CN216644423U - Temperature and humidity control system of plant protein food production workshop - Google Patents

Temperature and humidity control system of plant protein food production workshop Download PDF

Info

Publication number
CN216644423U
CN216644423U CN202220013054.1U CN202220013054U CN216644423U CN 216644423 U CN216644423 U CN 216644423U CN 202220013054 U CN202220013054 U CN 202220013054U CN 216644423 U CN216644423 U CN 216644423U
Authority
CN
China
Prior art keywords
workshop
temperature
fan
wall
protein food
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220013054.1U
Other languages
Chinese (zh)
Inventor
张晓敏
吕娜
王子玥
王宇辰
曹志鹏
刘亚男
刘佳文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitga Zibo Food Technology Co ltd
Original Assignee
Mitga Zibo Food Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitga Zibo Food Technology Co ltd filed Critical Mitga Zibo Food Technology Co ltd
Priority to CN202220013054.1U priority Critical patent/CN216644423U/en
Application granted granted Critical
Publication of CN216644423U publication Critical patent/CN216644423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model discloses a temperature and humidity control system of a plant protein food production workshop, belonging to the technical field of plant protein production, the technical scheme is characterized by comprising a workshop, wherein a door-shaped temperature control pipeline is arranged at the top end in the workshop, the outer wall of the temperature control pipeline is fixedly connected with the inner wall of a workshop through a plurality of anchor ears, the handle can rotate the movable plate, thereby reducing and expanding the included angle between the movable plate and the fixed plate, adjusting the expansion degree of the air injection ports so as to adjust the size of the air injection, gradually increasing the size of the air injection ports from left to right, thereby make a plurality of wind-jet openings can be even spout the wind, make the temperature more even, it is inconvenient to have solved current vegetable protein food workshop atmospheric control, and the temperature diffusion is inhomogeneous, leads to each interval in the workshop inside to have the difference in temperature, and the atmospheric temperature is difficult to control, leads to vegetable protein food production work to receive the problem of influence.

Description

Temperature and humidity control system of plant protein food production workshop
Technical Field
The utility model relates to the technical field of vegetable protein production, in particular to a temperature and humidity control system for a vegetable protein food production workshop.
Background
The vegetable protein is one of proteins, is derived from plants, has comprehensive nutrition, is similar to animal protein, is easy to digest and absorb by human bodies, has various physiological health-care functions, and has requirements on temperature and humidity in workshops during production of vegetable protein food.
The temperature and humidity control of the existing plant protein food production workshop is inconvenient, the temperature diffusion is not uniform, the temperature difference exists between each section in the workshop, the temperature and the humidity are difficult to control, and the plant protein food production work is influenced.
Disclosure of Invention
The utility model aims at the problems and provides a temperature and humidity control system of a plant protein food production workshop to solve the problems.
The utility model is realized in this way, a temperature and humidity control system for plant protein food production workshop, comprising:
the temperature control device comprises a workshop, wherein a door-shaped temperature control pipeline is arranged at the top end inside the workshop, and the outer wall of the temperature control pipeline is fixedly connected to the inner wall of the workshop through a plurality of hoops;
the temperature control device comprises a temperature control pipeline, a plurality of air injection ports, a fan-shaped fixed plate, a fan-shaped movable plate and a handle, wherein the air injection ports are uniformly distributed at the bottom of the temperature control pipeline;
and the temperature control device is positioned on the outer side wall of the workshop and used for adjusting and controlling the temperature and humidity inside the workshop.
In order to facilitate heating and cooling of the interior of the plant protein food production workshop, the temperature control device preferably comprises a branch pipe, one end of the branch pipe is closed, the other end of the branch pipe is communicated with a temperature control pipeline, a first fan and a heater positioned on the left side of the first fan are installed behind the outer wall of the workshop, a plurality of electric heating blocks are arranged inside the heater, a second fan is arranged on the outer wall of the heater, and the first fan and the heater are respectively communicated with the branch pipe through a first connecting pipe and a second connecting pipe.
In order to humidify and dehumidify the interior of the workshop, the temperature and humidity control system of the plant protein food production workshop is preferably characterized in that a humidifier is mounted on the right side of the outer wall of the workshop and is communicated with the interior of the workshop through a pipeline, and dehumidifying fans are mounted on the left side wall and the right side wall of the workshop.
In order to monitor the temperature and the humidity inside the workshop in real time, the temperature and humidity control system of the plant protein food production workshop is preferably used, and the front end of the inner wall of the workshop is provided with a temperature and humidity sensor.
In order to facilitate the control of the temperature and humidity inside the plant protein food production workshop, the temperature and humidity control system is preferably used as the temperature and humidity control system of the plant protein food production workshop, a control box is installed at the rear end of the inner wall of the workshop, the first fan, the second fan, the heater, the humidifier, the temperature and humidity sensor and the dehumidifying fan are all electrically connected with the control box, and a display screen and a control button are arranged on the outer wall of the control box.
In order to facilitate the control of the opening and closing of the first connecting pipe and the second connecting pipe, the outer walls of the first connecting pipe and the second connecting pipe are provided with valves, which is preferable for the temperature and humidity control system of the plant protein food production workshop.
Compared with the prior art, the utility model has the beneficial effects that:
the temperature control pipeline is arranged at the top end of the interior of a workshop in a door shape, a plurality of uniformly distributed air injection ports are arranged at the bottom of the temperature control pipeline, so that hot air and cold air can be uniformly diffused into the interior of the workshop, the temperature in the workshop is more uniform, a fan-shaped fixed plate is fixedly connected to the inner side of each air injection port, one side of the fixed plate is rotatably connected with a fan-shaped movable plate through a pin shaft, the movable plate can be rotated through a handle, so that the included angle between the movable plate and the fixed plate is reduced and enlarged, the expansion degree of the air injection ports is adjusted, and the size of the air injection ports is adjusted;
start first fan, cold wind gets into the control by temperature change pipeline through first connecting pipe, thereby be convenient for cool down, start second fan and heater, a plurality of electrical heating piece with the air heating, thereby make inside hot-air gets into the control by temperature change pipeline through the second connecting pipe, thereby be convenient for heat, the humidifier is convenient for carry out the humidification for the inside in workshop, the hydrofuge fan is convenient for take out the inside moisture in workshop, thereby reduce humidity, first fan can be controlled through the control button of control box, the second fan, the heater, opening and close of humidifier and hydrofuge fan, be convenient for carry out operation control, temperature and humidity sensor's monitoring data passes through the display screen and shows, convenient to use person observes.
Drawings
FIG. 1 is an overall top view block diagram of the present invention;
FIG. 2 is a bottom view of the temperature controlled pipeline of the present invention;
FIG. 3 is a view showing the structure of a tuyere of the present invention;
fig. 4 is a front view structural diagram of the control box of the present invention.
In the figure, 1, a workshop; 2. a temperature controlled pipeline; 3. hooping; 4. an air injection port; 5. a fixing plate; 6. a pin shaft; 7. a movable plate; 8. a handle; 9. a branch pipe; 10. a first fan; 11. a first connecting pipe; 12. a heater; 13. an electrical heating block; 14. a second fan; 15. a second connecting pipe; 16. a humidifier; 17. a temperature and humidity sensor; 18. a control box; 19. a display screen; 20. a control button; 21. a moisture exhausting fan; 22. and (4) a valve.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships illustrated in the drawings, and are used merely for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention. Further, in the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Referring to fig. 1-4, a temperature and humidity control system for a plant protein food production plant includes:
the temperature control device comprises a workshop 1, wherein a door-shaped temperature control pipeline 2 is arranged at the top end inside the workshop 1, and the outer wall of the temperature control pipeline 2 is fixedly connected to the inner wall of the workshop 1 through a plurality of hoops 3;
the temperature control device comprises an air injection port 4, wherein the air injection port 4 is provided with a plurality of air injection ports which are uniformly distributed at the bottom of a temperature control pipeline 2, the inner side of the air injection port 4 is fixedly connected with a fan-shaped fixed plate 5, one side of the fixed plate 5 is rotatably connected with a fan-shaped movable plate 7 through a pin shaft 6, and the outer wall of the movable plate 7 is fixedly connected with a handle 8;
and the temperature control device is positioned on the outer side wall of the workshop 1 and used for adjusting and controlling the temperature and humidity in the workshop 1.
In this embodiment: the temperature control pipeline 2 is arranged at the top end of the interior of the workshop 1 in a door shape, the bottom of the temperature control pipeline is provided with a plurality of uniformly distributed air injection ports 4, thereby enabling hot air and cold air to be uniformly diffused into the workshop 1, enabling the temperature in the workshop to be more uniform, fixedly connecting the inner side of the air injection port 4 with a fan-shaped fixed plate 5, rotatably connecting one side of the fixed plate 5 with a fan-shaped movable plate 7 through a pin shaft 6, rotating the movable plate 7 through a handle 8, thereby reducing and enlarging the included angle between the movable plate 7 and the fixed plate 5, adjusting the expansion degree of the air injection port 4 so as to adjust the size of the air injection, because hot-blast and cold wind get into from the left side of control by temperature change pipeline 2, get into the middle part afterwards, go to the right side again at last, so with the wind-blowing size of a plurality of wind-blowing mouths 4 from left to right increase gradually to make a plurality of wind-blowing mouths 4 can be even spout wind, make the temperature more even.
As a technical optimization scheme of the utility model, the temperature control device comprises a branch pipe 9, one end of the branch pipe 9 is closed, the other end of the branch pipe 9 is communicated with the temperature control pipeline 2, a first fan 10 and a heater 12 positioned on the left side of the first fan 10 are installed behind the outer wall of the workshop 1, a plurality of electric heating blocks 13 are arranged inside the heater 12, a second fan 14 is arranged on the outer wall of the heater 12, and the first fan 10 and the heater 12 are respectively communicated with the branch pipe 9 through a first connecting pipe 11 and a second connecting pipe 15.
In this embodiment: start first fan 10, cold wind gets into temperature control pipeline 2 through first connecting pipe 11 to be convenient for cool down, start second fan 14 and heater 12, a plurality of electrical heating piece 13 heat the air, thereby make hot-air get into temperature control pipeline 2 through second connecting pipe 15 inside, thereby be convenient for heat.
As a technical optimization scheme of the utility model, a humidifier 16 is arranged on the right side of the outer wall of the workshop 1, the humidifier 16 is communicated with the interior of the workshop 1 through a pipeline, and dehumidifying fans 21 are arranged on the left side wall and the right side wall of the workshop 1.
In this embodiment: the humidifier 16 is convenient for humidifying the inside of the plant 1, and the dehumidifying fan 21 is convenient for taking out moisture inside the plant 1, thereby reducing humidity.
As a technical optimization scheme of the utility model, a temperature and humidity sensor 17 is arranged at the front end of the inner wall of the workshop 1.
In this embodiment: temperature and humidity sensor 17 can monitor the inside humiture in workshop 1 in real time, is convenient for cooperate temperature control device to carry out temperature and humidity control.
As a technical optimization scheme of the utility model, a control box 18 is installed at the rear end of the inner wall of the workshop 1, the first fan 10, the second fan 14, the heater 12, the humidifier 16, the temperature and humidity sensor 17 and the dehumidifying fan 21 are all electrically connected with the control box 18, and a display screen 19 and a control button 20 are arranged on the outer wall of the control box 18.
In this embodiment: the opening and closing of the first fan 10, the second fan 14, the heater 12, the humidifier 16 and the dehumidifying fan 21 can be controlled through the control button 20 of the control box 18, so that the operation and control are convenient, and the monitoring data of the temperature and humidity sensor 17 is displayed through the display screen 19, so that the observation of a user is convenient.
As a technical optimization scheme of the present invention, the outer walls of the first connecting pipe 11 and the second connecting pipe 15 are provided with valves 22.
In this embodiment: the outer walls of the first connecting pipe 11 and the second connecting pipe 15 are both provided with valves 22, and the opening and closing of the first connecting pipe 11 and the second connecting pipe 15 are conveniently controlled through the valves 22.
The working principle and the using process of the utility model are as follows: the temperature control pipeline 2 is arranged at the top end inside the workshop 1 in a door shape, the bottom of the temperature control pipeline is provided with a plurality of uniformly distributed air injection ports 4, so that hot air and cold air can be uniformly diffused into the workshop 1, the temperature in the workshop is more uniform, the inner side of each air injection port 4 is fixedly connected with a fan-shaped fixed plate 5, one side of each fixed plate 5 is rotatably connected with a fan-shaped movable plate 7 through a pin shaft 6, the movable plate 7 can be rotated through a handle 8, the included angle between the movable plate 7 and the fixed plate 5 is enlarged, the expansion degree of each air injection port 4 is adjusted, the size of the air injection is adjusted conveniently, the hot air and the cold air enter from the left side of the temperature control pipeline 2 and then enter the middle part and finally reach the right side, the size of the air injection ports 4 is gradually increased from left to right, the air injection ports 4 can uniformly inject air, and the temperature is more uniform, start first fan 10, cold wind gets into temperature control pipeline 2 through first connecting pipe 11, thereby be convenient for lower the temperature, start second fan 14 and heater 12, a plurality of electrical heating piece 13 are with the air heating, thereby make hot-air pass through inside second connecting pipe 15 gets into temperature control pipeline 2, thereby be convenient for heat, humidifier 16 is convenient for carry out the humidification for the inside in workshop 1, hydrofuge fan 21 is convenient for take out the inside moisture in workshop 1, thereby reduce humidity, first fan 10 can be controlled through control button 20 of control box 18, second fan 14, heater 12, opening and close of humidifier 16 and hydrofuge fan 21, be convenient for carry out operation control, temperature and humidity sensor 17's monitoring data passes through display screen 19 and shows, convenient to use person observes.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a temperature humidity control system in vegetable protein food manufacturing shop which characterized in that: the method comprises the following steps:
the temperature control device comprises a workshop (1), wherein a door-shaped temperature control pipeline (2) is arranged at the top end inside the workshop (1), and the outer wall of the temperature control pipeline (2) is fixedly connected to the inner wall of the workshop (1) through a plurality of anchor ears (3);
the temperature control device comprises a tuyere (4), wherein a plurality of tuyeres (4) are uniformly distributed at the bottom of a temperature control pipeline (2), the inner side of the tuyere (4) is fixedly connected with a fan-shaped fixed plate (5), one side of the fixed plate (5) is rotatably connected with a fan-shaped movable plate (7) through a pin shaft (6), and the outer wall of the movable plate (7) is fixedly connected with a handle (8);
and the temperature control device is positioned on the outer side wall of the workshop (1) and used for adjusting and controlling the temperature and humidity in the workshop (1).
2. The system of claim 1, wherein the plant protein food production plant further comprises: temperature control device includes branch pipe (9), branch pipe (9) one end is sealed and the other end and control by temperature change pipeline (2) intercommunication, first fan (10) and be located left heater (12) of first fan (10) are installed to the outer wall rear of workshop (1), the inside of heater (12) is provided with a plurality of electric heating piece (13), the outer wall of heater (12) is provided with second fan (14), first fan (10) and heater (12) are respectively through first connecting pipe (11) and second connecting pipe (15) and branch pipe (9) intercommunication.
3. The system of claim 2, wherein the plant protein food production plant further comprises: humidifier (16) are installed on the outer wall right side in workshop (1), humidifier (16) pass through the inside intercommunication in pipeline and workshop (1), hydrofuge fan (21) are all installed to the left and right sides wall in workshop (1).
4. The system of claim 3, wherein the plant protein food production plant further comprises: and a temperature and humidity sensor (17) is arranged at the front end of the inner wall of the workshop (1).
5. The system of claim 4, wherein the plant protein food production plant further comprises: control box (18) are installed to the inner wall rear end in workshop (1), first fan (10), second fan (14), heater (12), humidifier (16), temperature and humidity sensor (17) and hydrofuge fan (21) all with control box (18) electric connection, the outer wall of control box (18) is provided with display screen (19) and control button (20).
6. The system of claim 2, wherein the plant protein food production plant further comprises: and valves (22) are arranged on the outer walls of the first connecting pipe (11) and the second connecting pipe (15).
CN202220013054.1U 2022-01-05 2022-01-05 Temperature and humidity control system of plant protein food production workshop Active CN216644423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220013054.1U CN216644423U (en) 2022-01-05 2022-01-05 Temperature and humidity control system of plant protein food production workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220013054.1U CN216644423U (en) 2022-01-05 2022-01-05 Temperature and humidity control system of plant protein food production workshop

Publications (1)

Publication Number Publication Date
CN216644423U true CN216644423U (en) 2022-05-31

Family

ID=81724960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220013054.1U Active CN216644423U (en) 2022-01-05 2022-01-05 Temperature and humidity control system of plant protein food production workshop

Country Status (1)

Country Link
CN (1) CN216644423U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115903969A (en) * 2022-11-21 2023-04-04 苏州明浩电子有限公司 Automatic temperature and humidity control system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115903969A (en) * 2022-11-21 2023-04-04 苏州明浩电子有限公司 Automatic temperature and humidity control system

Similar Documents

Publication Publication Date Title
CN106403033B (en) The air-out control method of cabinet air-conditioner, air conditioner and cabinet air-conditioner
CN216644423U (en) Temperature and humidity control system of plant protein food production workshop
CN201533509U (en) Intelligent low-temperature grain storage automatic control system
CN107642874A (en) The control method and air conditioner of air conditioner
CN106338102B (en) The air-out control method of cabinet air-conditioner, air conditioner and cabinet air-conditioner
CN101976050A (en) Air-condition constant temperature operation energy-conservation control system
CN115838628A (en) Environment simulation box for biological culture and use method thereof
CN104991591A (en) Control system used for capsule drying and storage
CN209744866U (en) Full-automatic tea brick drying room that blooms
WO2023184944A1 (en) Novel electric refrigerated truck refrigeration apparatus, control system, and control method
CN206273086U (en) A kind of heliogreenhouse environment conditioning system
CN209279564U (en) Drying device is used in a kind of processing of fructus lycii
CN215301997U (en) Automatic control system for mushroom culture room
CN206726073U (en) Electrostatic refrigeration storage system
CN213523669U (en) Baked food cooling box for food processing
CN208320850U (en) A kind of Novel bunk temperature wet heating testing case
CN113396782A (en) Automatic control system for mushroom culture room
CN220951827U (en) Fermentation box capable of controlling internal temperature
CN109520226B (en) Multifunctional green brick drying equipment
CN206556139U (en) A kind of intelligent air processing system
CN2156447Y (en) Low-temp. refrigeration and temp. controller
CN206739456U (en) Air ducting and air conditioner
CN212623788U (en) Medical fridge of reduction humiture fluctuation
CN215067899U (en) Device for controlling fermentation temperature of pure natural bean curd milk
CN219995788U (en) Endoscope drying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant