CN216664120U - Use stable pile device for electric power engineering construction - Google Patents

Use stable pile device for electric power engineering construction Download PDF

Info

Publication number
CN216664120U
CN216664120U CN202122946921.5U CN202122946921U CN216664120U CN 216664120 U CN216664120 U CN 216664120U CN 202122946921 U CN202122946921 U CN 202122946921U CN 216664120 U CN216664120 U CN 216664120U
Authority
CN
China
Prior art keywords
slide
electric power
engineering construction
power engineering
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122946921.5U
Other languages
Chinese (zh)
Inventor
董虎松
孙文利
刘善厂
张涛
赵清宇
聂胜利
邱松林
王大鹏
刘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Tongxin Power Engineering Co ltd
Original Assignee
Henan Tongxin Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Tongxin Power Engineering Co ltd filed Critical Henan Tongxin Power Engineering Co ltd
Priority to CN202122946921.5U priority Critical patent/CN216664120U/en
Application granted granted Critical
Publication of CN216664120U publication Critical patent/CN216664120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a piling device for electric power engineering construction, which is stable in use and comprises: the drilling machine comprises a base, wherein a push rod is fixedly connected to one end of the base, a drill hole is formed in the middle of the base, supporting rods are arranged on two sides of the drill hole, a sliding plate is arranged between the supporting rods and slides up and down between the supporting rods, a motor is arranged at the top of the sliding plate, a rotating shaft of the motor penetrates through the sliding plate, the rotating shaft of the motor is connected with a drilling device through a connecting rod, and the drilling device penetrates through the drill hole.

Description

Use stable electric power engineering construction with pile device
Technical Field
The utility model relates to the technical field of a piling device for stable use in power engineering construction, in particular to a piling device for stable use in power engineering construction.
Background
The hammering pile sinking method mainly overcomes the resistance of soil to the pile through the impact generated by the falling of a pile hammer, so that the pile is driven into the foundation. A commonly used pile hammer includes: diesel hammers and hydraulic hammers. The diesel hammer drives the piston to reciprocate through fuel oil explosion to hammer and pile, has a simple mechanical structure, but has low energy transfer rate, poor reliability of the device, frequent maintenance and repair, difficulty in accurately adjusting and controlling the piling force, serious environmental pollution caused by exhaust gas oil smoke discharged during operation, and very severe working conditions of operators. The hydraulic hammer mainly strikes the pile body through the impact part driven by the oil cylinder, and compared with a diesel hammer, the hydraulic hammer has shorter stroke and higher impact frequency. The impact force can be adjusted by adjusting the oil pressure, but the hydraulic hammer has a complex structure, is complex to control, and has high manufacturing cost, high manufacturing cost and high energy consumption.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a piling device for electric power engineering construction, which is stable in use.
In order to solve the above problems, the present invention provides a pile driving device for electric power engineering construction, which is stable in use, including: the base, base one end fixedly connected with push rod, the base intermediate position is equipped with drilling, the drilling both sides are equipped with the bracing piece, be equipped with the slide between the bracing piece, the slide slides from top to bottom between the bracing piece, the slide top is equipped with the motor, the slide is passed in the pivot of motor, the pivot of motor is connected with the device of boring through the link rod ware, the device of boring passes drilling.
The utility model provides a piling device for electric power engineering construction, which is stable in use and further has the following technical characteristics:
further, the bottom of the base is provided with wheels, and one side, away from each other, of each wheel is provided with a supporting device.
Further, strutting arrangement includes the backup pad, the fixed hydraulic stem that is equipped with in the backup pad, hydraulic stem and base fixed connection, backup pad bottom fixed connection shock pad, the shock pad is the rubber slab.
Furthermore, sliding grooves are formed in two opposite sides of the supporting rod, sliding rods are arranged in the sliding grooves, one ends of the sliding rods are fixedly connected with the tops of the sliding grooves, the other ends of the sliding rods are fixedly connected with the bottoms of the sliding grooves, sliding plates are sleeved on the sliding rods and move up and down along the sliding rods, the sliding plates are placed downwards, and springs are sleeved on the sliding rods in the sliding grooves.
Furthermore, a pressing plate is arranged on one side of the sliding plate and fixedly connected with the sliding plate.
Further, the drilling device comprises a drill rod or a spiral rotating rod.
The utility model has the following beneficial effects:
1. according to the utility model, the motor drives the punching device to move, and the downward movement force of the punching device is manually controlled, so that a suitable hole can be quickly and better punched for the pile.
2. The utility model is carried by the trolley, can be conveniently and rapidly moved, and is convenient for an operator to operate.
3. According to the utility model, the trolley can be placed through the supporting device, because the wheels are unstable, the height can be adjusted according to different terrains, and the damping effect is achieved through the damping pad.
Drawings
Fig. 1 is a schematic structural diagram of a piling device for electric power engineering construction, which is stable in use.
Fig. 2 is a schematic diagram of a structure of a support plate in a pile driving device for electric power engineering construction.
Fig. 3 is a schematic side view of a pile driving device for electric power engineering construction.
Fig. 4 is a schematic structural diagram of a supporting device in a piling device for electric engineering construction, which is stable in use.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 4, a pile driving apparatus for construction using stable power engineering, comprising: base 1, 1 one end fixedly connected with push rod 2 of base, 1 intermediate position of base is equipped with drilling 5, drilling 5 both sides are equipped with bracing piece 7, be equipped with slide 9 between the bracing piece 7, slide 9 slides from top to bottom between bracing piece 7, slide 9 top is equipped with motor 8, slide 9 is passed in motor 8's pivot, motor 8's pivot is connected with drilling device 6 through link 10, drilling device 6 passes drilling 5.
The sliding plate 9 moves downwards, so that the drilling device 6 is driven to move downwards to drill holes. And after the hole is punched, the pile is conveniently punched into the hole.
The bottom of the base 1 is provided with wheels 3, and one side of the wheels 3, which are far away from each other, is provided with a supporting device 4. The wheels 3 facilitate moving the piling device.
The supporting device 4 comprises a supporting plate 4-2, a hydraulic rod 4-1 is fixedly arranged on the supporting plate 4-2, the hydraulic rod 4-1 is fixedly connected with the base 1, the bottom of the supporting plate 4-2 is fixedly connected with a shock pad 4-3, and the shock pad 4-3 is a rubber plate.
The bar wheel 3 can be supported by the continuous extension of the hydraulic rod 4-1, the base is supported by the supporting plate 4-2, and the shock absorption pad 4-3 can absorb shock.
The both sides in opposite directions of bracing piece 7 are equipped with spout 12, be equipped with slide bar 11 in the spout 12, the top fixed connection of slide bar 11 one end and spout 12 with the bottom fixed connection of the other end of slide bar 11 and spout 12, the cover is equipped with slide 9 on the slide bar 11, slide 9 is reciprocating along slide bar 11, slide 9 is transferred, and the cover is equipped with spring 13 on the slide bar 11 in the spout 12. A pressing plate 14 is arranged on one side of the sliding plate 9, and the pressing plate 14 is fixedly connected with the sliding plate 9.
By pressing the pressing plate 14, the pressing plate 14 drives the sliding plate 9 to move downwards, the sliding plate 9 moves on the sliding rod 11 to press the spring 13, and the sliding plate 9 pushes the hole drilling device 6 to perform large hole drilling.
The drilling device 6 comprises a drill rod or a helical rod.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (6)

1. A pile driving apparatus for electric power engineering construction with stable use, comprising: base (1), its characterized in that: base (1) one end fixedly connected with push rod (2), base (1) intermediate position is equipped with drilling (5), drilling (5) both sides are equipped with bracing piece (7), be equipped with slide (9) between bracing piece (7), slide (9) slide from top to bottom between bracing piece (7), slide (9) top is equipped with motor (8), slide (9) are passed in the pivot of motor (8), the pivot of motor (8) is connected with drilling device (6) through connecting rod ware (10), drilling (5) are passed in drilling device (6).
2. The pile driving apparatus for electric power engineering construction using the stabilization as set forth in claim 1, wherein: the base (1) bottom is equipped with wheel (3), one side that wheel (3) kept away from each other is equipped with strutting arrangement (4).
3. The pile driving apparatus for electric power engineering construction using the stabilization as set forth in claim 2, wherein: the supporting device (4) comprises a supporting plate (4-2), a hydraulic rod (4-1) is fixedly arranged on the supporting plate (4-2), the hydraulic rod (4-1) is fixedly connected with the base (1), a shock pad (4-3) is fixedly connected to the bottom of the supporting plate (4-2), and the shock pad (4-3) is a rubber plate.
4. The pile driving apparatus for electric power engineering construction using the stabilization as set forth in claim 1, wherein: the utility model discloses a spring support, including bracing piece (7), be equipped with in spout (12) and slide bar (11), the top fixed connection of bracing piece (7) both sides in opposite directions is equipped with spout (12), be equipped with slide bar (11) in spout (12), slide bar (11) one end and spout (12) the top fixed connection with the bottom fixed connection of the other end of slide bar (11) and spout (12), the cover is equipped with slide (9) on slide bar (11), slide (9) reciprocate along slide bar (11), slide (9) are transferred, and the cover is equipped with spring (13) on slide bar (11) in spout (12).
5. The pile driving apparatus for electric power engineering construction using the stabilization as set forth in claim 1, wherein: one side of the sliding plate (9) is provided with a pressing plate (14), and the pressing plate (14) is fixedly connected with the sliding plate (9).
6. The pile driving apparatus for electric power engineering construction using the stabilization as set forth in claim 1, wherein: the drilling device (6) comprises a drill rod or a spiral rotating rod.
CN202122946921.5U 2021-11-29 2021-11-29 Use stable pile device for electric power engineering construction Active CN216664120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122946921.5U CN216664120U (en) 2021-11-29 2021-11-29 Use stable pile device for electric power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122946921.5U CN216664120U (en) 2021-11-29 2021-11-29 Use stable pile device for electric power engineering construction

Publications (1)

Publication Number Publication Date
CN216664120U true CN216664120U (en) 2022-06-03

Family

ID=81786470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122946921.5U Active CN216664120U (en) 2021-11-29 2021-11-29 Use stable pile device for electric power engineering construction

Country Status (1)

Country Link
CN (1) CN216664120U (en)

Similar Documents

Publication Publication Date Title
CN104018541A (en) Gravity type hydraulic breaking hammer
CN216664120U (en) Use stable pile device for electric power engineering construction
CN201362811Y (en) Portable impact pickaxe
CN208472697U (en) A kind of shockproof frog type rammer
CN212925688U (en) Road surface tamping device for highway construction
CN215565697U (en) Open-air blasting construction is with blasting drilling equipment
CN215292332U (en) Electric pile driver
CN115142414A (en) Hydraulic pile driver
CN111691393B (en) Saline soil foundation treatment device
CN107700487A (en) A kind of portable hydraulic piling machine mechanism
CN112482481A (en) Single-side striking breaking hammer
CN211058713U (en) Portable pile driver for constructional engineering
CN111119178A (en) Slide plate operation device of pile driver
CN213417785U (en) Foundation stone vibration tamping device for highway construction
CN201907106U (en) Portable manual impact pickax
CN221495916U (en) Automatic excitation hammering device
CN221438001U (en) Heavy-duty track cable car removes interval stop device
CN216238518U (en) Piling device for small-sized single building
CN213773359U (en) Low-power-consumption hydraulic hammer pile driver convenient to replace and maintain
CN210482301U (en) Pile pressing device
CN214463861U (en) Rotary drilling rig power head damper device
CN221481845U (en) Ground perforating device for bridge construction
CN217324927U (en) Hammer crusher for rubblizing of concrete base
CN215318430U (en) Pin shaft dismounting device
CN220725082U (en) Piling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant