CN216618858U - Drainage pipe of hydraulic engineering antiseep - Google Patents
Drainage pipe of hydraulic engineering antiseep Download PDFInfo
- Publication number
- CN216618858U CN216618858U CN202122887653.4U CN202122887653U CN216618858U CN 216618858 U CN216618858 U CN 216618858U CN 202122887653 U CN202122887653 U CN 202122887653U CN 216618858 U CN216618858 U CN 216618858U
- Authority
- CN
- China
- Prior art keywords
- pipe
- fixed
- plate
- collection
- hydraulic engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007789 sealing Methods 0.000 claims description 60
- 239000010865 sewage Substances 0.000 claims description 31
- 239000002893 slag Substances 0.000 claims description 25
- 238000007599 discharging Methods 0.000 claims description 14
- 239000013049 sediment Substances 0.000 claims description 2
- 239000012535 impurity Substances 0.000 abstract description 10
- 238000013461 design Methods 0.000 abstract description 8
- 238000001914 filtration Methods 0.000 abstract description 5
- 230000002787 reinforcement Effects 0.000 abstract description 3
- 230000002262 irrigation Effects 0.000 description 12
- 238000003973 irrigation Methods 0.000 description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 238000000034 method Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000006872 improvement Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000005574 cross-species transmission Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The application discloses drainage pipe of hydraulic engineering antiseep, including first body and second body. Through the bayonet design of first body and second body, with the bayonet design cooperation of sealed crown plate and seal groove, and make second body and sealed crown plate butt on sealed shim, thereby guarantee the leakproofness of first body and second body junction, avoid drainage pipe to take place the seepage, collect the impurity after filtering filter plate through dirty pipe collection, and through dirty pipe both ends formula design of can opening and shutting, conveniently clear up dirty intraduct of collection, avoid piling up because of impurity and causing dirty intraduct peculiar smell etc. appear in the collection, drainage pipe's practicality is provided, carry out supplementary reinforcement to dirty pipe collection through limiting plate and removal cardboard cooperation, it is too much because of impurity collection to avoid dirty intraduct of collection, the great of weight causes and the connection of scum pipe is sent, firmness and stability when dirty pipe and scum pipe are connected have been improved.
Description
Technical Field
The application relates to a drainage pipeline, in particular to a water conservancy project anti-leakage drainage pipeline.
Background
Hydraulic engineering is mainly the engineering operation in aspects such as planning, design, construction, scientific research and management that departments such as water conservancy, water and electricity, water guarantor carried out, and hydraulic engineering can set up drainage pipe according to the drainage route for the convenience of drainage when the construction.
Many drainage pipe are for the convenience to handle inside jam, all can set up the pipeline into the segmental type, then fix through flange or screw thread, but because traditional fixed mode leakproofness is relatively poor, after fixed the completion, still probably because rivers spill over, the holistic leakproofness of drainage pipe has been reduced, some pipelines are provided with filtration, filter through filtering net plate, then collect through the collecting pipe, but traditional collection subassembly collection space is less, it is also comparatively inconvenient during the clearance. Therefore, a water conservancy project anti-leakage drainage pipeline is provided for solving the problems.
Disclosure of Invention
The drainage pipe that provides a hydraulic engineering antiseep in this embodiment is used for solving among the prior art the relatively poor and inconvenient problem of debris collection clearance after filtering of drainage pipe junction leakproofness for the hydraulic engineering.
According to one aspect of the application, the leakage-proof drainage pipeline for the hydraulic engineering comprises a first pipe body and a second pipe body, wherein a slag discharging pipe is fixed at the bottom end of one side, close to the second pipe body, of the first pipe body, a slag discharging port is formed in the first pipe body at the top end of the slag discharging pipe, a filter screen plate is fixed at one end, close to the first pipe body, of the second pipe body, and the first pipe body is in threaded connection with the second pipe body; the utility model discloses a slag discharge pipe, including first body, second body, first body, sealed crown plate, first seal ring plate, first lead screw, second body, first body, second body, first body, second body, first body, second body, first body, first body, first body, first.
Further, collect the structure including dirty pipe, connector and sealed lid of collection, arrange sediment bottom of pipe threaded connection and have dirty pipe of collection, and dirty pipe both ends of collection all are fixed with the connector, connector outside threaded connection has sealed lid, the row's of collection dirt pipe top outside is provided with reinforced structure.
Further, reinforced structure includes the fixed plate, the scum pipe outside on collection dirty tub top is fixed with the fixed plate, the dirty tub top outside of collection is fixed with the limiting plate, limiting plate outside equidistance block has the removal cardboard, four remove the cardboard top and all be fixed with the movable block, the movable block all with the inside sliding connection of fixed plate, the support lead screw has all been cup jointed through the screw hole to movable block inside, and the support lead screw all passes through bearing and fixed plate internal connection.
Furthermore, the second body is fixed with another sealed cushion near one side of first body, first body and second body junction set up to "L" shape of mutually supporting.
Further, a plurality of fixing holes matched with the fixing screw rods are formed in the second annular plate at equal intervals, and the fixing screw rods between the fixing nuts and the second annular plate are all sleeved with the anti-loosening washers.
Further, the seal groove is arranged to be annular and matched with the seal ring plate, the thickness of the seal ring plate is larger than that of the seal groove, and the length of the fixing screw rod is larger than the sum of the thicknesses of the second ring plate and the seal ring plate.
Furthermore, the inside of the sealing cover at the outer end of the connecting port is fixed with another sealing rubber gasket, and the diameter of the outer ring of the sealing cover is smaller than that of the outer ring of the sewage collecting pipe.
Furthermore, the diameter of the outer ring of the fixing plate is larger than that of the outer ring of the sewage collecting pipe, and the bottom end of the fixing plate at the top end of the sewage collecting pipe is fixed with another sealing rubber gasket.
Furthermore, the fixed plate is internally provided with moving grooves matched with the moving blocks and the supporting screw rods, and the thickness of each moving groove is larger than that of the limiting plate.
Further, the removal cardboard all sets up to "L" shape with the limiting plate complex, four support lead screw all sets up to horizontal "T" shape of placing.
Through the above-mentioned embodiment of this application, inside and outside complex seal structure has been adopted, after the second body inserted first body, extrude the inside sealed cushion of first body, make the inside sealed cushion of sealing ring plate extrusion seal groove simultaneously, and seal the protection through sealing ring plate to first body and second body junction, the leakproofness of junction has been guaranteed, rethread fixed lead screw and fixation nut cooperation fixed can, the relatively poor and inconvenient problem of debris collection clearance after filtering of drainage pipe junction leakproofness for hydraulic engineering, the leakproofness and the practicality of drainage pipe are provided.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic perspective view of an embodiment of the present application;
FIG. 2 is a schematic sectional front view of a portion of an embodiment of the present application;
FIG. 3 is a schematic side sectional view of a portion of one embodiment of the present application;
FIG. 4 is an enlarged view of the structure at A in FIG. 2 according to an embodiment of the present application;
fig. 5 is an enlarged schematic view of a structure at B in fig. 2 according to an embodiment of the present application.
In the figure: 1. a first pipe body; 2. a second tube body; 3. a slag discharge pipe; 4. a slag discharge port; 5. a filter screen plate; 6. a first ring plate; 7. a second ring plate; 8. a seal ring plate; 9. a sealing groove; 10. Sealing the rubber gasket; 11. fixing the screw rod; 12. fixing a nut; 13. a sewage collecting pipe; 14. a connecting port; 15. a sealing cover; 16. a fixing plate; 17. a limiting plate; 18. moving the clamping plate; 19. a moving block; 20. and supporting the screw rod.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
Furthermore, the terms "mounted," "disposed," "provided," "connected," and "sleeved" are to be construed broadly. For example, it may be a fixed connection, a removable connection, or a unitary construction; can be a mechanical connection, or an electrical connection; may be directly connected, or indirectly connected through intervening media, or may be in internal communication between two devices, elements or components. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
Drainage pipe in this embodiment can be applicable to irrigation equipment, for example, provides the drainage pipe of following hydraulic engineering antiseep in this embodiment, and drainage pipe in this embodiment can be used for an assembled hydraulic engineering uses multi-functional irrigation equipment.
The irrigation control box comprises an irrigation control box body, an irrigation control box door is installed on the front side surface of the irrigation control box body, an upper baffle cover is installed on the top end of the irrigation control box body, a rotary seat is installed at the bottom end of the irrigation control box body, a support rod is movably connected to the bottom end of the rotary seat, a first baffle rod is installed on the side surface of the support rod, a second baffle rod is installed on the rear side surface of the support rod, a movable groove is formed in the rotary seat, a rotary column matched with the movable groove is fixedly connected to the top end of the support rod, a solar cell panel is embedded in the upper end of the upper baffle cover and is located at the central position of the upper surface of the upper baffle cover, a fan is installed on the top end of the interior of the irrigation control box body, a PCB is installed in the irrigation control box body and is located below the fan, and a radio frequency card induction screen and an operation panel are installed on the surface of the irrigation control box door, operating panel is in one side of radio frequency card response screen, the bottom contained angle of second pin and first pin is the right angle, second pin and first pin all pass mount pad embedding branch through the bolt and fix, branch passes through the column spinner with the roating seat and is connected with the rotatory block in movable groove, solar cell panel all passes through electric connection with fan and PCB board.
Of course, the present embodiment may be used with other irrigation devices. The detailed description is omitted, and the water discharge pipeline of the embodiment of the present application is described below.
Referring to fig. 1-5, a water conservancy project leakage-proof drainage pipeline comprises a first pipe body 1 and a second pipe body 2, wherein a slag discharge pipe 3 is fixed at the bottom end of one side of the first pipe body 1 close to the second pipe body 2, a slag discharge port 4 is formed in the first pipe body 1 at the top end of the slag discharge pipe 3, a filter screen plate 5 is fixed at one end of the second pipe body 2 close to the first pipe body 1, and the first pipe body 1 is in threaded connection with the second pipe body 2; a second ring plate 7 is fixed on the outer ring of one end of the first pipe body 1 close to the second pipe body 2, a first ring plate 6 is fixed on the outer ring of one end of the second pipe body 2 close to the first pipe body 1, a sealing ring plate 8 is fixed on one side of the second ring plate 7 close to the first ring plate 6, a sealing groove 9 matched with the sealing ring plate 8 is arranged in the first ring plate 6, a sealing rubber gasket 10 is fixed in the sealing groove 9 on the side edge of the sealing ring plate 8, a plurality of fixing screw rods 11 are equidistantly fixed on the first ring plate 6 outside the sealing groove 9, one ends of the fixing screw rods 11 penetrating to the other side of the second ring plate 7 are all in threaded connection with fixing nuts 12, a collecting structure is arranged at the bottom end of the slag discharging pipe 3, the joint of the first pipe body 1 and the second pipe body 2 is sealed and protected by the sealing ring plate 8, so that the joint of the first pipe body 1 and the second pipe body 2 is tighter, and then is matched and fixed by the fixing screw rods 11 and the fixing nuts 12, the leakage at the joint of the first pipe body 1 and the second pipe body 2 is avoided;
the collecting structure comprises a sewage collecting pipe 13, a connecting port 14 and a sealing cover 15, the bottom end of the slag discharging pipe 3 is in threaded connection with the sewage collecting pipe 13, the connecting ports 14 are fixed at two ends of the sewage collecting pipe 13, the sealing cover 15 is in threaded connection with the outer side of the connecting port 14, a reinforcing structure is arranged on the outer side of the slag discharging pipe 3 at the top end of the sewage collecting pipe 13, impurities filtered by the filter screen plate 5 are collected through the sewage collecting pipe 13, and the interior of the sewage collecting pipe 13 is convenient to clean through the openable design of two ends of the sewage collecting pipe 13; the reinforcing structure comprises a fixed plate 16, the fixed plate 16 is fixed on the outer side of the slag discharging pipe 3 at the top end of the sewage collecting pipe 13, a limiting plate 17 is fixed on the outer side of the top end of the sewage collecting pipe 13, movable clamping plates 18 are clamped on the outer side of the limiting plate 17 at equal intervals, movable blocks 19 are fixed on the top ends of the four movable clamping plates 18, the movable blocks 19 are all in sliding connection with the inner part of the fixed plate 16, support lead screws 20 are all sleeved on the inner parts of the movable blocks 19 through threaded holes, the support lead screws 20 are all connected with the inner part of the fixed plate 16 through bearings, and auxiliary reinforcement is carried out between the sewage collecting pipe 13 and the first pipe body 1 through the matching of the limiting plates 17 and the movable clamping plates 18, so that the connection between the sewage collecting pipe 13 and the slag discharging pipe 3 is firmer and more stable;
the other sealing rubber gasket 10 is fixed on one side, close to the first pipe body 1, of the second pipe body 2, and the joint of the first pipe body 1 and the second pipe body 2 is in an L shape matched with each other, so that the sealing performance of the joint of the first pipe body 1 and the second pipe body 2 is guaranteed; a plurality of fixing holes matched with the fixing screw rod 11 are formed in the second annular plate 7 at equal intervals, the fixing screw rod 11 between the fixing nut 12 and the second annular plate 7 is sleeved with a check washer, the fixing screw rod 11 conveniently penetrates through the second annular plate 7, the check washer is composed of two washers, the outer side of the check washer is provided with a radial convex thread surface, and the inner side of the check washer is an oblique tooth surface. When the connecting piece is vibrated and the bolt is loosened, only the inclined tooth surfaces at the inner sides of the two gaskets are allowed to relatively move in a staggered manner to generate lifting tension, so that a locking effect is achieved, and the fixing nut 12 and the fixing screw rod 11 are connected more firmly and stably; the sealing groove 9 is in an annular shape matched with the sealing ring plate 8, the thickness of the sealing ring plate 8 is larger than that of the sealing groove 9, the length of the fixing screw rod 11 is larger than the sum of the thicknesses of the second ring plate 7 and the sealing ring plate 8, the sealing ring plate 8 is conveniently inserted into the sealing groove 9, the sealing ring plate 8 can be tightly abutted against a sealing rubber gasket 10 in the sealing groove 9, and the fixing screw rod 11 can penetrate through the second ring plate 7; the other sealing rubber gasket 10 is fixed inside each sealing cover 15 at the outer end of the connecting port 14, the outer ring diameter of each sealing cover 15 is smaller than that of the sewage collecting pipe 13, the sealing performance of the connection between the connecting port 14 and the sealing cover 15 is guaranteed, and the sealing cover 15 can be abutted against the fixing plate 16; the diameter of the outer ring of the fixed plate 16 is larger than that of the outer ring of the sewage collecting pipe 13, the bottom end of the fixed plate 16 at the top end of the sewage collecting pipe 13 is fixed with another sealing rubber gasket 10, so that when the sewage collecting pipe 13 is screwed to the slag discharging pipe 3 for fixation, the top end of the sewage collecting pipe 13 can be abutted against the sealing rubber gasket 10 at the bottom end of the fixed plate 16, and the sealing property of the joint of the sewage collecting pipe 13 and the slag discharging pipe 3 is kept; fixed plate 16 is inside all to be seted up with movable block 19 and support lead screw 20 complex shifting chute, and the thickness of shifting chute all is greater than the thickness of limiting plate 17, make things convenient for movable block 19 under support lead screw 20's drive, at the inside removal of fixed plate 16, guarantee simultaneously that removal cardboard 18 can remove to misplace with limiting plate 17, removal cardboard 18 all sets up to "L" shape with limiting plate 17 complex, four support lead screw 20 all set up to "T" shape of horizontal placing, conveniently remove cardboard 18 and limiting plate 17 block, and conveniently twist support lead screw 20 when the split.
When the drainage pipe is used normally, when water flow in the first pipe body 1 enters the second pipe body 2, the water flow is filtered by the filter screen plate 5, filtered impurities and the like enter the slag discharge pipe 3 through the slag discharge port 4 and then enter the sewage collection pipe 13 through the slag discharge pipe 3, when more impurities exist in the sewage collection pipe 13, the support screw rod 20 is screwed, the movable clamping plate 18 is driven by the movable block 19 to move outwards under the action of threads when the support screw rod 20 rotates, so that the limiting clamping between the movable clamping plate 18 and the limiting plate 17 is released, the sewage collection pipe 13 is rotated, the sewage collection pipe 13 and the slag discharge pipe 3 are separated and released, then the sealing covers 15 at two ends are screwed, the impurities collected in the sewage collection pipe 13 can be poured out, the inside of the sewage collection pipe 13 is also convenient to be washed, after the washing is completed, the sealing covers 15 are screwed back to the connecting port 14 to be fixed, screwing the sewage collecting pipe 13 to the slag discharge pipe 3 for fixing, then rotating the supporting screw rod 20, driving the movable clamping plate 18 to be clamped to the side edge of the limiting plate 17, when the filter screen plate 5 needs to be cleaned, screwing the fixing nut 12, separating the fixing nut 12 from the fixing screw rod 11, so that the fixing between the second ring plate 7 and the first ring plate 6 can be released, then pulling the second pipe body 2 out of the first pipe body 1, so that the filter screen plate 5 can be cleaned, after the cleaning is completed, aligning the fixing screw rod 11 with the fixing hole, inserting the second pipe body 2 into the first pipe body 1 again, enabling the fixing screw rod 11 to penetrate through the second ring plate 7, screwing the fixing nut 12 to the fixing screw rod 11 for fixing, inserting the sealing ring plate 8 into the sealing groove 9 at the moment, and tightly abutting against the sealing rubber gasket 10.
The application has the advantages that:
1. the sealing structure is simple to operate, and the first pipe body 1 and the second pipe body 2 are in plug-in design and are matched with the plug-in design of the sealing ring plate 8 and the sealing groove 9, and the second pipe body 2 and the sealing ring plate 8 are abutted against the sealing rubber gasket 10, so that the sealing performance of the joint of the first pipe body 1 and the second pipe body 2 is ensured, and the leakage of a drainage pipeline is avoided;
2. the structure is reasonable, the impurities filtered by the filter screen plate 5 are collected through the dirt collecting pipe 13, and the inside of the dirt collecting pipe 13 is convenient to clean through the openable design of the two ends of the dirt collecting pipe 13, so that peculiar smell and the like in the dirt collecting pipe 13 caused by accumulation of the impurities are avoided, and the practicability of the drainage pipeline is improved;
3. this application is rational in infrastructure, through limiting plate 17 with remove 18 cooperation of cardboard and assist the reinforcement to dirty pipe 13 of collection, avoid dirty pipe 13 of collection inside too much because of impurity collection, weight is great to cause and to send with being connected of scum pipe 3, firmness and stability when dirty pipe 13 of collection is connected with scum pipe 3 have been improved.
It is well within the skill of those in the art to implement, without undue experimentation, the present application is not directed to software and process improvements, as they relate to circuits and electronic components and modules.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims (10)
1. The utility model provides a drainage pipe of hydraulic engineering antiseep which characterized in that: the slag discharging pipe comprises a first pipe body (1) and a second pipe body (2), wherein a slag discharging pipe (3) is fixed at the bottom end of one side, close to the second pipe body (2), of the first pipe body (1), a slag discharging port (4) is formed in the first pipe body (1) at the top end of the slag discharging pipe (3), a filter screen plate (5) is fixed at one end, close to the first pipe body (1), of the second pipe body (2), and the first pipe body (1) and the second pipe body (2) are in threaded connection; first body (1) is fixed with second crown plate (7) on being close to the outer lane of second body (2) one end, second body (2) are fixed with first crown plate (6) on being close to the outer lane of first body (1) one end, one side that second crown plate (7) are close to first crown plate (6) is fixed with sealed crown plate (8), first crown plate (6) inside offer with sealed crown plate (8) complex seal groove (9), seal groove (9) internal fixation of sealed crown plate (8) side has sealed cushion (10), first crown plate (6) in the seal groove (9) outside are equidistantly fixed with a plurality of fixed screw (11), and fixed screw (11) run through to the one end of second crown plate (7) opposite side all threaded connection have fixation nut (12), arrange sediment pipe (3) bottom and set up collection structure.
2. The hydraulic engineering leakage-proof drainage pipeline according to claim 1, characterized in that: collect the structure including dirty pipe (13), connector (14) and sealed lid (15) of collection, scum pipe (3) bottom threaded connection has dirty pipe (13) of collection, and just collects dirty pipe (13) both ends and all is fixed with connector (14), connector (14) outside threaded connection has sealed lid (15), the scum pipe (3) outside on dirty pipe (13) top of collection is provided with reinforced structure.
3. The hydraulic engineering leakage-proof drainage pipeline according to claim 2, characterized in that: the reinforced structure includes fixed plate (16), the scum pipe (3) outside on dirt collection pipe (13) top is fixed with fixed plate (16), dirt collection pipe (13) top outside is fixed with limiting plate (17), limiting plate (17) outside equidistance block has removal cardboard (18), four remove cardboard (18) top and all be fixed with movable block (19), movable block (19) all with fixed plate (16) inside sliding connection, support lead screw (20) have all been cup jointed through the screw hole to movable block (19) inside, and support lead screw (20) all through bearing and fixed plate (16) internal connection.
4. The hydraulic engineering leakage-proof drainage pipeline according to claim 1, characterized in that: one side that second body (2) are close to first body (1) is fixed with another sealed cushion (10), first body (1) and second body (2) junction set up to "L" shape of mutually supporting.
5. The hydraulic engineering leakage-proof drainage pipeline according to claim 1, characterized in that: a plurality of and fixed screw (11) complex fixed orificess have been seted up to inside equidistance of second crown plate (7), all the cover is equipped with lock washer on fixed screw (11) between fixation nut (12) and second crown plate (7).
6. The hydraulic engineering leakage-proof drainage pipeline according to claim 1, characterized in that: the sealing groove (9) is arranged to be annular and matched with the sealing ring plate (8), the thickness of the sealing ring plate (8) is larger than that of the sealing groove (9), and the length of the fixed screw rod (11) is larger than the sum of the thicknesses of the second ring plate (7) and the sealing ring plate (8).
7. The hydraulic engineering leakage-proof drainage pipeline according to claim 2, characterized in that: the inside of a sealing cover (15) at the outer end of the connecting port (14) is fixed with another sealing rubber gasket (10), and the diameters of the outer rings of the sealing covers (15) are smaller than the diameter of the outer ring of the sewage collecting pipe (13).
8. The hydraulic engineering leakage-proof drainage pipeline according to claim 3, characterized in that: the diameter of the outer ring of the fixed plate (16) is larger than that of the outer ring of the sewage collecting pipe (13), and the bottom end of the fixed plate (16) at the top end of the sewage collecting pipe (13) is fixed with another sealing rubber gasket (10).
9. The hydraulic engineering leakage-proof drainage pipeline according to claim 3, characterized in that: the fixed plate (16) is internally provided with moving grooves matched with the moving block (19) and the supporting screw rod (20), and the thickness of each moving groove is larger than that of the limiting plate (17).
10. The hydraulic engineering leakage-proof drainage pipeline according to claim 3, characterized in that: the movable clamping plates (18) are all arranged to be L-shaped and matched with the limiting plates (17), and the four supporting screw rods (20) are all arranged to be T-shaped and transversely arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122887653.4U CN216618858U (en) | 2021-11-23 | 2021-11-23 | Drainage pipe of hydraulic engineering antiseep |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122887653.4U CN216618858U (en) | 2021-11-23 | 2021-11-23 | Drainage pipe of hydraulic engineering antiseep |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216618858U true CN216618858U (en) | 2022-05-27 |
Family
ID=81696765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122887653.4U Expired - Fee Related CN216618858U (en) | 2021-11-23 | 2021-11-23 | Drainage pipe of hydraulic engineering antiseep |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216618858U (en) |
-
2021
- 2021-11-23 CN CN202122887653.4U patent/CN216618858U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216618858U (en) | Drainage pipe of hydraulic engineering antiseep | |
CN211521845U (en) | Energy-concerving and environment-protective sewage treatment device | |
CN213234042U (en) | Assembled rainwater pipeline for municipal administration | |
CN210049350U (en) | Filter cover for urban drain pipe outlet | |
CN111188241B (en) | A drainage structures for town road | |
CN208260330U (en) | A kind of Environment Protection and Drainage of Pulled Water water energy-saving equipment | |
CN216092450U (en) | Sewage treatment plant is used in hydraulic engineering construction | |
CN219449468U (en) | Integrated MBR sewage treatment equipment | |
CN218405709U (en) | Civil engineering road drainage device | |
CN221656054U (en) | Glass fiber reinforced plastic filtering device with good sealing performance | |
CN214738623U (en) | Municipal works drainage is with preventing blockking up pipeline | |
CN221374509U (en) | Hydraulic engineering is with pipeline that has filtering capability | |
CN219794119U (en) | Intelligent rainwater guiding device | |
CN214809142U (en) | Acid drain pipe waste acid precipitation and collection device | |
CN221655978U (en) | Filter residue device of biological pond water distribution well | |
CN209817045U (en) | Novel urban construction drainage device of environmental protection | |
CN216839231U (en) | Water conservancy is diversion device for water and electricity | |
CN221276788U (en) | Road drainage structure | |
CN219942075U (en) | Crude oil filtering device for soybean oil processing | |
CN219386549U (en) | Flow dividing device of municipal rainwater drainage pipe network | |
CN219744155U (en) | Printing and dyeing sewage filter equipment | |
CN214833284U (en) | Rainwater is collected and is used inspection shaft | |
CN214940620U (en) | Rainwater recovery unit for construction | |
CN221181890U (en) | Municipal administration drain pipe filter equipment | |
CN213741357U (en) | Urban rainwater collecting and filtering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220527 |
|
CF01 | Termination of patent right due to non-payment of annual fee |