CN216627833U - Construction project cost budgets professional workstation - Google Patents

Construction project cost budgets professional workstation Download PDF

Info

Publication number
CN216627833U
CN216627833U CN202123256422.XU CN202123256422U CN216627833U CN 216627833 U CN216627833 U CN 216627833U CN 202123256422 U CN202123256422 U CN 202123256422U CN 216627833 U CN216627833 U CN 216627833U
Authority
CN
China
Prior art keywords
workstation
plate
workbench
professional
cost budget
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123256422.XU
Other languages
Chinese (zh)
Inventor
肖宇坤
胡美玲
罗银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123256422.XU priority Critical patent/CN216627833U/en
Application granted granted Critical
Publication of CN216627833U publication Critical patent/CN216627833U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to the technical field of building engineering, in particular to a professional workbench for cost budget of building engineering, which comprises a bottom plate and a workbench, wherein four corners at the top of the bottom plate are all provided with sleeves, four corners at the bottom of the workbench are all provided with telescopic rods corresponding to the positions of the sleeves, the bottom ends of the telescopic rods are movably inserted in the sleeves, an adjusting mechanism is arranged between the bottom plate and the workbench, the top of the workbench is provided with a second chute along the length direction, two second slide blocks are connected in the second chute in a sliding way, each second slide block is connected with a press plate, one side of the rear end of the top of the workbench is provided with a data box, the data box is divided into a plurality of data placing cavities by the arranged data box and the partition board, so that project cost documents can be conveniently stored in a classified manner, make the baffle can the optional position regulation through first slider and first spout, the space in the cavity is placed to the rational planning data of being convenient for.

Description

Construction cost budget professional workstation of building engineering
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a construction cost budget professional workbench for constructional engineering.
Background
With the rapid development of social economy in China, the pace of urban construction is continuously promoted, the construction project cost budget management is an important component of project management, budget managers need to ensure the accuracy of budget, effectively control the construction cost and smoothly complete the project construction target, and the budget managers need to use special construction project cost budget workbenches when carrying out budget.
Most of the existing workbench for construction project cost budget is a simple desk, the workbench does not have the function of storing files, the files are placed disorderly and have no seal, the tidiness of the desk surface is affected, drawing and calculating tools such as a tool ruler, an eraser, a pencil and the like used in measurement cannot be stored and are easy to lose, and the use function of the workbench is poor, so that a professional workbench for construction project cost budget is needed to improve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a construction project cost budget professional workbench to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a building engineering cost budget specialty workstation, includes bottom plate and workstation, the sleeve is all installed to four corners at bottom plate top, the telescopic link that corresponds with the sleeve position is all installed to four corners of workstation bottom, the bottom activity of telescopic link is pegged graft in the sleeve, be provided with adjustment mechanism between bottom plate and the workstation, the top of workstation is provided with the second spout along length direction, sliding connection has two second sliders in the second spout, all be connected with the clamp plate on the second slider, the data box is installed to one side of workstation top rear end, the opposite side of workstation top rear end has been seted up the instrument and has been accomodate the chamber.
Preferably, the inside activity of material box is provided with a plurality of baffles, transversely be provided with first spout on the inner wall of material box, one side that the baffle is close to first spout is provided with first slider, through first slider and first spout sliding connection between baffle and the material box.
Preferably, L shape fixed plate is installed to the rear end at baffle top, threaded connection has the threaded rod on the L shape fixed plate, the top of threaded rod is connected with the knob, the bottom of threaded rod is connected with supports the clamp plate, support the clamp plate and support the top tightly at the data box.
Preferably, the inside top department of chamber is accomodate to the instrument is provided with the spacing groove, the cross-sectional area of spacing groove is greater than the cross-sectional area of chamber is accomodate to the instrument, the inside of spacing groove is provided with the apron, apron one end passes through hinge swing joint with the spacing groove, the handle is installed at the top of apron.
Preferably, the top of second slider is vertical installs square guide post, clamp plate one end activity cover is established on square guide post, the limiting plate is installed at the top of square guide post, the outside cover that is located square guide post between limiting plate and the clamp plate is equipped with reset spring.
Preferably, the bottom of the pressure plate is provided with a rubber pressing strip.
Preferably, the adjusting mechanism comprises a threaded sleeve, a bearing, a screw rod and a driving assembly for driving the threaded sleeve to rotate, the top end of the threaded sleeve is mounted at the center of the bottom of the workbench through the bearing, the screw rod is connected in the threaded sleeve in a threaded manner, and the bottom end of the screw rod is fixed at the center of the top of the bottom plate.
Preferably, drive assembly includes that fixed cover establishes at the first bevel gear in the thread bush outside, transversely sets up the dwang in the workstation bottom and install in dwang one end and with the second bevel gear of first bevel gear meshing, the dwang passes through the bearing frame and installs the bottom at the workstation, the dwang is kept away from the one end of second bevel gear and is installed and rotate the handle.
Preferably, the outer side of the rotating handle is sleeved with a rubber anti-slip sleeve.
Preferably, four corners of bottom plate bottom all install and remove the wheel, it is provided with the brake block on the wheel to remove.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the data box is divided into the plurality of data containing cavities through the arranged data box and the partition boards, so that engineering cost files can be stored in a classified manner conveniently, the partition boards can be adjusted at any position through the first sliding block and the first sliding groove, the space of the data containing cavities can be planned reasonably conveniently, tools used in engineering cost budget can be stored conveniently through the arranged tool containing cavities, the tools are stored and contained in a concentrated manner, the construction engineering drawing is flatly laid on the workbench through the arranged pressing plate, the position of the pressing plate can be adjusted through the second sliding block and the second sliding groove, then the pressing plate is moved upwards, two ends of the drawing are arranged below the pressing plate, the two sides of the drawing are pressed through the elastic action of the reset spring, so that a worker can conveniently measure the drawing and the like, and the use functionality of the drawing is expanded.
2. According to the utility model, through the arranged adjusting mechanism, the rotating rod is driven to rotate through the rotating handle, the rotating rod drives the second bevel gear to rotate, and the second bevel gear drives the meshed first bevel gear to rotate, so that the threaded sleeve rotates, and the exposed length of the screw rod is adjusted, thereby facilitating the adjustment of the height of the workbench and being more suitable for operators to use.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a construction project cost budget professional workbench according to the present invention;
FIG. 2 is a front view of a construction project cost budget professional workstation of the present invention;
FIG. 3 is a sectional view of a data box of a construction project cost budget professional workbench according to the present invention;
fig. 4 is an enlarged schematic view of the structure of the area a in fig. 1.
In the figure: 1. a base plate; 2. a work table; 3. a sleeve; 4. a telescopic rod; 5. an adjustment mechanism; 501. a threaded sleeve; 502. a bearing; 503. a screw rod; 504. a first bevel gear; 505. rotating the rod; 506. a second bevel gear; 507. a bearing seat; 508. rotating the handle; 6. a moving wheel; 7. pressing a plate; 701. pressing a rubber strip; 8. a data box; 801. a partition plate; 802. an L-shaped fixing plate; 803. a threaded rod; 804. a knob; 805. pressing the plate; 806. a first chute; 807. a first slider; 9. a tool receiving cavity; 901. a limiting groove; 10. a cover plate; 11. a handle; 12. a second chute; 13. a second slider; 14. a square guide post; 15. a limiting plate; 16. a return spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person skilled in the art without making creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.
To facilitate an understanding of the utility model, the utility model will now be described more fully with reference to the accompanying drawings. Several embodiments of the utility model are presented in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-4, the present invention provides a technical solution:
the utility model provides a building engineering cost budget specialty workstation, including bottom plate 1 and workstation 2, sleeve 3 is all installed to four corners at 1 top of bottom plate, telescopic link 4 that corresponds with sleeve 3 position is all installed to four corners of 2 bottoms of workstation, the bottom activity of telescopic link 4 is pegged graft in sleeve 3, be provided with adjustment mechanism 5 between bottom plate 1 and the workstation 2, the top of workstation 2 is provided with second spout 12 along length direction, sliding connection has two second sliders 13 in the second spout 12, all be connected with clamp plate 7 on the second slider 13, data box 8 is installed to one side of 2 top rear ends of workstation, the opposite side of 2 top rear ends of workstation has seted up the instrument and has accomodate chamber 9.
In this embodiment, referring to fig. 3, a plurality of partition boards 801 are movably disposed inside a data box 8, a first sliding slot 806 is transversely disposed on an inner wall of the data box 8, a first sliding block 807 is disposed on a side of the partition board 801 close to the first sliding slot 806, the partition board 801 and the data box 8 are slidably connected through the first sliding block 807 and the first sliding slot 806, an L-shaped fixing plate 802 is mounted at a rear end of a top of the partition board 801, a threaded rod 803 is threadedly connected to the L-shaped fixing plate 802, a knob 804 is connected to a top end of the threaded rod 803, a pressing plate 805 is connected to a bottom end of the threaded rod 803, the pressing plate 805 is pressed against the top of the data box 8, the partition board 801 can be arbitrarily adjusted in position by the disposed first sliding block 807 and the first sliding slot 806, and after the position is properly adjusted, the knob 804 is rotated to drive the threaded rod 803 to rotate, so that the pressing plate 805 is pressed against the top of the data box 8, thereby fixing the position of the partition board 801, the data box 8 is reasonably planned into a plurality of data placing cavities according to use requirements, so that project cost files can be conveniently stored in a classified mode.
In this embodiment, please refer to fig. 1, a limiting groove 901 is disposed at the top end inside the tool storage cavity 9, the cross-sectional area of the limiting groove 901 is larger than that of the tool storage cavity 9, a cover plate 10 is disposed inside the limiting groove 901, one end of the cover plate 10 is movably connected with the limiting groove 901 through a hinge, a handle 11 is mounted at the top of the cover plate 10, tools used when the engineering cost budget is stored are convenient to store through the set tool storage cavity 9, the tools are stored and stored in a centralized manner, the trouble of searching is reduced, the tool storage cavity 9 can be shielded through the cover plate 10, and the tools are prevented from being polluted by dust.
In this embodiment, please refer to fig. 4, square guide post 14 is vertically installed at the top of second slider 13, a movable cover of one end of pressing plate 7 is installed on square guide post 14, limiting plate 15 is installed at the top of square guide post 14, the outside cover that is located square guide post 14 between limiting plate 15 and pressing plate 7 is equipped with reset spring 16, during the use, lay the construction engineering drawing on workstation 2 flatly, make pressing plate 7 can the adjusting position through second slider 13 and second spout 12, then move pressing plate 7 upwards, place the below of pressing plate 7 in with the both ends of drawing, make pressing plate 7 push down the drawing both sides through reset spring 16's elastic action, the staff of being convenient for measures the drawing etc.
In this embodiment, referring to fig. 4, a rubber strip 701 is installed at the bottom of the pressing plate 7, and the damage to the drawing paper is avoided by the rubber strip 701.
In this embodiment, referring to fig. 2, the adjusting mechanism 5 includes a threaded sleeve 501, a bearing 502, a screw rod 503 and a driving component for driving the threaded sleeve 501 to rotate, the top end of the threaded sleeve 501 is installed at the center of the bottom of the workbench 2 through the bearing 502, the threaded sleeve 501 is connected with the screw rod 503 in a threaded manner, the bottom end of the screw rod 503 is fixed at the center of the top of the bottom plate 1, the driving component includes a first bevel gear 504 fixedly sleeved on the outer side of the threaded sleeve 501, a rotating rod 505 transversely disposed at the bottom of the workbench 2, and a second bevel gear 506 installed at one end of the rotating rod 505 and engaged with the first bevel gear 504, the rotating rod 505 is installed at the bottom of the workbench 2 through a bearing seat 507, a rotating handle 508 is installed at one end of the rotating rod 505 away from the second bevel gear 506, an anti-slip rubber sleeve is sleeved on the outer side of the rotating handle 508, when in use, the rotating rod 505 is driven to rotate by the rotating handle 508, the rotating rod 505 drives the second bevel gear 506 to rotate, the second bevel gear 506 drives the meshed first bevel gear 504 to rotate, so that the threaded sleeve 501 rotates, the exposed length of the screw rod 503 is adjusted, the height of the workbench 2 is adjusted conveniently, and the workbench can be used by an operator more conveniently.
In this embodiment, please refer to fig. 1, the moving wheels 6 are installed at four corners of the bottom plate 1, the moving wheels 6 are provided with brake pads, the moving wheels 6 are convenient for moving the whole device, and the moving wheels 6 are locked and limited by the brake pads after being moved to a use area.
The working principle of the utility model is as follows: when in use, the moving wheel 6 is convenient to move, after the moving wheel is moved to a use area, the moving wheel 6 is locked and limited through the brake block, the partition plate 801 can be adjusted at any position through the arranged first sliding block 807 and the arranged first sliding groove 806, after the position is adjusted properly, the threaded rod 803 is driven to rotate through the rotating knob 804, the pressing plate 805 is abutted against the top of the material box 8, so that the partition plate 801 is fixed in position, the material box 8 is reasonably planned into a plurality of material placing cavities according to use requirements, engineering cost files are conveniently stored in a classified mode, tools used in engineering cost budget can be conveniently stored through the arranged tool containing cavity 9, the tools are stored and contained in a concentrated mode, the trouble of searching is reduced, the construction engineering drawing is flatly laid on the workbench 2, the pressing plate 7 can be adjusted in position through the second sliding block 13 and the second sliding groove 12, and then the pressing plate 7 is moved upwards, arrange the below of clamp plate 7 in the both ends of drawing, elastic action through reset spring 16 makes clamp plate 7 push down the drawing both sides, the staff of being convenient for measures operation such as to the drawing, drive dwang 505 through rotating 508 and rotate, dwang 505 drives second bevel gear 506 and rotates, second bevel gear 506 drives the first bevel gear 504 rotation of meshing, thereby make the thread bush 501 rotate, the naked length of accommodate the lead screw 503, thereby be convenient for adjust the height of workstation 2, accord with the operating personnel use more.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a construction engineering cost budgets professional workstation, includes bottom plate (1) and workstation (2), its characterized in that: sleeve (3) are all installed to four corners at bottom plate (1) top, telescopic link (4) that correspond with sleeve (3) position are all installed to four corners of workstation (2) bottom, the bottom activity of telescopic link (4) is pegged graft in sleeve (3), be provided with adjustment mechanism (5) between bottom plate (1) and workstation (2), the top of workstation (2) is provided with second spout (12) along length direction, sliding connection has two second slider (13) in second spout (12), all be connected with clamp plate (7) on second slider (13), data box (8) are installed to one side of workstation (2) top rear end, instrument storage chamber (9) have been seted up to the opposite side of workstation (2) top rear end.
2. The construction project cost budget professional workstation of claim 1, wherein: the inside activity of material box (8) is provided with a plurality of baffles (801), transversely be provided with first spout (806) on the inner wall of material box (8), one side that baffle (801) are close to first spout (806) is provided with first slider (807), through first slider (807) and first spout (806) sliding connection between baffle (801) and material box (8).
3. The construction project cost budget professional workstation of claim 2, characterized in that: l shape fixed plate (802) is installed to the rear end at baffle (801) top, threaded connection has threaded rod (803) on L shape fixed plate (802), the top of threaded rod (803) is connected with knob (804), the bottom of threaded rod (803) is connected with and supports clamp plate (805), support clamp plate (805) and support the top tight at data box (8).
4. The construction project cost budget professional workstation of claim 2, wherein: the tool storage cavity is characterized in that a limiting groove (901) is formed in the top end of the inside of the tool storage cavity (9), the cross section area of the limiting groove (901) is larger than that of the tool storage cavity (9), a cover plate (10) is arranged inside the limiting groove (901), one end of the cover plate (10) is movably connected with the limiting groove (901) through a hinge, and a handle (11) is mounted at the top of the cover plate (10).
5. The construction project cost budget professional workstation of claim 1, wherein: the top of second slider (13) is vertical installs square guide post (14), clamp plate (7) one end movable sleeve is established on square guide post (14), limiting plate (15) are installed at the top of square guide post (14), the outside cover that is located square guide post (14) between limiting plate (15) and clamp plate (7) is equipped with reset spring (16).
6. The construction cost budget professional workstation of claim 5, wherein: and a rubber pressing strip (701) is arranged at the bottom of the pressing plate (7).
7. The construction project cost budget professional workstation of claim 1, characterized in that: adjustment mechanism (5) are including thread bush (501), bearing (502), lead screw (503) and drive thread bush (501) pivoted drive assembly, the center department in workstation (2) bottom is installed through bearing (502) in the top of thread bush (501), thread bush (501) female connection has lead screw (503), the bottom mounting of lead screw (503) is in the center department at bottom plate (1) top.
8. The construction cost budget professional workstation of claim 7, wherein: the drive assembly comprises a first bevel gear (504) fixedly sleeved on the outer side of the threaded sleeve (501), a rotating rod (505) transversely arranged at the bottom of the workbench (2) and a second bevel gear (506) arranged at one end of the rotating rod (505) and meshed with the first bevel gear (504), the rotating rod (505) is arranged at the bottom of the workbench (2) through a bearing seat (507), and one end, far away from the second bevel gear (506), of the rotating rod (505) is provided with a rotating handle (508).
9. The construction cost budget professional workstation of claim 8, wherein: the outer side of the rotating handle (508) is sleeved with a rubber anti-slip sleeve.
10. The construction project cost budget professional workstation of claim 1, wherein: four corners of bottom plate (1) bottom all install removal wheel (6), be provided with the brake block on removing wheel (6).
CN202123256422.XU 2021-12-22 2021-12-22 Construction project cost budgets professional workstation Active CN216627833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123256422.XU CN216627833U (en) 2021-12-22 2021-12-22 Construction project cost budgets professional workstation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123256422.XU CN216627833U (en) 2021-12-22 2021-12-22 Construction project cost budgets professional workstation

Publications (1)

Publication Number Publication Date
CN216627833U true CN216627833U (en) 2022-05-31

Family

ID=81744467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123256422.XU Active CN216627833U (en) 2021-12-22 2021-12-22 Construction project cost budgets professional workstation

Country Status (1)

Country Link
CN (1) CN216627833U (en)

Similar Documents

Publication Publication Date Title
CN209185852U (en) Convenient for the workbench of project cost budget
CN216627833U (en) Construction project cost budgets professional workstation
CN114831417B (en) Construction engineering cost accounting system
CN213951721U (en) Adjustable fixing table for tailoring
CN211029960U (en) Movable assembly trolley
CN213308195U (en) Portable light-transmitting workbench for manual animation production
CN210941096U (en) Mechanical drawing tool
CN211154380U (en) Drawing device for drawing building budget
CN211408080U (en) Budget processing device for construction cost
CN213562427U (en) Workbench with electric movable sliding table
CN214135902U (en) Use electronic experiment operation workstation
CN215397938U (en) Rotatable accounting articles for use toolbox
CN214803270U (en) Special workstation of building engineering cost budget
CN206047478U (en) A kind of welding bench
CN214489894U (en) Data acquisition device for machine tool machining on-line monitoring
CN213634974U (en) Workbench for engineering training
CN213859199U (en) Toolbox for building engineering cost
CN214963393U (en) Device for drawing industrial economic knowledge map
CN220462973U (en) Positioning tool for case
CN219925980U (en) Machining bench worker workstation
CN214135966U (en) Tool kit for computer network equipment maintenance
CN220777754U (en) Operation panel for engineering cost
CN219515630U (en) Drawing auxiliary device special for architectural design
CN211477138U (en) Supplementary mapping device of mapping engineering
CN219152847U (en) Layered tool box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant