a civil engineering construction equipment of transformer substation, includes the arc wall that first mount top was seted up, the inner wall joint of arc wall has the telescopic link, adjustable adjusting bolt is connected with to the inner wall screw thread of telescopic link, the top joint of telescopic link has the guard plate that has the guard action, the gliding spout of slider of can being convenient for is seted up to the surface of guard plate, makes the inner wall of tight spout is supported to the surface of slider, one side fixedly connected with of slider can be convenient for the safety buckle hang the go-between.
Optionally, one side fixedly connected with of first mount has the backup pad of supporting role, the top of backup pad is equipped with skid-proof anti-skidding line, the equal fixedly connected with spacing hook that can be spacing in both sides of backup pad.
Optionally, the inner wall joint of spacing hook has the horizontal pole that can the person of facilitating the use scrambles, the surface of horizontal pole is equipped with the friction pad that can improve frictional force.
Optionally, the two ends of the cross rod are fixedly connected with fixing rings which can be connected with the vertical rod, so that the inner walls of the fixing rings support against the outer surface of the vertical rod through bolts.
Optionally, the bottom fixedly connected with of montant can be convenient for remove the removal wheel, the inner wall joint that removes the wheel has can be to the spacing piece that removes the wheel braking, the surface that removes the wheel is equipped with the protection line that can protect.
Optionally, the outer surface of the vertical rod is connected with a second fixing frame capable of improving overall stability through bolts, and the outer surface of the second fixing frame is fixedly connected with a warning plate with a warning effect.
(III) advantageous effects
The utility model provides a civil engineering construction equipment of transformer substation possesses following beneficial effect:
1. this civil engineering construction equipment of transformer substation sets up through the cooperation of first mount, arc wall, telescopic link, adjusting bolt and guard plate, and operating personnel can be the inner wall of telescopic link bottom joint at the arc wall, then makes the telescopic link can fix on first mount, then can adjust the height of telescopic link according to operating personnel's height to for constructor provides the region that the hand can support, thereby the effectual risk that reduces during the construction.
2. This civil engineering construction equipment of transformer substation sets up through the cooperation of guard plate, slider, spout and go-between, and operating personnel can be on the go-between to the safety catch joint when carrying out high altitude construction to can avoid constructor to follow the risk that the eminence dropped in the work progress, and the slider can slide in spout inner wall department, thereby can not influence the condition that constructor removed at the top repeatedly.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic diagram of the structure of the supporting plate of the present invention;
FIG. 3 is a schematic view of the internal structure of the protection plate of the present invention;
FIG. 4 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 5 is a schematic view of the slider structure of the present invention.
In the figure: 1. a first fixing frame; 2. an arc-shaped slot; 3. a telescopic rod; 4. adjusting the bolt; 5. a protection plate; 6. a slider; 7. a chute; 8. a connecting ring; 9. a support plate; 10. a limiting hook; 11. a cross bar; 12. A vertical rod; 13. a fixing ring; 14. a moving wheel; 15. a second fixing frame; 16. a warning panel.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 5, the present invention provides a technical solution: a civil construction device of a transformer substation comprises an arc-shaped groove 2 arranged at the top of a first fixing frame 1, a supporting plate 9 with a supporting function is fixedly connected to one side of the first fixing frame 1, anti-skid anti-skidding lines are arranged at the top of the supporting plate 9, limiting hooks 10 capable of limiting are fixedly connected to both sides of the supporting plate 9, a cross rod 11 capable of being conveniently climbed by a user is clamped on the inner wall of each limiting hook 10, a friction pad capable of improving friction force is arranged on the outer surface of each cross rod 11, a telescopic rod 3 is clamped on the inner wall of the arc-shaped groove 2, an adjustable adjusting bolt 4 is in threaded connection with the inner wall of each telescopic rod 3, an operator can clamp the limiting hooks 10 at corresponding positions according to the height required by construction, the surface of the supporting plate 9 can facilitate repeated walking construction of operators, and the arrangement of the balance cross rod 11 can facilitate the operators to climb the supporting plate 9;
the top of the telescopic rod 3 is clamped with a protective plate 5 with a protective function, the outer surface of the protective plate 5 is provided with a chute 7 which is convenient for the sliding of the slide block 6, the outer surface of the slide block 6 is tightly propped against the inner wall of the chute 7, one side of the slide block 6 is fixedly connected with a connecting ring 8 which is convenient for the safe buckle suspension, both ends of the cross rod 11 are fixedly connected with fixing rings 13 which are connected with the vertical rod 12, the inner wall of the fixing ring 13 is tightly propped against the outer surface of the vertical rod 12 through bolts, and the protective plate 5 is arranged, can support the hands of operators, can reduce the risk of falling from high places of constructors, the arrangement of the connecting ring 8 is convenient for operators to buckle the safety belt on the connecting ring 8, therefore, the damage caused by falling from a high place can be reduced, and the sliding block 6 can slide on the inner wall of the sliding groove 7, so that the walking of constructors on the supporting plate 9 is not influenced;
the bottom fixedly connected with of montant 12 can be convenient for remove removal wheel 14, the inner wall joint that removes wheel 14 has can be to the spacing piece that removes the braking of wheel 14, the surface that removes wheel 14 is equipped with the protection line that can protect, there is the second mount 15 that can improve the overall stability the surface of montant 12 through bolted connection, the external fixed surface of second mount 15 is connected with the warning board 16 that has the warning effect, the setting of wheel 14 is removed to the bottom, the holistic flexibility of the device has been improved, and second mount 15 can play reinforced (rfd) effect to both sides montant 12.
The utility model discloses in, the device's working procedure as follows:
1. an operator can clamp the limiting hook 10 at a corresponding position of the cross rod 11 according to construction requirements, and then the operator can climb onto the supporting plate 9 from the surface of the cross rod 11;
2. after the steps are completed, an operator can connect the telescopic rod 3 to the inner wall of the supporting plate 9 and then adjust the height of the supporting plate 9 according to the use requirement;
3. after the steps are completed, an operator can fix the safety belt on the connecting ring 8, and when the operator moves on the supporting plate 9, the sliding block 6 can slide on the inner wall of the sliding groove 7, so that the operator is not influenced to construct.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a civil engineering construction equipment of transformer substation, includes arc wall (2) that first mount (1) top was seted up, its characterized in that: the inner wall joint of arc wall (2) has telescopic link (3), the inner wall threaded connection of telescopic link (3) has adjustable adjusting bolt (4), the top joint of telescopic link (3) has guard plate (5) that have the guard action, gliding spout (7) of slider (6) of can being convenient for are seted up to the surface of guard plate (5), make the inner wall of tight spout (7) is supported to the surface of slider (6), one side fixedly connected with of slider (6) can be convenient for safety buckle suspension go-between (8).
2. The transformer substation civil engineering construction device of claim 1, characterized in that: one side fixedly connected with of first mount (1) has backup pad (9) of supporting role, the top of backup pad (9) is equipped with skid-proof anti-skidding line, the equal fixedly connected with spacing hook (10) that can be spacing in both sides of backup pad (9).
3. A substation civil engineering construction installation according to claim 2, characterised in that: the inner wall joint of spacing hook (10) has horizontal pole (11) that can the user of facilitating the use climbs, the surface of horizontal pole (11) is equipped with the friction pad that can improve frictional force.
4. A substation civil engineering construction installation according to claim 3, characterised in that: the two ends of the cross rod (11) are fixedly connected with fixing rings (13) which can be connected with the vertical rod (12), so that the inner walls of the fixing rings (13) are tightly abutted to the outer surface of the vertical rod (12) through bolts.
5. A transformer substation civil engineering construction device according to claim 4, characterized in that: the bottom fixedly connected with of montant (12) can be convenient for remove wheel (14), the inner wall joint that removes wheel (14) has the spacing piece that can take turns (14) braking to removing, the surface that removes wheel (14) is equipped with the protection line that can protect.
6. A transformer substation civil engineering construction installation according to claim 4, characterized in that: the surface of montant (12) has second mount (15) that can improve overall stability through bolted connection, the surface fixed connection of second mount (15) has warning board (16) that have the warning effect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122913231.XU CN216740612U (en) | 2021-11-25 | 2021-11-25 | Civil engineering construction equipment of transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122913231.XU CN216740612U (en) | 2021-11-25 | 2021-11-25 | Civil engineering construction equipment of transformer substation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216740612U true CN216740612U (en) | 2022-06-14 |
Family
ID=81928793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122913231.XU Expired - Fee Related CN216740612U (en) | 2021-11-25 | 2021-11-25 | Civil engineering construction equipment of transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216740612U (en) |
-
2021
- 2021-11-25 CN CN202122913231.XU patent/CN216740612U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205452906U (en) | Combination dock switch overhauls platform | |
CN209760750U (en) | Movable lifting scaffold | |
CN205241189U (en) | A integrated device that is used for handling of guardrail template and installation to demolish | |
CN216740612U (en) | Civil engineering construction equipment of transformer substation | |
CN205188839U (en) | Movably -assembled anti -collision bridge wall construction hanging basket | |
CN103981811A (en) | Cross over type multifunctional cantilever external anti-collision wall installing and moving device and construction method thereof | |
CN215653515U (en) | High altitude construction protector for electric power engineering | |
CN211548658U (en) | Novel scaffold for building construction | |
CN209891681U (en) | Anti-tilting scaffold | |
CN104847159A (en) | Special safety belt pendant for annular concrete pole | |
CN210798819U (en) | Anti-falling device on tubular portal frame of transformer substation | |
CN206530033U (en) | A kind of overhanging type movable Scaffold | |
CN216304427U (en) | Road and bridge construction is with safe construction platform | |
CN205500654U (en) | Apron jack -up tool of transformer substation | |
CN110528852B (en) | Electric power iron tower overhauls with portable operation platform | |
CN209990165U (en) | Can have enough to meet need reuse's safety and face frontier defense and protect | |
CN215668888U (en) | Curb clamping device for electric power | |
CN214034677U (en) | Hanging basket for construction | |
CN116392738B (en) | Safety protection device for long-distance edge operation and use method thereof | |
CN219548444U (en) | Bridge construction protection frame that falls | |
CN219466048U (en) | Dismantlement platform with preliminary treatment clearance function | |
CN204475878U (en) | A kind of construction protection hurdle | |
CN216921994U (en) | Engineering ladder for mounting mine electromechanical equipment | |
CN218493529U (en) | Crossing structure for power transmission and transformation engineering | |
CN211473298U (en) | Electric power supporting device for electric power installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220614 |