CN216625083U - Integrated operation and maintenance tool for automatic equipment of transformer substation - Google Patents

Integrated operation and maintenance tool for automatic equipment of transformer substation Download PDF

Info

Publication number
CN216625083U
CN216625083U CN202123213744.6U CN202123213744U CN216625083U CN 216625083 U CN216625083 U CN 216625083U CN 202123213744 U CN202123213744 U CN 202123213744U CN 216625083 U CN216625083 U CN 216625083U
Authority
CN
China
Prior art keywords
tool box
maintenance
plate
tool
end surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123213744.6U
Other languages
Chinese (zh)
Inventor
严飞亨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123213744.6U priority Critical patent/CN216625083U/en
Application granted granted Critical
Publication of CN216625083U publication Critical patent/CN216625083U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an integrated operation and maintenance tool for substation automation equipment, which comprises a base plate, wherein support columns are connected to the periphery of the upper end surface of the base plate, lifting plates vertically penetrate through the support columns at the periphery in a sliding mode, a guardrail assembly is installed on the left side of the upper end surface of each lifting plate, and a tool box is installed on the right side of the upper end surface of each lifting plate. The lifting plate is simple in structure, clear and understandable in structure, and when the operation and maintenance operation is performed on the transformer substation, after the whole operation and maintenance device is moved to a specified position, operation and maintenance personnel stand in the guardrail assemblies on the lifting plate, so that transformer substation equipment at different heights can be overhauled; the whole device is made of high-strength insulating materials, and insulating paint is coated on the surface of the device, so that the operation and maintenance safety is high; fortune dimension instrument is deposited in the toolbox, and different instrument classifications are placed in the toolbox different toolboxes, through the business turn over of control button control toolboxes in the toolbox, the instrument is got and is taken conveniently, and the protectiveness is high, and the practicality is strong, is worth using widely.

Description

Integrated operation and maintenance tool for automatic equipment of transformer substation
Technical Field
The utility model relates to the technical field of transformer substation operation and maintenance, in particular to an integrated operation and maintenance tool for a transformer substation automation device.
Background
The certain distance that exists between instrument room and the equipment district when carrying out the power transmission operation in the transformer substation to the detection that needs and the use of maintaining carry more instrument, detecting instrument and change electronic component that needs etc. because need the instrument that uses and detecting instrument be difficult to need carry that kind of maintenance instrument when overhauing, consequently need once only carry more thing, the extra work load of very big increase operation team personnel.
Therefore, how to conveniently carry tools and detection instruments which are needed by micro-size and replace needed electronic elements is achieved, the accident treatment of power transformation operation and maintenance is completed in the shortest time, and the phenomenon that the time spent in the fault treatment is delayed due to the fact that the tools and the detection instruments are forgotten to carry during troubleshooting or the replacement of the electronic elements is avoided, so that the power transmission time is influenced, and the accident treatment timeliness rate is directly influenced.
Through retrieval, the Chinese patent No. CN 211388703U discloses a transformer substation operation and maintenance pull rod tool trolley, which adopts the design of a pull rod trolley, and both sides of the pull rod trolley are provided with a flip type storage box and an electronic component storage plate which can be opened, so that the carrying of the trolley on maintenance tools, instruments and electronic components is increased on the premise of not increasing the volume of the trolley.
Above-mentioned disclosed instrument dolly is used for placing various fortune dimension instruments, however, at actual fortune dimension in-process, fortune dimension instrument is more, if deposit through above-mentioned dolly, and the space is not enough, and the instrument drops easily, does not have the effect to fortune dimension's efficiency and convenience, and the practicality is not strong, consequently, needs a transformer substation automation equipment integration fortune dimension instrument.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art, and provides an integrated operation and maintenance tool for a substation automation device.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a transformer substation automation equipment integration fortune dimension instrument, includes the bottom plate, the bottom plate up end is connected with the support column all around, and the lifter plate is worn to be equipped with in vertical slip on the support column all around, the guardrail subassembly is installed in lifter plate up end left side, the toolbox is installed on lifter plate up end right side, connect between lifter plate and the bottom plate and install lift platform.
Furthermore, universal rollers are connected and installed on the periphery of the bottom end face of the bottom plate.
Further, guardrail subassembly of lifter plate up end left side installation is including preventing the railing, prevent that the railing is installed at lifter plate up end front and back side, lifter plate up end left side is rotated and is installed the switch door, lift platform control button is installed to the left support column upper end in bottom plate top.
Further, the right side is connected with the baffle in the toolbox, be connected with a plurality of guide rails between baffle left side wall and the toolbox left side wall, slidable mounting has the toolbox on the guide rail, a plurality of flexible motors are installed to baffle right side wall, flexible motor output and toolbox right-hand member fixed connection, the controller is installed at the top in the toolbox, a plurality of control button are installed to toolbox left side wall top.
Furthermore, the tool boxes arranged in the tool box are provided with seven groups, and the tool box at the lowest position in the tool box is the tool box with the largest volume.
Compared with the prior art, the utility model has the beneficial effects that:
1. the utility model is an integrated operation and maintenance tool of a transformer substation, the structure is simple, the structure is clear and understandable, a tool box is arranged on a lifting plate, a lifting platform is connected and arranged between the bottom end surface of the lifting plate and the upper end surface of a bottom plate, the lifting platform can push the lifting plate and the tool box on the lifting plate to do lifting motion, when the transformer substation is operated and maintained, after the whole operation and maintenance device is moved to a specified position, operation and maintenance personnel stand in guardrail components on the lifting plate, and can overhaul transformer substation equipment with different heights, and in the operation and maintenance process, the operation and maintenance tool can be directly taken from the tool box;
2. the whole device disclosed by the utility model is made of high-strength insulating materials, and the surface of the device is coated with insulating paint, so that the operation and maintenance safety is high;
3. the operation and maintenance tools are stored in the tool boxes, different tools are placed in different tool boxes in the tool boxes in a classified mode, the tool boxes are controlled to enter and exit from the tool boxes through the control buttons, the tools are convenient to take, the protection performance is high, and the practicability is high.
In conclusion, the integrated operation and maintenance tool for the transformer substation is simple in structure, clear and understandable in structure, the tool box is mounted on the lifting plate, the lifting platform is connected and mounted between the bottom end face of the lifting plate and the upper end face of the bottom plate, the lifting platform can push the lifting plate and the tool box on the lifting plate to do lifting motion, when the transformer substation is operated and maintained, after the whole operation and maintenance device is moved to a specified position, operation and maintenance personnel stand in the guardrail assemblies on the lifting plate, can overhaul transformer substation equipment at different heights, and can directly take the operation and maintenance tool from the tool box in the operation and maintenance process, so that the integrated operation and maintenance tool is practical and convenient, high in operation and maintenance efficiency and high in safety; the whole device is made of high-strength insulating materials, and insulating paint is coated on the surface of the device, so that the operation and maintenance safety is high; fortune dimension instrument is deposited in the toolbox, and different instrument classifications are placed in the toolbox different toolboxes, through the business turn over of control button control toolbox in the toolbox, the instrument is got and is taken the convenience, and the protectiveness is high, and the practicality is strong, is worth using widely.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model.
Fig. 1 is a schematic perspective view of an integrated operation and maintenance tool for a substation automation device according to the present invention;
fig. 2 is a schematic rear perspective view of an integrated operation and maintenance tool for a substation automation device according to the present invention;
fig. 3 is a schematic front view structural diagram of an integrated operation and maintenance tool for a substation automation device according to the present invention;
fig. 4 is a schematic partial cross-sectional view of a front view of an integrated operation and maintenance tool for a substation automation device according to the present invention.
In the figure: 1-lifting platform, 2-universal roller, 3-bottom plate, 4-support column, 5-lifting plate, 6-opening and closing door, 7-lifting platform control button, 8-protective railing, 9-tool box, 10-control button, 11-tool box, 12-controller, 13-partition board, 14-guide rail and 15-telescopic motor.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-4, a transformer substation automation equipment integration fortune dimension instrument, includes bottom plate 3, 3 up end of bottom plate is connected with support column 4 all around, and the lifter plate 5 is worn to be equipped with in vertical slip on support column 4 all around, guardrail subassembly is installed in 5 up end left sides of lifter plate, toolbox 11 is installed on 5 up end right sides of lifter plate, connect between lifter plate 5 and the bottom plate 3 and install lift platform 1.
The utility model relates to an integrated operation and maintenance tool for a transformer substation, which comprises a tool box 11, wherein the tool box 11 is arranged on a lifting plate 5, a lifting platform 1 is connected and arranged between the bottom end surface of the lifting plate 5 and the upper end surface of a bottom plate 3, the lifting platform 1 can push the lifting plate 5 and the tool box 11 on the lifting plate to do lifting motion, when the transformer substation is operated in operation and maintenance, operation and maintenance personnel stand in guardrail assemblies on the lifting plate 5, can overhaul transformer substation equipment with different heights, and can directly take the operation and maintenance tool from the tool box 11 in the operation and maintenance process.
The bottom plate 3, the lifting plate 5, the tool box 11 and the guardrail component are all made of high-strength insulating materials, and the surfaces of the bottom plate, the lifting plate, the tool box and the guardrail component are coated with insulating paint, so that electric shock danger of operation and maintenance personnel in the operation and maintenance process is avoided.
The universal idler wheels 2 are connected and installed on the periphery of the bottom end face of the bottom plate 3, and the whole device can be moved conveniently.
Guardrail subassembly of 5 up end left sides installations of lifter plate is including preventing guardrail 8, prevent guardrail 8 side-mounting around 5 up end of lifter plate, 5 up end left sides of lifter plate rotate and install switch door 6, lift platform control button 7 is installed to the left support column 4 upper end in bottom plate 3 top.
Fortune dimension personnel stand and overhaul transformer substation equipment in preventing guardrail bar 8, and the protectiveness is good, and lift platform control button 7 is installed to the left support column 4 upper end in bottom plate 3 top for lift control of lift platform 1.
The right side is connected with baffle 13 in the toolbox 11, be connected with a plurality of guide rails 14 between the left side wall in baffle 13 left side wall and toolbox 11, slidable mounting has toolbox 9 on the guide rail 14, a plurality of flexible motors 15 are installed to baffle 13 right side wall, flexible motor 15 output and toolbox 9 right-hand member fixed connection, controller 12 is installed at the top in the toolbox 11, a plurality of control button 10 are installed to toolbox 11 left side wall top.
When the operation and maintenance personnel need to use the tool, the corresponding control button 10 is pressed, the corresponding telescopic motor 15 is opened by the control button 10 through the controller 12, the corresponding tool box 9 is pushed out of the tool box 11 by the telescopic motor 15, the control button 10 is pressed again, and the corresponding tool box 9 can be pulled into the tool box 11 by the telescopic motor 15, so that the operation and maintenance tool is well protected.
Seven groups of tool boxes 9 are arranged in the tool box 11, and the tool box 9 at the lowest position in the tool box 11 is the tool box with the largest volume.
Through seven groups of tool boxes 9 that set up, classify to the fortune dimension instrument of difference and deposit, make things convenient for fortune dimension operation.
The working principle and the using process of the utility model are as follows: the utility model relates to an integrated operation and maintenance tool for a transformer substation, which comprises a tool box 11, wherein the tool box 11 is arranged on a lifting plate 5, a lifting platform 1 is connected and arranged between the bottom end surface of the lifting plate 5 and the upper end surface of a bottom plate 3, the lifting platform 1 can push the lifting plate 5 and the tool box 11 thereon to do lifting motion, when the transformer substation is operated in operation and maintenance, operation and maintenance personnel stand in guardrail assemblies on the lifting plate 5, can overhaul transformer substation equipment with different heights, and can directly take the operation and maintenance tool from the tool box 11 in the operation and maintenance process, so that the integrated operation and maintenance tool is practical and convenient, high in operation and maintenance efficiency and high in safety;
when the operation and maintenance personnel need to use the tool, the corresponding control button 10 is pressed, the corresponding telescopic motor 15 is opened by the control button 10 through the controller 12, the corresponding tool box 9 is pushed out of the tool box 11 by the telescopic motor 15, the control button 10 is pressed again, and the corresponding tool box 9 can be pulled into the tool box 11 by the telescopic motor 15, so that the operation and maintenance tool is well protected.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (5)

1. The utility model provides a transformer substation automation equipment integration fortune dimension instrument, includes bottom plate (3), its characterized in that, bottom plate (3) up end is connected with support column (4) all around, and lifter plate (5) are worn to be equipped with in vertical slip on support column (4) all around, the guardrail subassembly is installed in lifter plate (5) up end left side, toolbox (11) are installed on lifter plate (5) up end right side, connect between lifter plate (5) and bottom plate (3) and install lift platform (1).
2. The substation automation equipment integration operation and maintenance tool according to claim 1, wherein the universal rollers (2) are connected and installed around the bottom end surface of the bottom plate (3).
3. The substation automation equipment integrated operation and maintenance tool according to claim 2, wherein the guardrail assembly installed on the left side of the upper end surface of the lifting plate (5) comprises a protective guardrail (8), the protective guardrail (8) is installed on the front side and the rear side of the upper end surface of the lifting plate (5), the switch door (6) is rotatably installed on the left side of the upper end surface of the lifting plate (5), and the lifting platform control button (7) is installed on the upper end of the support column (4) on the left side above the bottom plate (3).
4. The substation automation equipment integrated operation and maintenance tool according to claim 3, wherein a partition plate (13) is connected to the right side in the tool box (11), a plurality of guide rails (14) are connected between the left side wall of the partition plate (13) and the left side wall in the tool box (11), a tool box (9) is slidably mounted on the guide rails (14), a plurality of telescopic motors (15) are mounted on the right side wall of the partition plate (13), the output ends of the telescopic motors (15) are fixedly connected with the right end of the tool box (9), a controller (12) is mounted at the top in the tool box (11), and a plurality of control buttons (10) are mounted above the left side wall of the tool box (11).
5. The substation automation equipment integrated operation and maintenance tool according to claim 4, wherein the tool boxes (9) installed in the tool box (11) are provided with seven groups, and the lowermost tool box (9) in the tool box (11) is the tool box with the largest volume.
CN202123213744.6U 2021-12-20 2021-12-20 Integrated operation and maintenance tool for automatic equipment of transformer substation Active CN216625083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123213744.6U CN216625083U (en) 2021-12-20 2021-12-20 Integrated operation and maintenance tool for automatic equipment of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123213744.6U CN216625083U (en) 2021-12-20 2021-12-20 Integrated operation and maintenance tool for automatic equipment of transformer substation

Publications (1)

Publication Number Publication Date
CN216625083U true CN216625083U (en) 2022-05-27

Family

ID=81705637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123213744.6U Active CN216625083U (en) 2021-12-20 2021-12-20 Integrated operation and maintenance tool for automatic equipment of transformer substation

Country Status (1)

Country Link
CN (1) CN216625083U (en)

Similar Documents

Publication Publication Date Title
CN212533819U (en) Power equipment warning device
CN216625083U (en) Integrated operation and maintenance tool for automatic equipment of transformer substation
CN210313409U (en) High-voltage circuit breaker overhauling device for electric power engineering
CN212908745U (en) Safety maintenance protector of light current engineering equipment
CN212356271U (en) Super thick cell board hoist and mount track device
CN211703895U (en) Electric automatization control cabinet
CN207530406U (en) A kind of assembling distribution box climbing frame with side stay
CN209737560U (en) Portable power system maintenance device
CN220762586U (en) Photovoltaic power plant fortune maintenance device
CN210273163U (en) Low-voltage draw-out type switch cabinet body convenient to install and fix
CN220593099U (en) Container shore bridge lifting appliance maintenance platform
CN215854993U (en) A safe construction platform for maintenance of transformer substation
CN213918197U (en) A instrument car of ascending a height for secondary wiring
CN214481888U (en) Indoor cabinet for communication equipment
CN220775171U (en) Movable maintenance platform for distribution room
CN213106684U (en) Maintenance frame for maintaining multilayer tandem voltage transformer
CN214828852U (en) Forklift manned platform
CN220131848U (en) Inspection device is maintained in inspection of transformer substation's inspection
CN216038502U (en) Supplementary installation crane of electric power engineering
CN219807746U (en) Maintenance construction table
CN219535313U (en) Debugging cabinet connection structure
CN216268900U (en) Lower spare compartment with lifting mechanism
CN219636839U (en) Lifting frame for coating
CN220896603U (en) Photovoltaic panel assembly convenient to install
CN215101837U (en) Machine room operation and maintenance overhauling operation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant