CN216552990U - Steel rope fastening structure for aerial work hanging basket - Google Patents

Steel rope fastening structure for aerial work hanging basket Download PDF

Info

Publication number
CN216552990U
CN216552990U CN202123241481.XU CN202123241481U CN216552990U CN 216552990 U CN216552990 U CN 216552990U CN 202123241481 U CN202123241481 U CN 202123241481U CN 216552990 U CN216552990 U CN 216552990U
Authority
CN
China
Prior art keywords
connecting block
fastening structure
screw rod
steel rope
limiting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123241481.XU
Other languages
Chinese (zh)
Inventor
左鑫艺
景慧超
刘佳
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202123241481.XU priority Critical patent/CN216552990U/en
Application granted granted Critical
Publication of CN216552990U publication Critical patent/CN216552990U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a steel rope fastening structure for a hanging basket for high-altitude operation, which comprises a connecting block arranged on a steel rope body, wherein a through hole is formed in the connecting block, a thread sleeve is arranged on the connecting block, a second screw rod is arranged in the thread sleeve, a ball bearing is arranged on the second screw rod, a limiting frame is arranged on the ball bearing, the steel rope body is fixedly connected with an external thread sleeve, a thread groove is formed in the bottom of the limiting plate, an alarm is arranged on the limiting plate, an installing plate is arranged on the limiting plate, a press switch is arranged on the installing plate, a supporting column is arranged on the installing plate, the steel rope body can be effectively fastened into a U shape through the second screw rod, the thread sleeve, the connecting block, the ball bearing and the limiting frame, so that the hanging basket is conveniently hung, the use of the hanging basket is convenient, and an alarm can be effectively sent out when the steel rope body is slightly loosened by means of the alarm, the press switch and the supporting column, therefore, timely maintenance is carried out, and the phenomenon that the hanging basket directly drops from the high altitude is avoided.

