CN216616574U - Control tool for thickness of concrete floor and interval of steel bars - Google Patents

Control tool for thickness of concrete floor and interval of steel bars Download PDF

Info

Publication number
CN216616574U
CN216616574U CN202122633051.6U CN202122633051U CN216616574U CN 216616574 U CN216616574 U CN 216616574U CN 202122633051 U CN202122633051 U CN 202122633051U CN 216616574 U CN216616574 U CN 216616574U
Authority
CN
China
Prior art keywords
main frame
steel bar
thickness
bar fixing
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122633051.6U
Other languages
Chinese (zh)
Inventor
罗果
俞嘉豪
梁健新
李富华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202122633051.6U priority Critical patent/CN216616574U/en
Application granted granted Critical
Publication of CN216616574U publication Critical patent/CN216616574U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the field of building construction, in particular to a tool for controlling the thickness of a concrete floor and the distance between reinforcing steel bars. The steel bar fixing device comprises a tubular main frame, wherein an annular control plate is arranged at the top end of the main frame, an annular base is arranged at the bottom end of the main frame, two steel bar fixing layers are oppositely arranged on the outer surface of the main frame, and four steel bar fixing seats are uniformly distributed in each steel bar fixing layer.

Description

Control tool for thickness of concrete floor and interval of steel bars
Technical Field
The utility model relates to the field of building construction, in particular to a tool for controlling the thickness of a concrete floor and the distance between reinforcing steel bars.
Background
The floor controller is very common in the present application in construction, but combine the floor controller of commonly used to see, the performance is more single, and in the construction floor controller installation back, can receive the influence of external force great, single fixed mode may lead to controller displacement or take off the nail, situation such as thickness control deviation or floor controller pine come-up when leading to concrete placement, may lead to the reinforcing bar to shift when pouring moreover, the problem of reinforcing bar aversion can not be solved to current floor controller.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to solving the above problems, and thus provides a tool for controlling the thickness of a concrete floor and the distance between reinforcing bars, which prevents displacement of a floor controller and reinforcing bars.
The utility model solves the problems and adopts the technical scheme that:
the utility model provides a control tool of concrete floor thickness and reinforcing bar interval, includes pipy main frame, and the top of main frame is provided with the ring control board, and the bottom of main frame is provided with annular base, and relative on the surface of main frame is provided with two reinforcing bar fixed beds, and four reinforcing bar fixing bases of equipartition in every reinforcing bar fixed bed.
Compared with the prior art, the utility model adopting the technical scheme has the outstanding characteristics that:
the utility model can combine the thickness control of the floor slab and the fixation of the steel bars together, not only can accurately control the thickness of the floor slab, but also can control the spacing of the steel bars, and prevent the steel bars from generating displacement after pouring.
Preferably, the further technical scheme of the utility model is as follows:
a plurality of nailing holes are formed in the annular base at equal intervals, and screws penetrate through the nailing holes to fixedly connect the annular base with the operation surface.
The pipe wall of the main frame is provided with a plurality of long holes communicated with the inside of the main frame, and the inside and the outside of the main frame can be filled with concrete during pouring to form a whole, so that the stability is improved.
The steel bar fixing seat is provided with a placing groove which is suitable for the size of the steel bar.
The space between the placing grooves in the two adjacent steel bar fixing seats in each steel bar fixing layer is consistent with the steel bar space required by engineering drawings, steel bars can be directly placed in the placing grooves during construction, space measurement is not needed, the construction progress is accelerated, the construction precision is guaranteed, and the steel bars can not be displaced after pouring.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic top view of the present invention.
Labeled as: a main frame 1; a ring-shaped control plate 2; an annular base 3; a reinforcing steel bar fixing layer 4; a steel bar fixing seat 401; the recess 4011 is placed.
Detailed Description
The utility model will be further illustrated by the following examples, which are intended only for a better understanding of the present invention and therefore do not limit the scope of the utility model.
Referring to fig. 1-2, a tool for controlling the thickness of a concrete floor and the distance between reinforcing steel bars comprises a tubular main frame 1, an annular control plate 2, an annular base 3, reinforcing steel bar fixing layers 4, reinforcing steel bar fixing seats 401 and placing grooves 4011, wherein the annular control plate 2 is arranged at the top end of the main frame 1, the annular base 3 is arranged at the bottom end of the main frame 1, two reinforcing steel bar fixing layers 4 are oppositely arranged on the outer surface of the main frame 1, and four reinforcing steel bar fixing seats 401 are uniformly distributed in each reinforcing steel bar fixing layer 4; a plurality of nailing holes are formed in the annular base 3 at equal intervals, and screws penetrate through the nailing holes to connect and fix the annular base and the operation surface; the pipe wall of the main frame 1 is provided with a plurality of long holes communicated with the inside of the main frame 1, and the inside and the outside of the main frame 1 can be filled with concrete during pouring to form a whole, so that the stability is improved; a placing groove 4011 which is suitable for the size of the steel bar is formed in the steel bar fixing seat 401; the distance between the placing grooves 4011 on the two adjacent steel bar fixing seats 401 in each steel bar fixing layer 4 is consistent with the steel bar distance required by engineering drawings, steel bars can be directly placed in the placing grooves 4011 during construction, distance measurement is not needed, the construction progress is accelerated, the construction precision is guaranteed, and the steel bars can not be displaced after pouring; the whole material of instrument uses plastics to make, can mark the design thickness of floor on the up end of annular control panel 2 to remind the thickness value of concrete work face of pouring at present.
Place corresponding floor construction department with this control tool, it is fixed with this instrument to use the screw to pass the nailing hole, in a reinforcing bar fixed bed, put into the recess 4011 of placing of two adjacent reinforcing bar fixing bases 401 with a reinforcing bar, put into the recess 4011 of placing of two other adjacent reinforcing bar fixing bases 401 of same layer with another reinforcing bar again, interval between two reinforcing bars at this moment is the required reinforcing bar interval of construction promptly, overlap joint reinforcement again, another reinforcing bar fixed bed 4 uses same construction procedure, after finishing fixing the floor reinforcing bar through setting up a plurality of this control tool, can pour.
The utility model can fix the floor controller and the reinforcing steel bars together, not only can accurately control the thickness of the floor but also can control the spacing of the reinforcing steel bars, and prevent the floor controller and the reinforcing steel bars from generating displacement after pouring.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, which is defined in the appended claims.

Claims (4)

1. The utility model provides a control tool of concrete floor thickness and reinforcing bar interval, includes pipy main frame, and the top of main frame is provided with the ring control board, and the bottom of main frame is provided with annular base, its characterized in that: two reinforcing steel bar fixing layers are oppositely arranged on the outer surface of the main frame, and four reinforcing steel bar fixing seats are uniformly distributed in each reinforcing steel bar fixing layer.
2. The tool for controlling the thickness and the distance between reinforcing bars of a concrete floor according to claim 1, wherein: a plurality of nailing holes are formed in the annular base at equal intervals, and screws penetrate through the nailing holes to fixedly connect the annular base with the operation surface.
3. The tool for controlling the thickness and the distance between reinforcing bars of a concrete floor according to claim 1, wherein: the pipe wall of the main frame is provided with a plurality of long holes communicated with the inside of the main frame.
4. The tool for controlling the thickness and the distance between reinforcing bars of a concrete floor according to claim 1, wherein: the steel bar fixing seat is provided with a placing groove which is suitable for the size of the steel bar.
CN202122633051.6U 2021-10-31 2021-10-31 Control tool for thickness of concrete floor and interval of steel bars Active CN216616574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122633051.6U CN216616574U (en) 2021-10-31 2021-10-31 Control tool for thickness of concrete floor and interval of steel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122633051.6U CN216616574U (en) 2021-10-31 2021-10-31 Control tool for thickness of concrete floor and interval of steel bars

Publications (1)

Publication Number Publication Date
CN216616574U true CN216616574U (en) 2022-05-27

Family

ID=81692819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122633051.6U Active CN216616574U (en) 2021-10-31 2021-10-31 Control tool for thickness of concrete floor and interval of steel bars

Country Status (1)

Country Link
CN (1) CN216616574U (en)

Similar Documents

Publication Publication Date Title
EP2393994B1 (en) Concrete anchor
JP6968375B2 (en) Formwork unit and concrete structure construction method
KR20060088919A (en) Pin connection structure of concrete beam and pc post, and construction method thereof
CN216616574U (en) Control tool for thickness of concrete floor and interval of steel bars
KR100769582B1 (en) A lay bricks panel
KR20190077869A (en) construction method using the same and exterior insulation fixture is Integrally formed for building for gang-form supporting device
CN111502177A (en) Installation method of leveling substrate assembly
CN213742375U (en) Plate thickness controller
JP2008031706A (en) Steel sill packing with leveling and balancing function, for wooden building
CN209837756U (en) Constructional column bar planting positioner
JPH089306Y2 (en) Tiled wall structure
KR100390059B1 (en) Level for a plaster
CN110924587A (en) Strong building brick
KR102135318B1 (en) Improved insulation fixture for bricks
JP2005240286A (en) Implement and method for positioning precast concrete column
CN220848747U (en) Template fixing device
JPH09256593A (en) Execution method of wall surface facing material
CN217759401U (en) Assembled building wall
JPH11264228A (en) Tiling construction method and tile unit
JP2010065494A (en) Construction method of double floor and partition wall
CN211949008U (en) Intermediate support of annular rib shear wall
CN216276986U (en) Floor thickness control structure
KR102549806B1 (en) Construction method of substructure and foundation
CN210551982U (en) Be applied to prefabricated column component location structure of prefabricated building
JP3118453U (en) Water thread for tile construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant