CN216608980U - A steel support device - Google Patents

A steel support device Download PDF

Info

Publication number
CN216608980U
CN216608980U CN202123434586.7U CN202123434586U CN216608980U CN 216608980 U CN216608980 U CN 216608980U CN 202123434586 U CN202123434586 U CN 202123434586U CN 216608980 U CN216608980 U CN 216608980U
Authority
CN
China
Prior art keywords
connecting rod
backup pad
support device
fixed
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123434586.7U
Other languages
Chinese (zh)
Inventor
宋小刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xinshan Heavy Industry Technology Co ltd
Original Assignee
Beijing Xinshan Heavy Industry Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xinshan Heavy Industry Technology Co ltd filed Critical Beijing Xinshan Heavy Industry Technology Co ltd
Priority to CN202123434586.7U priority Critical patent/CN216608980U/en
Application granted granted Critical
Publication of CN216608980U publication Critical patent/CN216608980U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a reinforcing bar strutting arrangement, reinforcing bar net welded technical field, it includes that two intervals set up supporting component, supporting component includes first backup pad and second backup pad, first backup pad with second backup pad fixed connection, first backup pad is located the top of the second backup pad of telling, second backup pad horizontal direction sets up, the both ends of the top surface of first backup pad are fixed with spacing arch, two respectively recess is constituteed with first backup pad to spacing arch, and the reinforcing bar is located in the recess. This application has the effect that makes things convenient for the overhead traveling crane to hoist the reinforcing bar, improves work efficiency.

Description

一种钢筋支撑装置A steel support device

技术领域technical field

本申请涉及钢筋网焊接的技术领域,尤其是涉及一种钢筋支撑装置。The present application relates to the technical field of reinforcement mesh welding, and in particular, to a reinforcement support device.

背景技术Background technique

钢筋焊接网是纵向钢筋和横向钢筋分别以一定的间距排列且互成直角、全部交叉点均焊接在一起的网片。Welded steel mesh is a mesh in which longitudinal reinforcement and transverse reinforcement are arranged at a certain distance and at right angles to each other, and all intersections are welded together.

在焊接钢筋网的过程中,钢筋放在车间的地面上,然后通过天车将多根钢筋输送到工作台上,在工作台上对钢筋进行焊接。将钢筋放到地面上,不方便天车将钢筋吊起,降低了工作效率。In the process of welding the steel mesh, the steel bars are placed on the floor of the workshop, and then multiple steel bars are transported to the workbench through the overhead crane, and the steel bars are welded on the workbench. Placing the steel bar on the ground is inconvenient for the crane to lift the steel bar, which reduces the work efficiency.

实用新型内容Utility model content

为了方便天车将钢筋吊起,提高工作效率,本申请提供一种钢筋支撑装置。In order to facilitate the crane to hoist the steel bar and improve the work efficiency, the present application provides a steel bar support device.

本申请提供的一种钢筋支撑装置采用如下的技术方案:A kind of reinforcement supporting device provided by this application adopts the following technical scheme:

一种钢筋支撑装置,包括两个间隔设置支撑组件,所述支撑组件包括第一支撑板和第二支撑板,所述第一支撑板与所述第二支撑板固定连接,所述第一支撑板位于所诉第二支撑板的上方,所述第二支撑板水平方向设置,所述第一支撑板的顶面的两端分别固定有限位凸起,两个所述限位凸起与第一支撑板组成凹槽,钢筋位于所述凹槽内。A steel bar supporting device includes two supporting components arranged at intervals, the supporting components include a first supporting plate and a second supporting plate, the first supporting plate is fixedly connected with the second supporting plate, the first supporting plate is The plate is located above the second support plate, the second support plate is arranged in the horizontal direction, the two ends of the top surface of the first support plate are respectively fixed with limit protrusions, and the two limit protrusions are connected with the first support plate. A support plate forms a groove, and the steel bars are located in the groove.

通过采用上述技术方案,对钢筋进行放置时,将钢筋的一端放到其中一个支撑板上,钢筋位于两个限位凸起之间,钢筋的另一端放到另一个支撑板上,钢筋与地面存在一定的距离,便于天车将钢筋吊起。By adopting the above technical solution, when placing the steel bar, one end of the steel bar is placed on one of the support plates, the steel bar is located between the two limit protrusions, the other end of the steel bar is placed on the other support plate, and the steel bar is connected to the ground. There is a certain distance, which is convenient for the crane to hoist the steel bars.

可选的,所述第二支撑板的两端均固定有限位杆,所述限位杆的高度高于所述限位凸起的高度,所述第一支撑板位于两个所述限位杆之间。Optionally, limit bars are fixed at both ends of the second support plate, the height of the limit bars is higher than the height of the limit protrusions, and the first support plate is located at two of the limit bars. between the rods.

通过采用上述技术方案,限位杆的设置,能够使钢筋盛放的更多。By adopting the above technical solution, the setting of the limit rod can enable more steel bars to be contained.

可选的,两个所述第二支撑板相互靠近的一侧均固定有第三支撑板,所述第三支撑板与地面接触。Optionally, a third support plate is fixed on each side of the two second support plates close to each other, and the third support plate is in contact with the ground.

通过采用上述技术方案,第三支撑板对第一支撑板起到支撑的作用,增加了第一支撑板的稳定性,从而使第一支撑板对钢筋稳定地进行支撑。By adopting the above technical solution, the third support plate supports the first support plate, which increases the stability of the first support plate, so that the first support plate supports the steel bars stably.

可选的,两个所述第三支撑板之间安装有连接杆。Optionally, a connecting rod is installed between the two third support plates.

通过采用上述技术方案,连接杆两个第三支撑板之间的稳定性,从而增加了两个支撑组件的稳定性。By adopting the above technical solution, the stability between the two third support plates of the connecting rod is increased, thereby increasing the stability of the two support assemblies.

可选的,所述连接杆包括第一连接杆和第二连接杆,所述第一连接杆靠近所述第二连接杆的一端开设有容纳孔,所述第二连接杆靠近所述第一连接杆的一端与容纳孔插接。Optionally, the connecting rod includes a first connecting rod and a second connecting rod, an end of the first connecting rod close to the second connecting rod is provided with a receiving hole, and the second connecting rod is close to the first connecting rod. One end of the connecting rod is inserted into the accommodating hole.

通过采用上述技术方案,第二连接杆靠近第一连接杆的一端与容纳孔插接,第二连接杆伸出容纳孔的长度能够调节,从而使两个支撑组件之间的距离能够调节,两个支撑组件能够对不同长度的钢筋进行稳定地支撑。By adopting the above technical solution, one end of the second connecting rod close to the first connecting rod is inserted into the accommodating hole, and the length of the second connecting rod extending out of the accommodating hole can be adjusted, so that the distance between the two supporting components can be adjusted, and the two A support assembly can stably support bars of different lengths.

可选的,所述第一连接的侧壁上设置有抵紧螺栓,所述抵紧螺栓与第一连接杆的侧壁螺纹连接并抵紧第二连接杆。Optionally, a pressing bolt is provided on the side wall of the first connection, and the pressing bolt is threadedly connected to the side wall of the first connecting rod and abuts the second connecting rod.

通过采用上述技术方案,将第二连接杆伸出容纳孔的长度调节好后,通过抵紧螺栓抵紧第二连接杆,将第二连接杆与第一连接杆固定。By adopting the above technical solution, after adjusting the length of the second connecting rod extending out of the accommodating hole, the second connecting rod is fixed to the first connecting rod by pressing the bolt against the second connecting rod.

可选的,所述第一连接杆远离所述第二连接杆的一端开设有第一插孔,靠近所述第一连接杆的第三支撑板上固定有第一螺纹杆,第一螺纹杆贯穿第一插孔;Optionally, a first socket is opened at one end of the first connecting rod away from the second connecting rod, and a first threaded rod is fixed on a third support plate close to the first connecting rod. through the first jack;

所述第二连接杆远离所述第一连接杆的一端开设有第二插孔,靠近所述第二连接杆的所述第三支撑板上固定有第二螺纹杆,所述第二螺纹杆贯穿所述第二插孔。The end of the second connecting rod away from the first connecting rod is provided with a second insertion hole, a second threaded rod is fixed on the third support plate close to the second connecting rod, and the second threaded rod is through the second jack.

通过采用上述技术方案,对第一连接杆和第二连接杆进行安装时,将第一螺纹杆与第一插孔插接,然后将第二螺纹杆与第二插孔插接,之后将第二连接杆靠近第一连接杆的一端插入到容纳孔中,通过抵紧螺栓将第一连接杆和第二连接杆固定。By adopting the above technical solution, when the first connecting rod and the second connecting rod are installed, the first threaded rod is inserted into the first socket, then the second threaded rod is inserted into the second socket, and then the first threaded rod is inserted into the second socket. One end of the two connecting rods close to the first connecting rod is inserted into the accommodating hole, and the first connecting rod and the second connecting rod are fixed by abutting bolts.

可选的,所述第一螺纹杆上螺纹连接有第一螺母,所述第一螺母位于所述第一连接杆的上方,第二螺纹杆上螺纹连接有第二螺母,所述第二螺母位于第二连接杆的上方。Optionally, a first nut is threadedly connected to the first threaded rod, the first nut is located above the first connecting rod, a second nut is threadedly connected to the second threaded rod, and the second nut is above the second connecting rod.

通过采用上述技术方案,拧紧第一锁紧螺母,第一锁紧螺母抵紧第一连接杆,拧紧第二锁紧螺母,第二锁紧螺母抵紧第二连接杆。By adopting the above technical solution, the first locking nut is tightened, the first locking nut is pressed against the first connecting rod, the second locking nut is tightened, and the second locking nut is pressed against the second connecting rod.

综上所述,本申请包括以下至少一种有益技术效果:To sum up, the present application includes at least one of the following beneficial technical effects:

1.将钢筋放到支撑组件上,钢筋与地面存在一定的距离,便于天车将钢筋吊起;1. Put the steel bar on the support component, and there is a certain distance between the steel bar and the ground, so that the crane can lift the steel bar;

2.第三支撑板对第一支撑板起到支撑的作用,增加了第一支撑板的稳定性,从而使第一支撑板对钢筋稳定地进行支撑;2. The third support plate supports the first support plate, which increases the stability of the first support plate, so that the first support plate supports the steel bars stably;

3.第二连接杆伸出容纳孔的长度能够调节,从而使两个支撑组件之间的距离能够调节,两个支撑组件能够对不同长度的钢筋进行稳定地支撑。3. The length of the second connecting rod extending out of the accommodating hole can be adjusted, so that the distance between the two support assemblies can be adjusted, and the two support assemblies can stably support steel bars of different lengths.

附图说明Description of drawings

图1是体现本申请实施例一的整体结构示意图。FIG. 1 is a schematic diagram showing the overall structure of Embodiment 1 of the present application.

图2是体现本申请实施例一中限位凸起和凹槽的示意图。FIG. 2 is a schematic diagram showing the limiting protrusions and grooves in Embodiment 1 of the present application.

图3是体现本申请实施例二的结构示意图。FIG. 3 is a schematic structural diagram embodying the second embodiment of the present application.

图4是体现本申请实施例二中抵紧螺栓和第二螺纹杆的结构示意图。FIG. 4 is a schematic structural diagram of a pressing bolt and a second threaded rod in Embodiment 2 of the present application.

附图标记说明:1、支撑组件;11、第一支撑板;111、限位凸起;112、凹槽;113、限位杆;12、第二支撑板;2、第三支撑板;3、连接杆;31、第一连接杆;311、容纳孔;312、第一插孔;313、第一螺纹杆;314、第一螺母;32、第二连接杆;321、抵紧螺栓;322、第二插孔;323、第二螺纹杆;324、第二螺母。Description of reference numerals: 1. Support assembly; 11, First support plate; 111, Limit protrusion; 112, Groove; 113, Limit rod; 12, Second support plate; 2, Third support plate; 3 31, the first connecting rod; 311, the receiving hole; 312, the first jack; 313, the first threaded rod; 314, the first nut; 32, the second connecting rod; 321, the tightening bolt; 322 , the second jack; 323, the second threaded rod; 324, the second nut.

具体实施方式Detailed ways

以下结合附图1-4对本申请作进一步详细说明。The present application will be further described in detail below in conjunction with accompanying drawings 1-4.

实施例一Example 1

本申请实施例公开一种钢筋支撑装置。参照图1和图2,钢筋支撑装置包括两个支撑组件1,两个支撑组件1间隔设置,支撑组件1包括第一支撑板11和第二支撑板12,第一支撑板11与第二支撑板12垂直设置并固定,第二支撑板12水平放置并与地面接触。The embodiment of the present application discloses a reinforcement supporting device. Referring to FIGS. 1 and 2 , the reinforcement supporting device includes two support assemblies 1 , the two support assemblies 1 are arranged at intervals, and the support assembly 1 includes a first support plate 11 and a second support plate 12 , the first support plate 11 and the second support plate 11 The plate 12 is vertically arranged and fixed, and the second support plate 12 is placed horizontally and in contact with the ground.

第一支撑板11顶面的两端固定有限位凸起111,两个限位凸起111与第一支撑板11板之间形成凹槽112,钢筋位于凹槽112内。Limiting protrusions 111 are fixed on both ends of the top surface of the first support plate 11 , a groove 112 is formed between the two limiting protrusions 111 and the plate of the first support plate 11 , and the steel bars are located in the grooves 112 .

第二支撑板12的两端均固定有限位杆113,限位杆113的高度高于限位凸起111的高度,第一支撑板11位于两个限位杆113之间。限位杆113的设置,增加了盛放钢筋的数量。Limiting rods 113 are fixed at both ends of the second support plate 12 , the height of the limiting rods 113 is higher than the height of the limiting protrusions 111 , and the first support plate 11 is located between the two limiting rods 113 . The setting of the limit rod 113 increases the quantity of the steel bars.

本申请实施例一的一种钢筋支撑装置的实施原理为:对钢筋进行放置时,将钢筋放到两个支撑组件1之间,使钢筋位于两个限位杆113之间,第一支撑板11对钢筋进行支撑,钢筋距离地面有一定的距离,便于天车将钢筋吊起。The implementation principle of the reinforcing bar supporting device according to the first embodiment of the present application is as follows: when placing the reinforcing bar, place the reinforcing bar between the two supporting components 1, so that the reinforcing bar is located between the two limit rods 113, and the first supporting plate 11. Support the steel bars, and the steel bars have a certain distance from the ground, which is convenient for the crane to hoist the steel bars.

实施例二Embodiment 2

参照图3和图4,与实施例一的不同之处在于,两个第二支撑板12相互靠近的一侧均固定有第三支撑板2,第三支撑板2与地面接触,增加了第一支撑板11的稳定性,从而使第一支撑板11对钢筋稳定地支撑。Referring to FIGS. 3 and 4 , the difference from the first embodiment is that a third support plate 2 is fixed on the sides of the two second support plates 12 that are close to each other, and the third support plate 2 is in contact with the ground, increasing the number of second support plates 12 . The stability of the first support plate 11 enables the first support plate 11 to stably support the steel bars.

两个第三支撑板2之间设置有连接杆3,连接杆3包括第一连接杆31和第二连接杆32,第一连接杆31与第二连接杆32套接。第一连接杆31靠近第二连接杆32的一端开设有容纳孔311,第二连接杆32靠近第一连接杆31的一端插入到容纳孔311中。A connecting rod 3 is disposed between the two third support plates 2 , and the connecting rod 3 includes a first connecting rod 31 and a second connecting rod 32 , and the first connecting rod 31 is sleeved with the second connecting rod 32 . One end of the first connecting rod 31 close to the second connecting rod 32 is provided with an accommodating hole 311 , and one end of the second connecting rod 32 close to the first connecting rod 31 is inserted into the accommodating hole 311 .

第一连接杆31的侧壁上设置有抵紧螺栓321,抵紧螺栓321与第一连接杆31的侧壁螺纹连接,抵紧螺栓321抵紧第二连接杆32,从而将第一连接杆31和第二连接杆32固定。The side wall of the first connecting rod 31 is provided with a pressing bolt 321, the pressing bolt 321 is threadedly connected with the side wall of the first connecting rod 31, and the pressing bolt 321 is pressed against the second connecting rod 32, so that the first connecting rod 31 and the second connecting rod 32 are fixed.

第一连接杆31远离第二连接杆32的一端开设有第一插孔312,靠近第一连接杆31的第三支撑板2上固定有第一螺纹杆313,第一螺纹杆313与第一插孔312插接,第一螺纹杆313贯穿第一插孔312并螺纹连接有第一螺母314。第二连接杆32远离第一连接杆31的一端开设有第二插孔322,靠近第二连接杆32的第三支撑板2上固定有第二螺纹杆323,第二螺纹杆323管贯穿第二插孔322并螺纹连接有第二螺母324。One end of the first connecting rod 31 away from the second connecting rod 32 is provided with a first insertion hole 312 , and a first threaded rod 313 is fixed on the third support plate 2 close to the first connecting rod 31 . The insertion hole 312 is inserted, and the first threaded rod 313 penetrates through the first insertion hole 312 and is threadedly connected with a first nut 314 . The end of the second connecting rod 32 away from the first connecting rod 31 is provided with a second insertion hole 322 , and a second threaded rod 323 is fixed on the third support plate 2 close to the second connecting rod 32 . The two sockets 322 are screwed with a second nut 324 .

对第一连接杆31和第二连接杆32进行安装时,先将第一螺纹杆313与第一插孔312插接,通过第一螺母314将第一连接杆31固定,然后将第二螺纹杆323与第二插孔322插接,通过第二螺母324将第二连接杆32固定。最后将第二连接杆32插入到容纳孔311中,并通过抵紧螺栓321将第一连接杆31和第二连接杆32固定。When installing the first connecting rod 31 and the second connecting rod 32 , firstly insert the first threaded rod 313 into the first socket 312 , fix the first connecting rod 31 by the first nut 314 , and then screw the second threaded rod 313 into place. The rod 323 is inserted into the second insertion hole 322 , and the second connecting rod 32 is fixed by the second nut 324 . Finally, insert the second connecting rod 32 into the accommodating hole 311 , and fix the first connecting rod 31 and the second connecting rod 32 by pressing the bolt 321 .

本申请实施例二的一种钢筋支撑装置的实施原理为:第三支撑板2的设置,增加了第一支撑板11的稳定性,使第一支撑板11能够对钢筋能够稳定地支撑。第一连接杆31与第二连接杆32套接,第一连接杆31和第二连接杆32的总长度能够调节,从而能够调节两个支撑组件1之间的距离,便于对不同长度的钢筋进行支撑。The implementation principle of the reinforcement supporting device of the second embodiment of the present application is as follows: the arrangement of the third supporting plate 2 increases the stability of the first supporting plate 11 so that the first supporting plate 11 can stably support the reinforcement. The first connecting rod 31 is sleeved with the second connecting rod 32, and the total length of the first connecting rod 31 and the second connecting rod 32 can be adjusted, so that the distance between the two supporting assemblies 1 can be adjusted, which is convenient for steel bars of different lengths. support.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.

Claims (8)

1. The utility model provides a reinforcing bar strutting arrangement which characterized in that: set up supporting component (1) including two intervals, supporting component (1) includes first backup pad (11) and second backup pad (12), first backup pad (11) with second backup pad (12) fixed connection, first backup pad (11) are located the top of the second backup pad (12) of telling, second backup pad (12) horizontal direction sets up, the both ends of the top surface of first backup pad (11) are fixed with spacing arch (111) respectively, two recess (112) are constituteed with first backup pad (11) to spacing arch (111), and the reinforcing bar is located in recess (112).
2. A rebar support device as claimed in claim 1, wherein: both ends of second backup pad (12) all are fixed with gag lever post (113), gag lever post (113) highly be higher than spacing arch (111) highly, first backup pad (11) are located two between gag lever post (113).
3. A rebar support device as claimed in claim 2, wherein: and a third supporting plate (2) is fixed on one side of each of the two second supporting plates (12) close to each other, and the third supporting plates (2) are in contact with the ground.
4. A rebar support device as claimed in claim 3, wherein: and a connecting rod (3) is arranged between the two third supporting plates (2).
5. A rebar support device as claimed in claim 4, wherein: the connecting rod (3) comprises a first connecting rod (31) and a second connecting rod (32), wherein the first connecting rod (31) is close to one end of the second connecting rod (32), a containing hole (311) is formed in the end, close to the first connecting rod (31), of the second connecting rod (32), and the end, close to the first connecting rod (31), of the second connecting rod is connected with the containing hole (311) in an inserting mode.
6. A rebar support device as claimed in claim 5, wherein: and the side wall of the first connecting rod (31) is provided with a fastening bolt (321), and the fastening bolt (321) is in threaded connection with the side wall of the first connecting rod (31) and is fastened against the second connecting rod (32).
7. A rebar support device as claimed in claim 6, wherein: a first insertion hole (312) is formed in one end, far away from the second connecting rod (32), of the first connecting rod (31), a first threaded rod (313) is fixed on a third supporting plate (2) close to the first connecting rod (31), and the first threaded rod (313) penetrates through the first insertion hole (312);
a second insertion hole (322) is formed in one end, far away from the first connecting rod (31), of the second connecting rod (32), a second threaded rod (323) is fixed on the third supporting plate (2) close to the second connecting rod (32), and the second threaded rod (323) penetrates through the second insertion hole (322).
8. A rebar support device as claimed in claim 7, wherein: a first nut (314) is connected to the first threaded rod (313) in a threaded manner, the first nut (314) is located above the first connecting rod (31), a second nut (324) is connected to the second threaded rod (323) in a threaded manner, and the second nut (324) is located above the second connecting rod (32).
CN202123434586.7U 2021-12-30 2021-12-30 A steel support device Expired - Fee Related CN216608980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123434586.7U CN216608980U (en) 2021-12-30 2021-12-30 A steel support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123434586.7U CN216608980U (en) 2021-12-30 2021-12-30 A steel support device

Publications (1)

Publication Number Publication Date
CN216608980U true CN216608980U (en) 2022-05-27

Family

ID=81686544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123434586.7U Expired - Fee Related CN216608980U (en) 2021-12-30 2021-12-30 A steel support device

Country Status (1)

Country Link
CN (1) CN216608980U (en)

Similar Documents

Publication Publication Date Title
CN102359269B (en) Support structure of cast-in-place concrete beam template
CN209989942U (en) Building steel structure combination beam convenient to equipment
CN216608980U (en) A steel support device
CN209779871U (en) Building steel structure
CN206172874U (en) Loading and unloading goods is with fixed jack -up lifting device
CN210105278U (en) Straight insertion type wheel buckle type steel pipe support
CN211117980U (en) Overhead structure of gas pipeline
CN202266025U (en) Support structure for on-site concrete beam template
CN203006069U (en) External wall PC (poly carbonate) board storage rack
CN210857751U (en) Circulating device for positioning suspension ribs in dense rib beam
CN217167200U (en) An adjustable steel plate positioning welding combination device
CN209854980U (en) Prefabricated light steel structure energy-saving composite wall
CN211851143U (en) 750kV truss structure suitable for slope place
CN208088657U (en) A kind of truss structure
CN210744635U (en) A bracket structure for cable fixing
CN221321877U (en) Building curtain wall reinforcing structure
CN222936402U (en) Cantilever I-steel end fixing device
CN216586997U (en) Beam-column connection corrosion-resistant hardware fitting
CN222478082U (en) Safety frame for construction of building edge structural column
CN218028468U (en) Concrete building structure for civil engineering
CN115012636B (en) System and method for supporting corbel and jacking formwork
CN219653948U (en) Large-span steel beam connection structure
CN206211006U (en) A kind of train automatic identification antenna mounting frame
CN220539329U (en) A wall-mounted component for fixing ladder cages
CN222025479U (en) Shear wall steel bar positioning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220527