CN216616138U - City planning municipal drainage pipe - Google Patents
City planning municipal drainage pipe Download PDFInfo
- Publication number
- CN216616138U CN216616138U CN202122945455.9U CN202122945455U CN216616138U CN 216616138 U CN216616138 U CN 216616138U CN 202122945455 U CN202122945455 U CN 202122945455U CN 216616138 U CN216616138 U CN 216616138U
- Authority
- CN
- China
- Prior art keywords
- pipeline body
- plate
- pipeline
- adjusting ball
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007789 sealing Methods 0.000 claims abstract description 24
- 230000001681 protective effect Effects 0.000 claims description 16
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000004140 cleaning Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 4
- 238000000926 separation method Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a municipal drainage pipeline for urban planning, and particularly relates to the technical field of drainage pipelines. According to the utility model, the conveying port on the adjusting ball corresponds to the operation port by rotating the adjusting ball, then the mounting plate and the sealing plug are disassembled, then the filter plate is pushed, so that the filter plate drives deposits in the conveying port to move, and the deposits are discharged from the opposite operation port, thereby cleaning the deposits and the filter plate in the pipeline body, and the deposits in the pipeline body are conveniently cleaned by the integral structure, so that the influence on the drainage effect caused by the blockage of the filter plate is avoided.
Description
Technical Field
The utility model relates to the technical field of drainage pipelines, in particular to a municipal drainage pipeline for urban planning.
Background
With the improvement of cities, the deterioration of the environment and the occurrence of extreme weather, city water pipes are often waterlogged or broken due to external reasons, and the drainage pipelines refer to systems consisting of pipelines collecting and discharging sewage, wastewater and rainwater and their affiliated facilities. Including main pipes, branch pipes and pipes leading to the treatment plant, whether built on the street or anywhere else, as long as the pipes are used for drainage, they are regarded as drainage statistics.
The existing drainage pipeline is inconvenient to clean the internal deposits, and the normal conveying of the drainage pipeline is influenced by the excessive accumulated impurities, so that a municipal drainage pipeline for city planning is needed.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model provides a municipal drainage pipeline for urban planning, wherein a conveying port on an adjusting ball corresponds to an operation port by rotating the adjusting ball, then a mounting plate and a sealing plug are disassembled, then a filter plate is pushed, so that the filter plate drives deposits in the conveying port to move, and the deposits are discharged from the opposite operation ports, and further the deposits in a pipeline body and the filter plate are cleaned.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a city planning municipal drainage pipe, includes the pipeline body, the inside regulation ball that is equipped with of pipeline body, the delivery port has been seted up to inside running through of regulation ball, the spout has all been seted up to delivery port both sides inner wall, the inside slider that is equipped with of spout is equipped with the filter plate between two sliders, filter plate one side and slider fixed connection, the fixed baffle that is equipped with in filter plate front side, baffle and spout looks adaptation, the operation mouth has all been seted up to pipeline body both sides, the inside sealing plug that is equipped with of operation mouth, the sealing plug contacts with the regulation ball outer wall, the sealing plug outside is equipped with fixing device, the standing groove has been seted up at the regulation ball top, the inside operating means that is equipped with of standing groove.
In a preferred embodiment, the fixing device comprises a mounting plate, the mounting plate is located on one side of the sealing plug away from the pipeline body, the mounting plate is fixedly connected with the sealing plug, bolts are arranged on the front side and the rear side of the mounting plate, the bolts penetrate through the mounting plate and extend into the pipeline body, and the bolts are in threaded connection with the pipeline body.
In a preferred embodiment, the operating device includes a fixed column, the fixed column is fixedly arranged inside the placing groove, the top end of the fixed column penetrates through the pipeline body and extends to the top of the pipeline body, a positioning groove is formed in the top of the fixed column, a positioning column is arranged inside the positioning groove, the top end of the positioning column penetrates through the positioning groove and extends to the top of the positioning groove, limiting grooves are formed in the front side and the rear side of the positioning groove, limiting plates are arranged inside the limiting grooves, the limiting plates are fixedly connected with one side of the bottom end of the positioning column, and an operating panel is fixedly arranged at the top end of the positioning column.
In a preferred embodiment, a protective pipe is sleeved outside the top end of the fixed column, the bottom end of the protective pipe is fixedly connected with the top of the pipeline body, clamping plates are fixedly arranged on the inner walls of the front side and the rear side of the protective pipe, a clamping groove is formed in one side, close to the clamping plates, of the bottom end of the operating panel in a penetrating mode, the clamping plates are located inside the clamping groove, and the clamping plates are clamped with the clamping groove.
In a preferred embodiment, a threaded sleeve plate is externally screwed on the top end of the protective pipe.
In a preferred embodiment, a drainage funnel is arranged on the front side of the adjusting ball.
The utility model has the technical effects and advantages that:
1. according to the utility model, the conveying port on the adjusting ball corresponds to the operation port by rotating the adjusting ball, then the mounting plate and the sealing plug are disassembled, then the filter plate in the adjusting ball is pushed, so that the filter plate drives the deposit in the conveying port to move, and the deposit is discharged from the opposite operation port, thereby cleaning the deposit and the filter plate in the pipeline body, after cleaning, the adjusting ball is driven to rotate by matching of the positioning column, the operation disc, the limiting groove and the limiting plate, so that the conveying port is staggered with the operation port, thereby enabling the conveying port to carry out normal drainage conveying, and then the sealing plug and the mounting plate are sequentially mounted, so that the deposit in the pipeline body can be cleaned conveniently by the integral structure, and the influence on the drainage effect caused by the blockage of the filter plate is avoided;
2. according to the utility model, the threaded sleeve plate is separated from the protective pipe by rotating the threaded sleeve plate, then the operation plate is pulled to separate the clamping groove from the clamping plate, the positioning column and the limiting plate are also driven to move upwards, then the limiting plate and the limiting groove are matched to drive the fixing column to rotate, then the fixing column is used for driving the adjusting ball to rotate, after the operation is finished, the operation plate is fixed and limited by the clamping and matching of the clamping groove and the clamping plate, the phenomenon that the operation plate shakes due to external impact is avoided, the position of the adjusting ball is influenced, the integral structure avoids misoperation, and the safety in use is improved.
Drawings
Fig. 1 is a front view of the overall structure of the present invention.
Fig. 2 is an exploded view of the regulating ball of the present invention.
Fig. 3 is a diagram showing the rotation of the adjusting ball according to the present invention.
Fig. 4 is an exploded view of the fixing post and positioning post of the present invention.
FIG. 5 is a cross-sectional view of the fixing post and locating post of the present invention.
The reference signs are: 1. a pipe body; 2. adjusting the ball; 3. a delivery port; 4. a chute; 5. a slider; 6. filtering the plate; 7. a baffle plate; 8. an operation port; 9. a sealing plug; 10. a placement groove; 11. mounting a plate; 12. fixing a column; 13. positioning a groove; 14. a positioning column; 15. a limiting groove; 16. a limiting plate; 17. an operation panel; 18. a protective tube; 19. clamping a plate; 20. a card slot; 21. a threaded bushing plate; 22. a drainage funnel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to the attached drawings 1-5 of the specification, the municipal drainage pipeline for city planning of the embodiment comprises a pipeline body 1, an adjusting ball 2 is arranged inside the pipeline body 1, a conveying port 3 penetrates through the inside of the adjusting ball 2, sliding grooves 4 are formed in the inner walls of two sides of the conveying port 3, sliding blocks 5 are arranged inside the sliding grooves 4, a filter plate 6 is arranged between the two sliding blocks 5, one side of the filter plate 6 is fixedly connected with the sliding blocks 5, a baffle 7 is fixedly arranged on the front side of the filter plate 6, the baffle 7 is matched with the sliding grooves 4, operation ports 8 are formed in two sides of the pipeline body 1, a sealing plug 9 is arranged inside the operation port 8, the sealing plug 9 is in contact with the outer wall of the adjusting ball 2, a fixing device is arranged outside the sealing plug 9, a placing groove 10 is formed in the top of the adjusting ball 2, and an operation device is arranged inside the placing groove 10, through rotating adjusting ball 2, make the delivery port 3 on the adjusting ball 2 correspond with operation mouth 8, later disassemble mounting panel 11 and sealing plug 9, then through carrying out the propelling movement to the filter plate 6 in the adjusting ball 2, make the deposit in filter plate 6 drive delivery port 3 remove to discharge the deposit from relative operation mouth 8, and then accomplished the cleanness to the inside deposit of pipeline body 1 and filter plate 6.
Fixing device includes mounting panel 11, mounting panel 11 is located sealing plug 9 and keeps away from one side of pipeline body 1, mounting panel 11 and sealing plug 9 fixed connection, both sides all are equipped with the bolt around mounting panel 11, the bolt runs through mounting panel 11 and extends to pipeline body 1 inside, the bolt is threaded connection with pipeline body 1, through mounting panel 11's setting, is convenient for install and dismantle sealing plug 9.
Adjusting ball 2 front side is equipped with drainage funnel 22, through drainage funnel 22's setting, is convenient for to in leading rivers to delivery port 3, then carries out the drainage through delivery port 3 and carry.
The implementation scenario is specifically as follows: the positioning column 14 is driven to rotate by the operation disc 17, the positioning column 14 drives the fixing column 12 and the adjusting ball 2 to rotate by the matching of the limiting groove 15 and the limiting plate 16, the conveying port 3 on the adjusting ball 2 corresponds to the operation ports 8 on two sides of the pipeline body 1, then the mounting plate 11 and the sealing plug 9 are dismounted by dismounting the bolt, at the moment, a user can push the filter plate 6 in the adjusting ball 2, so that the filter plate 6 drives the deposits in the conveying port 3 to move and discharge the deposits from the opposite operation ports 8, further cleaning of the deposits and the filter plate 6 in the pipeline body 1 is completed, after cleaning, the adjusting ball 2 is driven to rotate by the matching of the positioning column 14, the operation disc 17, the limiting groove 15 and the limiting plate 16, so that the conveying port 3 is staggered with the operation ports 8, thereby the conveying port 3 is normally drained and conveyed, and then the sealing plug 9 and the mounting plate 11 are sequentially mounted, the integral structure is convenient for clean the deposit in the pipeline body 1, and avoids the filter plate 6 from being blocked to influence the drainage effect.
Referring to fig. 4 and 5 of the specification, the embodiment of the municipal drainage pipeline for city planning comprises a fixed column 12, the fixed columns 12 are fixedly arranged inside the placing groove 10, the top ends of the fixed columns 12 penetrate through the pipeline body 1 and extend to the top of the pipeline body 1, a positioning groove 13 is arranged at the top of the fixing column 12, a positioning column 14 is arranged inside the positioning groove 13, the top end of the positioning column 14 penetrates through the positioning groove 13 and extends to the top of the positioning groove 13, the front side and the rear side of the positioning groove 13 are both provided with limiting grooves 15, a limiting plate 16 is arranged in the limiting groove 15, the limiting plate 16 is fixedly connected with one side of the bottom end of the positioning column 14, an operating panel 17 is fixedly arranged at the top end of the positioning column 14, the operation panel 17 drives the positioning column 14 to rotate, the positioning column 14 drives the fixing column 12 to rotate through the matching of the limiting plate 16 and the limiting groove 15, and the fixing column 12 drives the adjusting ball 2 to rotate at the same time.
The outer cover in fixed column 12 top is equipped with protective tube 18, protective tube 18 bottom and 1 top fixed connection of pipeline body, protective tube 18 front and back both sides inner wall all is fixed and is equipped with cardboard 19, one side that operation panel 17 bottom is close to cardboard 19 runs through and has seted up draw-in groove 20, cardboard 19 is located inside draw-in groove 20, cardboard 19 and draw-in groove 20 joint, through the cooperation of cardboard 19 and draw-in groove 20, the user can drive fixed column 12 through rotating reference column 14 and rotate, and then accomplish the rotation operation to adjusting ball 2.
The outside threaded connection in protective tube 18 top has screw sleeve board 21, drainage funnel 22 front end outer wall and 1 inner wall fixed connection of pipeline body are convenient for protect reference column 14 and operation panel 17 isotructure through the setting of screw sleeve board 21.
The implementation scenario is specifically as follows: through rotating thread sleeve plate 21, make thread sleeve plate 21 and protective tube 18 separation, then pulling operation panel 17 makes draw-in groove 20 and cardboard 19 separation, also drive reference column 14 and limiting plate 16 and move up simultaneously, then can drive fixed column 12 through limiting plate 16 and limiting groove 15's cooperation and rotate, then drive adjusting ball 2 with the help of fixed column 12 and rotate, after the operation is ended, joint cooperation through draw-in groove 20 and cardboard 19 is fixed spacingly to operation panel 17, avoid operation panel 17 to receive external striking to take place to rock and cause the influence to adjusting ball 2's position, rethread thread sleeve plate 21 and protective tube 18's cooperation at last, protect overall structure.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the utility model, only the structures related to the disclosed embodiments are referred to, other structures can refer to common designs, and the same embodiment and different embodiments of the utility model can be combined with each other without conflict;
and finally: the above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that are within the spirit and principle of the present invention are intended to be included in the scope of the present invention.
Claims (6)
1. The utility model provides a city planning municipal drainage pipe, includes pipeline body (1), its characterized in that: an adjusting ball (2) is arranged in the pipeline body (1), a conveying opening (3) is arranged in the adjusting ball (2) in a penetrating way, the inner walls of the two sides of the conveying opening (3) are both provided with sliding chutes (4), sliding blocks (5) are arranged inside the sliding chutes (4), a filter plate (6) is arranged between the two sliding blocks (5), one side of the filter plate (6) is fixedly connected with the slide block (5), a baffle plate (7) is fixedly arranged on the front side of the filter plate (6), the baffle (7) is matched with the chute (4), both sides of the pipeline body (1) are provided with operation ports (8), a sealing plug (9) is arranged in the operation port (8), the sealing plug (9) is contacted with the outer wall of the adjusting ball (2), the sealing plug (9) is externally provided with a fixing device, the top of the adjusting ball (2) is provided with a placing groove (10), and an operating device is arranged inside the placing groove (10).
2. The city planning municipal drainage pipeline of claim 1, wherein: the fixing device comprises a mounting plate (11), the mounting plate (11) is located on one side, far away from the pipeline body (1), of the sealing plug (9), the mounting plate (11) is fixedly connected with the sealing plug (9), bolts are arranged on the front side and the rear side of the mounting plate (11), penetrate through the mounting plate (11) and extend to the interior of the pipeline body (1), and the bolts are in threaded connection with the pipeline body (1).
3. The urban planning municipal drainage pipeline according to claim 1 or 2, wherein: operating means includes fixed column (12), fixed column (12) are fixed to be located inside standing groove (10), fixed column (12) top is run through pipeline body (1) and is extended to pipeline body (1) top, constant head tank (13) have been seted up at fixed column (12) top, constant head tank (13) inside is equipped with reference column (14), constant head tank (13) are run through and are extended to constant head tank (13) top on reference column (14) top, spacing groove (15) have all been seted up to both sides around constant head tank (13), spacing groove (15) inside is equipped with limiting plate (16), limiting plate (16) and reference column (14) bottom one side fixed connection, fixed operating panel (17) that is equipped with in reference column (14) top.
4. The city planning municipal drainage pipeline of claim 3, wherein: the pipeline fixing device is characterized in that a protective pipe (18) is sleeved outside the top end of the fixing column (12), the bottom end of the protective pipe (18) is fixedly connected with the top of the pipeline body (1), clamping plates (19) are fixedly arranged on the inner walls of the front side and the rear side of the protective pipe (18), a clamping groove (20) is formed in one side, close to the clamping plates (19), of the bottom end of the operating plate (17) in a penetrating mode, the clamping plates (19) are located inside the clamping groove (20), and the clamping plates (19) are clamped with the clamping groove (20).
5. The city planning municipal drainage pipeline of claim 4, wherein: the external thread of the top end of the protective pipe (18) is connected with a thread sleeve plate (21).
6. The city planning municipal drainage pipeline of claim 1, wherein: a drainage funnel (22) is arranged on the front side of the adjusting ball (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122945455.9U CN216616138U (en) | 2021-11-29 | 2021-11-29 | City planning municipal drainage pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122945455.9U CN216616138U (en) | 2021-11-29 | 2021-11-29 | City planning municipal drainage pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216616138U true CN216616138U (en) | 2022-05-27 |
Family
ID=81700218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122945455.9U Expired - Fee Related CN216616138U (en) | 2021-11-29 | 2021-11-29 | City planning municipal drainage pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216616138U (en) |
-
2021
- 2021-11-29 CN CN202122945455.9U patent/CN216616138U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211341081U (en) | Building drainage structure | |
CN110700375A (en) | Waterlogging prevention flood diversion equipment for urban heavy rain | |
CN112554303B (en) | Intelligent waterlogging prevention flood diversion system device and method based on smart sponge city | |
CN114319543B (en) | Drain real-time detection device | |
CN216616138U (en) | City planning municipal drainage pipe | |
CN209522672U (en) | A kind of detention tank adding water convenient for draining | |
CN115739876A (en) | Bury formula integration sewage treatment device | |
CN113187549A (en) | Drainage device for tunnel construction and use method thereof | |
CN111905432B (en) | Sedimentation tank and sedimentation method for mine coal slag water | |
CN210009690U (en) | Sponge city rainwater collection and purification device capable of cleaning garbage | |
CN208618451U (en) | Anti- ponding hand hole well in a kind of greenbelt | |
CN220598574U (en) | Forestry rainwater is collected and is filled structure | |
CN219411548U (en) | Waterproof construction of roof for factory building construction | |
CN216170249U (en) | Anti-blocking building water supply and drainage pipeline device | |
CN215168349U (en) | Crack grouting device for building engineering construction | |
CN218042956U (en) | Automatic spray irrigation device for side hanging basket of urban overpass | |
CN214657565U (en) | Drainage pipe for water conservancy station | |
CN220813919U (en) | Building foundation pit dewatering device | |
CN218479420U (en) | Building roof drainage structures | |
CN219653872U (en) | Shunting drainage intercepting well | |
CN214835158U (en) | Swimming pool escape canal structure | |
CN218116721U (en) | Slag removing device for drainage pipeline | |
CN220725301U (en) | Rain and sewage diversion pipe network structure | |
CN210177669U (en) | Sewage promotes pump station convenient to remove silt | |
CN219638071U (en) | Sponge city oozes row structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220527 |