Description

Steel rope fastening structure for aerial work hanging basket
Technical Field
The utility model relates to the field of hanging baskets, in particular to a steel rope fastening structure for an aerial work hanging basket.
Background
The hanging basket is a construction tool for high-altitude operation in construction engineering, and is used for mounting a curtain wall and cleaning an outer wall. The suspension mechanism is erected on a building or a structure, the suspension platform is driven by the lifting mechanism, and the construction facility which runs up and down along the vertical surface of the building or the structure through the steel wire rope is also an operation platform for operators.
When the hanging basket is used, the steel rope is required to be pulled, so that the hanging basket can ascend and descend under the action of the hanging basket support, but the steel rope pulls the hanging basket and the fastening structure is required to be utilized, so that the steel rope cannot be loosened, but the conventional fastening structure only has the fastening function, does not have the function of early warning, and is not convenient to mount and dismount, and therefore the steel rope fastening structure for the hanging basket for high-altitude operation is designed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a steel rope fastening structure for an aerial work hanging basket, which aims to solve the technical problem.
In order to solve the technical problems, the utility model adopts the following technical scheme:
a steel rope fastening structure for an aerial work hanging basket comprises a connecting block fixedly arranged on a steel rope body, a through hole is arranged on the connecting block in a penetrating way, a plurality of thread sleeves are fixedly arranged on the right side of the connecting block in a penetrating way, a second screw rod is connected with the inner threads of the thread sleeves, one end of the second screw rod, which is positioned at the through hole, is sleeved with a ball bearing, a limiting frame is fixedly arranged on the ball bearing, the other end of the steel rope body passes through the through hole and extends to the upper part of the connecting block to be fixedly connected with the external thread sleeve, a limiting plate is arranged above the external thread sleeve, the middle of the bottom of the limiting plate is provided with a thread groove which is in threaded connection with the external thread pipe, the alarm is fixedly arranged at the top of the limiting plate, the mounting plate is fixedly arranged on the left side of the limiting plate, the press switch is fixedly arranged at the bottom of the mounting plate, and the support column is arranged below the mounting plate and connected with the connecting block.
Preferably, the limiting frame is connected with the through hole in a sliding mode.
Preferably, a friction pad is fixedly arranged on the left side of the inner cavity of the through hole.
Preferably, the press switch is electrically connected with an alarm, and the alarm is an electric storage type alarm.
Preferably, the right side of the second screw is fixedly provided with an internal thread pipe, and the internal thread pipes are connected through the first screw.
Preferably, the external screw thread pipe left and right sides all is provided with the recess, the recess is inside to have set firmly the rotating turret, the inside rotation of rotating turret is connected with the third screw rod, the limiting plate bottom left and right sides all is provided with the spout, the inside sliding connection of spout has the removal frame, it is connected with the third screw rod through the nut to remove the frame.
Preferably, the two sliding grooves are respectively positioned at the left side and the right side of the thread groove.
The utility model has the beneficial effects that:
1. according to the utility model, the steel rope body can be effectively fastened into a U shape through the second screw rod, the threaded sleeve, the connecting block, the ball bearing and the limiting frame, so that a hanging basket can be conveniently hung and used, and an alarm can be effectively sent out when the steel rope body is slightly loosened by virtue of the alarm, the press switch and the supporting column, so that the hanging basket can be timely maintained, and the phenomenon that the hanging basket directly falls from high altitude is avoided.
2. Through removing frame, third screw rod, limiting plate, bolt, spacing steel cable body that can step forward prevents that the steel cable body from the through-hole landing, causes the hanging flower basket to drop.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the connection of the male screw pipe with the third screw according to the present invention;
reference numerals: 1. a steel rope body; 2. connecting blocks; 3. a friction pad; 4. a threaded sleeve; 5. a first screw; 6. an internally threaded tube; 7. a through hole; 8. a ball bearing; 9. a limiting frame; 10. a second screw; 11. an alarm; 12. a thread groove; 13. a third screw; 14. an externally threaded tube; 15. a groove; 16. a movable frame; 17. a nut; 18. a chute; 19. a support pillar; 20. a push switch; 21. mounting a plate; 22. a limiting plate; 23. and (6) a rotating frame.
Detailed Description
In order to make the technical means, the original characteristics, the achieved purposes and the effects of the utility model easily understood, the utility model is further described below with reference to the specific embodiments and the attached drawings, but the following embodiments are only the preferred embodiments of the utility model, and not all embodiments. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative efforts belong to the protection scope of the present invention.
Specific embodiments of the present invention are described below with reference to the accompanying drawings.
As shown in fig. 1-3, a steel cable fastening structure for an aerial work hanging basket comprises a connecting block 2 fixedly arranged on a steel cable body 1, a through hole 7 is arranged on the connecting block 2 in a penetrating manner, a plurality of thread sleeves 4 are fixedly arranged on the right side of the connecting block 2 in a penetrating manner, a second screw 10 is connected with the inner threads of the thread sleeves 4 in a threaded manner, a ball bearing 8 is sleeved at one end of the second screw 10 positioned in the through hole 7, a limiting frame 9 is fixedly arranged on the ball bearing 8, the other end of the steel cable body 1 penetrates through the through hole 7 and extends to the upper part of the connecting block 2 to be fixedly connected with an external thread sleeve 4, a limiting plate 22 is arranged above the external thread sleeve 4, a thread groove 12 is arranged in the middle of the bottom of the limiting plate 22, the thread groove 12 is in threaded connection with an external thread pipe 14, an alarm 11 is fixedly arranged at the top of the limiting plate 22, a mounting plate 21 is fixedly arranged on the left side of the limiting plate 22, a press switch 20 is fixedly arranged at the bottom of the mounting plate 21, and a supporting column 19 is arranged below the mounting plate 21, the supporting column 19 is connected with the connecting block 2, the limiting frame 9 is in sliding connection with the through hole 7, the friction pad 3 is fixedly arranged on the left side of the inner cavity of the through hole 7, the press switch 20 is electrically connected with the alarm 11, and the alarm 11 is an electric storage type alarm 11;
