CN216534527U - Construction cost analysis device for building economic management - Google Patents

Construction cost analysis device for building economic management Download PDF

Info

Publication number
CN216534527U
CN216534527U CN202123025072.6U CN202123025072U CN216534527U CN 216534527 U CN216534527 U CN 216534527U CN 202123025072 U CN202123025072 U CN 202123025072U CN 216534527 U CN216534527 U CN 216534527U
Authority
CN
China
Prior art keywords
hole
base
construction cost
economic management
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123025072.6U
Other languages
Chinese (zh)
Inventor
盛宝柱
王玉兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123025072.6U priority Critical patent/CN216534527U/en
Application granted granted Critical
Publication of CN216534527U publication Critical patent/CN216534527U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model provides a construction cost analysis device for building economic management, which comprises a base, wherein an analysis plate is arranged on the upper side of the base, two support rods for supporting the analysis plate are arranged at the lower part of one side surface of the analysis plate, the support rods are inserted into a square tube and are fixed in the square tube through clamping bolts, a round hole is formed in the upper end of each support rod, a through hole matched with the round hole is formed in the intersection of the analysis plate and the support rods, an insertion frame is arranged at one side of each through hole, which is far away from the support rods, an insertion block is arranged in the insertion frame, a first threaded hole aligned with the through hole is formed in one side of the insertion block, which faces the through hole, a connecting screw is arranged in the round hole, and the connecting screw penetrates through the round hole and is in threaded connection with the first threaded hole, and compared with the prior art, the construction cost analysis device has the following beneficial effects: realize the combination formula assembly at threaded connection position, the impaired threaded connection position is changed alone in the later stage of being convenient for, need not directly process the screw on the analysis board.

Description

Construction cost analysis device for building economic management
Technical Field
The utility model discloses a construction cost analysis device for building economic management, and belongs to the technical field of building economy.
Background
In outdoor operations, data is generally printed on paper, and the paper with the printed data is then attached to an analysis board for calculation and viewing. At present, the analysis plate is installed on the base through a supporting structure, wherein the supporting structure generally adopts screws to be fixedly connected with the analysis plate, most screw holes matched with the screws are directly machined on the analysis plate, and when the screw holes machined on the analysis plate are damaged due to wrong wires and the like, the whole analysis plate needs to be replaced, so that resources are wasted, and the maintenance and replacement cost is high.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model aims to provide a construction cost analysis device for building economic management, which solves the problems that when a screw hole machined on an analysis plate is damaged due to wrong threads and the like in the background technology, the whole analysis plate needs to be replaced, resources are wasted, and the maintenance and replacement cost is high.
In order to realize the purpose, the utility model is realized by the following technical scheme: a construction cost analysis device for building economic management comprises a base, an analysis plate is arranged on the upper side of the base, two supporting rods for supporting the analysis plate are arranged at the lower part of one side surface of the analysis plate, the supporting rods are inserted in the square tubes and are fixed in the square tubes through clamping bolts, the square pipe is spliced with the base through the plug connector, the upper end of the supporting rod is provided with a round hole, the intersection of the analysis plate and the supporting rod is provided with a through hole matched with the round hole, one side of the through hole, which is far away from the support rod, is provided with an inserting frame, the inserting frame is fixedly connected with the analysis plate, the upper end of the inserting frame is in an opening shape, an inserting block is arranged in the inserting frame, a first threaded hole aligned with the through hole is formed in one surface of the inserting block facing the through hole, the round hole is internally provided with a connecting screw which penetrates through the round hole and the through hole and is in threaded connection with the first threaded hole.
Furthermore, a second threaded hole is formed in the upper portion of one side face of the square pipe, the clamping bolt is connected in the second threaded hole in a threaded mode, and a handle is fixed to the outer surface of one end of the clamping bolt.
Further, the plug connector includes the slider, the slider is fixed at square tub of lower extreme, the slider is T type structure, two T type grooves with slider matched with have been seted up to base upper surface symmetry, slider slidable mounting is in T type inslot, T type groove is arranged along the width direction of base.
Furthermore, two wheels are installed on two parallel side faces of the base.
Furthermore, a counterweight is fixed on the upper surface of the base and arranged in the middle of the upper surface of the base.
Further, the counterweight includes the storage water tank, the storage water tank is fixed at the base upper surface, surface mounting has the filler on the storage water tank, filler upper end threaded connection has the blanking cover, the drain valve is installed to a storage water tank side lower part position.
The utility model has the beneficial effects that:
1. the position of slider in T type inslot is adjusted along T type groove, and then the relative position of square pipe and base changes, and the position of assay board changes simultaneously together, and after the slider was in one side edge in T type inslot, the assay board was in one side of base to be convenient for make the assay board be close to personnel.
2. The length of the support rod in the square tube is adjusted, and the position of the support rod in the square tube is fixed by the clamping bolt, so that the purpose of conveniently adjusting the height of the analysis plate is achieved.
3. Insert the inserted block that will process first screw hole and insert in the space that frame and analysis board formed, then pass the round hole with the connecting screw, the through-hole twists in the first screw hole, accomplish the fixed connection of bracing piece and analysis board, when first screw hole is impaired because of reasons such as wrong silk, take out the inserted block and change can, realize the combination formula assembly at threaded connection position, the impaired threaded connection position is changed alone in the later stage of being convenient for, need not directly process the screw on the analysis board.
Drawings
Other features, objects and advantages of the utility model will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a schematic structural view of a construction cost analyzing apparatus for economic management of buildings according to the present invention;
FIG. 2 is a schematic view showing the assembly of the support rods, the connection screws, the insertion blocks and the analysis plate in the cost analysis apparatus for building economic management according to the present invention;
FIG. 3 is a schematic view showing the assembly of a slider and a square tube in the cost analysis apparatus for construction economic management according to the present invention;
in the figure: 1-base, 2-wheel, 3-drain valve, 4-T type groove, 5-square tube, 6-support bar, 7-analysis plate, 8-connecting screw, 9-clamping bolt, 10-water storage tank, 11-blanking cover, 12-water filling port, 13-round hole, 14-insert block, 15-first threaded hole, 16-insert frame, 17-through hole and 18-slide block.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a cost analytical equipment for building economic management, includes base 1, all installs two wheels 2 on two parallel sides of base 1, installs wheel 2 on base 1, is convenient for remove the position of base 1.
1 upside of base is equipped with analysis board 7, 7 side lower part positions of analysis board are equipped with two bracing pieces 6 that are used for supporting analysis board 7, bracing piece 6 assigns in square pipe 5 and bracing piece 6 fixes in square pipe 5 through clamp bolt 9, the second screw hole has been seted up to 5 side upper portion positions of square pipe, clamp bolt 9 threaded connection is in the second screw hole, clamp bolt 9 one end external fixed surface has the handle, the length of adjustment bracing piece 6 in square pipe 5, and utilize the position of 9 fixed support bar 6 in square pipe 5 of clamp bolt, realize the purpose of convenient adjustment analysis board 7 height.
Square 5 lower extreme fixedly connected with sliders 18 of pipe, slider 18 is T type structure, base 1 upper surface symmetry has seted up two T type grooves 4 with slider 18 matched with, slider 18 slidable mounting is in T type groove 4, T type groove 4 arranges along base 1's width direction, adjust the position of slider 18 in T type groove 4 along T type groove 4, and then square 5 and base 1's relative position changes, the position of assay board 7 changes simultaneously together, after slider 18 is in one side edge in T type groove 4, assay board 7 is in one side of base 1, thereby be convenient for make assay board 7 be close to personnel.
The upper end of the supporting rod 6 is provided with a round hole 13, the intersection of the analysis plate 7 and the supporting rod 6 is provided with a through hole 17 matched with the round hole 13, one side of the through hole 17, which is far away from the supporting rod 6, is provided with an insertion frame 16, the insertion frame 16 is fixedly connected with the analysis plate 7, the upper end of the insertion frame 16 is in an open shape, an insertion block 14 is arranged in the insertion frame 16, one side of the insertion block 14, which faces the through hole 17, is provided with a first threaded hole 15 aligned with the through hole 17, a connecting screw 8 is arranged in the round hole 13, the connecting screw 8 penetrates through the round hole 13 and the through hole 17 to be connected in the first threaded hole 15 in a threaded manner, the insertion block 14 with the first threaded hole 15 is inserted in a space formed by the insertion frame 16 and the analysis plate 7, then the connecting screw 8 penetrates through the round hole 13 and the through hole 17 to be screwed in the first threaded hole 15, the fixed connection between the supporting rod 6 and the analysis plate 7 is completed, when the first threaded hole 15 is damaged due to a wrong wire and the like, the insertion block 14 is taken out and replaced, the combined assembly of the threaded connection part is realized, the damaged threaded connection part can be conveniently and independently replaced in the later period, and the screw hole is not required to be directly processed on the analysis plate 7.
The fixed surface of base 1 has storage water tank 10, and storage water tank 10 sets up in base 1 upper surface middle part position, and surface mounting has filler 12 on storage water tank 10, and threaded connection has blanking cover 11 on filler 12, and drain valve 3 is installed to storage water tank 10 side lower part position, adds appropriate amount moisture in 12 casees storage water tank 10 through the filler to increase base 1's whole weight, improve base 1's stability, open the moisture in the drainage storage water tank 10 of being convenient for after drain valve 3.
Although the present description is described in terms of embodiments, not every embodiment includes only a single embodiment, and such description is for clarity only, and those skilled in the art should be able to integrate the description as a whole, and the embodiments can be appropriately combined to form other embodiments as will be understood by those skilled in the art.

Claims (6)

1. The utility model provides a cost analytical equipment for building economic management, includes base (1), its characterized in that: base (1) upside is equipped with analysis board (7), analysis board (7) a side lower part position is equipped with two bracing pieces (6) that are used for supporting analysis board (7), bracing piece (6) are inserted in square pipe (5) and bracing piece (6) are fixed in square pipe (5) through clamping bolt (9), square pipe (5) are pegged graft mutually with base (1) through the plug connector, round hole (13) have been seted up to bracing piece (6) upper end, analysis board (7) and bracing piece (6) intersect the department and seted up with round hole (13) matched with through-hole (17), one side that through-hole (17) deviate from bracing piece (6) is equipped with and inserts frame (16), insert frame (16) and analysis board (7) fixed connection and insert frame (16) upper end and be the opening form, be equipped with inserted block (14) in inserted frame (16), first screw hole (15) that align mutually with through-hole (17) are seted up towards the one side of through-hole (17) to inserted block (14) ) And a connecting screw (8) is arranged in the round hole (13), and the connecting screw (8) penetrates through the round hole (13) and the through hole (17) and is connected in the first threaded hole (15) in a threaded manner.
2. The construction cost analysis device for building economic management according to claim 1, characterized in that: a second threaded hole is formed in the upper portion of one side face of the square pipe (5), the clamping bolt (9) is in threaded connection with the second threaded hole, and a handle is fixed to the outer surface of one end of the clamping bolt (9).
3. The construction cost analysis device for building economic management according to claim 1, characterized in that: the plug connector includes slider (18), slider (18) are fixed at square pipe (5) lower extreme, slider (18) are T type structure, base (1) upper surface symmetry has seted up two T type grooves (4) with slider (18) matched with, slider (18) slidable mounting is in T type groove (4), T type groove (4) are arranged along the width direction of base (1).
4. The construction cost analysis device for building economic management according to claim 1, characterized in that: two wheels (2) are arranged on two parallel side faces of the base (1).
5. The construction cost analysis device for building economic management according to claim 1, characterized in that: the upper surface of the base (1) is fixed with a counterweight which is arranged in the middle of the upper surface of the base (1).
6. The construction cost analysis apparatus for building economic management according to claim 5, characterized in that: the weight piece includes storage water tank (10), storage water tank (10) are fixed at base (1) upper surface, storage water tank (10) upper surface mounting has filler (12), threaded connection has blanking cover (11) on filler (12), drain valve (3) are installed to storage water tank (10) side lower part position.
CN202123025072.6U 2021-12-01 2021-12-01 Construction cost analysis device for building economic management Expired - Fee Related CN216534527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123025072.6U CN216534527U (en) 2021-12-01 2021-12-01 Construction cost analysis device for building economic management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123025072.6U CN216534527U (en) 2021-12-01 2021-12-01 Construction cost analysis device for building economic management

Publications (1)

Publication Number Publication Date
CN216534527U true CN216534527U (en) 2022-05-17

Family

ID=81538563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123025072.6U Expired - Fee Related CN216534527U (en) 2021-12-01 2021-12-01 Construction cost analysis device for building economic management

Country Status (1)

Country Link
CN (1) CN216534527U (en)

Similar Documents

Publication Publication Date Title
CN216534527U (en) Construction cost analysis device for building economic management
CN212896816U (en) Assembled steel construction with subassembly is strengthened to junction
CN212613209U (en) Assembled curtain board fixed knot constructs
CN210024263U (en) Universal liquid cooling plate welding fixture
CN219431092U (en) Socket type assembled partition keel
CN218445513U (en) A cement mortar crack resistance testing arrangement for monitoring of dynamic temperature and humidity
CN210227539U (en) Fixing device is used in sofa frame installation
CN216405694U (en) Two-way adjustable fabricated building
CN221627359U (en) Install convenient curtain board
CN221236268U (en) Assembled aluminium square through corner splicing structure
CN212776710U (en) Electronic engineering network adapter mounting bracket
CN221031193U (en) Building curtain wall moulding connection structure
CN220394850U (en) Building structure connecting piece
CN214590352U (en) Novel groove type cable bridge
CN212343260U (en) Power transmission and transformation engineering cable fixing support
CN214061816U (en) High-sensitivity non-negative-pressure water supply vacuum suppressor
CN216431868U (en) Divide water collector suitable for novel earth source heat pump
CN209725483U (en) Pipeline fixing structure for interior decoration
CN216390334U (en) Wiring frame for engineering
CN218416528U (en) GIS meter monitoring camera device
CN217080989U (en) Assembled plywood
CN221550976U (en) A distributing box for optical cable wiring
CN221897269U (en) Pipeline laying device for engineering construction
CN214370616U (en) Comprehensive arrangement construction device for large-scale multi-connected air conditioner outdoor units
CN213117924U (en) Groove type reducing butt joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220517