CN216740507U - A dry-hanging stone installation structure for external wall - Google Patents
A dry-hanging stone installation structure for external wall Download PDFInfo
- Publication number
- CN216740507U CN216740507U CN202123141973.1U CN202123141973U CN216740507U CN 216740507 U CN216740507 U CN 216740507U CN 202123141973 U CN202123141973 U CN 202123141973U CN 216740507 U CN216740507 U CN 216740507U
- Authority
- CN
- China
- Prior art keywords
- plate
- connecting pipe
- splint
- wall
- installation structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004575 stone Substances 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 238000010030 laminating Methods 0.000 claims 1
- 239000000463 material Substances 0.000 claims 1
- 239000010454 slate Substances 0.000 abstract description 23
- 230000007613 environmental effect Effects 0.000 abstract description 5
- 238000005034 decoration Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 241001272720 Medialuna californiensis Species 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Finishing Walls (AREA)
Abstract
本申请公开了一种外墙干挂石材安装结构,涉及建筑装修相关技术领域,该外墙干挂石材安装结构,包括墙体,墙体的正面相对设置有三脚架,三脚架的内壁插接有连接管,连接管设置有若干,连接管的表面设置有装夹装置,装夹装置正面设置有固定板,固定板的正面设置有石板,装夹装置包括有上夹板和下夹板,下夹板位于上夹板的底部,连接管位于上夹板和下夹板的中心处,夹板顶部靠近固定板的一侧设置有铰链,夹板通过铰链与固定板转动连接,下夹板靠近固定板的一侧与固定板固定连接,本申请的设计通过预安装石板的设计减少了石板安装复杂度,通过固定板的设计减少装夹装置对石板的损坏,使石板可回收利用,增加了石板在使用中的环保性。
The present application discloses an installation structure for dry-hanging stone on an outer wall, which relates to the technical field of building decoration. The installation structure for dry-hanging stone on an outer wall includes a wall, a tripod is arranged opposite to the front of the wall, and the inner wall of the tripod is connected with a plug-in connection There are several connecting pipes. The surface of the connecting pipe is provided with a clamping device. The front of the clamping device is provided with a fixing plate. The front of the fixing plate is provided with a stone plate. The clamping device includes an upper clamping plate and a lower clamping plate. At the bottom of the splint, the connecting pipe is located at the center of the upper splint and the lower splint, the top of the splint is provided with a hinge on the side close to the fixed plate, the splint is connected with the fixed plate through the hinge, and the side of the lower splint close to the fixed plate is fixedly connected with the fixed plate The design of the present application reduces the complexity of slate installation through the design of pre-installed slates, reduces the damage to the slate by the clamping device through the design of the fixed plate, makes the slate recyclable, and increases the environmental protection of the slate in use.
Description
技术领域technical field
本申请涉及建筑装修相关技术领域,尤其是涉及一种外墙干挂石材安装结构。The present application relates to the technical field of building decoration, and in particular, to a dry-hanging stone installation structure for external walls.
背景技术Background technique
石材干挂法又名空挂法。是目前墙面装饰中一种新型的施工工艺。该方法以金属挂件将饰面石材直接吊挂于墙面或空挂于钢架之上,不需再灌浆粘贴。其原理是在主体结构上设主要受力点,通过金属挂件将石材固定在建筑物上,形成石材装饰幕墙。Stone dry hanging method is also known as empty hanging method. It is a new type of construction technology in the current wall decoration. In this method, the veneer stone is directly hung on the wall or empty on the steel frame with metal pendants, without grouting and pasting. The principle is to set the main force point on the main structure, and fix the stone on the building through the metal pendant to form the stone decorative curtain wall.
上述石墙板在安装时,现有的外墙干挂连接件仍然存在一些缺点,现有的外墙干挂连接件,结构复杂,施工难度大,由于现场施工操作空间有限,导致不便于安装操作,造成了资源的浪费,不利于环保。When the above-mentioned stone wall panels are installed, the existing dry-hanging connectors for external walls still have some shortcomings. The existing dry-hanging connectors for external walls have complex structures and are difficult to construct. Due to the limited space for on-site construction operations, installation is inconvenient. Operation, resulting in a waste of resources, is not conducive to environmental protection.
实用新型内容Utility model content
为了解决现有的外墙干挂连接件,结构复杂,施工难度大,由于现场施工操作空间有限,导致不便于安装操作的问题,本申请提供一种外墙干挂石材安装结构。In order to solve the problem that the existing dry-hanging connectors for external walls are complicated in structure, difficult to construct, and inconvenient for installation and operation due to limited operating space for on-site construction, the present application provides an installation structure for dry-hanging stone for external walls.
本申请提供一种外墙干挂石材安装结构,采用如下的技术方案:The application provides a dry-hanging stone installation structure for an external wall, which adopts the following technical solutions:
一种外墙干挂石材安装结构,包括墙体,所述墙体的正面相对设置有三脚架,所述三脚架的内壁插接有连接管,所述连接管设置有若干,所述连接管的表面设置有装夹装置,所述装夹装置包括有上夹板和下夹板,所述下夹板位于所述上夹板的底部,所述连接管位于所述上夹板和下夹板的中心处,所述装夹装置正面设置有固定板,所述固定板的正面设置有石板。An outer wall dry hanging stone installation structure, comprising a wall body, the front of the wall body is oppositely arranged with a tripod, the inner wall of the tripod is inserted with a connecting pipe, the connecting pipe is provided with a plurality of, and the surface of the connecting pipe is A clamping device is provided, the clamping device includes an upper clamping plate and a lower clamping plate, the lower clamping plate is located at the bottom of the upper clamping plate, the connecting pipe is located at the center of the upper clamping plate and the lower clamping plate, and the clamping plate is located at the center of the upper clamping plate and the lower clamping plate. A fixing plate is arranged on the front of the clamping device, and a stone plate is arranged on the front of the fixing plate.
通过采用上述技术方案:通过固定板的设计减少装夹装置对石板的损坏,使石板可回收利用,增加了石板在使用中的环保性。By adopting the above technical solution, the design of the fixing plate reduces the damage of the clamping device to the slate, makes the slate recyclable, and increases the environmental protection of the slate in use.
可选的,所述夹板顶部靠近所述固定板的一侧设置有铰链,所述夹板通过所述铰链与固定板转动连接,所述下夹板靠近所述固定板的一侧与所述固定板固定连接。Optionally, a hinge is provided on the side of the top of the splint close to the fixed plate, the splint is rotatably connected to the fixed plate through the hinge, and the side of the lower splint close to the fixed plate is connected to the fixed plate. Fixed connection.
通过采用上述技术方案:通过对下夹板的设计增加了夹板的稳定性,上夹板和下夹板的厚度一致。By adopting the above technical solution: the stability of the splint is increased through the design of the lower splint, and the thickness of the upper splint and the lower splint are the same.
可选的,所述上夹板的顶部设置有固定柱,所述固定柱垂直于所述连接管的顶部,所述固定柱的内部设置有螺栓,所述螺栓贯穿所述固定柱、上夹板和连接管。Optionally, a fixing column is arranged on the top of the upper splint, the fixing column is perpendicular to the top of the connecting pipe, and a bolt is arranged inside the fixing column, and the bolt penetrates through the fixing column, the upper splint and the connecting pipe. Connecting pipe.
通过采用上述技术方案:固定柱为空心柱,且固定柱的内部开设有螺纹,螺栓与固定柱螺纹连接,上夹板通过螺栓贯穿连接管的设计,增加了连接管的稳定性,减少上夹板的晃动。By adopting the above technical scheme: the fixing column is a hollow column, and the interior of the fixing column is provided with threads, the bolts are connected with the fixing column threadedly, and the design of the upper splint passing through the connecting pipe through the bolt increases the stability of the connecting pipe and reduces the damage of the upper splint. shaking.
可选的,所述下夹板的底部设置有连接板,所述连接板的外壁与所述固定板贴合。Optionally, the bottom of the lower clamping plate is provided with a connecting plate, and the outer wall of the connecting plate is attached to the fixing plate.
通过采用上述技术方案:连接板垂直于下夹板的底部,通过对连接板的设计增加了下夹板的稳定性。By adopting the above technical solution: the connecting plate is perpendicular to the bottom of the lower clamping plate, and the stability of the lower clamping plate is increased through the design of the connecting plate.
可选的,所述三脚架的内部设置有紧固板,所述紧固板套接于所述连接管的表面。Optionally, a fastening plate is provided inside the tripod, and the fastening plate is sleeved on the surface of the connecting pipe.
通过采用上述技术方案:紧固板的内壁设置有防滑纹,通过对连接管的设计增加了连接管与三脚架连接处的稳定性。By adopting the above technical solution, the inner wall of the fastening plate is provided with anti-skid patterns, and the stability of the connection between the connecting pipe and the tripod is increased by the design of the connecting pipe.
可选的,所述连接管的两侧出口端设置有锁头,所述锁头远离所述连接管的一侧螺纹连接有螺帽。Optionally, the outlet ends on both sides of the connecting pipe are provided with locking heads, and a side of the locking head away from the connecting pipe is threadedly connected with a nut.
与现有技术相比,本申请的有益效果是:Compared with the prior art, the beneficial effects of the present application are:
1、固定板远离石板的一侧安装下夹板和上夹板,将连接管放置于下夹板的内部,上夹板通过铰链与下夹板贴合,对连接管进行锁死,将连接管的两侧插接三脚架后的出口端插接锁头,三脚架通过螺栓与墙体固定连接,将石板固定于墙体的表面,这样的设计通过预安装石板的设计减少了石板安装复杂度,通过固定板的设计减少装夹装置对石板的损坏,使石板可回收利用,增加了石板在使用中的环保性。1. Install the lower splint and the upper splint on the side of the fixing plate away from the stone slab, place the connecting pipe inside the lower splint, and attach the upper splint to the lower splint through a hinge, lock the connecting pipe, and insert the two sides of the connecting pipe into the lower splint. The outlet end of the tripod is plugged into the lock, and the tripod is fixedly connected to the wall through bolts, and the slate is fixed on the surface of the wall. This design reduces the complexity of slate installation through the design of the pre-installed slate. The damage to the slate by the clamping device is reduced, the slate can be recycled, and the environmental protection of the slate in use is increased.
2、所述连接管的两侧出口端设置有锁头,锁头增加了连接管的密封性,所述锁头远离所述连接管的一侧螺纹连接有螺帽,所述螺帽靠近连接管的一侧设置有弹簧,所述弹簧位于所述锁头的内部,螺帽的设计方便锁头的打开,弹簧远离的螺帽一端与连接管紧密贴合,通过弹簧对螺帽的压力,使螺帽不易锁死,方便螺帽的打开。2. The outlet ends on both sides of the connection pipe are provided with lock heads, which increase the sealing performance of the connection pipe. The side of the lock head away from the connection pipe is threadedly connected with a nut, and the nut is close to the connection. One side of the tube is provided with a spring, the spring is located inside the lock head, the design of the nut is convenient for the opening of the lock head, and the end of the nut away from the spring is tightly fitted with the connecting tube, and the pressure of the spring on the nut, The nut is not easy to be locked, and the opening of the nut is convenient.
附图说明Description of drawings
图1为本申请中的整体结构示意图;Fig. 1 is the overall structure schematic diagram in the application;
图2为本申请中的装夹装置剖视结构示意图;Fig. 2 is the cross-sectional structural schematic diagram of the clamping device in the application;
图3为本申请中的锁头结构示意图;3 is a schematic view of the lock structure in the application;
图4为本申请中的三脚架结构示意图。FIG. 4 is a schematic diagram of the structure of the tripod in the application.
附图标记说明:1、墙体;2、三脚架;21、紧固板;3、连接管;4、装夹装置;41、上夹板;411、铰链;42、下夹板;421、连接板;43、固定柱;44、螺栓;5、固定板;6、石板;7、锁头;71、螺帽。Description of reference numerals: 1. Wall body; 2. Tripod; 21. Fastening plate; 3. Connecting pipe; 4. Clamping device; 41. Upper clamping plate; 43. Fixed column; 44. Bolt; 5. Fixed plate; 6. Slate; 7. Lock head; 71. Nut.
具体实施方式Detailed ways
以下结和附图1-4对本申请作进一步详细说明。The following sections and accompanying drawings 1-4 further describe the present application.
本申请提供以下技术方案,请参阅图1、图2和图3,该外墙干挂石材安装结构,包括墙体1,墙体1的正面相对设置有三脚架2,三脚架2为金属材质,三脚架2的内壁插接有连接管3,三脚架2的内部设置有紧固板21,紧固板21套接于连接管3的表面,紧固板21的内壁设置有防滑纹,通过对连接管3的设计增加了连接管3与三脚架2连接处的稳定性。连接管3为空心管,内部可走线,连接管3设置有若干,连接管3的表面设置有装夹装置4,装夹装置4为可拆卸设置,增加了回收利用率,装夹装置4正面设置有固定板5,固定板5的正面设置有石板6。The application provides the following technical solutions, please refer to FIG. 1 , FIG. 2 and FIG. 3 , the installation structure for dry-hanging stone on an external wall includes a wall body 1 , and a
请参阅图1、图3和图4,装夹装置4包括有上夹板41和下夹板42,下夹板42位于上夹板41的底部,上夹板41和下夹板42的连接处开设有半月槽,半月槽的内部设置有防滑垫,连接管3位于上夹板41和下夹板42的中心处,上夹板41顶部靠近固定板5的一侧设置有铰链411,铰链411与固定板5固定连接,上夹板41通过铰链411与固定板5转动连接,下夹板42靠近固定板5的一侧与固定板5固定连接,通过对下夹板42的设计增加了上夹板41的稳定性,上夹板41和下夹板42的厚度一致。上夹板41的顶部设置有固定柱43,固定柱43垂直于连接管3的顶部,固定柱43的内部设置有螺栓44,螺栓44贯穿固定柱43、上夹板41和连接管3,固定柱43为空心柱,且固定柱43的内部开设有螺纹,螺栓44与固定柱43螺纹连接,上夹板41通过螺栓44贯穿连接管3的设计,增加了连接管3的稳定性,减少上夹板41的晃动。下夹板42的底部设置有连接板421,连接板421的外壁与固定板5贴合,连接板421垂直于下夹板42的底部,通过对连接板421的设计增加了下夹板42的稳定性。Please refer to FIG. 1, FIG. 3 and FIG. 4, the
请参阅图1和图3,连接管3的两侧出口端螺纹连接有锁头7,锁头7增加了连接管3的密封性,锁头7远离连接管3的一侧螺纹连接有螺帽71,螺帽71的设计方便锁头7的打开,螺帽71与锁头7螺纹不易锁死,方便螺帽71的打开。Please refer to FIG. 1 and FIG. 3 , the outlet ends on both sides of the
本申请实施例的外墙干挂石材安装结构的实施原理为:The implementation principle of the dry-hanging stone installation structure for the exterior wall of the embodiment of the present application is:
使用时,将石板6放置于平面,固定板5固定于石板6的顶部,固定板5远离石板6的一侧安装下夹板42和上夹板41,将连接管3放置于下夹板42的内部,上夹板41通过铰链411与下夹板42贴合,对连接管3进行锁死,将连接管3的两侧插接三脚架2后的出口端插接锁头7,三脚架2与墙体1固定连接,将石板6固定于墙体1的表面,这样的设计通过预安装石板6的设计减少了石板6安装复杂度,通过固定板5的设计减少装夹装置4对石板6的损坏,使石板6可回收利用,增加了石板6在使用中的环保性。When in use, the
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202123141973.1U CN216740507U (en) | 2021-12-14 | 2021-12-14 | A dry-hanging stone installation structure for external wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202123141973.1U CN216740507U (en) | 2021-12-14 | 2021-12-14 | A dry-hanging stone installation structure for external wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216740507U true CN216740507U (en) | 2022-06-14 |
Family
ID=81935081
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202123141973.1U Expired - Fee Related CN216740507U (en) | 2021-12-14 | 2021-12-14 | A dry-hanging stone installation structure for external wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216740507U (en) |
-
2021
- 2021-12-14 CN CN202123141973.1U patent/CN216740507U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201826468U (en) | Thermal decorating plate | |
| CN207314597U (en) | All steel section bar fastening piece type partition-type structures | |
| CN216740507U (en) | A dry-hanging stone installation structure for external wall | |
| CN211421565U (en) | Height-adjustable point structure of suspended ceiling | |
| CN201943226U (en) | Insertion and hang type pottery tube curtain wall | |
| CN206903018U (en) | A kind of curtain wall construction device for building | |
| CN210947814U (en) | A assembled cut-off basin for aluminium mould concrete outer wall | |
| CN203701501U (en) | Stainless steel dry hanging device | |
| CN111677268A (en) | A fair-faced concrete single-side support formwork system suitable for side walls of underground engineering | |
| CN202577639U (en) | Buckle used energy-saving vacuum insulation board of building | |
| CN215563621U (en) | A dry-hanging connection structure for concrete curtain wall | |
| CN216428876U (en) | Low-carbon energy-saving building wallboard | |
| CN110541507A (en) | Glass curtain wall installation components and usage methods | |
| CN213015076U (en) | Composite board convenient for wall surface dry hanging construction | |
| CN203174837U (en) | Combination hanging piece and beam-free reinforced ceramic gravel curtain wall system | |
| CN209637050U (en) | A kind of building curtain wall mounting and fixing bracket | |
| CN209323791U (en) | A keel connection member for curtain wall | |
| CN217400023U (en) | A positioning member for building prefabricated concrete curtain wall | |
| CN217027455U (en) | Green's light gauge steel building frame | |
| CN221957021U (en) | Glass curtain wall beam upright post mounting structure | |
| CN211923333U (en) | Building outer wall hangs stone material positioner futilely | |
| CN207647077U (en) | A kind of outer wall decoration board and its post-reinforcing structure | |
| CN203174834U (en) | Combination hanging piece and ceramic gravel curtain wall with beams | |
| CN211873468U (en) | A stone curtain wall system | |
| CN206829443U (en) | A kind of novel curtain wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20231120 Address after: No. 253 Longdu Avenue, Qinglong Industrial Park, Pengshan District, Meishan City, Sichuan Province, 620000 Patentee after: Sichuan Jicai energy saving and environmental protection material Co.,Ltd. Address before: No. 34, Group 7, Benhe Village, Shilong Town, Langzhong City, Nanchong City, Sichuan Province, 637400 Patentee before: Yang Dong Patentee before: Sichuan Honghai Zhongxin Trading Co.,Ltd. Effective date of registration: 20231120 Address after: No. 34, Group 7, Benhe Village, Shilong Town, Langzhong City, Nanchong City, Sichuan Province, 637400 Patentee after: Yang Dong Patentee after: Sichuan Honghai Zhongxin Trading Co.,Ltd. Address before: 710003 room 801, unit 2, building 1, Taide Ziyu residence, No. 24, Fengcheng 1st Road, economic development zone, Xi'an, Shaanxi Province Patentee before: Shaanxi Fulei Construction Group Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220614 |