CN216737158U - Template hoisting equipment for constructional engineering construction - Google Patents

Template hoisting equipment for constructional engineering construction Download PDF

Info

Publication number
CN216737158U
CN216737158U CN202123432434.3U CN202123432434U CN216737158U CN 216737158 U CN216737158 U CN 216737158U CN 202123432434 U CN202123432434 U CN 202123432434U CN 216737158 U CN216737158 U CN 216737158U
Authority
CN
China
Prior art keywords
template
sliding block
magnet
fixedly connected
constructional engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123432434.3U
Other languages
Chinese (zh)
Inventor
张辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Zhanliang
Shi Lishen
Original Assignee
Guo Zhanliang
Shi Lishen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guo Zhanliang, Shi Lishen filed Critical Guo Zhanliang
Priority to CN202123432434.3U priority Critical patent/CN216737158U/en
Application granted granted Critical
Publication of CN216737158U publication Critical patent/CN216737158U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of constructional engineering, and discloses template hoisting equipment for constructional engineering construction, which comprises a supporting plate, wherein the end part of the supporting plate penetrates through a notch formed in the side surface of a sliding block and is movably connected with the sliding block, the bottom of the sliding block is fixedly connected with a fixing plate, the side surface of the fixing plate is fixedly connected with an inserting column, the sliding block is connected with a positioning mechanism, and the top part of the supporting plate is connected with a pull rope through an arched shackle. According to the utility model, the inserting columns are inserted into the holes formed in the side surfaces of the building template by moving the sliding blocks, so that the building template is stably supported and clamped, and the positions of the inserting columns are positioned by the positioning mechanism, so that the stability of hoisting the template is improved.

Description

Template hoisting equipment for constructional engineering construction
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to template hoisting equipment for constructional engineering construction.
Background
Hoisting equipment is needed to be used in the process of dispatching and transporting the building templates, such as the following patent numbers: CN104863376A has applied for a building templates lifting device, has solved when the hoist and mount template need change lifting device's size and the problem that the incident takes place because hoist and mount template weight is too big according to the size, the quantity of on-the-spot template, but its lifting rope that only can hoist and bind the template can not stable fix a position the template, easily causes the in-process of hoist and mount of template to drop.
SUMMERY OF THE UTILITY MODEL
The utility model provides template hoisting equipment for construction of constructional engineering, which solves the problem that the existing template hoisting device cannot stably position a template.
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a template handling equipment for building engineering construction, includes the backup pad, the tip of backup pad run through the notch that the slider side was seted up and with slider swing joint, the bottom fixedly connected with fixed plate of slider, the post is inserted to the side fixedly connected with of fixed plate, be connected with positioning mechanism on the slider, the top of backup pad is connected with the stay cord through bow-shaped shackle.
Preferably, the number of the positioning mechanisms is two, and the two positioning mechanisms are symmetrically distributed on two sides of the top of the supporting plate.
Preferably, the positioning mechanism comprises an inserted link, a first positioning groove, a second positioning groove and a connecting plate;
the bottom of the inserted bar penetrates through a first positioning groove formed in the sliding block and a second positioning groove formed in the supporting plate in sequence and is movably connected with the sliding block and the supporting plate, and a connecting plate is fixedly connected to the top of the inserted bar.
Preferably, the number of the inserted bars is two, and the two inserted bars are symmetrically distributed on two sides of the bottom of the connecting plate.
Preferably, the top of the connecting plate is fixedly connected with a pull ring, and the outer surface of the pull ring is fixedly connected with a rubber sleeve.
Preferably, the bottom fixedly connected with second magnet of connecting plate, the bottom and the first magnet laminating of second magnet, first magnet fixed connection is at the top of slider, the magnetic pole of first magnet and second magnet opposite face is opposite.
By means of the technical scheme, the utility model provides template hoisting equipment for building engineering construction. The method at least has the following beneficial effects:
(1) this template handling equipment for building engineering construction, inside the hole of seting up in the building templates side through removing the slider messenger and inserting the post, carry out stable support and centre gripping to the building templates, fix a position the position of inserting the post through positioning mechanism, stability when having increased the hoist and mount template.
(2) This template handling equipment for building engineering construction, through the grafting location of inserted bar to slider and backup pad, increased the stability of inserting the post, prevent to insert the post at the in-process of transferring and transporting and remove and lead to the template to drop, prevent the separation of inserted bar and slider through first magnet and second magnet.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this application:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of portion A in FIG. 1 according to the present invention.
In the figure: 1 supporting plate, 2 sliding blocks, 3 fixing plates, 4 inserting columns, 5 positioning mechanisms, 501 inserting rods, 502 first positioning grooves, 503 second positioning grooves, 504 connecting plates, 505 pulling rings, 506 rubber sleeves, 507 first magnets, 508 second magnets, 6 bow shackles and 7 pulling ropes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-2, the present invention provides a technical solution:
the utility model provides a template handling equipment for building engineering construction, includes backup pad 1, the tip of backup pad 1 run through the notch that 2 sides of slider seted up and with 2 swing joint of slider, the bottom fixedly connected with fixed plate 3 of slider 2, the side fixedly connected with of fixed plate 3 inserts post 4, is connected with positioning mechanism 5 on the slider 2, the top of backup pad 1 is connected with stay cord 7 through bow-shaped breaking out.
Insert the post 4 through moving inside the slider 2 messenger and peg graft the hole that the building templates side was seted up, carry out stable support and centre gripping to the building templates, fix a position the position of inserting post 4 through positioning mechanism 5, stability when having increased hoist and mount template.
The number of the positioning mechanisms 5 is two, and the two positioning mechanisms 5 are symmetrically distributed on two sides of the top of the supporting plate 1.
The positioning mechanism 5 comprises an insertion rod 501, a first positioning groove 502, a second positioning groove 503 and a connecting plate 504;
the bottom of the inserted link 501 penetrates through a first positioning groove 502 formed in the slider 2 and a second positioning groove 503 formed in the support plate 1 in sequence and is movably connected with the slider 2 and the support plate 1, and a connecting plate 504 is fixedly connected to the top of the inserted link 501.
Through the grafting location of inserted bar 501 to slider 2 and backup pad 1, increased the stability of inserting post 4, prevent to insert the removal of post 4 and lead to the template to drop in the in-process of transferring.
The number of the insert rods 501 is two, and the two insert rods 501 are symmetrically distributed on two sides of the bottom of the connecting plate 504.
A pull ring 505 is fixedly connected to the top of the connecting plate 504, and a rubber sleeve 506 is fixedly connected to the outer surface of the pull ring 505.
The bottom fixedly connected with second magnet 508 of connecting plate 504, the bottom and the first magnet 507 laminating of second magnet 508, first magnet 507 fixed connection is at the top of slider 2, and the magnetic pole of the first magnet 507 and the opposite face of second magnet 508 is opposite.
The separation of the plunger 501 from the slider 2 is prevented by the first magnet 507 and the second magnet 508.
When the template hoisting equipment is used, the inserting columns 4 are inserted into holes formed in the side faces of the building templates through the movable sliding blocks 2, the building templates are stably supported and clamped, the positions of the inserting columns 4 are positioned through the positioning mechanisms 5, and the stability of the hoisting templates is improved.
Through the grafting location of inserted bar 501 to slider 2 and backup pad 1, increased the stability of inserting post 4, prevent to insert the removal of post 4 and lead to the template to drop in the in-process of transferring, prevent the separation of inserted bar 501 and slider 2 through first magnet 507 and second magnet 508.
The template hoisting equipment for building engineering construction provided by the utility model is described in detail above. The principles and embodiments of the present invention have been explained by applying specific examples, and the above descriptions of the embodiments are only used to help understanding the method and the core idea of the present invention. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a template handling equipment for building engineering construction, includes backup pad (1), its characterized in that: the end of the supporting plate (1) penetrates through a notch formed in the side face of the sliding block (2) and is movably connected with the sliding block (2), the bottom of the sliding block (2) is fixedly connected with a fixing plate (3), the side face of the fixing plate (3) is fixedly connected with an inserting column (4), the sliding block (2) is connected with a positioning mechanism (5), and the top of the supporting plate (1) is connected with a pull rope (7) through an arched shackle.
2. The template hoisting equipment for the construction of the constructional engineering according to claim 1, which is characterized in that: the number of the positioning mechanisms (5) is two, and the two positioning mechanisms (5) are symmetrically distributed on two sides of the top of the supporting plate (1).
3. The template hoisting equipment for the construction of the constructional engineering according to claim 1, which is characterized in that: the positioning mechanism (5) comprises an inserted rod (501), a first positioning groove (502), a second positioning groove (503) and a connecting plate (504);
the bottom of the inserted bar (501) penetrates through a first positioning groove (502) formed in the sliding block (2) and a second positioning groove (503) formed in the supporting plate (1) in sequence and is movably connected with the sliding block (2) and the supporting plate (1), and a connecting plate (504) is fixedly connected to the top of the inserted bar (501).
4. The template hoisting equipment for the construction of the constructional engineering as claimed in claim 3, which is characterized in that: the number of the insert rods (501) is two, and the two insert rods (501) are symmetrically distributed on two sides of the bottom of the connecting plate (504).
5. The template hoisting equipment for the construction of the constructional engineering as claimed in claim 3, which is characterized in that: the top of the connecting plate (504) is fixedly connected with a pull ring (505), and the outer surface of the pull ring (505) is fixedly connected with a rubber sleeve (506).
6. The template hoisting equipment for constructional engineering construction as claimed in claim 3, wherein: the bottom fixedly connected with second magnet (508) of connecting plate (504), the bottom and the first magnet (507) laminating of second magnet (508), first magnet (507) fixed connection is at the top of slider (2), the magnetic pole of first magnet (507) and second magnet (508) opposite face is opposite.
CN202123432434.3U 2021-12-30 2021-12-30 Template hoisting equipment for constructional engineering construction Expired - Fee Related CN216737158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123432434.3U CN216737158U (en) 2021-12-30 2021-12-30 Template hoisting equipment for constructional engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123432434.3U CN216737158U (en) 2021-12-30 2021-12-30 Template hoisting equipment for constructional engineering construction

Publications (1)

Publication Number Publication Date
CN216737158U true CN216737158U (en) 2022-06-14

Family

ID=81911257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123432434.3U Expired - Fee Related CN216737158U (en) 2021-12-30 2021-12-30 Template hoisting equipment for constructional engineering construction

Country Status (1)

Country Link
CN (1) CN216737158U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115432052A (en) * 2022-11-08 2022-12-06 安徽森科新材料有限公司 Production method of gypsum hollow building block and material loading and conveying equipment thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115432052A (en) * 2022-11-08 2022-12-06 安徽森科新材料有限公司 Production method of gypsum hollow building block and material loading and conveying equipment thereof
CN115432052B (en) * 2022-11-08 2023-02-28 安徽森科新材料有限公司 Production method of gypsum hollow building block and material loading and conveying equipment thereof

Similar Documents

Publication Publication Date Title
CN216737158U (en) Template hoisting equipment for constructional engineering construction
CN216190395U (en) Hoisting device for telegraph pole production
CN2912031Y (en) Live replacing device for strain 4-string insulator string
CN210450849U (en) Automatic adjusting balance mechanism of large manual core setting clamp
CN218619838U (en) Steel pipe truss hoist and mount auxiliary device
CN201010426Y (en) Special suspending device for T-type platform suspending construction
CN213059832U (en) Lifting appliance for hoisting bridge prefabricated bent cap
CN210430745U (en) Release device of concrete interlocking block soft mattress
CN211034868U (en) Steel reinforcement cage hoist device
CN108996383B (en) Hoisting device for steel reinforcement cage hanging bars of deep-buried underground diaphragm wall and construction method thereof
CN114655826B (en) Concrete construction device for hydraulic engineering
CN215626156U (en) Lifting device for safety valve
CN220376085U (en) Sectional hoisting structure for cross arm of current collection line tower
CN214989686U (en) Reinforcing bar bundle stone tongs
CN218809873U (en) Fused brick sand mould hoist device
CN217996499U (en) Middle support assembly of bridge girder erection machine
CN220056026U (en) Telegraph pole production hoisting mechanism
CN212292519U (en) Circular material hoisting device
CN209958225U (en) Plate girder bridge hoist and mount locating component
CN214879601U (en) Chain block jacking device
CN220976318U (en) Lifting support for cement precast slabs
CN111039139B (en) Simple 450-ton hanging row
CN217583328U (en) Flange type three-valve-group hoisting structure
CN217352424U (en) Be used for settling pole device of dark heavy steel reinforcement cage of ann's empty stake
CN213958301U (en) Electromagnetic automatic positioning and fixing device for light lifting beam of practical training high-speed rail bridge girder erection machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220614

CF01 Termination of patent right due to non-payment of annual fee