CN216616771U - Counterfort high wall steel reinforcement cage appearance frame - Google Patents

Counterfort high wall steel reinforcement cage appearance frame Download PDF

Info

Publication number
CN216616771U
CN216616771U CN202123340255.7U CN202123340255U CN216616771U CN 216616771 U CN216616771 U CN 216616771U CN 202123340255 U CN202123340255 U CN 202123340255U CN 216616771 U CN216616771 U CN 216616771U
Authority
CN
China
Prior art keywords
frame
layer
buttress
auxiliary
auxiliary member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123340255.7U
Other languages
Chinese (zh)
Inventor
吴刚
高正绪
闫军盈
袁一磊
王宝全
金安静
苏伟
华军
刘利国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
Original Assignee
Sinohydro Bureau 3 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN202123340255.7U priority Critical patent/CN216616771U/en
Application granted granted Critical
Publication of CN216616771U publication Critical patent/CN216616771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a buttress type high-wall reinforcement cage sample frame, which comprises an operator platform, wherein the operator platform comprises an operator platform base and a multilayer single operation layer, the single operation layer comprises a plurality of interlayer stand columns and a layer support frame fixedly arranged at the tops of the interlayer stand columns, a protective guard and a plurality of positioning columns which are arranged on the outer side of the protective guard along the peripheral side of the protective guard and are used for connecting a plurality of sample frame auxiliary parts are arranged at the edge position of the top of the layer support frame, and N is a positive integer not less than 2; the sample frame auxiliary part comprises an auxiliary part vertical rod, an auxiliary part cross rod, a telescopic rod, a sample frame fastener and a baffle column. The number of the operation sub platforms is selected according to the number of the buttress walls, the number of layers of the single operation layer is selected according to the height of the buttress walls, the positioning columns for connecting the plurality of sample frame auxiliary pieces are arranged on the outer sides of the protective guards along the peripheral sides of the protective guards, and the sample frame auxiliary pieces are provided with the sample frame fasteners for fixing the sample frames of the vertical bars and the two baffle columns for limiting the horizontal bars, so that the efficiency is high.

Description

Counterfort high wall steel reinforcement cage appearance frame
Technical Field
The utility model belongs to the technical field of installation of horizontal ribs of a counterfort type high-wall reinforcement cage, and particularly relates to a counterfort type high-wall reinforcement cage sample frame.
Background
In a reinforced concrete wall structure, especially in the installation and construction process of high wall steel bars with a high single layer, construction scaffolds are often required to be erected on the inner side and the outer side of a wall in advance, and then the high wall steel bars are installed one by one manually. And the installation of the counterfort type high wall steel bars needs to set up construction scaffolds between the inner side and the outer side of the retaining wall and each counterfort wall so as to provide a construction operation platform for operators. For a plurality of dry docks with the plane size of 550m multiplied by 75m, the dock walls of the dry docks are of a buttress type high-wall structure, the total height is 13.8m, one-time construction is required according to design requirements for removing middle vertical sections of wall bodies of lower toe walls and upper structure parts, the mounting height of single-layer steel bars is 8.65m, and the center distance between buttress walls is 4.0 m; if the conventional scaffold erecting mode is adopted for construction, the scaffold is frequently erected and dismantled, the workload is high, the construction period and the pressure-occupying time are long, the manual demand is high, high-altitude operation is more during erection, the safety and reliability are poor, the operation space of an operation platform is small due to the fact that the distance between upright rods of the scaffold is small, the influence on the whole construction progress of a project is obvious, and in addition, horizontal ribs in a counterfort type high-wall reinforcement cage are difficult to install one by one. Therefore, a buttress type high-wall reinforcement cage sample frame is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that the defects in the prior art are overcome, and the buttress type high-wall reinforcement cage sample frame is novel and reasonable in design, the number of the operation sub platforms is selected according to the number of the buttress walls, the number of layers of single operation layers is selected according to the height of the buttress walls, positioning columns for connecting a plurality of sample frame auxiliary parts are arranged on the outer sides of the protective guards along the circumferential sides of the protective guards, sample frame fasteners for fixing the sample frames of the vertical ribs and two spacing columns for limiting the horizontal ribs are arranged on the sample frame auxiliary parts, and the sample frame is large in operation space, safe, reliable, high in efficiency and convenient to popularize and use.
In order to solve the technical problems, the utility model adopts the technical scheme that: the utility model provides a counterfort high wall steel reinforcement cage appearance frame which characterized in that: the operation sub-platform comprises N +1 operation sub-platforms which are arranged among N buttress walls in an interval manner in a penetrating mode, each operation sub-platform comprises a sub-platform base and a plurality of single operation layers which are sequentially arranged from bottom to top, each sub-platform base comprises a base plate, each single operation layer comprises a plurality of interlayer stand columns and layer supporting frames fixedly arranged at the tops of the interlayer stand columns, guard rails and a plurality of positioning columns which are located on the outer sides of the guard rails along the peripheral sides of the guard rails and used for connecting a plurality of sample frame auxiliary pieces are arranged at the edge positions of the tops of the layer supporting frames, the number of the sample frame auxiliary pieces is equal to the number of the positioning columns and corresponds to one another, two ladder beams which are arranged in parallel are arranged between the two adjacent layers of supporting frames, a plurality of ladder steps are arranged between the two ladder beams from bottom to top, skirting boards are laid in non-ladder areas at the tops of the layer supporting frames, and N is a positive integer not less than 2;
the auxiliary sample frame comprises an auxiliary vertical rod and an auxiliary horizontal rod, wherein the auxiliary vertical rod and one end of the auxiliary vertical rod are connected through rotation of a positioning column, the auxiliary horizontal rod is fixed to the top of the auxiliary vertical rod, a telescopic rod is arranged on the inner sleeve of the other end of the auxiliary horizontal rod, one end, far away from the auxiliary horizontal rod, of the telescopic rod is provided with a sample frame fastener, the sample frame fastener is used for fixing a vertical rib, and two separation columns used for limiting horizontal ribs are arranged at the top of the auxiliary horizontal rod along the length direction.
Foretell buttress formula high wall steel reinforcement cage appearance frame, its characterized in that: the upper parts of two adjacent operation sub-platforms are connected through a connecting pedal.
Foretell buttress formula high wall steel reinforcement cage appearance frame, its characterized in that: the auxiliary member vertical rod is connected with the protective guard through an auxiliary member connector.
Foretell buttress formula high wall steel reinforcement cage appearance frame, its characterized in that: the auxiliary member vertical rod and the auxiliary member transverse rod are connected through an auxiliary member reinforcing rod, and a locking nut used for locking the telescopic rod is arranged on the auxiliary member transverse rod.
Foretell buttress formula high wall steel reinforcement cage appearance frame, its characterized in that: the layer supporting frame is a rectangular hollow grid type layer supporting frame.
Foretell buttress formula high wall steel reinforcement cage appearance frame, its characterized in that: the interlayer upright columns of the single operation layer on the first layer are fixed on the base plate, and the interlayer upright columns of the single operation layers on the other layers are fixed on the layer supporting frame of the single operation layer on the previous layer.
Foretell buttress formula high wall steel reinforcement cage appearance frame, its characterized in that: and a plurality of base inclined supports are arranged between the base plate and the first layer of the layer supporting frame of the single operation layer.
Foretell buttress formula high wall steel reinforcement cage appearance frame, its characterized in that: the height of the interlayer upright post is 1.8m to 2 m.
Compared with the prior art, the utility model has the following advantages:
1. the number of the operation sub-platforms is selected according to the number of the buttress walls, the upper parts of two adjacent operation sub-platforms are connected through the connecting pedal, the intercommunication and interconnection of the operation sub-platforms of the plurality of buttress walls are realized, the number of layers of a single operation layer is selected according to the height of the buttress walls, the arrangement is standardized, the operation space is large, and the device is safe, reliable and high in efficiency.
2. The edge position of the top of the layer supporting frame is provided with the protective guard and a plurality of positioning columns which are located on the outer side of the protective guard along the peripheral side of the protective guard and are used for connecting a plurality of sample frame auxiliary pieces, the auxiliary piece vertical rods are rotatably connected with the positioning columns, when the sample frame auxiliary pieces do not work, the sample frame auxiliary pieces are in a retracted state, the installation of an operation sub-platform is convenient, when the sample frame auxiliary pieces work, the sample frame auxiliary pieces are in an expanded state, the sample frame auxiliary pieces are provided with sample frame fasteners used for fixing sample frames of vertical bars and two baffle columns used for limiting horizontal bars, and the installation quality of the steel bars is controllable.
In conclusion, the utility model has novel and reasonable design, the number of the operation sub-platforms is selected according to the number of the buttress walls, the number of layers of the single operation layer is selected according to the height of the buttress walls, the positioning columns for connecting the plurality of sample frame auxiliary pieces are arranged on the outer sides of the protective guards along the peripheral sides of the protective guards, and the sample frame auxiliary pieces are provided with the sample frame fasteners for fixing the sample frames of the vertical ribs and the two baffle columns for limiting the horizontal ribs, so that the utility model has the advantages of large operation space, safety, reliability, high efficiency and convenience for popularization and use.
The technical solution of the present invention is further described in detail by the accompanying drawings and embodiments.
Drawings
Fig. 1 is a state diagram of the present invention in use.
FIG. 2 is a schematic structural diagram of the sample rack auxiliary member in the single manipulator platform in the retracted state according to the present invention.
Fig. 3 is a left side view of fig. 2.
Fig. 4 is a schematic structural view of the auxiliary sample rack in fig. 3 in a deployed state.
Fig. 5 is a top view of fig. 2.
FIG. 6 is a schematic view of the fitting relationship between the sample rack auxiliary member, the blocking post and the positioning post.
Description of reference numerals:
1-a base plate foundation; 2-retaining wall; 3-buttress wall;
4, connecting a pedal; 5-a sub-platform base; 6-operator platform;
7-base plate; 8, obliquely supporting the base; 9-interlayer upright post;
10-layer support frame; 11, protecting the fence; 12-skirting board;
13-a ladder beam; 14-step of ladder; 15-erecting a rib;
16-horizontal ribs; 17-a positioning column; 18-a sample rack aid;
19-an accessory vertical bar; 20-an auxiliary cross-bar; 21-auxiliary member reinforcing rod;
22 — an accessory connector; 23, a telescopic rod; 24-a locking nut;
25-sample holder fasteners; 26-a sample frame; 27-a gear shifting column.
Detailed Description
As shown in fig. 1 to 6, the utility model comprises N +1 operation sub-platforms 6 which are arranged between N buttress walls 3 in an interval manner in an inserting manner, each operation sub-platform 6 comprises a sub-platform base 5 and a plurality of single operation layers which are sequentially arranged from bottom to top, each sub-platform base 5 comprises a base plate 7, each single operation layer comprises a plurality of interlayer upright posts 9 and a plurality of layer support frames 10 which are fixedly arranged at the tops of the interlayer upright posts 9, a guard rail 11 and a plurality of positioning columns 17 which are arranged at the outer sides of the guard rail 11 along the circumferential sides of the guard rail 11 and are used for connecting a plurality of sample frame auxiliary members 18 are arranged at the edge positions of the tops of the layer support frames 10, the number of the sample frame auxiliary members 18 is equal to and is in one-to-one correspondence with the number of the positioning columns 17, two ladder beams 13 which are arranged in parallel are arranged between the two adjacent upper and lower layer support frames 10, a plurality of ladder steps 14 are arranged from bottom to top between the two ladder beams 13, skirting boards 12 are laid on the non-ladder areas at the tops of the layer support frames 10, wherein N is a positive integer not less than 2;
appearance frame auxiliary member 18 includes that auxiliary member montant 19 and one end of being connected rotate with reference column 17 fix the auxiliary member horizontal pole 20 at auxiliary member montant 19 top, and the other end endotheca of auxiliary member horizontal pole 20 is equipped with telescopic link 23, and telescopic link 23 is kept away from the one end of auxiliary member horizontal pole 20 and is installed the appearance frame fastener 25 that is used for fixed upright rib 15's appearance frame 26, and auxiliary member horizontal pole 20 top is provided with two fender posts 27 that are used for spacing horizontal rib 16 along length direction.
The number of the operation sub-platforms is selected according to the number of the buttress walls, the upper parts of two adjacent operation sub-platforms are connected through a connecting pedal, the operation sub-platforms of the plurality of buttress walls are interconnected, the number of layers of a single operation layer is selected according to the height of the buttress walls, and the device is standardized in setting, large in operation space, safe, reliable and high in efficiency; the top border position department of layer support frame 10 is provided with rail guard 11 and a plurality of reference columns that lie in the 11 outsides of rail guard and be used for connecting a plurality of appearance frame auxiliary members 18 along 11 week sides of rail guard, auxiliary member montant 19 rotates with reference column 17 to be connected, the out-of-work appearance frame auxiliary member 18 is for withdrawing the state, the installation of the operator platform 6 of being convenient for, the during operation appearance frame auxiliary member 18 is for expanding the state, install the appearance frame fastener that is used for fixed upright muscle on the appearance frame auxiliary member and two separate the shelves post that are used for spacing horizontal muscle, reinforcing bar installation quality is controllable.
In this embodiment, the upper parts of two adjacent operation sub-platforms 6 are connected through a connecting pedal 4.
In this embodiment, the auxiliary vertical bar 19 is connected to the guard rail 11 through an auxiliary connector 22.
In this embodiment, the auxiliary vertical rod 19 and the auxiliary horizontal rod 20 are connected by an auxiliary reinforcing rod 21, and a locking nut 24 for locking the telescopic rod 23 is arranged on the auxiliary horizontal rod 20.
In this embodiment, the layer supporting frame 10 is a rectangular hollow grid type layer supporting frame.
In this embodiment, the interlayer upright columns 9 of the first layer of the single operation layer are fixed on the base plate 7, and the interlayer upright columns 9 of the other layers of the single operation layer are fixed on the layer supporting frame 10 of the previous layer of the single operation layer.
In this embodiment, a plurality of base diagonal braces 8 are arranged between the base plate 7 and the layer supporting frame 10 of the first layer of the single operation layer.
In this embodiment, the height of the interlayer upright post 9 is 1.8m to 2m, which meets the requirement of normal standing construction of constructors.
When the utility model is used, the positions of a retaining wall 2 and a plurality of buttress walls 3 which are connected with the retaining wall 2 are planned on a bottom plate foundation 1, if the number of the buttress walls 3 is N, the number of operator platforms 6 is N +1, the N buttress walls 3 are alternately arranged between the N +1 operator platforms 6 in a spaced manner, the N +1 operator platforms 6 are sequentially connected by adopting at least N connecting pedals 4, a ladder beam 13 is arranged between two adjacent layers of support frames 10 at the upper part and the lower part and is parallel to the buttress walls 3, the ladder beam 13 is arranged at one end of the operator platforms 6 far away from the retaining wall 2, and the fact that constructors can normally go up, down, enter and exit is ensured, wherein N is a positive integer not less than 2;
a plurality of horizontal ribs 16 are arranged between two baffle columns 27 arranged along the length direction at the top of the auxiliary part cross bar 20 in advance;
the telescopic link 23 is equipped with to the other end endotheca of auxiliary member horizontal pole 20, the one end that auxiliary member horizontal pole 20 was kept away from to telescopic link 23 is installed and is used for the appearance frame fastener 25 of fixed stud 15, utilize the same high appearance frame fastener 25 of homonymy to put up a fixed appearance frame 26, appearance frame 26 is used for fixing a position fixed stud 15, the adjustable appearance frame 26 of telescopic link 23 stretches out length, the distance is controllable, after the installation of stud 15 is accomplished, operating personnel fixes the ligature in the 15 outsides of stud with horizontal rib 16, horizontal rib installation quality is controllable.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and all simple modifications, changes and equivalent structural changes made to the above embodiment according to the technical spirit of the present invention still fall within the protection scope of the technical solution of the present invention.

Claims (8)

1. The utility model provides a counterfort high wall steel reinforcement cage appearance frame which characterized in that: comprises N +1 operation sub-platforms (6) which are arranged between N buttress walls (3) in an interval manner in an inserting way, the operation sub-platforms (6) comprise sub-platform bases (5) and a plurality of single operation layers which are sequentially arranged from bottom to top, each sub-platform base (5) comprises a base plate (7), each single operation layer comprises a plurality of interlayer upright posts (9) and a layer support frame (10) which is fixedly arranged at the tops of the interlayer upright posts (9), a guard rail (11) and a plurality of positioning columns (17) which are arranged at the outer sides of the guard rail (11) along the circumferential sides of the guard rail (11) and are used for connecting a plurality of sample frame auxiliary pieces (18) are arranged at the edge positions of the tops of the layer support frames (10), the number of the sample frame auxiliary pieces (18) is equal to that of the positioning columns (17) and corresponds to one another, two ladder beams (13) which are arranged in parallel are arranged between the upper layer support frame and the lower layer support frame layer (10), a plurality of ladder steps (14) are arranged between the two ladder beams (13) from bottom to top, skirting boards (12) are laid in non-ladder areas on the top of the layer supporting frame (10), wherein N is a positive integer not less than 2;
appearance frame auxiliary member (18) include that auxiliary member montant (19) and one end of being connected rotate with reference column (17) are fixed auxiliary member horizontal pole (20) at auxiliary member montant (19) top, the other end endotheca of auxiliary member horizontal pole (20) is equipped with telescopic link (23), the one end that auxiliary member horizontal pole (20) were kept away from in telescopic link (23) is installed and is used for the appearance frame fastener (25) of appearance frame (26) of fixed stud (15), auxiliary member horizontal pole (20) top is provided with two and is used for spacing shelves post (27) of spacing horizontal rib (16) along length direction.
2. The buttress-type high-wall reinforcement cage-like frame according to claim 1, wherein: the upper parts of two adjacent operation sub-platforms (6) are connected through a connecting pedal (4).
3. The buttress-type high-wall reinforcement cage-like frame according to claim 1, wherein: the auxiliary piece vertical rod (19) is connected with the protective guard (11) through an auxiliary piece connector (22).
4. The buttress-type high-wall reinforcement cage-like frame according to claim 1, wherein: the auxiliary member vertical rod (19) is connected with the auxiliary member transverse rod (20) through an auxiliary member reinforcing rod (21), and a locking nut (24) used for locking the telescopic rod (23) is arranged on the auxiliary member transverse rod (20).
5. The buttress-type high-wall reinforcement cage-like frame according to claim 1, wherein: the layer supporting frame (10) is a rectangular hollow grid type layer supporting frame.
6. The buttress-type high-wall reinforcement cage-like frame according to claim 1, wherein: the interlayer upright columns (9) of the single operation layer of the first layer are fixed on the base plate (7), and the interlayer upright columns (9) of the single operation layers of the other layers are fixed on the layer supporting frame (10) of the single operation layer of the previous layer.
7. The buttress-type high-wall reinforcement cage-like frame according to claim 1, wherein: and a plurality of base inclined supports (8) are arranged between the base plate (7) and the layer supporting frame (10) of the single operation layer.
8. The buttress-type high-wall reinforcement cage-like frame according to claim 1, wherein: the height of the interlayer upright post (9) is 1.8m to 2 m.
CN202123340255.7U 2021-12-28 2021-12-28 Counterfort high wall steel reinforcement cage appearance frame Active CN216616771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123340255.7U CN216616771U (en) 2021-12-28 2021-12-28 Counterfort high wall steel reinforcement cage appearance frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123340255.7U CN216616771U (en) 2021-12-28 2021-12-28 Counterfort high wall steel reinforcement cage appearance frame

Publications (1)

Publication Number Publication Date
CN216616771U true CN216616771U (en) 2022-05-27

Family

ID=81683037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123340255.7U Active CN216616771U (en) 2021-12-28 2021-12-28 Counterfort high wall steel reinforcement cage appearance frame

Country Status (1)

Country Link
CN (1) CN216616771U (en)

Similar Documents

Publication Publication Date Title
KR101654483B1 (en) The building is equipped with safety scaffold equipment
CN109235861B (en) Be applied to small high-rise building's assembled scaffold frame
CN107338868B (en) Large spherical screen mounting system and construction method thereof
CN111576234B (en) Safe and rapid construction method for turnover-type high pier
US3472477A (en) Support bracket for concrete forms
US9556624B1 (en) Scaffold system
KR20120131834A (en) Built-up high load safety stair using temporary bent
CN114182962B (en) Buttress type high-wall steel bar installation and construction system
CN108412187B (en) Construction device and construction method for outer frame structure of ultra-high conjoined group tower
CN216616771U (en) Counterfort high wall steel reinforcement cage appearance frame
CN110735525B (en) Prefabricated assembled self-supporting steel pipe scaffold system
CN210369816U (en) External scaffold
CN216587591U (en) Counterfort formula high wall reinforcing bar mounting platform
CN114182961B (en) Counterfort type high-wall steel bar installation construction method
CN212802428U (en) Portable lifting scaffold
CN213571565U (en) Assembled bridge floor protection device
CN212897455U (en) Prevent portable scaffold frame that topples
CN212866794U (en) Assembled outer wall operation platform
CN112302320A (en) Building stand column modularized assembly type scaffold module, system and construction method
CN213837623U (en) Multipurpose combined scaffold
CN109537868B (en) Portable operation platform for hoisting assembled main beams
CN216587590U (en) Multilayer interconnection formula operation platform
CN220976391U (en) Mounting platform of tower crane
RU23899U1 (en) BUILDING FORESTS AND AREA FOR FASTENING DIAGONAL AND HORIZONTAL LINKS OF BEARING FRAMES OF BUILDING FORESTS
CN214462302U (en) Building stand modular assembly type scaffold module and system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant