CN216640958U - Connecting mechanism between concrete filled steel tube supports - Google Patents

Connecting mechanism between concrete filled steel tube supports Download PDF

Info

Publication number
CN216640958U
CN216640958U CN202123381959.9U CN202123381959U CN216640958U CN 216640958 U CN216640958 U CN 216640958U CN 202123381959 U CN202123381959 U CN 202123381959U CN 216640958 U CN216640958 U CN 216640958U
Authority
CN
China
Prior art keywords
clamp
clamping block
clamping
block
connecting mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123381959.9U
Other languages
Chinese (zh)
Inventor
丁厚刚
朱绪文
郅铭涛
曹国民
吴京山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Best Industrial Equipment Co ltd
Original Assignee
Shandong Best Industrial Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Best Industrial Equipment Co ltd filed Critical Shandong Best Industrial Equipment Co ltd
Priority to CN202123381959.9U priority Critical patent/CN216640958U/en
Application granted granted Critical
Publication of CN216640958U publication Critical patent/CN216640958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a connecting mechanism between steel pipe concrete support frames, which comprises a first clamp and a second clamp, wherein the second clamp is movably arranged at one end of the first clamp, a hinge is arranged between the second clamp and the first clamp, the first clamp and the second clamp respectively comprise a first clamping block and a second clamping block, clamping grooves for butting a support are respectively formed in the outer surfaces of the first clamping block and the second clamping block, the first clamping block and the second clamping block are movably connected through a telescopic inner plate, and splicing cushion blocks are respectively spliced and arranged on the inner sides of the first clamping block and the second clamping block; after first anchor clamps and second anchor clamps are closed, insert the bolt in first fixed knot and the fixed knot department of second, from the fixed operation of accomplishing between two sets of steel pipe concrete support outward, utilize the setting of flexible inner panel for coupling mechanism has flexible regulation structure between this steel pipe concrete support, makes it can do corresponding regulation operation according to the distance between two sets of supports.

Description

Connecting mechanism between concrete filled steel tube supports
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a connecting mechanism between concrete filled steel tube supports.
Background
The connecting mechanism between the concrete filled steel tube supports is used in the fixing process of the concrete filled steel tube supports, plays a role in fixing the two groups of concrete filled steel tube supports, and can enable the concrete filled steel tube supports to be more convenient to install and operate by utilizing the connecting mechanism.
Patent document CN203515613U discloses a push rod connection structure between concrete filled steel tube support, including many steel filled steel tube support that arrange side by side, connect through many ejector pins between two adjacent steel filled steel tube support, the ejector pin is hollow steel pipe, is filled with the concrete in the hollow steel pipe. The outer wall of the concrete filled steel tube support is welded with a push rod joint, the push rod joint is provided with a through hole, the end part of the push rod is provided with a bolt, and the bolt is fixed in the through hole. The two ends of the ejector rod are provided with cambered surfaces matched with the outer wall of the concrete-filled steel tube support. The constraint condition of the concrete filled steel tube support body is changed, the overall stability and the deformation resistance of the concrete filled steel tube support are improved, and the ejector rod has high compressive strength and deformation resistance.
However, the connecting mechanism between the steel pipe concrete supports has certain disadvantages when in use, and the traditional connecting mechanism between the steel pipe concrete supports cannot perform telescopic adjustment operation, so that the connecting mechanism cannot perform corresponding adjustment operation according to the distance between the two groups of supports, and the flexibility of the connecting mechanism in use is reduced; and secondly, the connecting mechanism between the traditional concrete filled steel tube supports does not have a combined fixing structure, so that the concrete filled steel tube supports with different calibers cannot be installed and fixed, the application range of the concrete filled steel tube supports is reduced, and certain inconvenience is brought to users.
SUMMERY OF THE UTILITY MODEL
The utility model solves the problems that:
1. the traditional connecting mechanism between the steel pipe concrete support frames cannot perform telescopic adjustment operation, so that the connecting mechanism cannot perform corresponding adjustment operation according to the distance between the two groups of supports, and the flexibility of the connecting mechanism in use is reduced;
2. the connecting mechanism between the traditional concrete filled steel tube supports does not have a combined fixing structure, so that the concrete filled steel tube supports with different calibers cannot be installed and fixed, and the application range of the concrete filled steel tube supports is reduced.
The purpose of the utility model can be realized by the following technical scheme:
the utility model provides a coupling mechanism between concrete filled steel tube support frame, includes first anchor clamps and second anchor clamps, second anchor clamps movable mounting is in the one end of first anchor clamps, and is equipped with the hinge between second anchor clamps and the first anchor clamps, first anchor clamps and second anchor clamps all include first fixture block and second fixture block, the surface of first fixture block and second fixture block all is equipped with the draw-in groove that is used for butt joint support, through flexible inner panel swing joint between first fixture block and the second fixture block, the inboard of first fixture block and second fixture block is all spliced and is installed the concatenation cushion, the inside of first fixture block and second fixture block is hollow structure.
As a further technical scheme of the utility model, two groups of limiting fixture blocks are fixedly arranged on the outer surfaces of two ends of the telescopic inner plate, fastening bolts for locking the limiting fixture blocks are in threaded connection with the inner sides of the first fixture block and the second fixture block, and the telescopic inner plate after telescopic adjustment can be locked and fixed by the aid of the fastening bolts, so that the telescopic inner plate is prevented from loosening.
As a further technical solution of the present invention, the end portions of the first clamp and the second clamp are respectively provided with a first fixing buckle and a second fixing buckle, and the inner sides of the first fixing buckle and the second fixing buckle are both provided with a circular notch in a penetrating manner, and the first clamp and the second clamp which are closed can be fixed by using the circular notches of the first fixing buckle and the second fixing buckle in cooperation with a bolt.
According to the further technical scheme, the arc-shaped clamping strips are fixedly arranged in the middle of the outer surface of the splicing cushion block, three groups of limiting clamping grooves are formed in the inner sides of the arc-shaped clamping strips, and the arc-shaped clamping strips are matched with the limiting clamping grooves, so that the first clamping block, the second clamping block and the splicing cushion block can be limited and fixed when the splicing cushion block is installed.
As a further technical scheme, clamping grooves matched with the arc-shaped clamping strips are formed in the inner sides of the first clamping block and the second clamping block, and the splicing cushion block and the arc-shaped clamping strips are fixed through welding.
As a further technical scheme of the present invention, the second fixture is movably connected to the first fixture through a hinge, the outer surfaces of the first fixture block and the second fixture block are provided with arc-shaped clamping grooves, the inner sides of the first fixture block and the second fixture block are provided with telescopic grooves, and the telescopic inner plate can perform telescopic adjustment operation between the first fixture block and the second fixture block by using the arrangement of the telescopic grooves.
The utility model has the beneficial effects that: the utility model arranges the telescopic inner plate, when the connecting mechanism between the steel pipe concrete support frames is used, a user can rotate the fastening bolt according to the distance between the two groups of steel pipe concrete support frames to loosen the first clamping block, the second clamping block and the telescopic inner plate, the user pulls the first clamping block and the second clamping block to draw the telescopic inner plate out of the first clamping block and the second clamping block, thereby adjusting the butt joint position of the arc-shaped clamping grooves on the first clamping block and the second clamping block, the user respectively clamps the arc-shaped clamping grooves of the first clamping block and the second clamping block on the two groups of steel pipe concrete support frames, after the first clamp and the second clamp are closed, bolts are inserted at the first fixing buckle and the second fixing buckle, the fixing operation between the two groups of steel pipe concrete support frames is finished from the outside, and the connecting mechanism between the steel pipe concrete support frames has a telescopic adjusting structure by utilizing the arrangement of the telescopic inner plate, the corresponding adjustment operation can be carried out according to the distance between the two groups of supports;
through setting up concatenation cushion and arc card strip, when coupling mechanism used between this concrete filled steel tube support, the user can be according to the steel pipe diameter of concrete filled steel tube support, through the concatenation cushion that the installation corresponds the aperture on first fixture block and second fixture block, make first fixture block and second fixture block can accomplish the butt joint operation to different bore diameter steel pipes, utilize the spacing draw-in groove of arc card strip cooperation, can be when the installation of concatenation cushion, to first fixture block, play spacing fixed action between second fixture block and the concatenation cushion, it is not hard up to avoid the concatenation cushion, through setting up concatenation cushion and arc card strip, make coupling mechanism have concatenation fixed knot to construct between this concrete filled steel tube support, promote its application scope.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an internal structural view of a first jig in the present invention;
FIG. 3 is an overall view of the splice block of the present invention.
In the figure: 1. a hinge; 2. a first clamp; 3. a second clamp; 4. a first fixing buckle; 5. splicing the cushion blocks; 6. an arc-shaped clamping groove; 7. a second fixing buckle; 8. a telescopic inner plate; 9. fastening a clamping bolt; 10. a limiting clamping block; 11. a first clamping block; 12. a second fixture block; 13. a limiting clamping groove; 14. an arc-shaped clamping strip.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-3, a connection mechanism between concrete filled steel tube support frames comprises a first clamp 2 and a second clamp 3, the second clamp 3 is movably mounted at one end of the first clamp 2, a hinge 1 is arranged between the second clamp 3 and the first clamp 2, the first clamp 2 and the second clamp 3 both comprise a first clamping block 11 and a second clamping block 12, clamping grooves for abutting against a support frame are formed in the outer surfaces of the first clamping block 11 and the second clamping block 12, the first clamping block 11 and the second clamping block 12 are movably connected through a telescopic inner plate 8, splicing cushion blocks 5 are respectively mounted on the inner sides of the first clamping block 11 and the second clamping block 12 in a splicing manner, and the first clamping block 11 and the second clamping block 12 are both hollow structures.
The outer surface of the two ends of the telescopic inner plate 8 is fixedly provided with two sets of limiting clamping blocks 10, the inner sides of the first clamping block 11 and the second clamping block 12 are in threaded connection with fastening clamping bolts 9 used for locking the limiting clamping blocks 10, the telescopic inner plate 8 after telescopic adjustment can be locked and fixed by means of the fastening clamping bolts 9, and the phenomenon that the telescopic inner plate 8 is loosened is avoided.
The tip of first anchor clamps 2 and second anchor clamps 3 is equipped with first fixed knot 4 and the fixed knot 7 of second respectively, and the inboard of the fixed knot 7 of first fixed knot 4 and second has all run through and has seted up circular notch, utilizes the fixed circular notch who detains 7 of first fixed knot 4 and second, and the cooperation bolt can play the fixed action to closed first anchor clamps 2 and second anchor clamps 3.
The arc-shaped clamping strips 14 are fixedly mounted in the middle of the outer surface of the splicing cushion block 5, three groups of limiting clamping grooves 13 are formed in the inner sides of the arc-shaped clamping strips 14, and the arc-shaped clamping strips 14 are matched with the limiting clamping grooves 13, so that the first clamping block 11, the second clamping block 12 and the splicing cushion block 5 can be fixed in a limiting mode when the splicing cushion block 5 is mounted.
The clamping grooves matched with the arc-shaped clamping strips 14 are formed in the inner sides of the first clamping block 11 and the second clamping block 12, and the splicing cushion block 5 and the arc-shaped clamping strips 14 are fixed through welding.
Through hinge 1 swing joint between second anchor clamps 3 and the first anchor clamps 2, and the surface of first fixture block 11 and second fixture block 12 is equipped with arc draw-in groove 6, and the inboard of first fixture block 11 and second fixture block 12 is equipped with flexible groove, utilizes the setting in flexible groove, can be so that flexible inner panel 8 does flexible regulation operation between first fixture block 11 and second fixture block 12.
A connecting mechanism between concrete filled steel tube supports is characterized in that a telescopic inner plate 8 is arranged, when the connecting mechanism between the concrete filled steel tube supports is used, a user can loosen a first clamping block 11, a second clamping block 12 and the telescopic inner plate 8 by rotating a fastening clamping bolt 9 according to the distance between two groups of concrete filled steel tube supports, the user can pull the telescopic inner plate 8 out of the first clamping block 11 and the second clamping block 12 by pulling the first clamping block 11 and the second clamping block 12, so that the butt joint position of an arc-shaped clamping groove 6 on the first clamping block 11 and the second clamping block 12 can be adjusted, the user can respectively clamp the arc-shaped clamping grooves 6 of the first clamping block 11 and the second clamping block 12 on the two groups of concrete filled steel tube supports, after a first clamp 2 and a second clamp 3 are closed, bolts are inserted into a first fixing buckle 4 and a second fixing buckle 7, and fixing operation between the two groups of concrete filled steel tube supports is finished from outside, by means of the arrangement of the telescopic inner plates 8, the connecting mechanism between the concrete filled steel tube support frames is provided with a telescopic adjusting structure, so that the connecting mechanism can perform corresponding adjusting operation according to the distance between the two groups of supports;
through setting up concatenation cushion 5 and arc card strip 14, when coupling mechanism uses between this concrete filled steel tube support, the user can be according to the steel pipe bore of concrete filled steel tube support, through the concatenation cushion 5 of corresponding aperture of installation on first fixture block 11 and second fixture block 12, make first fixture block 11 and second fixture block 12 can accomplish the butt joint operation to different bore steel pipes, utilize arc card strip 14 to cooperate spacing draw-in groove 13, can be when concatenation cushion 5 is installed, to first fixture block 11, play spacing fixed action between second fixture block 12 and the concatenation cushion 5, avoid concatenation cushion 5 not hard up, through setting up concatenation cushion 5 and arc card strip 14, make coupling mechanism has concatenation fixed knot to construct between this concrete filled steel tube support, promote its application scope.
The foregoing is merely exemplary and illustrative of the present invention, and various modifications, additions and substitutions of the specific embodiments described herein may be made by those skilled in the art without departing from the scope of the utility model as defined in the accompanying claims.

Claims (6)

1. A connecting mechanism between steel pipe concrete support frames comprises a first clamp (2) and a second clamp (3), wherein the second clamp (3) is movably arranged at one end of the first clamp (2), a hinge (1) is arranged between the second clamp (3) and the first clamp (2), characterized in that the first clamp (2) and the second clamp (3) both comprise a first clamping block (11) and a second clamping block (12), the outer surfaces of the first clamping block (11) and the second clamping block (12) are respectively provided with a clamping groove for butting the bracket, the first fixture block (11) and the second fixture block (12) are movably connected through a telescopic inner plate (8), the inner sides of the first clamping block (11) and the second clamping block (12) are respectively provided with a splicing cushion block (5), the interiors of the first clamping block (11) and the second clamping block (12) are both hollow structures.
2. The connecting mechanism between steel pipe concrete support frames according to claim 1, wherein two sets of limiting clamping blocks (10) are fixedly mounted on the outer surfaces of two ends of the telescopic inner plate (8), and fastening clamping bolts (9) used for locking the limiting clamping blocks (10) are in threaded connection with the inner sides of the first clamping block (11) and the second clamping block (12).
3. The connecting mechanism of the concrete filled steel tube support frames according to claim 1, wherein a first fixing buckle (4) and a second fixing buckle (7) are respectively arranged at the end parts of the first clamp (2) and the second clamp (3), and circular notches are respectively formed in the inner sides of the first fixing buckle (4) and the second fixing buckle (7) in a penetrating mode.
4. The connecting mechanism of the steel tube concrete support frames according to claim 1, wherein arc-shaped clamping strips (14) are fixedly installed in the middle of the outer surfaces of the splicing cushion blocks (5), and three groups of limiting clamping grooves (13) are formed in the inner sides of the arc-shaped clamping strips (14).
5. The connecting mechanism of the steel tube concrete support frames according to claim 4, wherein the inner sides of the first clamping block (11) and the second clamping block (12) are respectively provided with a clamping groove used for being matched with the arc-shaped clamping strip (14), and the splicing cushion block (5) and the arc-shaped clamping strip (14) are fixed through welding.
6. The connecting mechanism of the steel tube concrete support frame according to claim 1, wherein the second clamp (3) is movably connected with the first clamp (2) through a hinge (1), and arc-shaped clamping grooves (6) are formed in the outer surfaces of the first clamping block (11) and the second clamping block (12).
CN202123381959.9U 2021-12-30 2021-12-30 Connecting mechanism between concrete filled steel tube supports Active CN216640958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123381959.9U CN216640958U (en) 2021-12-30 2021-12-30 Connecting mechanism between concrete filled steel tube supports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123381959.9U CN216640958U (en) 2021-12-30 2021-12-30 Connecting mechanism between concrete filled steel tube supports

Publications (1)

Publication Number Publication Date
CN216640958U true CN216640958U (en) 2022-05-31

Family

ID=81745053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123381959.9U Active CN216640958U (en) 2021-12-30 2021-12-30 Connecting mechanism between concrete filled steel tube supports

Country Status (1)

Country Link
CN (1) CN216640958U (en)

Similar Documents

Publication Publication Date Title
CN210599020U (en) Tunnel supporting structure
CN217480405U (en) Assembled steel construction building
CN216640958U (en) Connecting mechanism between concrete filled steel tube supports
CN108442681B (en) Building outer wall scaffold connecting structure and mounting method
CN113089827A (en) Node structure of shaped steel concrete column and reinforced concrete beam
CN108487625B (en) Wall connecting structure for scaffold building and mounting method
CN212248808U (en) Connecting device for cast-in-place concrete structure building outer wall heat preservation system
CN212926619U (en) Hollow floor formed by core-mold anti-floating structure
CN112012472B (en) Building aluminum formwork aluminum profile product
CN210633523U (en) Pipeline clamp locking structure
CN216766288U (en) Combined spliced steel structure
CN219604576U (en) Locking type connecting piece for ultralow-energy-consumption composite heat-insulating wallboard
CN218323844U (en) Scaffold wall connecting piece
CN213563294U (en) Template for building construction
CN218815408U (en) Stable form reinforced column structure
CN215803166U (en) A wooden template for civil engineering construction easy to assemble and disassemble
CN218313191U (en) High-strength aluminum profile
CN217607402U (en) High-strength bridge
CN220954594U (en) Novel scaffold frame pull node with quick assembly disassembly function
CN216949253U (en) Flatness control device for splicing FS (file system) boards of outer wall
CN215927142U (en) Concatenation formula aluminium alloy
CN214090336U (en) Steel construction assembly adapting unit convenient to dismouting
CN212836764U (en) Anchor clamps are used in preparation of steel bar sleeve grout attach fitting
CN217352945U (en) High-quality connecting structure of double P plates and laminated floor slab of prefabricated building
CN216966613U (en) Welding device with butt joint structure for building steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A connection mechanism between concrete-filled steel tubular supports

Effective date of registration: 20220830

Granted publication date: 20220531

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong best industrial equipment Co.,Ltd.

Registration number: Y2022980013929

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231027

Granted publication date: 20220531

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong best industrial equipment Co.,Ltd.

Registration number: Y2022980013929

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A Connection Mechanism between Steel Pipe Concrete Support Frames

Effective date of registration: 20231030

Granted publication date: 20220531

Pledgee: Shandong Jining Yanzhou Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong best industrial equipment Co.,Ltd.

Registration number: Y2023110000455