when the steel rope fixing device is used specifically, the other end of the steel rope body 1 penetrates through the connecting end of the hanging basket, then penetrates through the through hole 7 and extends to the upper side of the connecting block 2, then the second screw rod 10 is rotated, the second screw rod 10 drives the limiting frame 9 to move, so that the limiting frame 9 extrudes the steel rope body 1, the steel rope body 1 is limited by means of the limiting frame 9 and the friction pad 3, the internal thread pipe 6 is fixedly arranged on the right side of the second screw rod 10, the internal thread pipes 6 are connected through the first screw rod 5, then the first screw rod 5 is utilized to connect the internal thread pipes 6 on the second screw rods 10, and therefore the steel rope fixing device is guaranteed not to be loosened when in use;
the left side and the right side of the external threaded pipe 14 are both provided with grooves 15, a rotating frame 23 is fixedly arranged in each groove 15, a third screw 13 is rotatably connected in each rotating frame 23, sliding grooves 18 are respectively arranged on the left side and the right side of the bottom of the limiting plate 22, a moving frame 16 is slidably connected in each sliding groove 18, each moving frame 16 is connected with the corresponding third screw 13 through a nut 17, the two sliding grooves 18 are respectively positioned on the left side and the right side of each thread groove 12, one end of a steel rope body 1 pair which penetrates through the through hole 7 and extends to the upper side of the connecting block 2 is connected with the corresponding thread groove 12 in the limiting plate 22, then, the third screw 13 in each groove 15 in the external threaded pipe 14 is rotated to enable the third screw 13 to be perpendicular to the external threaded pipe 14, then, the moving frame 16 is moved to enable the moving frame 16 to penetrate through the corresponding third screw 13, and finally, the screw 17 is connected with the corresponding third screw 13 to limit the moving frame 16, so that the limiting plate 22, the limiting plate 22 and the third screw 13 can be limited even if the steel rope body 1 is loosened, The third screw 13 and the movable frame 16 also limit the steel rope body 1, so that the steel rope body cannot pass through the through hole 7, and the hanging basket cannot fall off;
when using, when appearing steel cable body 1 pine and taking off, steel cable body 1 can drive limiting plate 22 and move down, and limiting plate 22 moves down and can drive push switch 20 through mounting panel 21 and move down to make push switch 20 receive to press and start alarm 11, thereby can inform the staff the very first time, the out of service carries out the maintenance.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and the preferred embodiments of the present invention are described in the above embodiments and the description, and are not intended to limit the present invention. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a cable fastening structure for high altitude construction hanging flower basket, includes connecting block (2) that set firmly on cable body (1), its characterized in that: the steel rope connecting structure is characterized in that a through hole (7) is arranged on the connecting block (2) in a penetrating mode, a plurality of thread sleeves (4) are fixedly arranged on the right side of the connecting block (2) in a penetrating mode, a second screw rod (10) is connected to the inner threads of the thread sleeves (4), one end, located in the through hole (7), of the second screw rod (10) is provided with a ball bearing (8), a limiting frame (9) is fixedly arranged on the ball bearing (8), the other end of the steel rope body (1) penetrates through the through hole (7) and extends to the upper portion of the connecting block (2) to be fixedly connected with an external thread sleeve (4), a limiting plate (22) is arranged above the external thread sleeve (4), a thread groove (12) is formed in the middle of the bottom of the limiting plate (22), the thread groove (12) is in threaded connection with an external thread pipe (14), an alarm (11) is fixedly arranged at the top of the limiting plate (22), a mounting plate (21) is fixedly arranged on the left side of the limiting plate (22), the bottom of the mounting plate (21) is fixedly provided with a press switch (20), a support column (19) is arranged below the mounting plate (21), and the support column (19) is connected with the connecting block (2).
2. A wire rope fastening structure for an aerial work basket according to claim 1, wherein: the limiting frame (9) is connected with the through hole (7) in a sliding mode.
3. A wire rope fastening structure for an aerial work basket according to claim 1, wherein: and a friction pad (3) is fixedly arranged on the left side of the inner cavity of the through hole (7).
4. A wire rope fastening structure for an aerial work basket according to claim 1, wherein: press switch (20) and alarm (11) electric connection, alarm (11) are electric power storage formula alarm.
5. A wire rope fastening structure for an aerial work basket according to claim 1, wherein: the right side of the second screw rod (10) is fixedly provided with an internal threaded pipe (6), and the internal threaded pipe (6) is connected through a first screw rod (5).
6. A wire rope fastening structure for an aerial work basket according to claim 1, wherein: outer threaded pipe (14) the left and right sides all is provided with recess (15), recess (15) inside has set firmly rotating turret (23), rotating turret (23) inside rotation is connected with third screw rod (13), limiting plate (22) bottom left and right sides all is provided with spout (18), spout (18) inside sliding connection has removal frame (16), removal frame (16) are connected with third screw rod (13) through nut (17).
7. A wire rope fastening structure for an aerial work basket according to claim 6, wherein: the two sliding grooves (18) are respectively positioned at the left side and the right side of the thread groove (12).
CN202123241481.XU 2021-12-22 2021-12-22 Steel rope fastening structure for aerial work hanging basket Active CN216552990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123241481.XU CN216552990U (en) 2021-12-22 2021-12-22 Steel rope fastening structure for aerial work hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123241481.XU CN216552990U (en) 2021-12-22 2021-12-22 Steel rope fastening structure for aerial work hanging basket

Publications (1)

Publication Number Publication Date
CN216552990U true CN216552990U (en) 2022-05-17

Family

ID=81545347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123241481.XU Active CN216552990U (en) 2021-12-22 2021-12-22 Steel rope fastening structure for aerial work hanging basket

Country Status (1)

Country Link
CN (1) CN216552990U (en)

Similar Documents

Publication Publication Date Title
CN216552990U (en) Steel rope fastening structure for aerial work hanging basket
CN110905179A (en) Construction equipment supporting platform for building construction
CN111584192B (en) Transformer
CN212176505U (en) Novel adjustable safety fixing type hanging basket for construction
CN111941672A (en) Preparation device and preparation method for semiconductor graphite wafer
CN214330113U (en) Inspection and maintenance platform for adjusting ring polishing equipment
CN211452922U (en) Be used for geological environment monitoring devices
CN214506405U (en) Power line support with hang tag function
CN213478278U (en) Oil-water well maintenance fishing operation device
CN213831409U (en) Contact net stand convenient to adjust
CN111747337A (en) Hoisting tool with support frame for power distribution network overhead line
CN219136295U (en) Lifting device for electromechanical installation of building
CN212193127U (en) Tool rack for mounting electromechanical equipment
CN213676440U (en) Contact net support convenient to installation
CN218647521U (en) Traffic signal indicating device convenient to detach
CN213148855U (en) Outdoor empty gas detection surveys device convenient to installation
CN216381294U (en) Oil field underground hydraulic fishing device suitable for multi-size falling objects
CN220612391U (en) Fast-assembling formula electric drill crane
CN219341428U (en) Extractor for screen of dehydrator
CN219170837U (en) Electromechanical maintenance device
CN214697886U (en) Anchor rod construction device for constructional engineering
CN215331898U (en) Safety device for building engineering
CN209970202U (en) Large-scale numerical control gantry lead screw support
CN216524209U (en) Water level monitoring device for hydraulic engineering surveying and mapping
CN217273155U (en) Road traffic monitoring equipment convenient to maintain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant