CN216557592U - Warm ventilation pipe of green building - Google Patents

Warm ventilation pipe of green building Download PDF

Info

Publication number
CN216557592U
CN216557592U CN202122873509.5U CN202122873509U CN216557592U CN 216557592 U CN216557592 U CN 216557592U CN 202122873509 U CN202122873509 U CN 202122873509U CN 216557592 U CN216557592 U CN 216557592U
Authority
CN
China
Prior art keywords
pipe
warm
fixedly connected
wall
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122873509.5U
Other languages
Chinese (zh)
Inventor
陈志江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Building Block Electromechanical Technology Co ltd
Original Assignee
Guangdong Building Block Electromechanical Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Building Block Electromechanical Technology Co ltd filed Critical Guangdong Building Block Electromechanical Technology Co ltd
Priority to CN202122873509.5U priority Critical patent/CN216557592U/en
Application granted granted Critical
Publication of CN216557592U publication Critical patent/CN216557592U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses a green building heating ventilation pipe, which comprises a first heating through pipe, wherein the side wall of the first heating through pipe is fixedly connected with a first connecting piece, the side wall of the first connecting piece is provided with a number eight of first holes, the inner parts of the holes are movably sleeved with bolts, the side walls of the eight bolts are movably sleeved with a second connecting piece at one side of the first connecting piece, the inner wall of the second connecting piece is fixedly connected with a second heating through pipe, the bottom of the second heating through pipe is fixedly connected with a transverse steel, the top surface of the transverse steel is provided with a number two of holes at the front back surface of the second heating through pipe, the inner parts of the number two holes are movably sleeved with a hanging rod, the first heating through pipe and the second heating through pipe form a node of the heating through pipe, the first heating through pipe is pushed to drive an inner connecting pipe to pass through a fixing ring to enter the inner part of the second heating through pipe during installation, a reverse cone sheet on the side wall of the inner connecting pipe is contracted under the influence of the fixing ring when the fixing ring passes through the fixing ring, the fixing ring is penetrated and then rebounded to be clamped in the second warm through pipe.

Description

Warm ventilation pipe of green building
Technical Field
The utility model relates to the technical field of pipeline conveying, in particular to a heating ventilation pipe for a green building.
Background
The application range of the heating ventilation pipe is very wide and can be used for: the air supply and return pipe of the purification system, the ventilation pipe of the central air conditioner, the ventilation pipe of the industrial air supply and exhaust, the suction and exhaust pipe of the environmental protection system, the mine gas drainage pipe, the mine rubberized fabric air duct and the like convey the heating air to the office space through the pipeline for heating, the whole shape is square, and the air supply and exhaust pipe is fixed on the ceiling through a lifting rope.
The prior art has some disadvantages;
firstly, when the pipeline is installed, a plurality of pipelines are assembled to form a set of heating and ventilation system, the joint needs to have better sealing performance, and in the prior art, the operation is complex in the assembling process, and welding is needed in necessary conditions, so that the working efficiency in the assembling process is low, and the installing process is complicated;
secondly, the warm-air pipeline can be generated by dust in the pipeline in long-term use, so that the discharged warm air has dust to influence the air quality.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects in the prior art, the utility model provides a green building heating ventilation pipe to solve the problems in the background art.
The utility model provides the following technical scheme: the utility model provides a warm logical tuber pipe of green building, includes first warm siphunculus, still includes:
the second warm-up pipe: a second warm through pipe is arranged on one side of the first warm through pipe;
a first connecting piece: the side wall of the first warm-through pipe is provided with a first connecting piece;
a second connecting sheet: the side wall of the first connecting sheet is provided with a second connecting sheet;
bolt: a bolt is arranged on one side of the first connecting sheet;
horizontal steel: the bottom of the second warm through pipe is provided with transverse steel;
suspender: a hanging rod is arranged at the top of the transverse steel;
furthermore, the side wall of the first warm through pipe is fixedly connected with a first connecting piece, the side wall of the first connecting piece is provided with a number one eight of holes, the inside of each hole is movably sleeved with a bolt, the side wall of each eight of the bolts is movably sleeved with a second connecting piece at one side of the first connecting piece, the inner wall of each second connecting piece is fixedly connected with a second warm through pipe, the bottom of each second warm through pipe is fixedly connected with a transverse steel, the top surface of the transverse steel is provided with a number two of holes at the front back of the second warm through pipe, the inside of each second hole is movably sleeved with a suspender, the inner wall of the first warm through pipe is fixedly connected with a connecting ring, the inner wall of the connecting ring is fixedly connected with an inner connecting pipe, the side wall of the inner connecting pipe is fixedly connected with an anti-cone sheet, the inner wall of the second warm through pipe is fixedly connected with a fixing ring, and the mounting simplification of the warm through pipe is facilitated, the working efficiency is improved, the pipeline joint is firmer through the matching of the reverse cone sheets and the fixing rings, and the connection tightness is ensured.
Further, the second warm siphunculus includes: air pipe, fixed filtering layer, active carbon, fixed filtering layer has been cup jointed in air pipe's inner wall activity, the inside fixedly connected with active carbon of fixed filtering layer, the both sides of fixed filtering layer are equipped with the fixture block, air pipe's inner wall both sides are equipped with the spout, fixed filtering layer both sides fixture block and air pipe inner wall spout looks adaptation, the warm interior air of ventilating pipe filters through active carbon and purifies mobile gas, and the cooperation through fixture block and spout is favorable to the dismantlement and the installation of fixed filtering layer.
Further, one side of interconnector pipe flushes with one side of anti-cone piece, the opposite side activity that the lateral wall of interconnector pipe is located the anti-cone piece has cup jointed solid fixed ring 0 between interconnector pipe and the solid fixed ring interference fit, one side length of a side of anti-cone piece is less than the opposite side length of anti-cone piece, makes interconnector pipe drive anti-cone piece pass solid fixed ring through promoting first warm siphunculus, and anti-cone piece contracts under solid fixed ring's influence at this in-process, rebounds back after the anti-cone piece passes solid fixed ring, makes and is connected the installation between warm siphunculus of first warm siphunculus and the warm siphunculus of second more simply firm.
Further, the opposite side of anti-cone piece closely laminates with solid fixed ring's opposite side, the opposite side lateral wall edge of anti-cone piece closely laminates with the inner wall of the warm siphunculus of second, through anti-cone piece and solid fixed ring's closely laminating, can guarantee the leakproofness of the warm siphunculus of first warm siphunculus and second and warm siphunculus inner space.
Further, the inner wall fixedly connected with go-between of first warm siphunculus, the inner wall fixedly connected with of go-between is interior to be managed, the anti-cone piece of the lateral wall fixedly connected with of interior even pipe, the opposite side activity that the lateral wall of interior even pipe is located anti-cone piece has cup jointed solid fixed ring, one side fixedly connected with rubber circle of solid fixed ring, the warm siphunculus of solid fixed ring's lateral wall fixedly connected with second makes it drive interior even pipe pass solid fixed ring and gets into the inside that the warm siphunculus of second through promoting first warm siphunculus, and anti-cone piece contracts under solid fixed ring's influence when passing solid fixed ring on the interior even pipe lateral wall, passes solid fixed ring back after the inside joint of the warm siphunculus of second, and solid fixed ring's opposite side closely laminates with one side of rubber circle simultaneously, has strengthened the leakproofness of junction under the material influence of rubber circle.
Further, air pipe's bottom is equipped with the draw-in groove, and fixed filtering layer has been cup jointed to the inside activity of its draw-in groove, the bottom that fixed filtering layer is located air pipe's bottom fixed connection has a bottom solid board, the bottom of bottom solid board is seted up a quantity and is two holes, and the screw has been cup jointed to the inside equal activity in No. two holes, air pipe has been cup jointed in the top activity that the lateral wall of screw is located bottom solid board, and the heating is intraductal gaseous through passing fixed filtering layer and is filtered and purified, makes bottom solid board and air pipe's disconnection through wrench movement screw when needing to change fixed filtering layer, and the bottom solid board of twitching downwards can dismantle the change with fixed filtering layer.
The utility model has the technical effects and advantages that:
1. according to the utility model, the first warm-up through pipe and the second warm-up through pipe are arranged to form a node of the warm-up through pipe, the first warm-up through pipe is pushed to drive the inner connecting pipe to penetrate through the fixing ring to enter the inside of the second warm-up through pipe during installation, the reverse cone sheet on the side wall of the inner connecting pipe shrinks under the influence of the fixing ring when penetrating through the fixing ring, the reverse cone sheet rebounds to be clamped in the inside of the second warm-up through pipe after penetrating through the fixing ring, the connecting ring plays a role in connecting the first warm-up through pipe and the inner connecting pipe, the first connecting sheet and the second connecting sheet can be aligned and attached after the reverse cone sheet is clamped in the inside of the second warm-up through pipe, the reverse cone sheet and the fixing ring can be fixed through bolts, the installation simplification of the warm-up through pipe is facilitated, the working efficiency is improved, the connection position of the pipe is firmer through the matching of the reverse cone sheet and the fixing ring, and the connection tightness is ensured.
2. The fixed filter layer is fixed through the ventilating duct, the activated carbon can be loaded through the fixed filter layer, when air flows in the heating and ventilating duct, the air passes through the activated carbon, the air containing miscellaneous dust can be filtered through the activated carbon, the air is purified, the heating and ventilating system can filter and purify the dust generated in the air through the activated carbon for a long time, and the air quality of the exhausted air is improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an exploded view of the overall structure of the present invention.
Fig. 3 is a schematic view of a second heating and ventilating structure in fig. two of the present invention.
Fig. 4 is a schematic structural diagram of a second embodiment of the present invention.
FIG. 5 is a schematic diagram of a third structure according to an embodiment of the present invention.
The reference signs are: 1. a first warm-up pipe; 2. a second warm-up pipe; 251. a ventilation duct; 252. fixing the filter layer; 253. activated carbon; 3. a first connecting piece; 4. a second connecting sheet; 5. a bolt; 6. a boom; 7. transverse steel; 8. a connecting ring; 9. an interconnecting pipe; 10. a reverse cone sheet; 11. a fixing ring; 12. a bottom fixing plate; 13. a screw; 14. a rubber ring.
Detailed Description
The present invention will be described more fully with reference to the accompanying drawings, and the embodiments of the present invention are merely examples, and the green building heating and ventilating duct according to the present invention is not limited to the embodiments described below, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention.
The first embodiment is as follows: referring to fig. 1 and 2, the utility model provides a heating and ventilating duct for green buildings, which comprises a first heating and ventilating duct 1 and further comprises:
the second warm-up pipe 2: one side of the first warm-up through pipe 1 is provided with a second warm-up through pipe 2;
first connecting piece 3: the side wall of the first warm-up through pipe 1 is provided with a first connecting piece 3;
second connecting piece 4: the side wall of the first connecting sheet 3 is provided with a second connecting sheet 4;
and (5) bolts: one side of the first connecting sheet 3 is provided with a bolt 5;
7, transverse steel: the bottom of the second warm-up pipe 2 is provided with a horizontal steel 7;
a suspender 6: the top of the transverse steel 7 is provided with a suspender 6;
referring to fig. 1 and 2, a first connecting piece 3 is fixedly connected to a side wall of a first warm-keeping pipe 1, a number eight of holes are formed in the side wall of the first connecting piece 3, bolts 5 are movably sleeved inside the holes, a second connecting piece 4 is movably sleeved on one side of the first connecting piece 3 of the side walls of the eight bolts 5, a second warm-keeping pipe 2 is fixedly connected to an inner wall of the second connecting piece 4, a horizontal steel 7 is fixedly connected to a bottom of the second warm-keeping pipe 2, a number two of holes are formed in a top surface of the horizontal steel 7 and a front back surface of the second warm-keeping pipe 2, a hanging rod 6 is movably sleeved inside the number two of holes, a connecting ring 8 is fixedly connected to the inner wall of the first warm-keeping pipe 1, an inner connecting pipe 9 is fixedly connected to the inner wall of the connecting ring 8, an inner connecting pipe 9 is fixedly connected to the side wall of the inner connecting pipe 9, an anti-cone sheet 10 is fixedly connected to the side wall of the inner connecting pipe 9, a fixing ring 11 is fixedly connected to the inner wall of the second warm-keeping pipe 2, an anti-cone sheet 15 on the side wall of the inner connecting pipe 9 is contracted under the influence of the fixing ring 11 when passing through the fixing ring 11, pass fixed ring 11 back kick-back and make first warm siphunculus 1 more firm with being connected of warm siphunculus 2 of second at the inside joint of warm siphunculus 2 of second.
Referring to fig. 3, the second warm-up duct 2 includes: air pipe 251, fixed filtering layer 252, activated carbon 253, fixed filtering layer 252 has been cup jointed in the inner wall activity of air pipe 251, the inside fixedly connected with activated carbon 253 of fixed filtering layer 252, the both sides of fixed filtering layer 252 are equipped with the fixture block, the inner wall both sides of air pipe 251 are equipped with the spout, fixed filtering layer 252 both sides fixture block and air pipe 251 inner wall spout looks adaptation, gaseous passing from activated carbon 253 is inside when the interior gas flow of warm siphunculus, can contain the miscellaneous dirt with gas through activated carbon 253 and filter and purify the air.
Referring to fig. 2, one side of internal connection pipe 9 flushes with one side of anti-cone sheet 10, interference fit between internal connection pipe 9 and the solid fixed ring 11 is cup jointed in the opposite side activity that the lateral wall of internal connection pipe 9 is located anti-cone sheet 10, one side length of a side of anti-cone sheet 10 is less than the opposite side length of a side of anti-cone sheet 10, make internal connection pipe 9 can drive anti-cone sheet 10 and pass solid fixed ring 11 at the inside joint of warm siphunculus 2 of second, first warm siphunculus 1 is connected more firmly through the cooperation of anti-cone sheet 10 with solid fixed ring 11 with the warm siphunculus 2 junction structure of second.
Referring to fig. 3, the opposite side of anti-cone piece 15 and the inseparable laminating of the opposite side of solid fixed ring 11, the opposite side lateral wall edge of anti-cone piece 10 and the inseparable laminating of the warm siphunculus 2 of second, through the inseparable laminating of anti-cone piece 10 and solid fixed ring 11, can guarantee the leakproofness of first warm siphunculus 1 and the warm siphunculus 2 inner space of second, and anti-cone piece 10 is behind the warm siphunculus 2 inside joint of kick-backing of second, the leakproofness of the warm siphunculus 1 of reinforcing and the warm siphunculus 2 connection structure of second through the inseparable laminating of the opposite side lateral wall edge of anti-cone piece 10 and the warm siphunculus 2 of second.
The working principle of the first embodiment of the utility model is as follows: the first warm through pipe 1 and the second warm through pipe 2 are arranged to form a node of a warm through pipeline, the first warm through pipe 1 is pushed to drive the inner connecting pipe 9 to penetrate through the fixing ring 11 to enter the inside of the second warm through pipe 2 during installation, the reverse cone sheet 10 on the side wall of the inner connecting pipe 9 shrinks under the influence of the fixing ring 11 when penetrating through the fixing ring 11, the reverse cone sheet rebounds after penetrating through the fixing ring 11 and is clamped in the second warm through pipe 2, the connecting ring 8 plays a role in connecting the first warm through pipe 1 and the inner connecting pipe 9, when the reverse cone sheet 10 is clamped in the second warm through pipe 2, the first connecting sheet 3 and the second connecting sheet 4 are aligned and attached, and the first warm through pipe 1 and the second warm through pipe 2 can be fixed through the bolt 5;
the fixed filter layer 252 is fixed by the ventilation pipe 251, the activated carbon 253 can be loaded by the fixed filter layer 252, when the air in the heating ventilation pipe flows, the air passes through the activated carbon 253, and the air can be filtered and purified by the activated carbon 253.
Example two:
referring to fig. 4, a connecting ring 8 is fixedly connected to the inner wall of a first warm through pipe 1, an inner connecting pipe 9 is fixedly connected to the inner wall of the connecting ring 8, an anti-cone sheet 10 is fixedly connected to the side wall of the inner connecting pipe 9, a fixing ring 11 is movably sleeved on the other side of the anti-cone sheet 10 of the side wall of the inner connecting pipe 9, a rubber ring 14 is fixedly connected to one side of the fixing ring 11, a second warm through pipe 2 is fixedly connected to the side wall of the fixing ring 11, the first warm through pipe 1 is pushed to drive the inner connecting pipe 9 to pass through the fixing ring 11 to enter the inside of the second warm through pipe 2, the anti-cone sheet 10 on the side wall of the inner connecting pipe 9 shrinks under the influence of the fixing ring 11 when passing through the fixing ring 11, the first warm through pipe rebounds to be clamped in the inside of the second warm through pipe 2 after passing through the fixing ring 11, meanwhile, the other side of the fixing ring 11 is tightly attached to one side of the rubber ring 14, and the sealing performance of the joint is enhanced under the influence of the material of the rubber ring 14, the difference between the second embodiment and the first embodiment is that: the sealing performance is improved by adding the rubber ring.
Example three:
referring to fig. 5, the bottom of the ventilation duct 251 is provided with a clamping groove, the inside of the clamping groove is movably sleeved with the fixed filter layer 252, the bottom of the fixed filter layer 252 is located at the bottom of the ventilation duct 251 and is fixedly connected with the bottom fixing plate 12, the bottom of the bottom fixing plate 12 is provided with two holes, the inside of the two holes is movably sleeved with the screws 13, the side wall of each screw 13 is located above the bottom fixing plate 12 and is movably sleeved with the ventilation duct 251, the air in the heating ventilation duct is filtered and purified by penetrating through the fixed filter layer 252, when the fixed filter layer 252 needs to be replaced, the screws 13 are twisted to disconnect the connection between the bottom fixing plate 12 and the ventilation duct 251, the bottom fixing plate 12 is downwards pulled to detach and replace the fixed filter layer 252, and the difference between the third embodiment and the first embodiment is that: the fixed filter layer 252 is easy to remove and replace.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the utility model, only the structures related to the disclosed embodiments are referred to, other structures can refer to common designs, and the same embodiment and different embodiments of the utility model can be combined with each other without conflict;
and finally: the above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that are within the spirit and principle of the present invention are intended to be included in the scope of the present invention.

Claims (7)

1. The utility model provides a warm logical tuber pipe of green building, includes first warm siphunculus (1), its characterized in that still includes:
second warm-up tube (2): a second warm through pipe (2) is arranged on one side of the first warm through pipe (1);
first connecting piece (3): the side wall of the first warm-keeping pipe (1) is provided with a first connecting piece (3);
second connecting piece (4): the side wall of the first connecting sheet (3) is provided with a second connecting sheet (4);
bolt (5): a bolt (5) is arranged on one side of the first connecting piece (3);
transverse steel (7): the bottom of the second warm-up pipe (2) is provided with a transverse steel (7);
a boom (6): and a hanging rod (6) is arranged at the top of the transverse steel (7).
2. The green building heating and ventilation pipe of claim 1, wherein: the side wall of the first warm through pipe (1) is fixedly connected with a first connecting piece (3), the side wall of the first connecting piece (3) is provided with a number one of eight holes, a bolt (5) is movably sleeved in each hole, a second connecting piece (4) is movably sleeved on one side of the side wall of the eight bolts (5) which is positioned on the first connecting piece (3), the inner wall of the second connecting piece (4) is fixedly connected with a second warm through pipe (2), the bottom of the second warm through pipe (2) is fixedly connected with a transverse steel (7), the top surface of the transverse steel (7) is positioned on the positive back of the second warm through pipe (2) and is provided with a number two hole, a hanging rod (6) is movably sleeved in each hole, the inner wall of the first warm through pipe (1) is fixedly connected with a connecting ring (8), the inner wall of the transverse steel (8) is fixedly connected with an inner connecting pipe (9), the lateral wall fixedly connected with anti-cone piece (10) of interconnector pipe (9), the inner wall fixedly connected with solid fixed ring (11) of warm siphunculus of second (2).
3. The green building heating and ventilating duct of claim 2, wherein: the second warm siphunculus (2) including: ventilating duct (201), fixed filtering layer (202), active carbon (203), fixed filtering layer (202) have been cup jointed in the inner wall activity of ventilating duct (201), the inside fixedly connected with active carbon (203) of fixed filtering layer (202), the both sides of fixed filtering layer (202) are equipped with the fixture block, the inner wall both sides of ventilating duct (201) are equipped with the spout, fixed filtering layer (202) both sides fixture block and ventilating duct (201) inner wall spout looks adaptation.
4. The green building heating and ventilating duct of claim 2, wherein: one side of the inner connecting pipe (9) is flush with one side of the anti-cone sheet (10), the fixing ring (11) is movably sleeved on the other side, located on the anti-cone sheet (10), of the side wall of the inner connecting pipe (9), the inner connecting pipe (9) is in interference fit with the fixing ring (11), and the side length of one side of the anti-cone sheet (10) is smaller than that of the other side of the anti-cone sheet (10).
5. The green building heating and ventilation pipe according to claim 4, characterized in that: the opposite side of anti-cone piece (10) closely laminates with the opposite side of solid fixed ring (11), the opposite side lateral wall edge of anti-cone piece (10) closely laminates with the inner wall of warm siphunculus of second (2).
6. The green building heating and ventilating duct of claim 2, wherein: the warm siphunculus of inner wall fixedly connected with go-between (8) of first warm siphunculus (1), the inner wall fixedly connected with of go-between (8) is interior to be managed (9), the lateral wall fixedly connected with anti-cone piece (10) of interior even pipe (9), the opposite side activity that the lateral wall of interior even pipe (9) is located anti-cone piece (10) has cup jointed solid fixed ring (11), one side fixedly connected with rubber circle (14) of solid fixed ring (11), the warm siphunculus of lateral wall fixedly connected with second (2) of solid fixed ring (11).
7. The green building heating and ventilation pipe according to claim 3, characterized in that: the bottom of air pipe (201) is equipped with the draw-in groove, and fixed filtering layer (202) have been cup jointed in the inside activity of its draw-in groove, the bottom that fixed filtering layer (202) is located air pipe (201) is fixed to be connected with bottom solid board (12), the bottom of bottom solid board (12) is seted up a number two for the number two hole, and screw (13) have been cup jointed in the inside equal activity of No. two holes, air pipe (201) have been cup jointed in the top activity that the lateral wall of screw (13) is located bottom solid board (12).
CN202122873509.5U 2021-11-23 2021-11-23 Warm ventilation pipe of green building Active CN216557592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122873509.5U CN216557592U (en) 2021-11-23 2021-11-23 Warm ventilation pipe of green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122873509.5U CN216557592U (en) 2021-11-23 2021-11-23 Warm ventilation pipe of green building

Publications (1)

Publication Number Publication Date
CN216557592U true CN216557592U (en) 2022-05-17

Family

ID=81576732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122873509.5U Active CN216557592U (en) 2021-11-23 2021-11-23 Warm ventilation pipe of green building

Country Status (1)

Country Link
CN (1) CN216557592U (en)

Similar Documents

Publication Publication Date Title
CN216557592U (en) Warm ventilation pipe of green building
CN211084368U (en) Air conditioning system with graded air supply
CN214700992U (en) Novel high-efficient supply-air outlet
CN209891334U (en) Prevent municipal drainage pipe of stifled type
CN212773653U (en) Container type movable plate house roof structure
CN210263504U (en) Industrial building prefabricated part with heat insulation effect
CN204574327U (en) A kind of environment-friendly air conditioner group
CN210424033U (en) Bidirectional ventilating duct
CN207893266U (en) Suspension type integrates suspension and support
CN209816909U (en) Composite cable utility tunnel unit and composite cable utility tunnel
CN201157731Y (en) Self-cleaning air filter with gas sources on multi-sides
CN213313917U (en) Green building vent filter equipment
CN220647133U (en) Double-sided color steel plate composite air pipe for ventilation
CN216244721U (en) Automatic dust adsorption type power ventilating duct device
CN111321791A (en) Reinforced split type drainage channel
CN218408941U (en) Double-sided color steel glass fiber composite air pipe
CN219386743U (en) Wallboard and ground connection structure of industrial purification factory building
CN110986344B (en) Air draft structure for fresh air system
CN213178627U (en) Ventilation system of centralized central air conditioner
CN211575437U (en) Sectional type filtering ventilating duct
CN219242871U (en) Layer-inserted composite air pipe convenient to disassemble and assemble
CN216341262U (en) Intelligent workshop is used in monocrystalline silicon production based on high in clouds
CN219452214U (en) Combined exhaust manifold
CN212868847U (en) Special-shaped spliced air pipe and mounting structure thereof
CN210833217U (en) Cooling tower balance pipe device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant