CN216615541U - Connecting device for bridge main body mechanism and temporary structure - Google Patents

Connecting device for bridge main body mechanism and temporary structure Download PDF

Info

Publication number
CN216615541U
CN216615541U CN202123299819.7U CN202123299819U CN216615541U CN 216615541 U CN216615541 U CN 216615541U CN 202123299819 U CN202123299819 U CN 202123299819U CN 216615541 U CN216615541 U CN 216615541U
Authority
CN
China
Prior art keywords
fixedly connected
plate
temporary
main body
fixed frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123299819.7U
Other languages
Chinese (zh)
Inventor
孟强
赵建宇
韩春燕
吴季霜
吕蒙蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Datong Construction Group Co ltd
Original Assignee
Shandong Datong Highway Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Datong Highway Engineering Co ltd filed Critical Shandong Datong Highway Engineering Co ltd
Priority to CN202123299819.7U priority Critical patent/CN216615541U/en
Application granted granted Critical
Publication of CN216615541U publication Critical patent/CN216615541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The application discloses connecting device of bridge main body mechanism and temporary structure, relate to the relevant technical field of bridge, this connecting device of bridge main body mechanism and temporary structure, including fixed connection at the second connecting plate of bridge downside and fixed connection first connecting plate on the cushion cap, the downside fixedly connected with fixed frame of second connecting plate, the upside of first connecting plate is provided with interim reinforced column, fixed frame's inside is provided with clamping mechanism, the condition that current partial interim post may take place not stable enough after the installation has been improved, this makes interim post can't fine play support and reinforcement effect problem, interim reinforced column accessible first connecting plate plays support and reinforcement effect to the second connecting plate in this case, clamping mechanism can play spacing effect to interim reinforced column, make interim reinforced column more firm when using, It is stable, clamping mechanism's setting up makes the installation of interim reinforced column more convenient simultaneously.

Description

Connecting device for bridge main body mechanism and temporary structure
Technical Field
The application relates to the technical field of bridge correlation, in particular to a connecting device for a bridge main body mechanism and a temporary structure.
Background
The bridge is generally a structure erected on rivers, lakes and seas to enable vehicles, pedestrians and the like to smoothly pass through, and is also extended to be a building which is erected to span mountain stream, unfavorable geology or meet other traffic requirements to enable the vehicles, pedestrians and the like to pass through more conveniently in order to adapt to the modern high-speed developed traffic industry.
Bridge among the prior art is when building, and the stand is being connected the back with the beam slab, and most all need add between the two and be used for reinforced filler to make the supporting effect of stand better, but the support of stand is probably not stable enough when the filler is not adding, then at this moment need add interim support column and consolidate the support to the beam slab, and interim post probably takes place not stable enough the condition after the installation, and this makes interim post can't play support and reinforcement well.
SUMMERY OF THE UTILITY MODEL
The temporary column can happen the condition of not being stable enough after the installation in order to solve current part, and this makes temporary column can't play support and reinforcing effect problem well, and the application provides a bridge main body mechanism and temporary structure's connecting device.
The application provides a connecting device of bridge main body mechanism and temporary structure adopts following technical scheme:
a connecting device of a bridge main body mechanism and a temporary structure comprises a second connecting plate fixedly connected to the lower side of a bridge and a first connecting plate fixedly connected to a bearing platform, wherein the lower side of the second connecting plate is fixedly connected with a fixed frame, a temporary reinforcing column is arranged on the upper side of the first connecting plate, and a clamping mechanism is arranged inside the fixed frame;
clamping mechanism includes the inside gag lever post of fixed connection at fixed frame, fixed frame's inside is rotated and is connected with the screw rod, the outside fixedly connected with first clamp ring piece of gag lever post, the screw rod sets up the inside at first clamp ring piece, the outside threaded connection of screw rod has the second clamp ring piece, second clamp ring piece sliding connection is in the outside of gag lever post, first clamp ring piece and second clamp ring piece all set up the outside at interim reinforced column.
By adopting the technical scheme: the temporary reinforcement column can support and reinforce the second connecting plate through the first connecting plate, the fixing frame can play the roles of installation and limiting for the clamping mechanism, the clamping mechanism can be used normally, the clamping mechanism can play the role of limiting for the temporary reinforcement column, the temporary reinforcement column is firmer and more stable when being used, and meanwhile, the temporary reinforcement column is more convenient to install due to the fact that the clamping mechanism is arranged.
Optionally, a second fixing plate is fixedly connected to the outer side of the fixing frame, a second thread groove is formed in the second fixing plate, and the second thread groove is provided with a plurality of thread grooves.
By adopting the technical scheme: the setting of second fixed plate and second thread groove for the staff is more convenient when installing fixed frame, simultaneously because of adopting the bolt to install, and this makes fixed frame and the inside clamping mechanism of fixed frame more firm when using, difficult fracture.
Optionally, the upside fixedly connected with of first connecting plate connects the base, the inside of connecting the base is rotated and is connected with the connecting rod, the upside of connecting rod is rotated and is connected with and presss from both sides tight piece, it sets up in the outside of interim reinforced column to press from both sides tight piece.
By adopting the technical scheme: the setting of connecting the base makes and presss from both sides tight piece more stable when using, presss from both sides tight piece and can cooperate clamping mechanism to play spacing and further clamp tightly to interim reinforced column for interim reinforced column is more firm when using.
Optionally, one side of the connection base, which is far away from the temporary reinforcing column, is fixedly connected with a first fixing plate, and a first thread groove is formed in the first fixing plate.
By adopting the technical scheme: the bolt that first fixed plate accessible self inside set up plays the reinforcing action to connecting the base for connecting the base and carrying out spacing through pressing from both sides tight piece to interim reinforcement post, self has higher tightness.
Optionally, one side of the clamping block, which is close to the temporary reinforcing column, is fixedly connected with a limiting ring block, a first hollow groove is formed in the outer side of the temporary reinforcing column, and the limiting ring block is in sliding fit with the first hollow groove.
By adopting the technical scheme: the stop ring block will also be inserted into the interior of the first hollow groove, thereby serving as an auxiliary clamping block.
Optionally, a second hollow groove is formed in the lower side of the temporary reinforcing column, a fixing block is fixedly connected to the upper side of the first connecting plate, and the fixing block is in sliding fit with the second hollow groove.
By adopting the technical scheme: the fixed block accessible second hollow groove plays further spacing to interim reinforced column, and the fixed block can play the supplementary effect of aiming at simultaneously.
Optionally, one side of the screw rod penetrates through the fixed frame, a motor is arranged at one end, far away from the fixed frame, of the screw rod, and an output shaft of the motor is fixedly connected with the screw rod through a coupler.
By adopting the technical scheme: the setting up of motor makes the staff more convenient when needs rotate the screw rod, does not need the staff to rotate manually for the staff need not the climbing can rotate the screw rod.
Optionally, the lower side of the fixed frame is fixedly connected with a supporting and placing plate, the motor is fixedly connected with the supporting and placing plate, the upper side of the supporting and placing plate is fixedly connected with a limiting plate block, and the limiting plate block is arranged on the outer side of the motor.
By adopting the technical scheme: the limiting plate can limit the motor, so that the motor is not easy to move and shift when in use.
Compared with the prior art, the beneficial effects of this application are:
1. the temporary reinforcement column can be supported and reinforced by the first connecting plate, the clamping mechanism is arranged inside the fixed frame, the fixed frame can be installed and limited on the clamping mechanism, the clamping mechanism can be used normally, the clamping mechanism can be limited on the temporary reinforcement column, the temporary reinforcement column is firmer and more stable when being used, and meanwhile, the temporary reinforcement column is convenient to install due to the fact that the clamping mechanism is arranged.
2. First clamp ring piece and second clamp ring piece can mutually support and play centre gripping and spacing effect to interim anchor strut in the present case for interim anchor strut is when playing the supporting role, and self is difficult for taking place to rock, and second clamp ring piece sliding connection is in the outside of gag lever post, and when the screw rod is rotating, second clamp ring piece is because of being spacing by the gag lever post, and this makes the rotation of screw rod can drive second clamp ring piece and removes.
Drawings
FIG. 1 is a schematic structural diagram of the present application;
FIG. 2 is a schematic top view of a clamping mechanism according to an embodiment of the present application;
FIG. 3 is a schematic cross-sectional view of a first perspective in the present application;
fig. 4 is a schematic cross-sectional structure of a second view in the present application.
Description of reference numerals: 1. a first connecting plate; 2. a second connecting plate; 3. a temporary reinforcement post; 4. a fixed frame; 51. a screw; 52. a limiting rod; 53. a first clamping ring block; 54. a second clamping ring block; 6. a motor; 71. a connecting rod; 72. a clamping block; 73. connecting a base; 81. a first fixing plate; 82. a first thread groove; 91. a second fixing plate; 92. a second thread groove; 101. a first hollow groove; 102. a limit ring block; 111. a second hollow groove; 112. a fixed block; 12. supporting the placing plate; 13. and a limiting plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The application provides the following technical scheme, please refer to fig. 1 and 2, the connecting device of the bridge main body mechanism and the temporary structure comprises a second connecting plate 2 fixedly connected to the lower side of the bridge and a first connecting plate 1 fixedly connected to a bearing platform, wherein a fixing frame 4 is fixedly connected to the lower side of the second connecting plate 2, a temporary reinforcing column 3 is arranged on the upper side of the first connecting plate 1, and the temporary reinforcing column 3 can support and reinforce the second connecting plate 2 through the first connecting plate 1.
In addition, be provided with clamping mechanism in fixed frame 4's inside, fixed frame 4 can play installation and spacing effect to clamping mechanism for clamping mechanism can be normal use, and clamping mechanism can play spacing effect to interim reinforced column 3, makes interim reinforced column 3 more firm, stable when using, and clamping mechanism's setting makes interim reinforced column 3's installation more convenient simultaneously, and interim reinforced column 3 can be adjusted highly according to actual conditions.
Referring to fig. 1 and 2, the clamping mechanism includes a limiting rod 52 fixedly connected inside the fixed frame 4, and meanwhile, a screw 51 is rotatably connected inside the fixed frame 4, a first clamping ring block 53 is fixedly connected outside the limiting rod 52, the first clamping ring block 53 is fixedly connected inside the fixed frame 4, the screw 51 and the limiting rod 52 are respectively disposed on two sides inside the fixed frame 4, and meanwhile, the first clamping block 53 is disposed outside the screw 51 and the limiting rod 52.
Wherein, gag lever post 52 can play certain spacing and fixed action to first clamping ring piece 53 for first clamping ring piece 53 can use steadily, and screw rod 51 runs through the inside at first clamping ring piece 53, makes first clamping ring piece 53 can play certain support and guard action to screw rod 51's connection, makes screw rod 51 difficult fracture or skew take place when rotating.
In addition, referring to fig. 1 and 2, a second clamping ring block 54 is connected to the outer side of the screw 51 in a threaded manner, and the first clamping ring block 53 and the second clamping ring block 54 can be matched with each other to clamp and limit the temporary reinforcing column 3, so that the temporary reinforcing column 3 is not prone to shaking while supporting.
Meanwhile, the second clamping ring block 54 is slidably connected to the outer side of the limiting rod 52, and when the screw 51 rotates, the second clamping ring block 54 is limited by the limiting rod 52, so that the rotation of the screw 51 can drive the second clamping ring block 54 to move.
Referring to fig. 2, the first clamping ring block 53 and the second clamping ring block 54 are both disposed outside the temporary reinforcing column 3, and when the temporary reinforcing column 3 is installed, the worker only needs to attach the temporary reinforcing column 3 to the first clamping ring block 53 and rotate the screw 51, so that the second clamping ring block 54 is close to the first clamping ring block 53 to complete the preliminary fixing of the temporary reinforcing column 3, and the temporary reinforcing column 3 is more convenient to install.
In addition, the second fixing plate 91 is fixedly connected to the outer side of the fixing frame 4, a second thread groove 92 is formed in the second fixing plate 91, the second thread groove 92 is provided with a plurality of second thread grooves 92, the plurality of second thread grooves 92 are uniformly distributed at equal intervals along the length direction of the second fixing plate 91, when the fixing frame 4 is installed, a worker can install bolts into the second fixing plate 91 through the second thread grooves 92, the second fixing plate 91 and the second thread grooves 92 are arranged, the worker can install the fixing frame 4 more conveniently, meanwhile, the fixing frame 4 and a clamping mechanism inside the fixing frame 4 are installed by the bolts, and the fixing frame 4 and the clamping mechanism inside the fixing frame 4 are firmer in use and are not prone to fracture.
Referring to fig. 3 and 4, the upper side of the first connection plate 1 is fixedly connected with a connection base 73, the inside of the connection base 73 is rotatably connected with a connection rod 71, the upper side of the connection rod 71 is rotatably connected with a clamping block 72, the connection base 73 can be connected with the clamping block 72 through the connection rod 71, the cross section of the clamping block 72 is arc-shaped, and the connection base 73 and the clamping block 72 can be smoothly connected through the connection rod 71.
Meanwhile, the clamping block 72 is more stable when the temporary reinforcing column 3 is used due to the arrangement of the connecting base 73, the clamping block 72 is arranged on the outer side of the temporary reinforcing column 3, the clamping block 72 can be matched with a clamping mechanism to limit and further clamp the temporary reinforcing column 3, the temporary reinforcing column 3 is more stable when the temporary reinforcing column is used, the clamping block 72 is provided with two clamping blocks, a worker can connect the two clamping blocks 72 by using bolts after placing the two clamping blocks 72 on the outer side of the temporary reinforcing column 3, in addition, a first fixing plate 81 is fixedly connected to one side, far away from the temporary reinforcing column 3, of the connecting base 73, and a first thread groove 82 is formed in the first fixing plate 81.
During installation, staff can install the bolt to the inside of first fixed plate 81 through first thread groove 82 to carry out erection joint with first fixed plate 81 and first connecting plate 1 through the bolt, first fixed plate 81 accessible self inside set up bolt simultaneously plays the reinforcing effect to connecting base 73, makes connecting base 73 when spacing to interim reinforcement column 3 through pressing from both sides tight piece 72, makes itself have higher tightness.
Referring to fig. 3 and 4, one side of the clamping block 72 close to the temporary reinforcing column 3 is fixedly connected with a limiting ring block 102, the outer side of the temporary reinforcing column 3 is provided with a first hollow groove 101, the limiting ring block 102 is in sliding fit with the first hollow groove 101, and when the clamping block 72 is used for limiting and clamping the temporary reinforcing column 3, the limiting ring block 102 is also inserted into the first hollow groove 101, so that the auxiliary clamping block 72 is played.
In addition, second hollow groove 111 has been seted up at interim reinforced column 3's downside, the upside fixedly connected with fixed block 112 of first connecting plate 1, fixed block 112 and the cooperation of second hollow groove 111 cunning, fixed block 112 accessible second hollow groove 111 plays further spacing to interim reinforced column 3, fixed block 112 can play the supplementary effect of alignment simultaneously for the staff only needs to aim at fixed block 112 with second hollow groove 111 and can put when installing interim reinforced column 3.
Referring to fig. 2-4, one side of the screw rod 51 penetrates through the fixed frame 4, one end, far away from the fixed frame 4, of the screw rod 51 is provided with the motor 6, an output shaft of the motor 6 is fixedly connected with the screw rod 51 through a coupler, the height of the temporary reinforcing column 3 is adjusted along with actual conditions, so that if the temporary reinforcing column 3 is too high, a worker can extremely difficultly rotate the screw rod 51 when needing to rotate the screw rod 51, the arrangement of the motor 6 enables the worker to rotate the screw rod 51 more conveniently when needing to rotate the screw rod 51, the worker does not need to manually rotate the screw rod, the worker can rotate the screw rod 51 without climbing, and meanwhile, the danger of the worker when rotating the screw rod 51 is reduced.
In addition, place board 12 at the downside fixedly connected with support of fixed frame 4, motor 6 places fixed connection between board 12 with the support, support and place board 12 and can play fixed and the effect of placing motor 6, this makes motor 6 when using, difficult emergence fracture, in addition, place the spacing plate 13 of upside fixedly connected with of board 12 in the support, spacing plate 13 sets up the outside at motor 6, when motor 6 is when the function, can produce the vibrations of certain range, thereby produce and remove, spacing plate 13 can carry on spacingly to motor 6, make motor 6 difficult emergence when using remove and skew.
The implementation principle of the connecting device for the bridge main body mechanism and the temporary structure is as follows: when the device is used, the temporary reinforcing column 3 can be moved to the upper side of the first connecting plate 1, the second hollow groove 111 is aligned with the fixing block 112, the temporary reinforcing column 3 is placed on the outer side of the fixing block 112, then a worker can connect the first fixing plate 81 with the first connecting plate 1 through the bolt and the first threaded groove 82, and connect the second fixing plate 91 with the second connecting plate 2 through the bolt and the second threaded groove 92, after the connection of the first fixing plate 81 is completed, the worker can rotate the connecting rod 71 and insert the limit ring block 102 into the first hollow groove 101 to play a secondary limiting role for the temporary reinforcing column 3, meanwhile, due to the connection relationship between the fixing frame 4 and the second fixing plate 91, the fixing frame 4 is also stably installed on the second connecting plate 2, then the worker can start the motor 6, the motor 6 can drive the screw 51 to rotate, and screw rod 51 is spacing because of gag lever post 52 to second clamp ring piece 54 when rotatory for second clamp ring piece 54 can remove to first clamp ring piece 53, will cooperate first clamp ring piece 53 to carry out the centre gripping to interim reinforced column 3 after second clamp ring piece 54 removes to certain distance, thereby play main centre gripping and spacing effect to interim reinforced column 3, can solve present some interim posts and can take place not stable enough condition after the installation so far, this makes interim post can not play the problem of support and reinforcement effect well.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a connecting device of bridge main body mechanism and temporary structure, includes second connecting plate (2) and the first connecting plate (1) of fixed connection on the cushion cap of fixed connection in the bridge downside, its characterized in that: a fixed frame (4) is fixedly connected to the lower side of the second connecting plate (2), a temporary reinforcing column (3) is arranged on the upper side of the first connecting plate (1), and a clamping mechanism is arranged inside the fixed frame (4);
clamping mechanism includes inside gag lever post (52) of fixed connection in fixed frame (4), the inside rotation of fixed frame (4) is connected with screw rod (51), the outside fixedly connected with first clamp ring piece (53) of gag lever post (52), screw rod (51) set up the inside at first clamp ring piece (53), the outside threaded connection of screw rod (51) has second clamp ring piece (54), second clamp ring piece (54) sliding connection is in the outside of gag lever post (52), first clamp ring piece (53) and second clamp ring piece (54) all set up the outside at interim anchor strut (3).
2. The device for connecting a bridge main body mechanism with a temporary structure according to claim 1, wherein: the outer side of the fixed frame (4) is fixedly connected with a second fixed plate (91), a second thread groove (92) is formed in the second fixed plate (91), and a plurality of second thread grooves (92) are formed.
3. The device for connecting a bridge main body mechanism with a temporary structure according to claim 2, wherein: the upper side of the first connecting plate (1) is fixedly connected with a connecting base (73), the inside of the connecting base (73) is rotatably connected with a connecting rod (71), the upper side of the connecting rod (71) is rotatably connected with a clamping block (72), and the clamping block (72) is arranged on the outer side of the temporary reinforcing column (3).
4. The device for connecting a bridge main body mechanism and a temporary structure according to claim 3, wherein: one side of the connecting base (73) far away from the temporary reinforcing column (3) is fixedly connected with a first fixing plate (81), and a first thread groove (82) is formed in the first fixing plate (81).
5. The device for connecting a bridge main body mechanism and a temporary structure according to claim 4, wherein: one side, close to the temporary reinforcing column (3), of the clamping block (72) is fixedly connected with a limiting ring block (102), a first hollow groove (101) is formed in the outer side of the temporary reinforcing column (3), and the limiting ring block (102) is in sliding insertion fit with the first hollow groove (101).
6. The device for connecting a bridge main body mechanism with a temporary structure according to claim 1, wherein: the lower side of the temporary reinforcing column (3) is provided with a second hollow groove (111), the upper side of the first connecting plate (1) is fixedly connected with a fixing block (112), and the fixing block (112) is in sliding insertion fit with the second hollow groove (111).
7. The device for connecting a bridge main body mechanism with a temporary structure according to claim 1, wherein: one side of the screw rod (51) penetrates through the fixed frame (4), one end, far away from the fixed frame (4), of the screw rod (51) is provided with a motor (6), and an output shaft of the motor (6) is fixedly connected with the screw rod (51) through a coupler.
8. The device for connecting a bridge main body mechanism and a temporary structure according to claim 7, wherein: the lower side of the fixed frame (4) is fixedly connected with a supporting and placing plate (12), the motor (6) is fixedly connected with the supporting and placing plate (12), the upper side of the supporting and placing plate (12) is fixedly connected with a limiting plate block (13), and the limiting plate block (13) is arranged on the outer side of the motor (6).
CN202123299819.7U 2021-12-24 2021-12-24 Connecting device for bridge main body mechanism and temporary structure Active CN216615541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123299819.7U CN216615541U (en) 2021-12-24 2021-12-24 Connecting device for bridge main body mechanism and temporary structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123299819.7U CN216615541U (en) 2021-12-24 2021-12-24 Connecting device for bridge main body mechanism and temporary structure

Publications (1)

Publication Number Publication Date
CN216615541U true CN216615541U (en) 2022-05-27

Family

ID=81683696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123299819.7U Active CN216615541U (en) 2021-12-24 2021-12-24 Connecting device for bridge main body mechanism and temporary structure

Country Status (1)

Country Link
CN (1) CN216615541U (en)

Similar Documents

Publication Publication Date Title
CN111851565B (en) Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof
CN111472538B (en) Aluminum alloy template installation structure of exempting from to plaster
CN216615541U (en) Connecting device for bridge main body mechanism and temporary structure
CN214942373U (en) Shear force wall construction joint department template supports reinforcing apparatus based on BIM
CN210289148U (en) Be used for building aluminium template bracing piece iron pipe
CN109440809A (en) A kind of Construction of Steel Structure pre-embedded bolt protective device
CN216076412U (en) Steel stand straightness deviation of hanging down handles part
CN111395758B (en) Formwork supporting upright supporting device and construction method
CN213927469U (en) Upper shear wall template support system
CN210152271U (en) Aluminum formwork diagonal bracing device
CN219219102U (en) Side wall template support device and side wall template system
CN218091986U (en) Aluminum formwork for building convenient to splice fast
CN220319192U (en) Masonry anti-seismic reinforcing structure
CN219281272U (en) Cast-in-situ stair step splicing formwork adjustable system
CN220521355U (en) Multistage steel-pipe pile that struts of deep basal pit
CN217840861U (en) Multi-angle template jacking bracket
CN213980043U (en) Support is used in civil engineering construction
CN217949774U (en) Civil construction engineering template fixing device
CN218234468U (en) Vertical building prefab consolidates adjustment facility
CN220058734U (en) Support frame with anti-drop structure
CN220848343U (en) Clamping piece type anchor limiting device
CN217758376U (en) A template for basin formula support base stone is pour
CN211923479U (en) Embedded movable support and connecting structure thereof
CN219450471U (en) Square pier pouring template with reinforced structure
CN220550918U (en) Post-cast strip adjustable support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 102, Building 8, Tangye Academician Valley, No. 9099, Century Avenue, Tangye Street, Jinan District, China (Shandong) Pilot Free Trade Zone, 250000 Shandong Province

Patentee after: Shandong Datong Construction Group Co.,Ltd.

Address before: Room 101, attached building, office building, No.57 Huayuan Road, Licheng District, Jinan City, Shandong Province

Patentee before: Shandong Datong Highway Engineering Co.,Ltd.

CP03 Change of name, title or address