CN216555950U - Support hanger capable of realizing multi-pipeline installation - Google Patents

Support hanger capable of realizing multi-pipeline installation Download PDF

Info

Publication number
CN216555950U
CN216555950U CN202123052967.9U CN202123052967U CN216555950U CN 216555950 U CN216555950 U CN 216555950U CN 202123052967 U CN202123052967 U CN 202123052967U CN 216555950 U CN216555950 U CN 216555950U
Authority
CN
China
Prior art keywords
placing
wall
groups
threaded
placing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123052967.9U
Other languages
Chinese (zh)
Inventor
周波
查振梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Juzhuo Construction Technology Co ltd
Original Assignee
Chongqing Juzhuo Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Juzhuo Construction Technology Co ltd filed Critical Chongqing Juzhuo Construction Technology Co ltd
Priority to CN202123052967.9U priority Critical patent/CN216555950U/en
Application granted granted Critical
Publication of CN216555950U publication Critical patent/CN216555950U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a supporting and hanging bracket capable of realizing multi-pipeline installation, and relates to the technical field of supporting and hanging brackets. This can realize a gallows of multi-pipe installation, including placing board, ascending mechanism and adjustment mechanism, place and seted up the opening on the inside of board, the top fixed mounting who places the board has two sets of bracing pieces, and the equal fixed mounting in top of two sets of bracing pieces has fixed iron plate, and ascending mechanism locates on the outer wall of placing the board, and adjustment mechanism locates on the inner wall of placing the board. This can realize a gallows of multi-channel installation, through first threaded rod, first thread bush, first knob, the cooperation of first guide bar and first slider is used, the messenger places the board and can come the adjustment suitable height according to the building height and place the pipeline, can not influence the pedestrian walking, and the weight of pipeline can also be dispersed to the dispersion frame, can alleviate the bearing burden of placing the board, make the device's life longer, the device's application range has been extended, be favorable to promoting and using.

Description

Support hanger capable of realizing multi-pipeline installation
Technical Field
The utility model relates to the technical field of supports and hangers, in particular to a support and hanger capable of realizing multi-pipeline installation.
Background
Traditional gallows can not carry out height-adjusting to it when the installation pipeline, leads to a gallows too high or short at the in-process of installation, influences the pedestrian and walks to when the installation pipeline, traditional support of hanging can not adjust according to the size of pipeline, lead to the pipeline to place and hang the support and go up the air gap too big, cause the hidden danger, practicality and use experience are relatively poor, are unfavorable for promoting and using.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to solve at least one of the problems of the prior art, and an object of the present invention is to provide a support/hanger capable of realizing multi-pipe installation, which can solve the problems of the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: a can realize the supporting and hanging frame that the multi-pipe installs, including placing the board, raising the organization and regulating mechanism;
an opening is formed in the placing plate, two groups of supporting rods are fixedly mounted at the top of the placing plate, and fixed iron plates are fixedly mounted at the tops of the two groups of supporting rods;
the lifting mechanism is arranged on the outer wall of the placing plate and comprises a first threaded rod, a first threaded sleeve, a first knob, a first guide rod and a first sliding block, the first threaded rod is arranged on the outer wall of the placing plate, the first knob is fixedly arranged at one end of the first threaded rod, the first threaded sleeve is arranged on the outer wall of the first threaded rod in a threaded mode, the first threaded sleeve is fixedly arranged on the outer wall of the placing plate, two groups of first guide rods are arranged on the outer wall of the placing plate, the first sliding block is slidably arranged on the outer wall of the first guide rod, and the first sliding block is fixedly arranged on the outer wall of the placing plate;
the adjusting mechanism is arranged on the inner wall of the placing plate.
Preferably, the adjusting mechanism comprises a second threaded rod, a second threaded sleeve and a second knob, the second guide bar, the second slider with place the circle, place board open-ended centre department fixed mounting has the mounting panel, it all rotates between the both sides inner wall of placing the board and the outer wall of mounting panel and install two sets of second threaded rods to place, the one end of second threaded rod extends to the outside of placing the board respectively and fixed mounting has the second knob, equal threaded mounting has two sets of second threaded sleeve on the outer wall of two sets of second threaded rods, fixed mounting has two sets of second guide bars between the both sides inner wall of placing the board and the outer wall of mounting panel, slidable mounting has two sets of second sliders on the outer wall of second guide bar, fixed mounting has two sets of circles of placing on the sheathed tube outer wall of second thread, two sets of one end and the second slider fixed connection of placing the circle, can adjust the size of placing the circle according to the size of pipeline.
Preferably, first threaded rod locates in the middle of two sets of first guide bars, places fixed mounting on the outer wall of board and has the dispersion frame, and three groups of openings have been seted up to the bottom of dispersion frame, and three groups of openings are located two sets of first guide bars and first threaded rod under, and the opening size is greater than the one end of first guide bar and first threaded rod, can rise or descend along with placing the board, do not receive the limitation.
Preferably, the outer wall of the placing ring is fixedly provided with a rubber pad, one group of the outer wall of the placing ring is fixedly provided with a lock catch, the other group of the outer wall of the placing ring is fixedly provided with a lock hole, the lock catches are symmetrical to the lock holes and are positioned on the same horizontal line, and the two groups of the placing rings are fixedly connected when the size of the pipeline is adjusted to be proper.
Preferably, the outer wall of first guide bar and first threaded rod is gone up fixed mounting and is had the connecting rod, and the both ends of connecting rod and the outer wall fixed connection of two sets of first guide bars can play firm effect to first threaded rod and first guide bar.
Preferably, the top fixed mounting who places the board has the sponge, and fixed mounting has the board that takes precautions against earthquakes between two sets of bracing pieces, and the top fixed mounting who takes precautions against earthquakes the board has the sponge, can play absorbing effect to pipeline and a gallows.
Compared with the prior art, the utility model has the beneficial effects that:
(1) this can realize a gallows of multi-channel erection, through first threaded rod, first thread bush, first knob, the cooperation of first guide bar and first slider is used, the messenger places the board and can adjust suitable height according to the building height and place the pipeline, can not influence pedestrian's walking, and the weight of pipeline can also be dispersed to the dispersion frame, can alleviate the bearing burden of placing the board, make the device's life longer, the device's application range has been extended, be favorable to promoting and using.
(2) This can realize a gallows of multi-channel erection, through the second threaded rod, second thread bush, the second knob, the cooperation of second guide bar and second slider is used, it can come the adjustment interval according to the size of pipeline to place the circle, then utilize hasp and lockhole to place two sets of circles and fix and place the pipeline, there can not be great space after making the pipeline place, reduce hidden danger, and shockproof board can also have shockproof effect to the pipeline, the sponge of placing the roof portion has also played shockproof additional action, make gallows and pipeline can not receive external influence, the device's practicality has been improved.
Drawings
The utility model is further illustrated with reference to the following figures and examples:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a rear view of a first threaded rod of the present invention;
FIG. 3 is an enlarged view of part A of the present invention.
Reference numerals: the supporting device comprises a placing plate 1, a supporting rod 2, a lifting mechanism 3, a first threaded rod 301, a first threaded sleeve 302, a first knob 303, a first guide rod 304, a first sliding block 305, a connecting rod 4, an adjusting mechanism 5, a second threaded rod 501, a second threaded sleeve 502, a second knob 503, a second guide rod 504, a second sliding block 505, a placing ring 506, a dispersing frame 6, a shockproof plate 7, a fixed iron plate 8, a lock catch 9 and a lock hole 10.
Detailed Description
Reference will now be made in detail to the present preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to like elements throughout.
In the description of the present invention, it should be understood that the orientation or positional relationship referred to in the description of the orientation, such as the upper, lower, front, rear, left, right, etc., is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, greater than, less than, exceeding, etc. are understood as excluding the present numbers, and the above, below, inside, etc. are understood as including the present numbers. If the first and second are described for the purpose of distinguishing technical features, they are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of the technical features indicated.
In the description of the present invention, unless otherwise explicitly limited, terms such as arrangement, installation, connection and the like should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above terms in the present invention in combination with the specific contents of the technical solutions.
Referring to fig. 1-3, the present invention provides a technical solution: a supporting and hanging frame capable of realizing multi-pipeline installation comprises a placing plate 1, a lifting mechanism 3 and an adjusting mechanism 5, wherein an opening is formed in the placing plate 1, two groups of supporting rods 2 are fixedly installed on the top of the placing plate 1, fixed iron plates 8 are fixedly installed on the tops of the two groups of supporting rods 2, the lifting mechanism 3 is arranged on the outer wall of the placing plate 1, the lifting mechanism 3 comprises a first threaded rod 301, a first threaded sleeve 302, a first knob 303, a first guide rod 304 and a first sliding block 305, the outer wall of the placing plate 1 is provided with the first threaded rod 301, one end of the first threaded rod 301 is fixedly provided with the first knob 303, the outer wall of the first threaded rod 301 is provided with the first threaded sleeve 302 in a threaded manner, the first threaded sleeve 302 is fixedly installed with the outer wall of the placing plate 1, the outer wall of the placing plate 1 is provided with two groups of first guide rods 304, the outer wall of the first guide rod 304 is provided with the first sliding block 305 in a sliding manner, the first slider 305 is fixedly mounted to the outer wall of the placement plate 1, and the adjustment mechanism 5 is provided on the inner wall of the placement plate 1.
Further, the adjusting mechanism 5 comprises a second threaded rod 501, a second threaded sleeve 502, a second knob 503, a second guide rod 504, a second slider 505 and a placing ring 506, wherein the mounting plate is fixedly mounted in the middle of the opening of the placing plate 1, two groups of second threaded rods 501 are rotatably mounted between the inner walls at two sides of the placing plate 1 and the outer wall of the mounting plate, one end of each second threaded rod 501 extends to the outside of the placing plate 1 and is fixedly provided with the second knob 503, two groups of second threaded sleeves 502 are threadedly mounted on the outer walls of the two groups of second threaded rods 501, two groups of second guide rods 504 are fixedly mounted between the inner walls at two sides of the placing plate 1 and the outer wall of the mounting plate, two groups of second sliders 505 are slidably mounted on the outer wall of each second guide rod 504, two groups of placing rings 506 are fixedly mounted on the outer wall of each second threaded sleeve 502, and one ends of the two groups of placing rings 506 are fixedly connected with the second sliders 505, the sizes of the two groups of placing rings 506 are adjusted according to the size of the pipeline, so that the gap between the pipeline and the placing rings 506 is reduced, and potential safety hazards are reduced.
Still further, first threaded rod 301 is located two sets of first guide bars 304 in the middle of, places fixed mounting on the outer wall of board 1 has dispersion frame 6, three sets of openings have been seted up to dispersion frame 6's bottom, three sets of openings are located two sets of first guide bars 304 and first threaded rod 301 under, and the opening size is greater than the one end of first guide bar 304 and first threaded rod 301, the pipeline is at the most half bearing of weight on placing board 1, dispersion frame 6 can carry out dispersion weight to the pipeline, alleviate the gravity of placing board 1.
Furthermore, the outer walls of the placing rings 506 are fixedly provided with rubber pads, the outer walls of one of the placing rings 506 are fixedly provided with the lock catches 9, the outer walls of the other of the placing rings 506 are fixedly provided with the lock holes 10, the lock catches 9 are symmetrical to the lock holes 10 and are located on the same horizontal line, and when the two placing rings are adjusted to the proper size of the pipeline, the lock catches 9 and the lock holes 10 are fixed, so that the pipeline can be placed.
Secondly, connecting rod 4 is fixedly installed on the outer walls of first guide rod 304 and first threaded rod 301, and the two ends of connecting rod 4 are fixedly connected with the outer walls of two sets of first guide rods 304, in order to stabilize first guide rod 304 and first threaded rod 301.
Finally, place the top fixed mounting of board 1 and have the sponge, fixed mounting has shockproof board 7 between two sets of bracing pieces 2, and the top fixed mounting of board 7 that takes precautions against earthquakes has the sponge, can carry out the shock attenuation to a gallows in high floor, prevents to receive external influence and makes a gallows shakiness.
The working principle is as follows: fix fixed iron plate 8 in the assigned position, twist and move first knob 303, make first threaded rod 301 drive first screw sleeve 302 drive and place board 1 longitudinal movement to suitable height, dispersion frame 6 rises or descends along with placing board 1, according to the size of pipeline, twist and move second knob 503, second knob 503 drives two sets of second screw sleeve 502 lateral motion to the position that is fit for the pipeline size, then carry out the chucking with hasp 9 and lockhole 10 and fix, it is fixed to place circle 506 with two sets of, then it can to put into the pipeline.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the gist of the present invention.

Claims (6)

1. The utility model provides a can realize a gallows of multi-pipe installation, is including placing board (1), rising mechanism (3) and adjustment mechanism (5), its characterized in that:
an opening is formed in the placing plate (1), two groups of supporting rods (2) are fixedly mounted at the top of the placing plate (1), and fixed iron plates (8) are fixedly mounted at the tops of the two groups of supporting rods (2);
the lifting mechanism (3) is arranged on the outer wall of the placing plate (1), the lifting mechanism (3) comprises a first threaded rod (301), a first threaded sleeve (302), a first knob (303), a first guide rod (304) and a first sliding block (305), the first threaded rod (301) is arranged on the outer wall of the placing plate (1), the first knob (303) is fixedly installed at one end of the first threaded rod (301), the first threaded sleeve (302) is installed on the outer wall of the first threaded rod (301) in a threaded mode, the first threaded sleeve (302) is fixedly installed with the outer wall of the placing plate (1), two groups of first guide rods (304) are arranged on the outer wall of the placing plate (1), the first sliding block (305) is installed on the outer wall of the first guide rod (304) in a sliding mode, and the first sliding block (305) is fixedly installed with the outer wall of the placing plate (1);
the adjusting mechanism (5) is arranged on the inner wall of the placing plate (1).
2. The support and hanger capable of realizing multi-pipeline installation according to claim 1, wherein: the adjusting mechanism (5) comprises a second threaded rod (501), a second threaded sleeve (502), a second knob (503), a second guide rod (504), a second sliding block (505) and a placing ring (506), a mounting plate is fixedly mounted in the middle of an opening of the placing plate (1), two groups of second threaded rods (501) are rotatably mounted between inner walls on two sides of the placing plate (1) and outer walls of the mounting plate, one end of each second threaded rod (501) extends to the outer part of the placing plate (1) and is fixedly provided with the second knob (503), two groups of second threaded sleeves (502) are threadedly mounted on outer walls of the two groups of second threaded rods (501), two groups of second guide rods (504) are fixedly mounted between inner walls on two sides of the placing plate (1) and outer walls of the mounting plate, two groups of second sliding blocks (505) are slidably mounted on outer walls of the second guide rods (504), and two groups of placing rings (506) are fixedly mounted on outer walls of the second threaded sleeves (502), one end of each of the two groups of placing rings (506) is fixedly connected with the second sliding block (505).
3. The support and hanger capable of realizing multi-pipeline installation according to claim 2, wherein: first threaded rod (301) are located the positive centre of two sets of first guide bar (304), place fixed mounting on the outer wall of board (1) have dispersion frame (6), and three groups of openings have been seted up to the bottom of dispersion frame (6), and three groups of openings are located two sets of first guide bar (304) and first threaded rod (301) under, and the opening size is greater than the one end of first guide bar (304) and first threaded rod (301).
4. The support and hanger capable of realizing multi-pipeline installation according to claim 3, wherein: the outer wall of the placing ring (506) is fixedly provided with a rubber pad, one group of outer wall of the placing ring (506) is fixedly provided with a lock catch (9), the other group of outer wall of the placing ring (506) is fixedly provided with a lock hole (10), and the lock catch (9) is symmetrical to the lock hole (10) and is positioned on the same horizontal line.
5. The support and hanger capable of realizing multi-pipeline installation according to claim 4, wherein: the outer walls of the first guide rods (304) and the first threaded rods (301) are fixedly provided with connecting rods (4), and two ends of each connecting rod (4) are fixedly connected with the outer walls of the two groups of first guide rods (304).
6. The support and hanger capable of realizing multi-pipeline installation according to claim 5, wherein: the top of the placing plate (1) is fixedly provided with sponge, a shockproof plate (7) is fixedly arranged between the two groups of supporting rods (2), and the top of the shockproof plate (7) is fixedly provided with sponge.
CN202123052967.9U 2021-12-07 2021-12-07 Support hanger capable of realizing multi-pipeline installation Active CN216555950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123052967.9U CN216555950U (en) 2021-12-07 2021-12-07 Support hanger capable of realizing multi-pipeline installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123052967.9U CN216555950U (en) 2021-12-07 2021-12-07 Support hanger capable of realizing multi-pipeline installation

Publications (1)

Publication Number Publication Date
CN216555950U true CN216555950U (en) 2022-05-17

Family

ID=81539260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123052967.9U Active CN216555950U (en) 2021-12-07 2021-12-07 Support hanger capable of realizing multi-pipeline installation

Country Status (1)

Country Link
CN (1) CN216555950U (en)

Similar Documents

Publication Publication Date Title
CN208329288U (en) A kind of building curtain wall support construction
CN204849416U (en) Electric lift clothes airer
CN202081309U (en) Multipurpose landing hanger
CN216555950U (en) Support hanger capable of realizing multi-pipeline installation
CN209790704U (en) safe and stable horizontal bar and parallel bar body-building support with adjustable parallel bar distance
CN107387997A (en) A kind of adjustable TV machine wall hanging frame
CN207777976U (en) A kind of height-adjustable suspension arrangement for smart home formula television set
CN207213591U (en) A kind of suspension-type computer bracket
CN208895573U (en) A kind of large-size numerical control machine support device
CN208442500U (en) A kind of hospital's crusing robot cradle head device
CN208008277U (en) A kind of telescopic device of the flexible car floor of home lift
CN207861782U (en) A kind of boom hoisting for body of a motor car detection
CN207499473U (en) A kind of movable building engineering construction builder's jack device
CN207661358U (en) A kind of LED display supporting rack
CN207401088U (en) A kind of wall-mounted adjustable and balancing bar of dancing
CN201635228U (en) Novel flash rack ceiling system
CN219198379U (en) Spring support and hanger
CN220134826U (en) Water pipe suspension shock-absorbing frame
CN217243711U (en) Fixing device for building interior decoration
CN207285832U (en) Easy to the Window curtain structure of arrangement
CN220228665U (en) LCD hanger
CN209876273U (en) Spring support and hanger convenient to fix
CN213950509U (en) Anti-tilting device suitable for boiler maintenance platform
CN214384342U (en) Suspensible structure of 8K display screen
CN103784278B (en) A kind of movably connected nursing in neurology bed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant