CN216706564U CN202123384345.6U CN202123384345U CN216706564U CN 216706564 U CN216706564 U CN 216706564U CN 202123384345 U CN202123384345 U CN 202123384345U CN 216706564 U CN216706564 U CN 216706564U
Authority
CN
China
Prior art keywords
mounting
anchor
installation
hoisting
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123384345.6U
Other languages
Chinese (zh)
Inventor
张龙
纪江
夏莲
陈小健
娄和新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Nuclear Engineering Co Ltd
Original Assignee
PowerChina Nuclear Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Nuclear Engineering Co Ltd filed Critical PowerChina Nuclear Engineering Co Ltd
Priority to CN202123384345.6U priority Critical patent/CN216706564U/en
Application granted granted Critical
Publication of CN216706564U publication Critical patent/CN216706564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an anchor bolt mounting tool, which relates to the technical field of anchor bolt mounting and comprises a mounting main body, a fixing structure and a hoisting structure; the surface of the mounting main body is provided with a plurality of mounting holes for mounting anchor bolts, and the fixing structure is detachably connected with the anchor bolts in the mounting holes so as to fixedly mount one anchor bolt in each mounting hole; the hoisting structure is connected with the mounting main body; through utilizing installation main part and fixed knot to construct, can once only install a plurality of crab-bolts earlier in the mounting hole of installation main part, utilize crane and hoisting structure to be connected the back, with whole back of lifting, until once only descending a plurality of crab-bolts behind the anchor plate, separate fixed knot structure and crab-bolt, accomplish the operation of once hoisting many crab-bolts installation, through designing an installation appurtenance to anchor bolt formula fan basis, the installation effectiveness of crab-bolt has been improved, the installation time has been practiced thrift, it is big to have alleviated the single installation degree of difficulty of crab-bolt that exists among the prior art, the technical problem of inefficiency.

Description

Anchor bolt mounting tool
Technical Field
The utility model relates to the technical field of anchor bolt installation, in particular to an anchor bolt installation tool.
Background
Fan basis among the prior art includes basic annular form and crab-bolt form, includes crab-bolt and anchor disc to anchor bolt formula fan basis, is about to the crab-bolt and installs at the anchor disc and form fan basis.
Among the prior art, in the installation to anchor bolt formula fan basis, the installation adopts the crane to install single anchor bolt on the anchor plate one by one, however, because the crab-bolt installation belongs to high altitude construction, need the manual work to control the crab-bolt and counterpoint the installation on the anchor plate after the crane hoists the crab-bolt, and about 200 jin of single stock, installer is little at anchor plate working face operating space, therefore the artifical single installation degree of difficulty is great, need install many crab-bolts on the anchor plate simultaneously, single installation effectiveness one by one is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an anchor bolt mounting tool to solve the technical problems that in the prior art, a single anchor bolt is difficult to mount and low in efficiency.
The utility model provides an anchor bolt installation tool, which comprises: the method comprises the following steps of (1) installing a main body, a fixing structure and a hoisting structure;
the surface of the mounting main body is provided with a plurality of mounting holes for mounting the anchor bolts, and the fixing structure is detachably connected with the anchor bolts in the mounting holes, so that one anchor bolt is fixedly mounted in each mounting hole;
the hoisting structure is connected with the installation main body and used for being connected with an external crane.
In a preferred embodiment of the present invention, the mounting holes are uniformly arranged along the surface of the mounting body, and the pitch and size of the plurality of mounting holes are the same as the pitch and size of the holes of the anchor disk for mounting the anchor bolt.
In a preferred embodiment of the utility model, the mounting body comprises a mounting plate.
In a preferred embodiment of the present invention, the hoisting structure is located at a central position of the mounting body, and the hoisting structure is fixedly connected with a surface of the mounting body.
In a preferred embodiment of the present invention, the hoisting structure comprises a hoisting ring;
the hoisting ring is located one side of mounting panel, just the hoisting ring with the fixed surface of mounting panel is connected, the hoisting ring is kept away from the one end of mounting panel is used for being connected with outside crane, just the hoisting point of hoisting ring is located the central point of installation main part puts.
In a preferred embodiment of the present invention, the fixing structure comprises a fixing nut;
fixing nut with the one end threaded connection of crab-bolt, fixing nut be used for with the crab-bolt card is located installation subject's on the surface.
In the preferred embodiment of the utility model, the device further comprises a buffer structure;
buffer structure is located the installation main part corresponds the position of mounting hole, buffer structure with the installation main part is connected, just buffer structure is provided with the buffering passageway, the crab-bolt is used for running through in proper order the buffering passageway with the mounting hole, just fixed knot construct with the buffer structure butt.
In a preferred embodiment of the present invention, the buffer structure comprises an elastic ring;
the elastic ring and the mounting hole are arranged concentrically, one side of the elastic ring is fixedly connected with the surface of the mounting main body, and the other side of the elastic ring is used for being abutted against the fixing structure.
In the preferred embodiment of the utility model, the device also comprises a handle; the handle is fixedly connected with the mounting main body.
In a preferred embodiment of the utility model, the diameter of the mounting hole is greater than the diameter of the anchor bolt and the diameter of the mounting hole is less than the diameter of the fixation structure so that the anchor bolt has a deflection clearance within the mounting hole.
The utility model provides an anchor bolt installation tool, which comprises: installing a main body, a fixing structure and a hoisting structure; the surface of the mounting main body is provided with a plurality of mounting holes for mounting anchor bolts, and the fixing structure is detachably connected with the anchor bolts in the mounting holes so as to fixedly mount one anchor bolt in each mounting hole; the hoisting structure is connected with the mounting main body; through utilizing installation main part and fixed knot to construct, can once only install a plurality of crab-bolts earlier in the mounting hole of installation main part, utilize crane and hoisting structure to be connected the back, with whole back of lifting, until once only descending a plurality of crab-bolts behind the anchor plate, separate fixed knot structure and crab-bolt, accomplish the operation of once hoisting many crab-bolts installation, through designing an installation appurtenance to anchor bolt formula fan basis, the installation effectiveness of crab-bolt has been improved, the installation time has been practiced thrift, it is big to have alleviated the single installation degree of difficulty of crab-bolt that exists among the prior art, the technical problem of inefficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic view of the overall construction of an anchor bolt installation tool according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a mounting hole of the anchor bolt mounting tool for the annular anchor disk according to the embodiment of the utility model.
Icon: 100-a mounting body; 101-mounting holes; 200-hoisting structure; 300-handle.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings or orientations or positional relationships that the products of the present invention are conventionally placed in use, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element to which the description refers must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not to be construed as indicating or implying relative importance.
Furthermore, the terms "horizontal", "vertical", "overhang" and the like do not imply that the components are required to be absolutely horizontal or overhang, but may be slightly inclined. For example, "horizontal" merely means that the direction is more horizontal than "vertical" and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in a specific case to those of ordinary skill in the art.
Some embodiments of the utility model are described in detail below with reference to the accompanying drawings. The embodiments described below and the features of the embodiments can be combined with each other without conflict.
As shown in fig. 1-2, the present embodiment provides an anchor bolt installation tool, which includes: the installation body 100, the fixing structure and the hoisting structure 200; the surface of the mounting main body 100 is provided with a plurality of mounting holes 101 for mounting anchor bolts, and the fixing structure is detachably connected with the anchor bolts in the mounting holes 101, so that one anchor bolt is fixedly mounted in each mounting hole 101; the hoisting structure 200 is connected with the installation body 100, and the hoisting structure 200 is used for being connected with an external crane.
It should be noted that, the anchor bolt installation tool provided in this embodiment is used as an auxiliary tool for installing the anchor bolt type fan foundation, specifically, a plurality of anchor bolt holes are arranged at intervals along the surface of the anchor plate, when the anchor bolt is to be installed on the anchor plate, the anchor bolt is first inserted into the installation hole 101 in the horizontal direction, at this time, the fixing structure is connected to the end of the anchor bolt, after the anchor bolt is connected to the hoisting structure 200 by a crane, the plurality of anchor bolts are driven to be hoisted by the installation main body 100, so that the bottom of the anchor bolt exceeds the upper anchor plate, the crane is adjusted, then the anchor bolt holes of the anchor plate are manually aligned, the hook slowly descends until the anchor bolt is placed into the lower anchor bolt hole, the fixing structure is loosened, and the installation main body 100 is hoisted out. Optionally, in actual operation, two sets of anchor bolt installation tools can be prepared, namely, when one set of anchor bolt installation tools is hoisted, the other set of anchor bolt installation tools synchronously install anchor bolts, and the anchor bolt installation tools are alternately hoisted and installed, so that the anchor bolt installation efficiency is improved.
The present embodiment provides an anchor bolt installation tool, including: the installation body 100, the fixing structure and the hoisting structure 200; the surface of the mounting main body 100 is provided with a plurality of mounting holes 101 for mounting anchor bolts, and the fixing structure is detachably connected with the anchor bolts in the mounting holes 101, so that one anchor bolt is fixedly mounted in each mounting hole 101; the hoisting structure 200 is connected with the installation body 100; through utilizing installation main part 100 and fixed knot to construct, can once only install a plurality of crab-bolts in installation main part 100's mounting hole 101 earlier, utilize the crane to be connected the back with hoisting structure 200, with whole back of lifting, until once only descending a plurality of crab-bolts behind the anchor dish, separate fixed knot structure and crab-bolt, accomplish the operation of once hoisting many crab-bolts installation, through designing an installation appurtenance to anchor bolt formula fan basis, the installation effectiveness of crab-bolt has been improved, the installation time has been practiced thrift, it is big to have alleviated the single installation degree of difficulty of the crab-bolt that exists among the prior art, the technical problem of inefficiency.
In the preferred embodiment of the present invention, the mounting holes 101 are uniformly arranged along the surface of the mounting body 100, and the pitch and size of the plurality of mounting holes 101 are the same as the hole pitch and size of the anchor plate to which the anchor bolt is mounted.
In a preferred embodiment of the present invention, the mounting body 100 includes a mounting plate; optionally, the mounting plate may be a metal plate, and preferably, the mounting plate may be a steel plate, where the bearing capacity of the steel plate needs to meet the strength of hoisting the multiple anchor bolts, that is, the thickness of the steel plate is ensured; for example, when the number of the mounting holes 101 is 8, the thickness of the steel plate is at least 10mm and more.
In this embodiment, can choose the mounting panel of different shapes for use to the anchor disc of different shapes, set up the mounting hole 101 of same hole interval and size to the mounting panel according to the hole interval and the size of the anchor bolt hole on the anchor disc promptly, guaranteed when hoisting a plurality of crab-bolts through the mounting panel for a plurality of crab-bolts can just correspond the anchor bolt hole on the anchor disc and peg graft the installation.
In the preferred embodiment of the present invention, the hoisting structure 200 is located at the center of the installation body 100, and the hoisting structure 200 is fixedly connected to the surface of the installation body 100.
In the preferred embodiment of the present invention, the hoisting structure 200 comprises a hoisting ring; the hoisting ring is located on one side of the mounting plate and fixedly connected with the surface of the mounting plate, one end of the hoisting ring, which is far away from the mounting plate, is used for being connected with an external crane, and the hoisting point of the hoisting ring is located at the center of the mounting body 100.
Optionally, the connection mode of the hoisting ring and the mounting plate may be welding, threaded connection, riveting or the like, and preferably, the connection mode of the hoisting ring and the mounting plate is welding; after the hoisting ring is welded at the central position of the installation main body 100, namely, in the process of hoisting by connecting the crane and the hoisting ring, the acting force of the crane is just positioned at the central position of the installation main body 100, so that the stability in the hoisting process is ensured.
In a preferred embodiment of the utility model, the fixing structure comprises a fixing nut; a fixing nut is threadedly coupled to one end of the anchor bolt, and the fixing nut is used to clamp the anchor bolt to the surface of the mounting body 100.
In this embodiment, because the tip of crab-bolt has the screw thread section, after the tip threaded connection through utilizing fixation nut and crab-bolt, the surface laminating of fixation nut and mounting panel this moment is fixed to the surface that fixation nut and crab-bolt are connected is for having hoisting structure 200's surface, when the crane passes through hoisting structure 200 and exerts the effort to installation subject 100, the crab-bolt can make fixation nut and installation subject 100 closely laminate under the action of gravity this moment, thereby can utilize fixation nut and mounting panel to carry out interim installation and transportation with a plurality of bolts.
In a preferred embodiment of the present invention, the present invention further comprises a buffer structure; buffer structure is located the position that installation main part 100 corresponds mounting hole 101, and buffer structure is connected with installation main part 100, and buffer structure is provided with buffering passageway, and the crab-bolt is used for running through buffering passageway and mounting hole 101 in proper order, and fixed knot constructs and buffer structure butt.
In a preferred embodiment of the present invention, the buffer structure comprises an elastic ring; the elastic ring is concentrically arranged with the mounting hole 101, and one side of the elastic ring is fixedly connected with the surface of the mounting body 100, and the other side of the elastic ring is used for abutting against the fixed structure.
Optionally, the elastic ring may be a rubber buffer ring, that is, the rubber buffer ring is arranged at the position of each mounting hole 101, when the anchor bolt penetrates through the mounting hole 101, the buffer channel may also penetrate through the rubber buffer ring, at this time, after the anchor bolt is connected with the fixing nut, in the process of hoisting by the crane, the fixing nut may gradually contact the rubber buffer ring, and the buffer structure may be utilized to enable a buffer margin to be provided between the fixing structure and the mounting main body 100, that is, the rigid contact between the fixing structure and the surface of the mounting main body 100 is avoided, thereby improving the service life of the fixing structure and the mounting main body 100.
In the preferred embodiment of the present invention, a handle 300 is further included; the handle 300 is fixedly coupled to the mounting body 100.
In this embodiment, the handle 300 is connected to the side plate of the mounting plate, that is, after the mounting plate is vertically arranged by the handle 300, the anchor bolt horizontally arranged is inserted into the mounting hole 101, so that the fixing nut is connected to the anchor bolt; alternatively, the handle 300 may be connected to the mounting body 100 by welding.
In the preferred embodiment of the utility model, the diameter of the mounting hole 101 is greater than the diameter of the anchor bolt, and the diameter of the mounting hole 101 is less than the diameter of the fixation structure, so that the anchor bolt has a deflection clearance within the mounting hole 101.
In this embodiment, utilize fixation nut to articulate the crab-bolt on the mounting panel, wherein, the hourglass silk interval of the fixed back inside and outside nut of crab-bolt is inconsistent, namely makes the crab-bolt can have the clearance of deflecting in mounting hole 101 to can be favorable to aiming at the anchor bolt hole of anchor plate more.
It should be noted that, in the actual operation process, the anchor bolt installation tool provided by this embodiment is applied to the W58 machine position foundation anchor bolt installation engineering for the first time, and the installation of one time by 7 people is completed by one day instead of two and a half days by 3 people, so that the work efficiency is greatly improved.
And (3) economic analysis: labor cost saving: the daily wages of the anchor bolt installation personnel on site are about 350 yuan/day; if a single manual installation method is adopted, the cost required for completing the installation of the foundation anchor bolt of the single fan is as follows: 7 people 350 yuan/day 2.5 days 6125 yuan; this project fan basis counts 30 totally, and the total required cost of labor is about: 6125 × 30 ═ 183750 yuan. After using the crab-bolt mounting tool that this embodiment provided, the required expense of single fan basis crab-bolt installation is: 3 people 350 yuan/day 1 yuan; the total labor cost required by the installation of the 30 fan foundation anchor bolts is about: 1050 × 30 ═ 31500 members; saving labor cost and adding: 183750-. The mechanical cost is saved: local 25t automobile crane lease fees are as follows: 2000 yuan/day; if a single manual installation method is adopted, the cost required for completing the installation of the single fan foundation anchor bolt is 2000 x 2.5 to 5000 yuan, and the mechanical cost required for installing 30 fan foundation anchor bolts is as follows: 5000 x 30-150000 yuan. After the anchor bolt installation tool provided by the embodiment is used, the cost required for installing the foundation anchor bolts of 30 fans is as follows: 2000 × 1 × 30 ═ 60000 yuan. The sum of the saved mechanical cost is as follows: 150000-. The total cost is saved as follows: saving labor cost and mechanical cost: 152250+90000 ═ 242250 elements.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the utility model has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1. An anchor bolt installation tool, comprising: installing a main body, a fixing structure and a hoisting structure;
the surface of the mounting main body is provided with a plurality of mounting holes for mounting the anchor bolts, and the fixing structure is detachably connected with the anchor bolts in the mounting holes, so that one anchor bolt is fixedly mounted in each mounting hole;
the hoisting structure is connected with the installation main body and used for being connected with an external crane.
2. The anchor-mounting tool of claim 1, wherein the mounting holes are uniformly arranged along the surface of the mounting body, and the spacing and size of the plurality of mounting holes is the same as the hole spacing and size of the anchor pan to which the anchor is mounted.
3. The anchor-mounting tool of claim 2, wherein the mounting body includes a mounting plate.
4. The anchor bolt installation tool of claim 3, wherein the hoisting structure is located at a central position of the installation body, and the hoisting structure is fixedly connected with a surface of the installation body.
5. The anchor bolt installation tool of claim 4, wherein the hoisting structure comprises a hoisting ring;
the hoisting ring is located one side of mounting panel, just the hoisting ring with the fixed surface of mounting panel is connected, the hoisting ring is kept away from the one end of mounting panel is used for being connected with outside crane, just the hoisting point of hoisting ring is located the central point of installation main part puts.
6. The anchor-mounting tool of claim 1, wherein the securing structure includes a securing nut;
fixing nut with the one end threaded connection of crab-bolt, fixing nut be used for with the crab-bolt card is located installation subject's on the surface.
7. The anchor installation tool of claim 6, further comprising a buffer structure;
buffer structure is located the installation main part corresponds the position of mounting hole, buffer structure with the installation main part is connected, just buffer structure is provided with the buffering passageway, the crab-bolt is used for running through in proper order the buffering passageway with the mounting hole, just fixed knot construct with the buffer structure butt.
8. The anchor-mounting tool of claim 7, wherein the relief structure includes a resilient ring;
the elastic ring and the mounting hole are arranged concentrically, one side of the elastic ring is fixedly connected with the surface of the mounting main body, and the other side of the elastic ring is used for being abutted against the fixing structure.
9. The anchor installation tool as set forth in any one of claims 1-8, further including a handle; the handle is fixedly connected with the mounting main body.
10. The anchor-mounting tool as set forth in any one of claims 1-8, wherein the diameter of the mounting hole is greater than the diameter of the anchor, and the diameter of the mounting hole is less than the diameter of the fixation structure, such that the anchor has a deflection clearance within the mounting hole.
CN202123384345.6U 2021-12-29 2021-12-29 Anchor bolt mounting tool Active CN216706564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123384345.6U CN216706564U (en) 2021-12-29 2021-12-29 Anchor bolt mounting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123384345.6U CN216706564U (en) 2021-12-29 2021-12-29 Anchor bolt mounting tool

Publications (1)

Publication Number Publication Date
CN216706564U true CN216706564U (en) 2022-06-10

Family

ID=81889356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123384345.6U Active CN216706564U (en) 2021-12-29 2021-12-29 Anchor bolt mounting tool

Country Status (1)

Country Link
CN (1) CN216706564U (en)

Similar Documents

Publication Publication Date Title
CN216706564U (en) Anchor bolt mounting tool
CN111661746A (en) Lifting appliance
CN217106069U (en) Machine-room-less passenger elevator maintenance platform
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN218434545U (en) Wallboard lifting device for storage tank maintenance
CN218058086U (en) A hoist device for prefabricating air conditioner plate
CN220644869U (en) Spandrel girder structure
CN212962832U (en) Connecting assembly of guide chute of sintering machine
CN218579423U (en) Hoist device of prefabricated wallboard component processing usefulness
CN218177677U (en) Novel cantilever outer frame complete set anchoring bolt equipment
CN217325378U (en) Support is transferred to large-tonnage pile foundation steel reinforcement cage under assembled precipitous environment
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN210507791U (en) High strength steel frame construction
CN210797880U (en) Assembly type building structure system and foundation connecting device thereof
CN214828321U (en) Steel constructs group roof beam convenient to hoist and mount
CN214989670U (en) Prefabricated panel hoist
CN217516497U (en) Punching jack rigging for hoisting
CN219973865U (en) Auxiliary attachment device for construction lifter at unfavorable position
CN216948747U (en) Prefabricated steel structure convenient to installation is fixed
CN219684497U (en) Assembly fixture for energy storage converter
CN217921091U (en) Simple cantilever lifting device
CN213297278U (en) Building fixed connection device capable of positioning
CN219909915U (en) Tower crane even wall spare structure
CN210798336U (en) Vertical height adjusting structure for mounting prefabricated part
CN215315306U (en) Automatic material taking device for punching machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant