CN216641659U - Building engineering construction safety control rail - Google Patents
Building engineering construction safety control rail Download PDFInfo
- Publication number
- CN216641659U CN216641659U CN202123224878.8U CN202123224878U CN216641659U CN 216641659 U CN216641659 U CN 216641659U CN 202123224878 U CN202123224878 U CN 202123224878U CN 216641659 U CN216641659 U CN 216641659U
- Authority
- CN
- China
- Prior art keywords
- bolt
- holes
- plate
- construction safety
- seted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Fencing (AREA)
Abstract
The utility model discloses a construction safety management fence for building engineering, and particularly relates to the technical field of building fences. According to the utility model, the adjusting plate can move up and down by disassembling the first bolt, then the height of the adjusting plate is fixed by matching the first bolt with the positioning hole and the connecting hole, meanwhile, the movable column can also move up and down by the fourth bolt, then the height of the movable column is fixed by matching the fourth bolt with the through hole and the mounting hole, and the overall structure can adjust the height of the adjustable column according to the requirement, so that the adaptability and the practicability of the adjustable column are enhanced.
Description
Technical Field
The utility model relates to the field of art tools, in particular to a construction safety management fence for building engineering.
Background
All need establish interim safety protection rail and keep apart during construction, strengthen construction safety on the one hand, on the other hand can remind other people to notice the danger of job site. With the change of times of technology, people have higher and higher requirements on the construction of fences in constructional engineering.
The height of the existing safety fence cannot be adjusted according to actual conditions in the using process, so that the existing safety fence has certain limitation, and therefore a construction safety management fence for construction engineering is needed.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects in the prior art, the utility model provides a construction safety management fence for building engineering, wherein the height of an adjusting plate can be fixed by disassembling a first bolt, the height of the adjusting plate can be fixed by matching the first bolt with a positioning hole and a connecting hole, meanwhile, a movable column can be moved up and down by a fourth bolt, the height of the movable column can be fixed by matching the fourth bolt with a through hole and a mounting hole, and the overall structure can adjust the height of the safety management fence according to requirements, so that the adaptability and the practicability of the safety management fence are enhanced, and the problems in the background art are solved.
In order to achieve the purpose, the utility model provides the following technical scheme: a construction safety management fence for building engineering comprises two supporting plates, supporting grooves are arranged on the top of the two supporting plates, an adjusting plate is arranged in the supporting groove, a plurality of positioning holes are formed in the front side and the rear side of the supporting plate, the positioning holes are uniformly arranged at intervals from top to bottom, a plurality of connecting holes are arranged in the adjusting plate in a penetrating way, the connecting holes respectively correspond to the positioning holes in the front and back directions, the front side of the supporting plate is provided with a first bolt, the rear end of the first bolt sequentially penetrates through the positioning hole and the connecting hole and extends to the rear side of the supporting plate, the outer part of the rear end of the first bolt is connected with a first nut in a threaded manner, the outer part of the top end of the adjusting plate is sleeved with a shell, the casing cross-section is established to Jiong shapes, the casing top is equipped with the second bolt, the casing top is connected through second bolt and regulating plate top, fixedly between two casings is equipped with the diaphragm.
In a preferred embodiment, a base is fixedly arranged at the bottom end of the supporting plate, a frame is arranged at the top of the base, the frame is sleeved outside the supporting plate, a third bolt is arranged at the top of the frame, and the frame is connected with the base through the third bolt.
In a preferred embodiment, a fixing plate is fixedly arranged between the two frame bodies, a plurality of lower limiting grooves are formed in the top of the fixing plate, the lower limiting grooves are uniformly arranged at intervals, the fixing plate is located at the bottom of the transverse plate, a plurality of upper limiting grooves are formed in the bottom of the transverse plate, and the upper limiting grooves respectively correspond to the lower limiting grooves in position.
In a preferred embodiment, a positioning column is arranged inside the lower limiting groove, the top of the positioning column is provided with a positioning groove, the front side and the rear side of the positioning column are provided with a plurality of mounting holes, the mounting holes are uniformly arranged at intervals from top to bottom, and the mounting holes are communicated with the positioning groove.
In a preferred embodiment, the inside movable post that is equipped with of constant head tank, the movable post top runs through the constant head tank and extends to the inside of supreme spacing groove, a plurality of through-holes have been seted up in the inside running through of movable post, and even interval sets up about a plurality of through-holes, the reference column front side is equipped with the fourth bolt, fourth bolt rear end runs through mounting hole and through-hole in proper order and extends to the reference column rear side, the outside threaded connection in fourth bolt rear end has the second nut.
In a preferred embodiment, the plurality of through holes correspond to the plurality of mounting holes in front and rear positions, respectively.
The utility model has the technical effects and advantages that:
1. according to the utility model, the adjusting plate can move up and down by disassembling the first bolt, then the height of the adjusting plate is fixed by matching the first bolt with the positioning hole and the connecting hole, meanwhile, the movable column can also move up and down by the fourth bolt, then the height of the movable column is fixed by matching the fourth bolt with the through hole and the mounting hole, and the overall structure can adjust the height of the adjustable column according to the requirement, so that the adaptability and the practicability of the adjustable column are enhanced;
2. the shell and the transverse plate can be installed or disassembled through the arrangement of the second bolt, the supporting plate can be separated from or connected with the adjusting plate through the arrangement of the first bolt, the frame body and the base can be installed or separated through disassembling the third bolt, the positioning column can be connected with or separated from the movable column through the arrangement of the fourth bolt, the integral structure is convenient to install or disassemble, the integral structure does not occupy space after being disassembled, and subsequent conveying is convenient.
Drawings
Fig. 1 is a front view of the overall structure of the present invention.
Fig. 2 is an exploded view of the overall structure of the present invention.
Fig. 3 is an enlarged view of a portion a of fig. 2 according to the present invention.
Fig. 4 is an exploded view of the support plate of the present invention.
Fig. 5 is an exploded view of the positioning post of the present invention.
The reference signs are: 1. a support plate; 2. a support groove; 3. an adjusting plate; 4. positioning holes; 5. connecting holes; 6. a first bolt; 7. a first nut; 8. a housing; 9. a second bolt; 10. a transverse plate; 11. a base; 12. a frame body; 13. a third bolt; 14. a fixing plate; 15. a lower limiting groove; 16. an upper limiting groove; 17. a positioning column; 18. positioning a groove; 19. mounting holes; 20. a movable post; 21. a through hole; 22. four bolts; 23. a second nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to the attached drawings 1-5 of the specification, the construction safety management fence for the building engineering of the embodiment comprises two support plates 1, wherein the top of each support plate 1 is provided with a support groove 2, an adjusting plate 3 is arranged in each support groove 2, the front side and the rear side of each support plate 1 are provided with a plurality of positioning holes 4, the positioning holes 4 are uniformly arranged at intervals up and down, the adjusting plate 3 is internally provided with a plurality of connecting holes 5 in a penetrating manner, the connecting holes 5 respectively correspond to the positioning holes 4 in the front and the rear direction, the front side of each support plate 1 is provided with a first bolt 6, the adjusting plate 3 can be moved up and down by disassembling the first bolt 6, then the height of the adjusting plate 3 is fixed by matching the first bolt 6 with the positioning holes 4 and the connecting holes 5, meanwhile, the movable column 20 can be moved up and down by matching the fourth bolt 22 with the through hole 21 and the mounting hole 19, the height of the movable column 20 is fixed, the height of the adjustable column can be adjusted according to needs in the whole structure, and therefore adaptability and practicability of the adjustable column are improved, the rear end of the first bolt 6 sequentially penetrates through the positioning hole 4 and the connecting hole 5 and extends to the rear side of the supporting plate 1, the first nut 7 is connected to the outer portion of the rear end of the first bolt 6 through threads, the shell 8 is sleeved outside the top end of the adjusting plate 3, the cross section of the shell 8 is Jiong-shaped, the top end of the shell 8 is provided with the second bolt 9, the top end of the shell 8 is connected with the top of the adjusting plate 3 through the second bolt 9, and the transverse plate 10 is fixedly arranged between the two shells 8.
Fixed plate 14 that is equipped with between two framework 12, a plurality of spacing grooves 15 down have been seted up at fixed plate 14 top, and a plurality of spacing grooves 15 are evenly spaced to be set up down, fixed plate 14 is located diaphragm 10 bottom, a plurality of spacing grooves 16 up have been seted up to diaphragm 10 bottom, and a plurality of spacing grooves 16 up are corresponding from top to bottom with a plurality of spacing groove 15's position down respectively, through the setting of spacing groove 16 and spacing groove 15 down, are convenient for carry on spacing fixedly to reference column 17 and activity post 20, improve overall structure's stability.
The inside movable post 20 that is equipped with of constant head tank 18, the 20 tops of activity post run through constant head tank 18 and extend to supreme spacing groove 16 inside, a plurality of through-holes 21 have been seted up in the inside running through of activity post 20, and even interval sets up about a plurality of through-holes 21, reference column 17 front side is equipped with fourth bolt 22, fourth bolt 22 rear end runs through mounting hole 19 and through-hole 21 in proper order and extends to reference column 17 rear side, the outside threaded connection in fourth bolt 22 rear end has second nut 23, through the cooperation of second bolt 9 with mounting hole 19 and through-hole 21, installs fixedly reference column 17 and movable post 20.
The through holes 21 correspond to the mounting holes 19 in front and back positions, and the fourth bolt 22 can fix and limit the positioning column 17 and the movable column 20 through the through holes 21 and the mounting holes 19.
The implementation scenario is specifically as follows: a user can move the adjusting plate 3 up and down by disassembling the first bolt 6, then the height of the adjusting plate 3 is fixed by matching the first bolt 6 with the positioning hole 4 and the connecting hole 5, meanwhile, the movable column 20 can move up and down by the fourth bolt 22, then the height of the movable column 20 is fixed by matching the fourth bolt 22 with the through hole 21 and the mounting hole 19, and the overall structure can adjust the height of the adjustable column are further.
Referring to the attached drawings 2-5 in the specification, in the safety management fence for construction engineering of the building according to the embodiment, a base 11 is fixedly arranged at the bottom end of the supporting plate 1, a frame 12 is arranged at the top of the base 11, the frame 12 is sleeved outside the supporting plate 1, a third bolt 13 is arranged at the top of the frame 12, the frame 12 is connected with the base 11 through the third bolt 13, and the fixing plate 14 is conveniently mounted and fixed through the arrangement of the frame 12 and the third bolt 13.
The implementation scenario is specifically as follows: the shell 8 and the transverse plate 10 can be installed or disassembled through the arrangement of the second bolt 9, the supporting plate 1 and the adjusting plate 3 can be separated or connected through the arrangement of the first bolt 6, the frame body 12 and the base 11 can be installed or separated through the disassembly of the third bolt 13, and the positioning column 17 and the movable column 20 can be connected or separated through the arrangement of the fourth bolt 22.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the utility model, only the structures related to the disclosed embodiments are referred to, other structures can refer to common designs, and the same embodiment and different embodiments of the utility model can be combined with each other without conflict;
and finally: the above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that are within the spirit and principle of the present invention are intended to be included in the scope of the present invention.
Claims (6)
1. The utility model provides a building engineering construction safety control rail, includes two backup pads (1), its characterized in that: the top parts of two support plates (1) are respectively provided with a support groove (2), an adjusting plate (3) is arranged in the support groove (2), the front side and the rear side of each support plate (1) are respectively provided with a plurality of positioning holes (4), the positioning holes (4) are uniformly arranged at intervals from top to bottom, a plurality of connecting holes (5) are arranged in the adjusting plate (3) in a penetrating way, the connecting holes (5) are respectively corresponding to the positioning holes (4) from front to back, the front side of each support plate (1) is provided with a first bolt (6), the rear end of the first bolt (6) sequentially penetrates through the positioning holes (4) and the connecting holes (5) and extends to the rear side of the support plate (1), the outer part of the rear end of the first bolt (6) is in threaded connection with a first nut (7), the outer part of the top end of the adjusting plate (3) is sleeved with a shell (8), the cross section of the shell (8) is Jiong-shaped, the top end of the shell (8) is provided with a second bolt (9), the top end of the shell (8) is connected with the top of the adjusting plate (3) through a second bolt (9), and a transverse plate (10) is fixedly arranged between the two shells (8).
2. The construction safety management fence of claim 1, wherein: the supporting plate is characterized in that a base (11) is fixedly arranged at the bottom end of the supporting plate (1), a frame body (12) is arranged at the top of the base (11), the supporting plate (1) is sleeved with the frame body (12), a third bolt (13) is arranged at the top of the frame body (12), and the frame body (12) is connected with the base (11) through the third bolt (13).
3. The construction safety management fence of claim 2, wherein: fixed plate (14) of being equipped with between two framework (12), a plurality of spacing grooves (15) down have been seted up at fixed plate (14) top, and a plurality of spacing grooves (15) are down evenly spaced and set up, fixed plate (14) are located diaphragm (10) bottom, diaphragm (10) bottom has been seted up a plurality of spacing grooves (16) of going up, and a plurality of spacing grooves (16) of going up are corresponding from top to bottom with the position of a plurality of spacing grooves (15) down respectively.
4. The construction safety management fence of claim 3, wherein: lower spacing groove (15) inside is equipped with reference column (17), constant head tank (18) have been seted up at reference column (17) top, a plurality of mounting holes (19) have all been seted up to reference column (17) front and back both sides, and even interval sets up about a plurality of mounting holes (19), mounting hole (19) are linked together with constant head tank (18).
5. The construction safety management fence of claim 4, wherein: the utility model discloses a spacing groove (16) is equipped with in constant head tank (18) inside movable post (20) that is equipped with, movable post (20) top runs through constant head tank (18) and extends to inside spacing groove (16), a plurality of through-holes (21) have been seted up in inside running through of movable post (20), and even interval sets up about a plurality of through-holes (21), reference column (17) front side is equipped with fourth bolt (22), fourth bolt (22) rear end runs through mounting hole (19) and through-hole (21) in proper order and extends to reference column (17) rear side, fourth bolt (22) rear end outside threaded connection has second nut (23).
6. The construction safety management fence of claim 5, wherein: the through holes (21) correspond to the mounting holes (19) in the front-rear direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123224878.8U CN216641659U (en) | 2021-12-21 | 2021-12-21 | Building engineering construction safety control rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123224878.8U CN216641659U (en) | 2021-12-21 | 2021-12-21 | Building engineering construction safety control rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216641659U true CN216641659U (en) | 2022-05-31 |
Family
ID=81743709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123224878.8U Expired - Fee Related CN216641659U (en) | 2021-12-21 | 2021-12-21 | Building engineering construction safety control rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216641659U (en) |
-
2021
- 2021-12-21 CN CN202123224878.8U patent/CN216641659U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104878695B (en) | Viaduct cover beam shaping bottom die support and application method thereof | |
CN216641659U (en) | Building engineering construction safety control rail | |
CN216305383U (en) | Template for assembly type building construction | |
CN202596117U (en) | Modularized and integrated antistatic floor support | |
CN203977672U (en) | A kind of roof suspended ceiling integrated member | |
CN212614102U (en) | Safety enclosure for construction engineering | |
CN104110081A (en) | Assembled-type workshop wallboard and upright connecting structure | |
CN201645089U (en) | Assembly welding mould for battery box cover | |
CN204487462U (en) | Speed changer assembly bench | |
CN211173008U (en) | Operating platform for variable cross-section cross box column | |
CN214292782U (en) | Supporting device for cabin | |
CN213157112U (en) | Electric wheelchair controller circuit board convenient to dismouting | |
CN208184104U (en) | A kind of support formed steel construction | |
CN112663508A (en) | Novel hang basket and connect side form turning template | |
CN212735698U (en) | Flexible assembly fixture for unmanned aerial vehicle body | |
CN218758879U (en) | Building assembly type wall body mounting frame convenient to assemble and disassemble | |
CN216713372U (en) | Corrosion-resistant steel structure connecting piece | |
CN110748012A (en) | Steel structure crossbeam | |
CN218117245U (en) | Novel building engineering formwork supports device | |
CN212956989U (en) | Stable form activity board house outer frame | |
CN217135069U (en) | Wiring groove mounting structure | |
CN219368148U (en) | Rectifying tower ware structure of modularization cold box | |
CN218406853U (en) | Free type small wheel vehicle field splicing structure | |
CN218593476U (en) | Supporting platform for film production equipment | |
CN211251347U (en) | Embedded structure of display screen of 3D printing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220531 |