CN216690403U - Assembled pump line supporting structure - Google Patents

Assembled pump line supporting structure Download PDF

Info

Publication number
CN216690403U
CN216690403U CN202123031903.0U CN202123031903U CN216690403U CN 216690403 U CN216690403 U CN 216690403U CN 202123031903 U CN202123031903 U CN 202123031903U CN 216690403 U CN216690403 U CN 216690403U
Authority
CN
China
Prior art keywords
standard
pump pipe
standard knot
mounting
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123031903.0U
Other languages
Chinese (zh)
Inventor
江继东
刘飞
刘新宇
刘伟汉
陈一栋
亓琪
雷晓饶
赵帅
邱庆
吴滂轩
罗昭平
武威
把海亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huayu Science And Industry Group Co ltd
Original Assignee
Shenzhen Huahe Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huahe Construction Group Co ltd filed Critical Shenzhen Huahe Construction Group Co ltd
Priority to CN202123031903.0U priority Critical patent/CN216690403U/en
Application granted granted Critical
Publication of CN216690403U publication Critical patent/CN216690403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an assembled pump pipe support structure which comprises a fixed pier arranged at the bottom and a plurality of connected standard sections, wherein the standard sections are arranged along the outer side of a structure body on the basis of the fixed pier, an installation part and a fixing part are arranged in each standard section, the installation part and the fixing part form an enclosing structure, a pump pipe is arranged in the enclosing structure, and the pump pipe penetrates through the fixed pier and is arranged on the outer side of the structure body along the standard sections. The pump pipe mounting structure is formed by using the standard knot, so that the pump pipe mounting structure is assembled, the construction process is standardized and normalized, the production and manufacturing of the standard knot can be completed by oneself or can be directly purchased, the mounting is convenient, the construction efficiency is improved, meanwhile, the pump pipe mounted by the support structure is attached to the outer side of the structure body, the pump pipe can be cleaned and dredged quickly without influencing other construction areas, and the support structure arranged on the outer side of the structure body can be provided with the ladder stand and the protective structure, so that the safety of construction personnel is ensured.

Description

Assembled pump line supporting structure
Technical Field
The utility model relates to the technical field of engineering construction, in particular to an assembled pump pipe support structure.
Background
The assembly type building is a building production mode of prefabricating and producing components in a factory and assembling and installing components on site, the process has the characteristics of design standardization, mass production, construction standardization and the like, the processes of research and development design, production manufacturing, site assembly and the like can be integrated together, integration and information management are realized, the advantages of energy conservation, environmental protection, value maximization and the like of building products can be realized, and the assembly type building/construction becomes a trend technology of building engineering. Concrete pump pipe fixed knot among the prior art constructs not only to set up the process step loaded down with trivial details, and the material can not reuse, and when carrying out alternate construction, concrete placement can cause the influence to the fitment construction below, can seriously cause the secondary to destruction below construction point.
The above disadvantages need to be improved.
Disclosure of Invention
In order to overcome the defects of the prior art, the utility model provides an assembled pump pipe support structure.
The technical scheme of the utility model is as follows:
the utility model provides an assembled pump line supporting structure, is including setting up the anchor block in the bottom and a plurality of standard festival of being connected, the standard festival with the anchor block sets up along the structure outside on the basis, every set up installed part and mounting in the standard festival, the installed part with the mounting forms the surrounding structure, the built-in pump line of surrounding structure, the pump line passes the anchor block and along the standard festival sets up the structure outside, the perforation is preset to the wall body of structure, the pump line certainly the perforation gets into inside the structure.
The standard section is provided with a plurality of upper reserved bolt holes and lower reserved bolt holes respectively, and the lower reserved bolt holes of the upper reserved bolt holes of the next section of the standard section and the lower reserved bolt holes of the previous section of the standard section are aligned, so that the two adjacent sections of the standard section are fixedly connected through the high-strength bolts.
Furthermore, all apex angles of standard festival all weld the solid fixed cylinder, the inside of solid fixed cylinder sets up the internal connection screw thread and with the bolted connection that excels in.
Foretell assembled pump line supporting structure, the standard festival is the frame structure of cuboid, the side of standard festival all sets up diagonal brace spare, the both ends of diagonal brace spare set up respectively the both sides of standard festival side, the both ends of diagonal brace spare with be provided with certain distance between the base of standard festival, the topside.
The assembled pump pipe support structure is characterized in that the standard knot is close to one side of the wall body of the structure body, a connecting steel piece is arranged, one end of the connecting steel piece is fixedly connected with the standard knot through a high-strength bolt, and the other end of the connecting steel piece is fixedly connected with the wall body of the structure body through a high-strength bolt.
Furthermore, the connecting steel piece is angle steel or channel steel.
Foretell assembled pump line supporting structure, the mounting is the member, the both ends of mounting with the both sides face welding of standard festival, the installed part both ends with the mounting is parallel and passes through bolted connection, the middle part of installed part be the semicircle ring-shaped and with the pump line welding.
Furthermore, both ends of installed part with the both ends of mounting all set up the through-hole, the bolt passes the through-hole is connected the installed part with the mounting, the bolt with set up the spring leaf between the mounting.
Further, the contact surface of the mounting piece and the pump pipe is provided with a rubber strip.
The assembled pump pipe support structure is characterized in that the steel crawling ladder and the protection structure are arranged outside the standard section, and the standard section is connected with the steel crawling ladder and the protection structure through bolts.
The assembly type pump pipe support structure is characterized in that the fixed pier is a concrete block, and the pump pipe penetrates into the side face of the fixed pier and penetrates out of the top of the fixed pier.
According to the scheme, the pump pipe mounting structure is formed by the standard sections, so that the pump pipe mounting structure is assembled, the construction process is standardized and normalized, the standard sections can be manufactured and manufactured automatically or purchased directly, the mounting is convenient, the construction efficiency is improved, meanwhile, the pump pipes mounted by the support structure are attached to the outer side of the structure body, the pump pipes can be cleaned and dredged quickly without influencing other construction areas, and the support structure arranged on the outer side of the structure body can be provided with the ladder stand and the protection structure, so that the safety of construction personnel is guaranteed.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed for the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a schematic view of an installation structure between a standard knot and a wall body on the outer side of a structure body.
Fig. 2 is a partially enlarged view of fig. 1.
Fig. 3 is a schematic structural diagram of a standard knot.
Wherein, in the figures, the respective reference numerals:
1. a standard section; 11. a diagonal stay member; 12. a fixed cylinder; 13. reserving bolt holes; 14. a mounting member; 15. a fixing member; 16. erecting a rod; 17. a cross bar; 18. a rubber strip; 19. a spring plate;
2. connecting steel pieces; 3. a structure body; 4. a high-strength bolt; 5. and a wall connecting piece.
Detailed Description
In order to make the technical problems, technical solutions and advantageous effects to be solved by the present invention more clearly apparent, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
It will be understood that when an element is referred to as being "fixed" or "disposed" or "connected" to another element, it can be directly or indirectly located on the other element. The terms "upper", "lower", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positions based on the orientation or position shown in the drawings, and are for convenience of description only and should not be construed as limiting the technical solution. "Multi" means two or more unless specifically limited otherwise. The meaning of "a number" is one or more unless specifically limited otherwise.
The utility model provides an assembled pump line supporting structure, as shown in fig. 1, fig. 2, including setting up the anchor block and the standard festival 1 of a plurality of connections in the bottom, standard festival 1 uses the anchor block to set up along the structure 3 outside as the basis, set up installed part 14 and mounting 15 in every standard festival 1, installed part 14 forms the surrounding structure with mounting 15, the built-in pump line of surrounding structure, the pump line passes the anchor block and sets up in the structure 3 outside along standard festival 1, the perforation is predetermine to the wall body of structure 3, the pump line gets into inside the structure 3 from the perforation.
According to the utility model, the standard knot 1 is arranged on the outer side of the structure body 3 and used as a mounting bracket of the pump pipe, bottom fixing is carried out through the fixed pier, and the standard knot 1 is stacked, assembled and mounted, so that the mounting structure of the pump pipe is converted into assembly type construction, the whole construction process is standardized and standardized, and the standard knot 1 can also be produced in batches and automatically in batches or purchased from the outside. Simultaneously, set up the support of pump line in the 3 outsides of structure, the perforation is predetermine to the wall of structure 3, makes the pump line penetrate concreting, and this construction mode can effectively reduce the influence of concrete placement to below construction point, avoids causing the secondary to destroy to below fitment construction. In addition, if concrete placement in-process meets pipeline problems such as stifled pipe, because the pump line sets up in the 3 outsides of structure, can clear up, dredge alone the pump, cooperation cat ladder and protection can also avoid causing the influence to the below construction point when guaranteeing personnel's safety.
In a specific embodiment, as shown in fig. 3, the standard knot 1 is a rectangular frame structure, and includes a vertical rod 16 and a cross rod 17 made of square tube, the side surfaces of the vertical rod and the cross rod are both provided with diagonal support members 11, two ends of each diagonal support member 11 are respectively disposed at two sides of the side surface of the standard knot 1, a certain distance is provided between two ends of each diagonal support member 11 and the bottom edge and the top edge of the standard knot 1, and all the diagonal support members 11 are inclined toward the same direction.
All welding a fixed section of thick bamboo 12 in each apex angle department of standard festival 1, the inside of a fixed section of thick bamboo 12 sets up reserved bolt hole 13, forms promptly and reserves bolt hole and lower reserved bolt hole on, standard festival 1 is provided with on a plurality of respectively reserves bolt hole and lower reserved bolt hole. When the standard knot 1 is piled up the installation, the bolt hole of reserving on the standard knot 1 of next section is aligned with the bolt hole of reserving down of the standard knot 1 of last section and is set up for two adjacent sections of standard knot 1 are through high strength bolt fixed connection, through the standard knot 1 of two sections about the high strength bolted connection.
As shown in fig. 2, in the wall-attached portion of the standard knot 1, a connecting steel member 2 is arranged on one side of the standard knot 1 close to the wall body outside the structural body 3, one end of the connecting steel member 2 is fixedly connected with the standard knot 1 through a high-strength bolt 4, and the other end of the connecting steel member 2 is fixedly connected with the wall body of the structural body 3 through the high-strength bolt 4. In one embodiment, the connecting steel member 2 is an angle steel or a channel steel. The wall of structure 3 sets up and reserves the mounting hole, sets up on the mounting hole and links wall spare 5, or connects steel part 2 and be L font structure. For a single standard knot 1, the top end and the bottom end of the standard knot are provided with connecting steel pieces 2 to be connected with the wall of a structural body 3, so that the standard knot 1 can be arranged along the outer side of the structural body 3.
As shown in fig. 3, the pump pipe is disposed inside the standard knot 1 and climbs along the outside of the structure 3 along the standard knot 1. The connection of the pump pipe and the standard knot 1 is realized through a fixing piece 15 and a mounting piece 14, the fixing piece 15 and the mounting piece 14 form an enclosing structure enclosing a certain plane, and the pump pipe is wrapped and connected with the standard knot 1. The fixing piece 15 is a rod piece, two ends of the fixing piece 15 are welded with two side faces of the standard knot 1, two ends of the mounting piece 14 are parallel to the fixing piece 15 and are connected through bolts, the middle of the mounting piece 14 is semicircular and annular and is welded with the pump pipe, and the pump pipe is arranged in a semicircle in the middle of the mounting piece 14. Both ends of the mounting part 14 and both ends of the fixing part 15 are provided with through holes, bolts pass through the through holes to connect the mounting part 14 and the fixing part 15, and spring pieces 19 are arranged between the bolts and the fixing part 15. In one embodiment, the interface of the mounting member 14 and the pump tube is provided with a rubber strip 18, the rubber strip 18 having a thickness of at least greater than 5 mm to provide vibration damping. In one embodiment, the semicircular portion of the fixing member 15 is made of flat iron with a thickness of 5 mm, and the mounting member 14 has a size of not less than 50 mm x 5 mm.
The fixed pier is used as a base of a support formed by the standard knot 1, and the setting position of the fixed pier is the joint of a horizontal pump pipe and a vertical pump pipe on the first floor. The fixed pier is a concrete block, and the pump pipe penetrates into the side surface of the fixed pier and penetrates out of the top of the fixed pier. The size of the pump pipe joint exceeding the surface of the fixed pier is not smaller than 150 mm, the pump pipe is fixed on the ground by adopting an HRB335 grade steel bar support with the diameter of 14 mm, and the lower margin of the horizontal pump pipe is not smaller than 120 mm. In order to mark the position of the pump pipe, the fixed pier needs to be coated with yellow-black common paint, the width of a single yellow or black line is 150 mm, and the angle between the line and the horizontal plane is 60 degrees. The fixed piers need to be cast by concrete not less than C30, and the curing time is not less than 14 days. In engineering construction, the bottom of the floor slab at the position of the fixed pier is required to be reinforced by back jacking.
In the above embodiment, the steel ladder stand and the protection structure are arranged outside the standard knot 1, and the standard knot 1 is connected with the steel ladder stand and the protection structure through bolts respectively, so as to provide an implementation position for the installation, adjustment, dredging and other constructions of the pump pipe.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. The utility model provides an assembled pump line supporting structure, its characterized in that, is including setting up the anchor block in the bottom and a plurality of standard festival of being connected, the standard festival with the anchor block sets up along the structure outside as the basis, every set up installed part and mounting in the standard festival, the installed part with the mounting forms the surrounding structure, the built-in pump line of surrounding structure, the pump line passes the anchor block and along the standard festival sets up the structure outside, the perforation is predetermine to the wall body of structure, the pump line certainly the perforation gets into inside the structure.
2. An assembled pump pipe support structure as claimed in claim 1, wherein the standard knot is provided with a plurality of upper reserved bolt holes and lower reserved bolt holes, and the upper reserved bolt holes of the next standard knot are aligned with the lower reserved bolt holes of the previous standard knot, so that two adjacent standard knots are fixedly connected through high-strength bolts.
3. The fabricated pump pipe bracket structure according to claim 2, wherein a fixing cylinder is welded at each apex of the standard joint, and an inner connection thread is provided inside the fixing cylinder and connected with the high-strength bolt.
4. The assembled pump pipe support structure according to claim 1, wherein the standard knot is a rectangular frame structure, the side surfaces of the standard knot are provided with diagonal support members, two ends of each diagonal support member are respectively arranged at two sides of the side surface of the standard knot, and a certain distance is arranged between two ends of each diagonal support member and the bottom edge and the top edge of the standard knot.
5. The fabricated pump pipe support structure according to claim 1, wherein a connecting steel member is arranged on one side of the standard knot close to the wall of the structure body, one end of the connecting steel member is fixedly connected with the standard knot through a high-strength bolt, and the other end of the connecting steel member is fixedly connected with the wall of the structure body through a high-strength bolt.
6. An assembled pump pipe support structure as claimed in claim 1, wherein the fixing member is a rod member, both ends of the fixing member are welded to both side surfaces of the standard knot, both ends of the mounting member are parallel to the fixing member and are connected by bolts, and a middle portion of the mounting member is in a semi-circular shape and is welded to the pump pipe.
7. An assembled pump tube bracket structure according to claim 6, wherein through holes are provided at both ends of the mounting member and both ends of the fixing member, the bolt is passed through the through holes to connect the mounting member and the fixing member, and a spring plate is provided between the bolt and the fixing member.
8. A mounting structure for a pump line according to claim 6, wherein the mounting member is provided with a rubber strip at the interface with the pump line.
9. An assembled pump line supporting structure as claimed in claim 1, wherein a steel ladder and a protective structure are arranged outside the standard knot, and the standard knot is connected with the steel ladder and the protective structure through bolts.
10. The fabricated pump pipe support structure according to claim 1, wherein the fixed pier is a concrete block, and the pump pipe penetrates into the fixed pier from the side surface thereof and penetrates out from the top of the fixed pier.
CN202123031903.0U 2021-12-06 2021-12-06 Assembled pump line supporting structure Active CN216690403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123031903.0U CN216690403U (en) 2021-12-06 2021-12-06 Assembled pump line supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123031903.0U CN216690403U (en) 2021-12-06 2021-12-06 Assembled pump line supporting structure

Publications (1)

Publication Number Publication Date
CN216690403U true CN216690403U (en) 2022-06-07

Family

ID=81838408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123031903.0U Active CN216690403U (en) 2021-12-06 2021-12-06 Assembled pump line supporting structure

Country Status (1)

Country Link
CN (1) CN216690403U (en)

Similar Documents

Publication Publication Date Title
KR101648008B1 (en) Temporary bridge using precast truss assembly construction method
KR101178381B1 (en) Steel-concrete hybrid column using square shaped steel pipe and manufacturing method thereof
KR102079008B1 (en) E-z connecting structure for beam and column wherein the end-moment and bending resistibility are reinforced
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
KR20170090610A (en) Connection unit for coupling main steel girder and ancillary steel girder and, connection methods using the same
CN216690403U (en) Assembled pump line supporting structure
JP4461914B2 (en) Temporary deadline structure and temporary deadline method
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
KR101006545B1 (en) Girder bridge construction method using steel box girder with exterior longitudinal rib and interior reinfocing plate
WO2008100026A1 (en) Composite girder with steel truss web having hinge connecting, and connection structure thereof
KR20060079949A (en) Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
CN108589931A (en) The precast construction connecting node that concrete is combined with steel construction
KR102149128B1 (en) Pre-fabricated column with angle-type reinforcing bar
KR200394341Y1 (en) Polygonal diaphragm enabling installation of H-shaped cross beam in any direction of steel pipe pole
CN211947880U (en) Half-through type longitudinal block prefabricated box girder
CN208718097U (en) A kind of precast construction connecting node that concrete is combined with steel construction
CN110469130B (en) Pipe truss girder and pipe truss column flange plate mounting die and mounting method
CN210288825U (en) Assembled and cast-in-situ combined beam plate structure
CN113863494A (en) Assembly type concrete beam column connecting node and mounting method thereof
CN102888934A (en) Shearing force prefabricated component for assembled-type hollow grid plate floor system structure
CN102888929A (en) Shearing force prefabricated component for assembled-type hollow grid plate floor system structure
KR20060128150A (en) Polygonal diaphragm enabling installation of h-shaped cross beam in any direction of steel pipe pole and method for building h-shaped cross beam using the diaphragm
CN212002423U (en) Non-welding type bracing reinforcing apparatus of steel construction factory building beam column
CN212452324U (en) Urban road steel beam construction structure based on BIM
KR102201182B1 (en) Steel built-up beam for composite transfer girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 2908, building 4, phase II, Tianan Yungu Industrial Park, Gangtou community, Bantian street, Longgang District, Shenzhen, Guangdong

Patentee after: Shenzhen Huayu science and Industry Group Co.,Ltd.

Address before: 518000 2908, building 4, phase II, Tianan Yungu Industrial Park, Gangtou community, Bantian street, Longgang District, Shenzhen, Guangdong

Patentee before: Shenzhen Huahe Construction Group Co.,Ltd.

CP01 Change in the name or title of a patent holder