CN216647273U - Dustproof type chassis with real-time progress management system of engineering construction project - Google Patents

Dustproof type chassis with real-time progress management system of engineering construction project Download PDF

Info

Publication number
CN216647273U
CN216647273U CN202123246874.XU CN202123246874U CN216647273U CN 216647273 U CN216647273 U CN 216647273U CN 202123246874 U CN202123246874 U CN 202123246874U CN 216647273 U CN216647273 U CN 216647273U
Authority
CN
China
Prior art keywords
fixedly installed
case body
rod
real
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123246874.XU
Other languages
Chinese (zh)
Inventor
杨慧
吴闯
相维佳
丁锦辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huaxin Intelligent Technology Co ltd
Original Assignee
Jiangsu Huaxin Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huaxin Intelligent Technology Co ltd filed Critical Jiangsu Huaxin Intelligent Technology Co ltd
Priority to CN202123246874.XU priority Critical patent/CN216647273U/en
Application granted granted Critical
Publication of CN216647273U publication Critical patent/CN216647273U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses a dustproof case with an engineering construction project real-time progress management system, which comprises management equipment fixedly installed in a case body, wherein through grooves are formed in the front side and the rear side of the case body, filter screens are installed in the two through grooves, fixing plates are fixedly installed at the upper ends and the lower ends of the two filter screens, a clamping mechanism is installed between each fixing plate and the case body, an installation cavity is formed in the upper side wall of the case body, a fixing rod is fixedly installed in the installation cavity, a heat dissipation fan is installed on the fixing rod, a connecting rod is fixedly installed at the upper end of the heat dissipation fan, and a filter plate is fixedly installed at the upper end of the installation cavity. Has the advantages that: the filter screen is simple and convenient to assemble and disassemble on the case body, is convenient to clean hygienically, and can sweep dust falling on the upper end of the case body down while radiating heat of the case, thereby effectively improving the dustproof effect of the case.

Description

Dustproof type chassis with real-time progress management system of engineering construction project
Technical Field
The utility model relates to the technical field of engineering construction, in particular to a dustproof case with an engineering construction project real-time progress management system.
Background
In the engineering construction in-process, need manage real-time progress according to holistic project planning, then need to use engineering construction project real-time progress management system this moment, this type of system equipment is installed at the quick-witted incasement that corresponds usually, and for guaranteeing its normal operating, can set up the ventilation slot and install the filter screen and play dustproof effect on the quick-witted case, nevertheless the filter screen on the quick-witted case of current is mostly fixed mounting, it is comparatively inconvenient when leading to carrying out the health clearance to it, and machine case upper end can constantly have the dust to fall on it, make whole quick-witted case dustproof effect not good enough, consequently need to design a dustproof type quick-witted case that has engineering construction project real-time progress management system urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems in the prior art, and provides a dustproof case with an engineering construction project real-time progress management system.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a dustproof case with a real-time progress management system of an engineering construction project comprises a management device fixedly arranged in a case body, through grooves are formed in the front side and the rear side of the case body, filter screens are arranged in the two through grooves, fixed plates are fixedly arranged at the upper ends and the lower ends of the two filter screens, a clamping mechanism is arranged between each fixed plate and the case body, an installation cavity is arranged on the upper side wall of the case body, a fixed rod is fixedly arranged in the installation cavity, a heat dissipation fan is arranged on the fixed rod, a connecting rod is fixedly arranged at the upper end of the heat dissipation fan, a filter plate is fixedly arranged at the upper end of the installation cavity, and the filter plate is provided with a round hole matched with the connecting rod, the connecting rod is provided with a connecting block, and the connecting block is provided with an installation block, the side wall of the installation block is fixedly provided with a plurality of brushes, and the lower end of each brush is attached to the upper surface of the filter plate.
In foretell dustproof type case with real-time progress management system of engineering construction project, latch mechanism comprises through-hole, inserted bar, slot and arm-tie, the through-hole is seted up on the fixed plate, inserted bar sliding connection is in the through-hole, the slot is seted up on the lateral wall of chassis body, and slot and inserted bar cooperate, arm-tie fixed mounting is served at the one end that chassis body was kept away from to the inserted bar.
In foretell dustproof type case with real-time progress management system of engineering construction project, fixed mounting has a plurality of kellies on the one end lateral wall that the inserted bar is close to quick-witted case body, a plurality of draw-in grooves have been seted up on the lateral wall of slot, and every draw-in groove cooperatees with the kellies that correspond respectively, a plurality of and corresponding kellies matched with shifting chutes have been seted up on the lateral wall of through-hole.
In foretell dustproof type case with real-time progress management system of engineering construction project, the spout has been seted up on the connecting rod, connecting block lower extreme fixed mounting has the slide bar with spout matched with, and installs the extension spring between slide bar and the spout.
In foretell dustproof type case with real-time progress management system of engineering construction project, fixed mounting has two stoppers on the lateral wall of slide bar, two spacing grooves have been seted up on the lateral wall of spout, and two spacing grooves cooperate with two stoppers respectively.
In foretell dustproof type quick-witted case with real-time progress management system of engineering construction project, the upper end fixed mounting of connecting block has the threaded rod, and threaded rod and installation piece threaded connection.
Compared with the prior art, the utility model has the advantages that:
1: through the design of clamping mechanism, be convenient for carry out the dismouting between fixed plate and the quick-witted case body to make the dismouting of filter screen on quick-witted case body comparatively simple and convenient, be convenient for carry out the health clearance to it.
2: when the radiating fan works, the plurality of brushes rotate on the filter plate through the matching of the connecting rod, the connecting block and the mounting block, so that dust falling on the upper end of the case body can be swept down, and the dustproof effect of the case is effectively improved.
3: the design of the tension spring can apply downward acting force to the connecting block, so that the brush can be tightly attached to the filter plate, and the dust removal effect on the filter plate is ensured.
In conclusion, the filter screen is simple and convenient to disassemble and assemble on the case body, so that the filter screen is convenient to clean hygienically, dust falling on the upper end of the case body can be swept away while the case is cooled, and the dustproof effect of the case is effectively improved.
Drawings
Fig. 1 is a schematic structural diagram of a dustproof chassis with a real-time progress management system for an engineering construction project according to the present invention;
figure 2 is a cross-sectional view of the fixation rod of figure 1 taken along the centerline of the fixation rod;
FIG. 3 is an enlarged view of the structure of portion A in FIG. 1;
fig. 4 is an enlarged schematic view of a portion B in fig. 2.
In the figure: the cabinet comprises a cabinet body 1, a management device 2, a through groove 3, a filter screen 4, a fixing plate 5, an inserting rod 6, a through hole 7, an inserting groove 8, a pulling plate 9, a clamping rod 10, a clamping groove 11, a moving groove 12, a mounting cavity 13, a fixing rod 14, a heat dissipation fan 15, a filter plate 16, a connecting rod 17, a round hole 18, a connecting block 19, a mounting block 20, a brush 21, a sliding rod 22, a sliding groove 23, a tension spring 24, a limiting block 25 and a threaded rod 26.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
Referring to fig. 1-4, a dust-proof type machine case with real-time progress management system of engineering construction project, includes the management equipment 2 of fixed mounting in chassis body 1, and logical groove 3 has all been seted up to chassis body 1's front and back both sides, and all installs filter screen 4 in two logical groove 3.
The above is noteworthy:
1. management equipment 2 is used for managing the real-time progress of engineering construction project, and the equal fixed mounting in upper and lower both ends of two filter screens 4 has fixed plate 5, all installs latch mechanism between every fixed plate 5 and chassis body 1.
2. Clamping mechanism is by through-hole 7, inserted bar 6, slot 8 and arm-tie 9 are constituteed, through-hole 7 is seted up on fixed plate 5, inserted bar 6 sliding connection is in through-hole 7, slot 8 is seted up on chassis body 1's lateral wall, and slot 8 cooperatees with inserted bar 6, arm-tie 9 fixed mounting is kept away from chassis body 1 on one end at inserted bar 6, through clamping mechanism's design, be convenient for carry out the dismouting between fixed plate 5 and the chassis body 1, thereby make filter screen 4 comparatively simple and convenient at the dismouting on chassis body 1, be convenient for carry out the health clearance to it.
3. A plurality of clamping bars 10 are fixedly mounted on the side wall of one end, close to the case body 1, of the insert rod 6, a plurality of clamping grooves 11 are formed in the side wall of the slot 8, each clamping groove 11 is matched with the corresponding clamping bar 10, a plurality of moving grooves 12 matched with the corresponding clamping bars 10 are formed in the side wall of the through hole 7, and through the matching of the clamping bars 10 and the clamping grooves 11, the stability of the insert rod 6 after being connected with the slot 8 can be effectively improved.
4. Installation cavity 13 has been seted up to chassis body 1's last lateral wall, and fixed mounting has dead lever 14 in installation cavity 13, installs heat dissipation fan 15 on the dead lever 14, and installation cavity 13 upper end fixed mounting has filter plate 16, and heat dissipation fan 15 during operation can effectively discharge the steam in chassis body 1 to the management equipment 2 of being convenient for cools down.
5. 15 upper ends fixed mounting of heat dissipation fan has connecting rod 17, and seted up on the filter plate 16 with connecting rod 17 matched with round hole 18, install connecting block 19 on the connecting rod 17, and install installation piece 20 on the connecting block 19, fixed mounting has a plurality of brushes 21 on the lateral wall of installation piece 20, and every brush 21 lower extreme all pastes with the upper surface of filter plate 16 mutually, when 15 during operation of heat dissipation fan, accessible connecting rod 17, connecting block 19 and installation piece 20's cooperation, make a plurality of brushes 21 rotate on filter plate 16, thereby can sweep the dust that falls on machine case body 1 upper end, the dustproof effect of this machine case has effectively been improved.
6. The connecting rod 17 is provided with a chute 23, the lower end of the connecting block 19 is fixedly provided with a slide bar 22 matched with the chute 23, and a tension spring 24 is arranged between the slide bar 22 and the chute 23, and the tension spring 24 can apply a downward acting force to the connecting block 19, so that the brush 21 can be tightly attached to the filter plate 16, and the dust removal effect on the filter plate 16 is ensured.
7. Two limit blocks 25 are fixedly mounted on the side wall of the slide rod 22, two limit grooves are formed in the side wall of the sliding groove 23, and the two limit grooves are respectively matched with the two limit blocks 25, so that the connection effect between the slide rod 22 and the sliding groove 23 can be ensured, and the connecting rod 17 and the connecting block 19 are prevented from being separated from each other.
8. The upper end of the connecting block 19 is fixedly provided with a threaded rod 26, and the threaded rod 26 is in threaded connection with the mounting block 20, so that the mounting block 20 and the brush 21 thereon can be conveniently detached for cleaning or replacement.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (6)

1. The dustproof case with the real-time progress management system for the engineering construction project comprises management equipment (2) fixedly installed in a case body (1) and is characterized in that through grooves (3) are formed in the front side and the rear side of the case body (1), filter screens (4) are installed in the two through grooves (3), fixing plates (5) are fixedly installed at the upper end and the lower end of each filter screen (4), each clamping mechanism is installed between each fixing plate (5) and the case body (1), an installation cavity (13) is formed in the upper side wall of the case body (1), fixing rods (14) are fixedly installed in the installation cavity (13), heat dissipation fans (15) are installed on the fixing rods (14), connecting rods (17) are fixedly installed at the upper ends of the heat dissipation fans (15), and filter plates (16) are fixedly installed at the upper ends of the installation cavity (13), and seted up on filter plate (16) with connecting rod (17) matched with round hole (18), install connecting block (19) on connecting rod (17), and install installation piece (20) on connecting block (19), fixed mounting has a plurality of brushes (21) on the lateral wall of installation piece (20), and every brush (21) lower extreme all pastes with the upper surface of filter plate (16) mutually.
2. The dustproof case with the real-time progress management system for the engineering construction project according to claim 1, wherein the clamping mechanism is composed of a through hole (7), an insertion rod (6), a slot (8) and a pulling plate (9), the through hole (7) is formed in the fixing plate (5), the insertion rod (6) is slidably connected into the through hole (7), the slot (8) is formed in the side wall of the case body (1), the slot (8) is matched with the insertion rod (6), and the pulling plate (9) is fixedly installed at one end, away from the case body (1), of the insertion rod (6).
3. The dustproof case with the real-time progress management system for the engineering construction project according to claim 2, wherein a plurality of clamping rods (10) are fixedly mounted on the side wall of one end, close to the case body (1), of the insertion rod (6), a plurality of clamping grooves (11) are formed in the side wall of the insertion groove (8), each clamping groove (11) is matched with the corresponding clamping rod (10), and a plurality of moving grooves (12) matched with the corresponding clamping rods (10) are formed in the side wall of the through hole (7).
4. The dustproof case with the real-time progress management system for the engineering construction projects according to claim 1, wherein a sliding groove (23) is formed in the connecting rod (17), a sliding rod (22) matched with the sliding groove (23) is fixedly installed at the lower end of the connecting block (19), and a tension spring (24) is installed between the sliding rod (22) and the sliding groove (23).
5. The dustproof case with the real-time progress management system for the engineering construction projects according to claim 4, wherein two limit blocks (25) are fixedly installed on the side wall of the sliding rod (22), two limit grooves are formed in the side wall of the sliding groove (23), and the two limit grooves are respectively matched with the two limit blocks (25).
6. The dustproof type chassis with the real-time progress management system for the engineering construction project according to claim 1, wherein a threaded rod (26) is fixedly installed at the upper end of the connecting block (19), and the threaded rod (26) is in threaded connection with the installing block (20).
CN202123246874.XU 2021-12-22 2021-12-22 Dustproof type chassis with real-time progress management system of engineering construction project Active CN216647273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123246874.XU CN216647273U (en) 2021-12-22 2021-12-22 Dustproof type chassis with real-time progress management system of engineering construction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123246874.XU CN216647273U (en) 2021-12-22 2021-12-22 Dustproof type chassis with real-time progress management system of engineering construction project

Publications (1)

Publication Number Publication Date
CN216647273U true CN216647273U (en) 2022-05-31

Family

ID=81742692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123246874.XU Active CN216647273U (en) 2021-12-22 2021-12-22 Dustproof type chassis with real-time progress management system of engineering construction project

Country Status (1)

Country Link
CN (1) CN216647273U (en)

Similar Documents

Publication Publication Date Title
CN212936344U (en) Dustproof construction of communication machine case
CN216647273U (en) Dustproof type chassis with real-time progress management system of engineering construction project
CN210924376U (en) Computer machine case cleaning device
CN214151633U (en) Computer air-cooled external heat radiation structure
CN214175038U (en) Computer air guide cover
CN210381741U (en) Air-cooled heat dissipation box of optical transmission equipment
CN221149254U (en) Rack-mounted high-performance server
CN216355565U (en) Refrigeration heat abstractor for electric cabinet
CN112510515A (en) GCK feed cabinet convenient to heat dissipation
CN209766181U (en) Transformer cabinet capable of taking out and unloading ventilation opening
CN212384196U (en) Self-cleaning mechanism of computer case
CN209859621U (en) Big data storage dish dust-proof net case convenient to wash and change
CN218735749U (en) Computer network cabinet capable of radiating
CN219718704U (en) Power grid monitoring mechanism convenient to clear up dust
CN211557824U (en) Automatic change heat abstractor for equipment
CN210402082U (en) Three-phase energy consumption monitoring devices
CN218853765U (en) Computer heat dissipation case capable of automatically cleaning filter screen
CN111399596A (en) Low-load server memory heat radiation structure
CN215769612U (en) Computer machine case convenient to dismantle
CN210294987U (en) Fixing structure for connecting power supply adapter plate fixing piece and power supply
CN117939325A (en) Network data encryption device
CN221080672U (en) Protection mechanism of switch board connecting wire
CN219800101U (en) Cooling device for computer equipment
CN216772348U (en) Computer panel with quick disassembly mechanism
CN211481727U (en) Dustproof ventilation panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant