CN216690332U - Steel construction installation operation platform - Google Patents

Steel construction installation operation platform Download PDF

Info

Publication number
CN216690332U
CN216690332U CN202220195189.4U CN202220195189U CN216690332U CN 216690332 U CN216690332 U CN 216690332U CN 202220195189 U CN202220195189 U CN 202220195189U CN 216690332 U CN216690332 U CN 216690332U
Authority
CN
China
Prior art keywords
wall
column
fixedly connected
steel structure
operating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220195189.4U
Other languages
Chinese (zh)
Inventor
张国文
许云鹏
刘晓艳
曾令发
郑劲松
何官军
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202220195189.4U priority Critical patent/CN216690332U/en
Application granted granted Critical
Publication of CN216690332U publication Critical patent/CN216690332U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a steel structure installation operation platform which comprises an operation table, wherein a guardrail is arranged at the top end of the operation table, fixing columns are symmetrically arranged on one side of the operation table, support frames are symmetrically arranged at the bottom end of the operation table, threaded holes are formed in the top ends of the fixing columns and one side of the support frame, and installation bolts are in threaded connection with the inner walls of the threaded holes.

Description

Steel construction installation operation platform
Technical Field
The utility model relates to an operation platform, in particular to a steel structure installation operation platform.
Background
The steel construction platform is a full assembled platform, and platform overall structure designs comparatively in a flexible way, can carry out different designs according to the use scene of difference, and it generally comprises structures such as bed board, support column, railing, can divide into heavy operation platform, power load platform, the operation platform on the room according to the operation requirement.
The existing operating platform generally only protects workers on the operating platform by arranging the fence, but the general operating platform guardrail design process is about 1M in height, and the workers with higher height are easy to fall when working at high altitude.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a steel structure installation operation platform to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a steel construction installation operation platform, includes the operation panel, the top of operation panel is provided with the guardrail, a lateral symmetry of operation panel is provided with the fixed column, the bottom symmetry of operation panel is provided with the support frame, threaded hole has all been seted up on the top of fixed column and one side of support frame, the equal threaded connection of inner wall of screw hole has construction bolt, a lateral symmetry on operation panel top is provided with the connecting seat, the connecting hole has been seted up at the top of connecting seat, the inner wall of connecting hole rotates and is connected with the connecting axle, the first rotation wheel of one end fixedly connected with of connecting axle, the outside sliding connection of first rotation wheel has the fixed band, the one end fixed connection safety belt of fixed band, be provided with the buckle on the safety belt.
As a still further scheme of the utility model: the top of guardrail is provided with the couple, the inner wall of couple is connected with the inboard laminating of safety belt.
As a still further scheme of the utility model: one of them one side fixedly connected with L shaped plate of connecting seat, another one side fixedly connected with spliced pole of connecting seat, the round hole has all been seted up, two to one side of spliced pole and one side of L shaped plate the inner wall of round hole rotates and is connected with the lead screw, the wheel is rotated to the one end fixedly connected with second of lead screw, the outside threaded connection of lead screw has solid fixed ring, the spacing post of one side fixedly connected with of solid fixed ring, the quad slit has been seted up to one side of connecting axle, the inner wall of quad slit and the outer wall sliding connection of spacing post, the spout has been seted up to one side of L shaped plate, the inner wall of spout alternates with the outer wall of spacing post and is connected.
As a still further scheme of the utility model: the safety belt is made of elastic materials.
As a still further scheme of the utility model: the length of the limiting column is greater than that of the connecting seat.
As a still further scheme of the utility model: the length of the connecting column is equal to the width of the L-shaped plate.
Compared with the prior art, the utility model has the beneficial effects that:
1. through setting up fixing base, connecting axle, fixed band, safety belt make the security that the staff operated on the operation panel obtain improving, through rotating first rotation wheel to make the connecting axle rotate, thereby put long the fixed band after the connecting axle rotates, the staff takes off the safety belt and installs on the health on will getting in touch, thereby avoids the staff to take place the condition of falling in guardrail limit operation process, has improved the security of operation.
2. The connecting shaft rotating angle can be fixed by workers through the arranged lead screw, the second rotating wheel and the limiting column, the second rotating wheel is rotated to drive the lead screw to rotate, then the limiting column moves transversely on the lead screw, and then the limiting column enters the square hole, so that the connecting shaft rotating angle can be fixed conveniently.
Drawings
Fig. 1 is a schematic structural diagram of a steel structure installation operation platform.
Fig. 2 is a schematic view of a partial structure of a steel structure installation operation platform.
Fig. 3 is a schematic diagram of a limiting column structure in a steel structure installation operation platform.
Fig. 4 is a schematic structural view of a connecting shaft in a steel structure installation operation platform.
1. An operation table; 2. a guardrail; 3. fixing a column; 4. a support frame; 5. a connecting seat; 6. installing a bolt; 7. connecting holes; 8. a connecting shaft; 9. a first rotating wheel; 10. fixing belts; 11. a seat belt; 12. buckling; 13. an L-shaped plate; 14. connecting columns; 15. a circular hole; 16. a screw rod; 17. a chute; 18. a second rotating wheel; 19. a limiting column; 20. a square hole; 21. and (4) hanging hooks.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Please refer to fig. 1-4, which illustrate a steel structure installation operation platform, comprising an operation platform 1, a guardrail 2 disposed at the top of the operation platform 1, one side of the operating platform 1 is symmetrically provided with fixed columns 3, the bottom end of the operating platform 1 is symmetrically provided with supporting frames 4, threaded holes are respectively formed at the top end of the fixed column 3 and one side of the supporting frame 4, mounting bolts 6 are respectively connected with the inner walls of the threaded holes in a threaded manner, one side of the top end of the operating platform 1 is symmetrically provided with connecting seats 5, the top of each connecting seat 5 is provided with a connecting hole 7, the inner wall of the connecting hole 7 is rotatably connected with a connecting shaft 8, one end of the connecting shaft 8 is fixedly connected with a first rotating wheel 9, the outer side of the first rotating wheel 9 is connected with a fixing belt 10 in a sliding mode, one end of the fixing belt 10 is fixedly connected with a safety belt 11, and a buckle 12 is arranged on the safety belt 11.
As a still further scheme of the utility model: the top of guardrail 2 is provided with couple 21, the inner wall of couple 21 is connected with the inboard laminating of safety belt 11.
As a still further scheme of the utility model: one of them one side fixedly connected with L shaped plate 13 of connecting seat 5, another one side fixedly connected with spliced pole 14 of connecting seat 5, round hole 15, two have all been seted up to one side of spliced pole 14 and one side of L shaped plate 13 the inner wall of round hole 15 rotates and is connected with lead screw 16, wheel 18 is rotated to the one end fixedly connected with second of lead screw 16, the outside threaded connection of lead screw 16 has solid fixed ring, gu fixed ring's spacing post 19 of one side fixedly connected with, quad slit 20 has been seted up to one side of connecting axle 8, the inner wall of quad slit 20 and spacing post 19's outer wall sliding connection, spout 17 has been seted up to one side of L shaped plate 13, the inner wall of spout 17 alternates with spacing post 19's outer wall and is connected.
It should be noted that, through the arrangement of the limiting column 19 and the square hole 20, the rotation angle of the connecting shaft 8 is fixed after the connecting shaft rotates.
As a still further scheme of the utility model: the safety belt 11 is made of an elastic material.
As a still further scheme of the utility model: the length of the limiting column 19 is greater than that of the connecting seat 5.
As a still further scheme of the utility model: the length of the connecting column 14 is equal to the width of the L-shaped plate 13.
The working principle of the utility model is as follows:
when the safety belt fixing device is used, a worker fixes the fixing column 3 through the mounting bolt 6 and fixes the support frame 4 through the mounting bolt 6, so that the whole operation table 1 is fixed, when the worker operates on the operation table 1, the second rotating wheel 18 is rotated to drive the screw rod 16 to rotate through the second rotating wheel 18, the limiting column 19 slides out of the inner wall of the square hole 20, the first rotating wheel 9 is rotated to drive the connecting shaft 8 to rotate through the first rotating wheel 9, the fixing belt 10 is lengthened after the connecting shaft 8 rotates, the worker can take the safety belt 11 down from the hook 21, the safety belt 11 is installed on a body, and therefore safety of the worker operating on the operation table 1 is improved.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a steel construction installation operation platform, includes operation panel (1), its characterized in that: the top end of the operating platform (1) is provided with a guardrail (2), one side of the operating platform (1) is symmetrically provided with a fixed column (3), the bottom end of the operating platform (1) is symmetrically provided with a support frame (4), the top end of the fixed column (3) and one side of the support frame (4) are both provided with threaded holes, the inner wall of each threaded hole is in threaded connection with a mounting bolt (6), one side of the top end of the operating platform (1) is symmetrically provided with a connecting seat (5), the top of the connecting seat (5) is provided with a connecting hole (7), the inner wall of the connecting hole (7) is rotatably connected with a connecting shaft (8), one end of the connecting shaft (8) is fixedly connected with a first rotating wheel (9), the outer side of the first rotating wheel (9) is slidably connected with a fixing belt (10), and one end of the fixing belt (10) is fixedly connected with a safety belt (11), the safety belt (11) is provided with a buckle (12).
2. The steel structure installation and operation platform of claim 1, wherein: the top of guardrail (2) is provided with couple (21), the inner wall of couple (21) is connected with the inboard laminating of safety belt (11).
3. The steel structure installation and operation platform of claim 1, wherein: one side of one of the connecting seats (5) is fixedly connected with an L-shaped plate (13), one side of the other connecting seat (5) is fixedly connected with a connecting column (14), round holes (15) are respectively arranged at one side of the connecting column (14) and one side of the L-shaped plate (13), the inner walls of the two round holes (15) are rotatably connected with a screw rod (16), one end of the screw rod (16) is fixedly connected with a second rotating wheel (18), the outer side of the screw rod (16) is in threaded connection with a fixing ring, one side of the fixing ring is fixedly connected with a limiting column (19), one side of the connecting shaft (8) is provided with a square hole (20), the inner wall of the square hole (20) is connected with the outer wall of the limit column (19) in a sliding way, one side of the L-shaped plate (13) is provided with a sliding groove (17), and the inner wall of the sliding groove (17) is connected with the outer wall of the limiting column (19) in a penetrating manner.
4. The steel structure installation and operation platform of claim 1, wherein: the safety belt (11) is made of elastic materials.
5. The steel structure mounting and operating platform of claim 3, wherein: the length of the limiting column (19) is greater than that of the connecting seat (5).
6. The steel structure mounting and operating platform of claim 3, wherein: the length of the connecting column (14) is equal to the width of the L-shaped plate (13).
CN202220195189.4U 2022-01-20 2022-01-20 Steel construction installation operation platform Expired - Fee Related CN216690332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220195189.4U CN216690332U (en) 2022-01-20 2022-01-20 Steel construction installation operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220195189.4U CN216690332U (en) 2022-01-20 2022-01-20 Steel construction installation operation platform

Publications (1)

Publication Number Publication Date
CN216690332U true CN216690332U (en) 2022-06-07

Family

ID=81823540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220195189.4U Expired - Fee Related CN216690332U (en) 2022-01-20 2022-01-20 Steel construction installation operation platform

Country Status (1)

Country Link
CN (1) CN216690332U (en)

Similar Documents

Publication Publication Date Title
CN106744362A (en) Small portable family expenses boom hoisting
CN216690332U (en) Steel construction installation operation platform
CN212388955U (en) Hoisting construction scaffold for building construction
CN213710299U (en) Modular two-layer elevartor shaft integral lifting bracing operation platform
CN209907393U (en) Steel protects a section of thick bamboo and beats and pull up leading truck
CN112922301A (en) Anti-tilting scaffold
CN214995818U (en) Climbing type construction operation platform outside building
CN216239854U (en) Subway station foundation pit steel support anti-falling protection device
CN212054073U (en) Fence plate with noise reduction function for building construction
CN209878004U (en) Portable air environment monitor support frame
CN214739390U (en) Prefabricated staircase convenient to install
CN211341824U (en) Assembled steel structure sliding frame
CN212376301U (en) Assembly type structure component construction equipment that encorbelments
CN220845243U (en) Tower crane safety device
CN219344253U (en) Mesh base for fixing
CN220397117U (en) Auxiliary mounting frame for detecting verticality of main structure of building engineering
CN216616911U (en) Assembly type structure construction platform
CN214456399U (en) Hoist and mount operation safety auxiliary device
CN219387114U (en) Building construction hanging basket convenient to dismantle and install
CN211107547U (en) Reinforcing steel bar transport vehicle
CN219669888U (en) Novel indoor construction elevator
CN217000747U (en) Construction platform for building construction
CN218633786U (en) Single-upright-column flexible photovoltaic support
CN219604828U (en) Anti-falling climbing frame device for high-rise building construction
CN221027542U (en) Personnel protection device for hoisting steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220607

CF01 Termination of patent right due to non-payment of annual fee