CN216573570U - Split type ore dressing magnetic pulley ore separating plate - Google Patents
Split type ore dressing magnetic pulley ore separating plate Download PDFInfo
- Publication number
- CN216573570U CN216573570U CN202122442662.2U CN202122442662U CN216573570U CN 216573570 U CN216573570 U CN 216573570U CN 202122442662 U CN202122442662 U CN 202122442662U CN 216573570 U CN216573570 U CN 216573570U
- Authority
- CN
- China
- Prior art keywords
- ore
- pin
- magnetic pulley
- adjustable fender
- funnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a split type ore dressing magnetic pulley ore dressing plate, and belongs to the technical field of ore dressing equipment in the metallurgical industry. The technical scheme is as follows: divide ore plate body (9) to set up between ore funnel (7) and barren rock funnel (8), ore funnel (7) are close to magnetic pulley (5) one side, adjustable fender (3) are located the top of fixed stop (4), adjustable fender (3) are close to magnetic pulley (5), one side of adjustable fender (3) is equipped with a plurality of pins (1) of evenly arranging, be equipped with on fixed stop (4) and detain (2) with pin (1) assorted round pin, pin (1) on adjustable fender (3) are inserted in round pin on fixed stop (4) and are detained (2), link together adjustable fender (3) and fixed stop (4). The utility model has the beneficial effects that: can quick replacement divide ore deposit board wearing and tearing part, guarantee the magnetism pulley and divide ore deposit board effect, reduce parking time, improve equipment operating rate, whole line parking time can be reduced to 10 minutes by original 2 hours.
Description
Technical Field
The utility model relates to a split type ore dressing magnetic pulley ore dressing plate, and belongs to the technical field of ore dressing equipment in the metallurgical industry.
Background
In the production process of a concentrating mill, ores on a conveying belt are separated out of iron ores with different grades by utilizing the magnetic action in a magnetic pulley, the ores are separated into two parts by a separation plate in the throwing and separating process according to production requirements, the ores enter an ore hopper, and waste rocks enter a waste rock hopper. The magnetism pulley ore separating plate that uses at present is integral, and the ore separating plate can appear wearing and tearing phenomenon after using a period, influences the separation effect, causes partial useful ore to sneak into barren rock one side, causes the ore wasting of resources. The traditional magnetic pulley ore separating plate repairing method is to restore the ore separating plate to the sorting height by repair welding or iron rod welding and other methods at the abraded position of the ore separating plate, so as to ensure the sorting effect. For a large-scale ore dressing plant, the position of a magnetic pulley is more in the crushing process flow, maintenance personnel enter a funnel to repair the funnel, and the funnel is used for about 2 hours each time.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a split type mineral processing magnetic pulley ore separating plate, which can quickly replace a wear part, ensure the effect of the magnetic pulley ore separating plate, reduce the parking time, improve the equipment operation rate and solve the problems in the background technology.
The technical scheme of the utility model is as follows:
the utility model provides a split type ore dressing magnetic pulley ore dressing board, contains magnetic pulley, transportation belt, ore funnel, barren rock funnel and ore dressing board body, and ore dressing board body sets up between ore funnel and barren rock funnel, and the ore funnel is close to magnetic pulley one side, ore dressing board body contains pin, round pin knot, adjustable fender and fixed stop, and adjustable fender is located fixed stop's top, and adjustable fender is close to magnetic pulley, and one side of adjustable fender is equipped with a plurality of pins of evenly arranging, is equipped with on the fixed stop to detain with pin assorted round pin, and the pin on the adjustable fender inserts in the round pin on the fixed stop is detained, links together adjustable fender and fixed stop.
The pin on the movable baffle and the pin buckle on the fixed baffle are both positioned on one side of the waste stone funnel.
The pin on the movable baffle plate is welded at the lower part of the movable baffle plate, and the pin buckle on the fixed baffle plate is welded at the upper part of the fixed baffle plate.
By adopting the utility model, in the production process of a concentrating mill, after the normal production and use are carried out for a period of time, the upper part of the movable baffle is worn because the movable baffle is close to the magnetic pulley, and then the movable baffle can be replaced by pulling the pin on the movable baffle out of the pin buckle on the fixed baffle, thus being convenient and rapid.
The utility model has the beneficial effects that: the magnetic pulley ore separating plate abrasion part can be replaced quickly, the effect of the magnetic pulley ore separating plate is guaranteed, the parking time is shortened, and the equipment operation rate is improved. The whole line parking time can be reduced to 10 minutes from the original 2 hours, and the waste of iron ores is reduced.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a side view of FIG. 1;
in the figure: 1-pin, 2-pin buckle, 3-sliding baffle, 4-fixed baffle, 5-magnetic pulley, 6-conveying belt, 7-ore funnel, 8-waste rock funnel and 9-ore separating plate body.
Detailed Description
The utility model is further illustrated by way of example in the following with reference to the accompanying drawings.
Referring to the attached drawings 1-2, a split type ore dressing magnetic pulley ore separating plate contains magnetic pulley 5, transportation belt 6, ore funnel 7, waste rock funnel 8 and ore separating plate body 9, and ore separating plate body 9 sets up between ore funnel 7 and waste rock funnel 8, and ore funnel 7 is close to magnetic pulley 5 one side, ore separating plate body 9 contains pin 1, latch 2, adjustable fender 3 and fixed stop 4, and adjustable fender 3 is located fixed stop 4's top, and adjustable fender 3 is close to magnetic pulley 5, and one side of adjustable fender 3 is equipped with a plurality of pins 1 of evenly arranging, is equipped with on fixed stop 4 and detains 2 with 1 assorted latch, and pin 1 on the adjustable fender 3 inserts in the latch 2 on the fixed stop 4, links together adjustable fender 3 and fixed stop 4.
In this embodiment, referring to fig. 1-2, the ore-dividing plate body 9 is composed of a fixed baffle 4 and a movable baffle 3, and the movable baffle 3 is connected together by inserting a pin 1 uniformly welded at the lower part into a pin buckle 2 at the upper part of the fixed baffle 4.
The conveying belt 6 and the magnetic pulley 5 are arranged above the movable baffle 3, the ore hopper 7 is arranged at the lower part of the magnetic pulley 5, the waste rock hopper 8 is arranged at the outer side of the movable baffle 3, and the waste rock hopper 8 and the ore hopper 7 are separated by the ore separation plate body 9.
In the production process of a concentrating mill, ores on the conveying belt 6 are separated out of iron ores with different grades by utilizing the magnetic action inside the magnetic pulley 5, the ores are separated into two parts by the ore separation plate body 9 in the throwing separation process according to production requirements, the ores enter the ore hopper 7, and waste rocks enter the waste rock hopper 8.
Along with the continuation of production, the adjustable fender 3 on ore separating plate body 9 upper portion appears wearing and tearing easily and then influences the effect of selecting. After the movable baffle 3 on the upper part of the ore separating plate body 9 is worn, the movable baffle 3 can be replaced by pulling the pin 1 on the lower part of the movable baffle 3 out of the pin buckle 2 on the upper part of the fixed baffle 4, and the operation is convenient and fast.
Claims (3)
1. The utility model provides a split type ore dressing magnetic pulley ore dressing board, contains magnetic pulley (5), transportation belt (6), ore funnel (7), barren rock funnel (8) and ore dressing board body (9), and ore dressing board body (9) set up between ore funnel (7) and barren rock funnel (8), and ore funnel (7) are close to magnetic pulley (5) one side, its characterized in that: divide ore plate body (9) to contain pin (1), round pin knot (2), adjustable fender (3) and fixed stop (4), adjustable fender (3) are located the top of fixed stop (4), adjustable fender (3) are close to magnetic pulley (5), one side of adjustable fender (3) is equipped with a plurality of pins (1) of evenly arranging, be equipped with on fixed stop (4) and detain (2) with pin (1) assorted round pin, during round pin knot (2) on adjustable fender (3) pin (1) inserted fixed stop (4), link together adjustable fender (3) and fixed stop (4).
2. The split type ore-dressing magnetic pulley ore-separating plate according to claim 1, characterized in that: the pin (1) on the movable baffle (3) and the pin buckle (2) on the fixed baffle (4) are both positioned on one side of the waste stone funnel (8).
3. The split type ore-dressing magnetic pulley ore-separating plate according to claim 2, characterized in that: the pin (1) on the movable baffle plate (3) is welded at the lower part of the movable baffle plate (3), and the pin buckle (2) on the fixed baffle plate (4) is welded at the upper part of the fixed baffle plate (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122442662.2U CN216573570U (en) | 2021-10-11 | 2021-10-11 | Split type ore dressing magnetic pulley ore separating plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122442662.2U CN216573570U (en) | 2021-10-11 | 2021-10-11 | Split type ore dressing magnetic pulley ore separating plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216573570U true CN216573570U (en) | 2022-05-24 |
Family
ID=81639176
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122442662.2U Active CN216573570U (en) | 2021-10-11 | 2021-10-11 | Split type ore dressing magnetic pulley ore separating plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216573570U (en) |
-
2021
- 2021-10-11 CN CN202122442662.2U patent/CN216573570U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109351447B (en) | Lean magnetite's ore dressing production system | |
CN104874459B (en) | Useless ore-dressing technique is thrown in a kind of low-grade magnetite pre-selection | |
CN102205273B (en) | Beneficiation process of low-grade magnetite and specularite mixed ore | |
CN104475236B (en) | Combined beneficiation method for treating micro-fine grain disseminated iron ores | |
CN109569837B (en) | Crushing and grinding process for treating nickel-copper sulfide ore | |
CA3069632C (en) | Iron fine removal and sorting system for magnetic hard rocks | |
CN110560387A (en) | Intelligent sorting method for lead-zinc block ores | |
CN102189038A (en) | Preliminary separation process for ferromagnetic ore separation | |
CN102230070B (en) | Novel three-stage pre-dressing and crushing process for low-grade magnetite | |
CN108855584A (en) | A kind of difficulty selects the ore-dressing technique of producing high-quality iron ore concentrate by low-grade magnetic iron ore | |
CN101537410B (en) | Integrated equipment of dry concentration, rough concentration and fine concentration of waste disposal site and technique thereof | |
CN216573570U (en) | Split type ore dressing magnetic pulley ore separating plate | |
CN202316082U (en) | Concentrate screening and decontaminating system before high-pressure rolling grinding | |
CN218222811U (en) | Solid waste material non ferrous metal ore recovery production line | |
AU2021267559B2 (en) | Mine site comminution arrangement and methodology | |
EP3037560A1 (en) | Method and apparatus for the valorization of steel slags | |
CN101966486B (en) | Magnetic separation process of fine lean hematite | |
CN106694190B (en) | A kind of beneficiation method recycling nickel metal from discarded copper-nickel sulfide | |
CN102230071B (en) | Novel technology of low-grade magnetite two-stage pre-selecting and crushing | |
CN109865585B (en) | Method for improving yield of extremely-poor ore | |
CN209968502U (en) | Automatic transfer chain ferronickel ore breaker | |
CN206980980U (en) | A kind of magnetic pulley dry type magnetic separation feeding-distribution device | |
CN204911774U (en) | Colliery stone processingequipment | |
CN110714117A (en) | Intelligent pre-selection waste throwing-shaft furnace magnetizing roasting method for refractory iron ore | |
CN102120216B (en) | Drum slag online separation and sorting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |