foundation pile
hole
concrete foundation
mounting
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122661452.2U
Other languages
Chinese (zh)
Inventor
姚宏加
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xuhui Construction Engineering Co ltd
Original Assignee
Guangdong Xuhui Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xuhui Construction Engineering Co ltd filed Critical Guangdong Xuhui Construction Engineering Co ltd
Priority to CN202122661452.2U priority Critical patent/CN216640649U/en
Application granted granted Critical
Publication of CN216640649U publication Critical patent/CN216640649U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a concrete foundation pile capable of being quickly constructed, which comprises a bearing platform shell, wherein a protective block is fixedly embedded on the upper surface of the bearing platform shell, an installation groove is formed in the upper surface of the protective block, transverse ribs which are arranged at equal intervals are fixedly connected to the inner wall of the bearing platform shell, two groups of symmetrical vertical ribs are fixedly connected to the inner bottom wall of the bearing platform shell, and a group of pile jacking shells are fixedly embedded on the bottom surface of the bearing platform shell. This but concrete foundation pile of quick construction, pour the hole through first pouring and the second and carry out concrete placement, realize the site pouring of foundation pile, increase the safety and stability of foundation pile, through the protection piece that sets up, the mounting groove, the mounting disc, the mounting hole, can utilize the mounting groove to carry out safety protection to vertical muscle, prevent that vertical muscle from receiving the collision bending, and through the cooperation of mounting disc and mounting hole, can make vertical muscle carry out the fast and stable connection with other splice bar, the staff's of being convenient for quick construction work.

Description

Concrete foundation pile capable of being constructed quickly
Technical Field
The utility model belongs to the technical field of foundation piles, and particularly relates to a concrete foundation pile capable of being constructed quickly.
Background
The foundation pile is a professional term in building structures, and a foundation consisting of a pile and a bearing platform connected to the top of the pile is called a low bearing platform pile foundation if a pile body is completely buried in soil and the bottom surface of the bearing platform is in contact with the soil body, and is called a high bearing platform pile foundation if the upper part of the pile body is exposed out of the ground and the bottom of the bearing platform is positioned above the ground, the building pile foundation is usually a low bearing platform pile foundation, and the current concrete foundation pile has the following problems in use:
(1) when the existing concrete foundation pile is used, the foundation pile is generally directly rammed into a coating, so that the concrete is easily cracked and the reinforcing steel bars are easily bent in the ramming process, and the stability of the foundation pile is influenced;
(2) present concrete foundation pile lays the completion back, and cushion cap upper portion often can reserve out some splice bar and use as the fastening muscle of heel post, but these splice bars expose externally, receive the damage of external force easily, make the splice bar appear crooked damage, inconvenient and other splice bar carry out the fast and stable connection moreover, influence the stability of heel post, the staff's of not being convenient for quick construction, consequently for solving above problem, we provide the concrete foundation pile that can construct fast.
SUMMERY OF THE UTILITY MODEL
The utility model provides a concrete foundation pile, aiming at solving the problems that when the existing concrete foundation pile is used, the foundation pile is generally directly rammed into a coating, the concrete is easy to crack and the reinforcing steel bars are easy to bend in the ramming process, and the stability of the foundation pile is influenced.
The utility model is realized in such a way that a concrete foundation pile capable of being quickly constructed comprises a bearing platform shell, wherein a protective block is fixedly embedded on the upper surface of the bearing platform shell, a mounting groove is formed in the upper surface of the protective block, transverse ribs which are arranged at equal intervals are fixedly connected to the inner wall of the bearing platform shell, two groups of symmetrical vertical ribs are fixedly connected to the inner bottom wall of the bearing platform shell, a group of pile ejecting shells are fixedly embedded in the bottom surface of the bearing platform shell, connecting discs which are arranged at equal intervals are fixedly connected to the inner wall of each pile ejecting shell, a group of annularly arranged material passing holes are formed in the upper surface of each connecting disc, first through holes are formed in the upper surface of each connecting disc, and main jacking steel bars are sleeved in the first through holes of each group.
Each second through hole that the annular was arranged is all seted up to the upper surface of connection pad, every group the inside common cover of second through hole is equipped with vice top steel bar.
Every the surface of top stake casing all fixes to inlay has two sets of symmetrical firm shells, every the inside of firm shell all is equipped with ties up the reinforcing bar to one side.
Every the top of vertical muscle all runs through the protection piece and extends to the inside of mounting groove, every the equal fixedly connected with mounting disc of surface of vertical muscle, every a set of mounting hole has all been seted up to the upper surface of mounting disc.
The inner bottom wall of the mounting groove is provided with a first pouring hole, and the upper surface of the bearing platform shell is provided with two groups of symmetrical second pouring holes.
Two groups of symmetrical mounting grooves are formed in the upper surface of the protection block, and the number of the mounting grooves is at least four.
Compared with the prior art, the utility model has the beneficial effects that: this but concrete foundation pile of quick construction, cushion cap casing through setting up, horizontal muscle, vertical muscle, the top pile casing, main top reinforcing bar, vice top reinforcing bar, the hole is pour to first hole of pouring and second, can pour cushion cap casing and top pile casing in advance in the soil layer, pour the hole through first hole of pouring and second and carry out concrete placement, realize the site pouring of foundation pile, increase the safety and stability nature of foundation pile, through the protection piece that sets up, the mounting groove, the mounting disc, the mounting hole, can utilize the mounting groove to carry out safety protection to vertical muscle, prevent that vertical muscle from receiving the collision bending, and through the cooperation of mounting disc and mounting hole, can make vertical muscle carry out fast and stable with other splice bar and be connected, the staff's of being convenient for quick construction work.
Drawings
FIG. 1 is a schematic perspective view of a platform housing according to the present invention;
FIG. 2 is a cross-sectional view of a front view of the cap housing of the present invention;
FIG. 3 is a cross-sectional view of a top view of the pile driving housing of the present invention;
FIG. 4 is a top view of the protective block of the present invention;
FIG. 5 is an enlarged view of the structure at A in FIG. 2 according to the present invention.
In the figure: 1. a cushion cap housing; 2. a second pouring hole; 3. mounting grooves; 4. installing a groove; 5. a protection block; 6. jacking a pile shell; 7. a stabilizing shell; 8. mounting holes; 9. a first casting hole; 10. transverse ribs; 11. vertical ribs; 12. main top steel bars; 13. auxiliary top reinforcing steel bars; 14. a material inlet is formed; 15. a connecting disc; 16. a second through hole; 17. a first through hole; 18. mounting a disc; 19. and (5) obliquely binding steel bars.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships illustrated in the drawings, and are used merely for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention. Further, in the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Referring to fig. 1-5, a concrete foundation pile capable of being rapidly constructed includes a bearing platform shell 1, a protective block 5 is fixedly embedded on the upper surface of the bearing platform shell 1, a mounting groove 3 is formed on the upper surface of the protective block 5, transverse ribs 10 are fixedly connected to the inner wall of the bearing platform shell 1 and are equidistantly arranged, two groups of symmetrical vertical ribs 11 are fixedly connected to the inner bottom wall of the bearing platform shell 1, a group of top pile shells 6 are fixedly embedded on the bottom surface of the bearing platform shell 1, connecting discs 15 are fixedly connected to the inner wall of each top pile shell 6 and are equidistantly arranged, a group of annularly arranged feed openings 14 are formed in the upper surface of each connecting disc 15, first through holes 17 are formed in the upper surface of each connecting disc 15, and main top reinforcing steel bars 12 are jointly sleeved in the inner parts of the first through holes 17 of each group.
According to the utility model, the upper surface of each connecting disc 15 is provided with the second through holes 16 which are annularly arranged, the inside of each group of second through holes 16 is commonly sleeved with the auxiliary top steel bars 13, the stability and toughness of a top pile body can be effectively improved through the auxiliary top steel bars 13, the overall stability of the foundation pile is further improved, the outer surface of each top pile shell 6 is fixedly embedded with two groups of symmetrical stabilizing shells 7, the inside of each stabilizing shell 7 is provided with the inclined binding steel bars 19, the top pile shell 6 can be effectively supported, and the top pile shell 6 is more stable.
The top of every vertical muscle 11 all runs through protection piece 5 and extends to the inside of mounting groove 3, the equal fixedly connected with mounting disc 18 of surface of every vertical muscle 11, a set of mounting hole 8 has all been seted up to the upper surface of every mounting disc 18, can make things convenient for the staff to fix the high-speed joint of vertical muscle 11 and upper portion splice bar, the concrete placement of the follow-up bearing post of being convenient for, first hole 9 of pouring has been seted up to the inner bottom wall of mounting groove 3, two sets of symmetrical second holes 2 of pouring have been seted up to the upper surface of cushion cap casing 1, can be convenient carry out concrete placement to cushion cap casing 1 and top stake casing 6, the construction work of the staff of being convenient for, two sets of symmetrical mounting groove 4 have been seted up to the upper surface of protection piece 5, the quantity of mounting groove 4 is four at least, can make things convenient for the weldment work of staff to vertical muscle 11 and upper portion splice bar, the pouring work of the follow-up bearing post of being convenient for.
The working principle of the utility model is as follows: when in use, firstly, the inside of the top pile shell 6 is welded and installed into a plurality of connecting discs 15, a main top steel bar 12 and an auxiliary top steel bar 13 are respectively sleeved inside the connecting discs 15, meanwhile, a plurality of groups of transverse bars 10 and vertical bars 11 are welded inside the bearing platform shell 1, then, a worker drills holes on the earth surface, the top pile shell 6 and the bearing platform shell 1 are embedded inside the drilled holes to realize the frame assembly of the foundation pile, then, concrete is respectively injected into the bearing platform shell 1 and the top pile shell 6 through the first pouring hole 9 and the second pouring hole 2 to realize the concrete on-site pouring of the foundation pile, the stability integrity of the foundation pile is increased, after the pouring is finished and solidified, the worker respectively welds other connecting bars on the top ends of the vertical bars 11, and utilizes the connectors of the connecting bars to be fastened and connected with the mounting discs 18 on the surfaces of the vertical bars 11 to increase the stability of the connecting bars, the follow-up work of pouring of the heel post of being convenient for, the staff's of being convenient for quick construction.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a but concrete foundation pile of quick construction, includes cushion cap casing (1), its characterized in that: fixed surface inlays on cushion cap casing (1) and has protection piece (5), mounting groove (3) have been seted up to the upper surface of protection piece (5), horizontal muscle (10) that the inner wall fixedly connected with equidistance of cushion cap casing (1) was arranged, two sets of symmetrical vertical muscle (11) of inner diapire fixedly connected with of cushion cap casing (1), the fixed bottom surface of cushion cap casing (1) is inlayed and is had a set of top stake casing (6), every connection pad (15) that the equal fixedly connected with equidistance of inner wall of top stake casing (6) was arranged, every the upper surface of connection pad (15) all sets up a set of annular material passing hole (14) of arranging, every first through-hole (17) have all been seted up to the upper surface of connection pad (15), every group the common cover in inside of first through-hole (17) is equipped with main top reinforcing bar (12).
2. The rapidly-constructed concrete foundation pile as claimed in claim 1, wherein: every second through-hole (16) that the annular was arranged are all seted up to the upper surface of connection pad (15), every group the inside common cover of second through-hole (16) is equipped with vice top steel muscle (13).
3. The rapidly-constructed concrete foundation pile as claimed in claim 1, wherein: two groups of symmetrical stabilizing shells (7) are fixedly embedded in the outer surface of each pile jacking shell (6), and oblique binding steel bars (19) are arranged in each stabilizing shell (7).
4. The rapidly-constructed concrete foundation pile as claimed in claim 1, wherein: every the inside that protection piece (5) and extended to mounting groove (3) is all run through on the top of vertical muscle (11), every the equal fixedly connected with mounting disc (18) of surface of vertical muscle (11), every a set of mounting hole (8) have all been seted up to the upper surface of mounting disc (18).
5. The rapidly-constructed concrete foundation pile as claimed in claim 1, wherein: the inner bottom wall of the mounting groove (3) is provided with a first pouring hole (9), and the upper surface of the bearing platform shell (1) is provided with two groups of symmetrical second pouring holes (2).
6. The rapidly-constructed concrete foundation pile as claimed in claim 1, wherein: two sets of symmetrical mounting grooves (4) are formed in the upper surface of the protection block (5), and the number of the mounting grooves (4) is at least four.
CN202122661452.2U 2021-11-02 2021-11-02 Concrete foundation pile capable of being constructed quickly Active CN216640649U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122661452.2U CN216640649U (en) 2021-11-02 2021-11-02 Concrete foundation pile capable of being constructed quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122661452.2U CN216640649U (en) 2021-11-02 2021-11-02 Concrete foundation pile capable of being constructed quickly

Publications (1)

Publication Number Publication Date
CN216640649U true CN216640649U (en) 2022-05-31

Family

ID=81733077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122661452.2U Active CN216640649U (en) 2021-11-02 2021-11-02 Concrete foundation pile capable of being constructed quickly

Country Status (1)

Country Link
CN (1) CN216640649U (en)

Similar Documents

Publication Publication Date Title
CN210459228U (en) Building foundation pit supporting device
CN216640649U (en) Concrete foundation pile capable of being constructed quickly
CN211816301U (en) Supporting device for soft soil foundation pit
CN218508416U (en) Rotary excavating cast-in-place pile under miscellaneous fill high backfill geological condition
KR20180123247A (en) Pile for Reinforcing soft ground for verticality and stability improvement and lateral bearing power enhancement and method using the same
CN215053063U (en) Foundation pit supporting structure
CN113123811B (en) Rock mass cavity protective structure suitable for high-altitude area based on tunnel engineering
CN213805417U (en) Protective structure for reinforcing foundation pit excavation soil body close to pile foundation
CN210396760U (en) Assembled supporting system for diversion tunnel construction
CN211057618U (en) Steel casing anti-falling platform for underwater bridge foundation construction
CN210238492U (en) Crown beam type miniature pile construction formwork capable of being circulated
CN209742937U (en) Temporary supporting device for coal mining and tunneling
CN217298930U (en) Bridge pile foundation protects a section of thick bamboo auxiliary positioning device
CN206693259U (en) Suitable for the rock foundation structure of transmission line construction
CN216379542U (en) Deep sand bed foundation pit self-stabilizing double-row enclosure structure
CN219710382U (en) Composite soil nailing wall building base
CN214573896U (en) Pile foundation pile head reinforced structure is built in room
CN218195953U (en) Multi-fulcrum continuous beam bridge type prefabricated pedestal
CN213476909U (en) Stretching type inner support structure
CN212026277U (en) Foundation pit supporting pile
CN220954033U (en) Shear wall connection structure based on cantilever truss support system
CN216615821U (en) Pile tip structure of prefabricated pipe pile
CN215948249U (en) Single-pile hole digging foundation structure for power transmission line
CN211172009U (en) Combined type recyclable foundation pit supporting inner supporting stand column
CN108951618A (en) A kind of pile-anchor retaining device and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant