CN216523973U - Marker post structure for hydraulic engineering survey and drawing - Google Patents

Marker post structure for hydraulic engineering survey and drawing Download PDF

Info

Publication number
CN216523973U
CN216523973U CN202123186632.6U CN202123186632U CN216523973U CN 216523973 U CN216523973 U CN 216523973U CN 202123186632 U CN202123186632 U CN 202123186632U CN 216523973 U CN216523973 U CN 216523973U
Authority
CN
China
Prior art keywords
marker post
main body
post main
rod
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123186632.6U
Other languages
Chinese (zh)
Inventor
徐鹏程
傅立荣
方林聪
邵高平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123186632.6U priority Critical patent/CN216523973U/en
Application granted granted Critical
Publication of CN216523973U publication Critical patent/CN216523973U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Length-Measuring Instruments Using Mechanical Means (AREA)

Abstract

The utility model relates to the technical field of hydraulic engineering, and discloses a marker post structure for hydraulic engineering surveying and mapping, which comprises a marker post main body, wherein a detection mechanism is sleeved on the marker post main body, an auxiliary mechanism is arranged at the top of the marker post main body, the upper end of the auxiliary mechanism penetrates through the marker post main body and extends to the upper part of the marker post main body, an extension body is arranged at the bottom of the inner side of the marker post main body, and the lower end of the extension body movably penetrates through the marker post main body and extends to the lower part of the marker post main body; the detection mechanism comprises a rectangular fixed casing, the rectangular fixed casing is detachably sleeved on the marker post main body, a fixed plate is fixedly mounted at the middle position of the right end of the rectangular fixed casing, and a post barrel is fixedly mounted at the upper end of the fixed plate through a mounting bolt in a detachable mode. The utility model has the advantages of convenient adjustment and fixation, accurate measurement, convenient recording, good energy-saving effect and high practicability.

Description

Marker post structure for hydraulic engineering survey and drawing
Technical Field
The utility model relates to the technical field of hydraulic engineering, in particular to a marker post structure for hydraulic engineering surveying and mapping.
Background
At present, a water level marker post can be used at important flood prevention positions of rivers, lakes, reservoirs, hydropower stations, irrigation areas and the like, the water level marker post can measure the water potential, the existing marker post is simple in structure and difficult to adjust, the measuring precision is low, the water potential after rising is difficult to accurately record, and then the marker post structure for hydraulic engineering surveying and mapping is provided.
SUMMERY OF THE UTILITY MODEL
The utility model provides a marker post structure for hydraulic engineering surveying and mapping, which solves the problems in the background art.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a marker post structure for hydraulic engineering surveying and mapping comprises a marker post main body, wherein a detection mechanism is sleeved on the marker post main body, an auxiliary mechanism is installed at the top of the marker post main body, the upper end of the auxiliary mechanism penetrates through the marker post main body and extends to the upper part of the marker post main body, an extension body is installed at the bottom of the inner side of the marker post main body, and the lower end of the extension body movably penetrates through the marker post main body and extends to the lower part of the marker post main body;
the detection mechanism comprises a rectangular fixed casing, the rectangular fixed casing is detachably sleeved on the marker post main body, a fixed plate is fixedly mounted at the middle position of the right end of the rectangular fixed casing, a rod barrel is fixedly mounted at the upper end of the fixed plate through a mounting bolt, a lifting rod is movably mounted inside the rod barrel, the upper end of the lifting rod movably penetrates through the rod barrel and extends to the upper part of the rod barrel, the lifting rod is fixedly mounted on the lower end face of a first floating plate, and a second floating plate is hinged to the right end of the first floating plate.
Preferably, the auxiliary mechanism comprises a threaded rod and a storage battery, the threaded rod is in threaded connection with the top of the marker post main body and penetrates through the marker post main body, a locking nut is sleeved at a position above the marker post main body through threads, a lighting lamp is fixedly installed at the upper end of the threaded rod, two installation side levers are symmetrically and fixedly installed at the left end and the right end of the top of the threaded rod, supporting rods are fixedly installed at the upper ends of the two installation side levers, the top ends of the two supporting rods are symmetrically and fixedly installed on the lower end face of a second solar photovoltaic panel, two first solar photovoltaic panels are symmetrically and hinged at the left end and the right end of the second solar photovoltaic panel, the storage battery is fixedly connected with the inner wall of the top of the marker post main body, the storage battery is located below the threaded rod, and the first solar photovoltaic panel and the second solar photovoltaic panel are both electrically connected with the storage battery, the storage battery is electrically connected with the illuminating lamp.
Preferably, the marker post main body is detachably and fixedly connected with the extension body through a first jackscrew.
Preferably, a positioning inserted rod is fixedly installed in the middle of the lower end of the extension body.
Preferably, the rectangular fixing sleeve is detachably and fixedly connected with the benchmark main body through a second jackscrew.
Preferably, two second guide rods are symmetrically and fixedly mounted at the front end and the rear end of the lifting rod, the other ends of the second guide rods are connected with the inner wall of the rod barrel in a sliding mode along the vertical direction through sliding rails, and the rod barrel is detachably fixed with the lifting rod through a third jackscrew.
Preferably, first floating plate left end middle part position fixed mounting has first guide bar, first guide bar left end fixed mounting has the guide block, the spout has been seted up to sighting rod main part right-hand member, and the spout sets up along vertical direction, guide block and spout sliding connection.
Preferably, the right end of the marker post main body is provided with scale marks, and the scale marks are arranged along the vertical direction.
The utility model has the beneficial effects that: by arranging the detection mechanism, the scale marks and the like, the rising amplitude of the water potential can be conveniently and accurately measured, and the rising amplitude can be recorded; by arranging the auxiliary mechanism, solar energy can be conveniently converted into electric energy, the energy-saving effect is achieved, and illumination can be provided at night; through being provided with location inserted bar, extension body and first jackscrew, can be convenient for fix the sighting rod main part to can carry out altitude mixture control according to the water level height. The utility model has the advantages of convenient adjustment and fixation, accurate measurement, convenient recording, good energy-saving effect and high practicability.
Drawings
Fig. 1 is a schematic structural diagram of a marker post structure for hydraulic engineering surveying and mapping according to the present invention.
Fig. 2 is a schematic structural diagram of an auxiliary mechanism in a marker post structure for hydraulic engineering surveying and mapping provided by the utility model.
Fig. 3 is a schematic structural diagram of a detection mechanism in a marker post structure for hydraulic engineering surveying and mapping according to the present invention.
Fig. 4 is a partial structural cross-sectional view of a marker post structure for hydraulic engineering surveying and mapping according to the present invention.
Reference numbers in the figures: 1, marking a main body of a pole, 3 sliding grooves, 5 scale marks, 6 positioning inserted rods, 7 extending bodies and 8 first jackscrews;
2, an auxiliary mechanism, 201 threaded rods, 202 installation side rods, 203 support rods, 204 first solar photovoltaic panels, 205 second solar photovoltaic panels, 206 illuminating lamps, 207 storage batteries and 208 locking nuts;
the device comprises a 4 detection mechanism, a 401 rectangular fixed casing, 402 second jackscrews, 403 fixed plates, 404 mounting bolts, 405 rod cylinders, 406 lifting rods, 407 first floating plates, 408 second floating plates, 409 first guide rods, 410 guide blocks, 411 second guide rods and 412 third jackscrews.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, a marker post structure for hydraulic engineering surveying and mapping comprises a marker post main body 1, wherein a detection mechanism 4 is sleeved on the marker post main body 1, an auxiliary mechanism 2 is installed at the top of the marker post main body 1, the upper end of the auxiliary mechanism 2 penetrates through the marker post main body 1 and extends to the upper part of the marker post main body 1, an extension body 7 is installed at the bottom of the inner side of the marker post main body 1, and the lower end of the extension body 7 movably penetrates through the marker post main body 1 and extends to the lower part of the marker post main body 1;
detection mechanism 4 includes the fixed cover shell 401 of rectangle, the detachable suit of the fixed cover shell 401 of rectangle is on sighting rod main part 1, the fixed plate 403 of the fixed cover shell 401 right-hand member middle part position fixed mounting of rectangle, the detachable fixed mounting of mounting bolt 404 has a pole section of thick bamboo 405 in the fixed plate 403 upper end, the inside movable mounting of pole section of thick bamboo 405 has lifter 406, the activity of lifter 406 upper end runs through in pole section of thick bamboo 405, and extend to pole section of thick bamboo 405 top, and fixed mounting is terminal surface under first kickboard 407, the articulated second kickboard 408 of installing of first kickboard 407 right-hand member.
In this embodiment, the auxiliary mechanism 2 includes a threaded rod 201 and a storage battery 207, the threaded rod 201 is in threaded connection with the top of the target body 1, the threaded rod 201 penetrates through the target body 1, a locking nut 208 is screwed on the threaded rod 201 at a position above the target body 1, an illuminating lamp 206 is fixedly installed at the upper end of the threaded rod 201, two installation side rods 202 are symmetrically and fixedly installed at the left and right ends of the top of the threaded rod 201, support rods 203 are fixedly installed at the upper ends of the two installation side rods 202, the top ends of the two support rods 203 are symmetrically and fixedly installed on the lower end surface of the second solar photovoltaic panel 205, two first solar photovoltaic panels 204 are symmetrically and hingedly installed at the left and right ends of the second solar photovoltaic panel 205, the storage battery 207 is fixedly connected with the inner wall of the top of the target body 1, the storage battery 207 is located below the threaded rod 201, and the first solar photovoltaic panels 204 and the second solar photovoltaic panel 205 are electrically connected with the storage battery 207, the battery 207 is electrically connected to the illumination lamp 206. Through the design, the LED lamp can provide illumination at night conveniently, is convenient to use at night, and has good energy-saving effect.
The marker post main body 1 is detachably and fixedly connected with the extension body 7 through a first jackscrew 8.
The middle part of the lower end of the extension body 7 is fixedly provided with a positioning inserted bar 6. Through the design, the utility model can be conveniently fixed.
The rectangular fixing sleeve 401 is detachably and fixedly connected with the post main body 1 through a second jackscrew 402.
Two second guide rods 411 are symmetrically and fixedly mounted at the front end and the rear end of the lifting rod 406, the other ends of the two second guide rods 411 are connected with the inner wall of the rod barrel 405 in a sliding mode along the vertical direction through sliding rails, and the rod barrel 405 is detachably fixed with the lifting rod 406 through a third jackscrew 412. Through the above design, the stability of the up-and-down movement of the lifting rod 406 can be improved.
First kickboard 407 left end middle part position fixed mounting has first guide bar 409, and first guide bar 409 left end fixed mounting has guide block 410, and spout 3 has been seted up to sighting rod main part 1 right-hand member, and spout 3 sets up along vertical direction, guide block 410 and 3 sliding connection of spout. With the above design, the stability of the up-and-down movement of the first floating plate 407 can be improved.
1 right-hand member of sighting rod main part is provided with scale mark 5, and 5 vertical direction settings of edge of scale mark, through above-mentioned design, can rise and fall accurate measurement to the water potential.
The working principle is as follows: the utility model can be fixed by inserting the utility model into a water body through the positioning inserted rod 6, the first jackscrew 8 can be unscrewed, the extension body 7 can be adjusted, the height of the fixing plate 403 can be adjusted according to the height of the water level at the moment, the lower end surface of the fixing plate 403 is attached to the water surface, the position on the scale mark 5 where the guide block 410 is positioned is the initial position of the water level, then the first jackscrew 8 is screwed, the fixing plate 403 is fixed, the second floating plate 408 is unfolded, the second floating plate 408 and the first floating plate 407 are arranged in parallel, when the water level rises, the water jacks up the first floating plate 407 and the second floating plate 408, the lifting rod 406 moves upwards in the rod barrel 405, the guide block 410 slides in the sliding groove 3, the water level at the moment can be accurately measured according to the position of the scale mark 5 where the guide block 410 is positioned, and the lifting rod 406 can be fixed by screwing the third jackscrew 412, and then can fix guide block 410, and then can record the water level when this, through launching first solar photovoltaic board 204, first solar photovoltaic board 204 and second solar photovoltaic board 205 absorb solar energy, and become the electric energy, and store in spreading into battery 207, battery 207 can supply power to light 206, light 206 work, can throw light at night, through wrench movement threaded rod 201, screw threaded rod 201 into sighting rod main part 1 inside, screw up lock nut 208 at last, can fix threaded rod 201, not only can highly adjust light 206, and be convenient for accomodate light 206. By arranging the detection mechanism 4, the scale marks 5 and the like, the rising amplitude of the water potential can be conveniently and accurately measured, and the rising amplitude can be recorded; by arranging the auxiliary mechanism 2, solar energy can be conveniently converted into electric energy, the energy-saving effect is achieved, and illumination can be provided at night; through being provided with location inserted bar 6, extension body 7 and first jackscrew 8, can be convenient for fix sighting rod main part 1 to can carry out altitude mixture control according to the water level height. The utility model has the advantages of convenient adjustment and fixation, accurate measurement, convenient recording, good energy-saving effect and high practicability.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (8)

1. A marker post structure for hydraulic engineering surveying and mapping comprises a marker post main body (1) and is characterized in that a detection mechanism (4) is sleeved on the marker post main body (1), an auxiliary mechanism (2) is installed at the top of the marker post main body (1), the upper end of the auxiliary mechanism (2) penetrates through the marker post main body (1) and extends to the upper side of the marker post main body (1), an extension body (7) is installed at the bottom of the inner side of the marker post main body (1), and the lower end of the extension body (7) movably penetrates through the marker post main body (1) and extends to the lower side of the marker post main body (1);
detection mechanism (4) are including the fixed cover shell of rectangle (401), the detachable suit of the fixed cover shell of rectangle (401) is on sighting rod main part (1), the fixed cover shell of rectangle (401) right-hand member middle part fixed mounting has fixed plate (403), the detachable fixed mounting of fixed plate (403) upper end through construction bolt (404) has a pole section of thick bamboo (405), pole section of thick bamboo (405) inside movable mounting has lifter (406), lifter (406) upper end activity runs through in pole section of thick bamboo (405) to extend to pole section of thick bamboo (405) top, and fixed mounting is terminal surface under first kickboard (407), second kickboard (408) are installed in the articulated second of first kickboard (407) right-hand member.
2. The post structure for hydraulic engineering surveying and mapping according to claim 1, wherein the auxiliary mechanism (2) comprises a threaded rod (201) and a storage battery (207), the threaded rod (201) is in threaded connection with the top of the post body (1), the threaded rod (201) penetrates through the post body (1), a locking nut (208) is sleeved on the threaded rod (201) and is located at a position above the post body (1) in a threaded manner, a lighting lamp (206) is fixedly installed at the upper end of the threaded rod (201), two installation side levers (202) are symmetrically and fixedly installed at the left end and the right end of the top of the threaded rod (201), two support rods (203) are fixedly installed at the upper ends of the installation side levers (202), two support rods (203) are symmetrically and fixedly installed at the top end face of a second solar photovoltaic panel (205), two first solar photovoltaic panels (204) are symmetrically and hingedly installed at the left end and the right end of the second solar photovoltaic panel (205), battery (207) and sighting rod main part (1) top inner wall fixed connection, battery (207) are located threaded rod (201) below, first solar photovoltaic board (204) and second solar photovoltaic board (205) all with battery (207) electric connection, battery (207) and light (206) electric connection.
3. The marker post structure for the water conservancy project survey and drawing according to claim 1, characterized in that, the marker post main body (1) is detachably and fixedly connected with the extension body (7) through a first jackscrew (8).
4. The marker post structure for water conservancy project surveying and mapping according to claim 1, characterized in that a positioning inserted bar (6) is fixedly installed at the middle position of the lower end of the extension body (7).
5. The post structure for the hydraulic engineering surveying and mapping according to claim 1, characterized in that the rectangular fixing sleeve (401) is detachably and fixedly connected with the post body (1) through a second jackscrew (402).
6. The marker post structure for the water conservancy project mapping according to claim 1, wherein the front end and the rear end of the lifting rod (406) are symmetrically and fixedly provided with two second guide rods (411), the other ends of the two second guide rods (411) are connected with the inner wall of the rod barrel (405) in a sliding mode along the vertical direction through slide rails, and the rod barrel (405) is detachably fixed with the lifting rod (406) through a third jackscrew (412).
7. The marker post structure for the hydraulic engineering surveying and mapping according to claim 1, wherein a first guide rod (409) is fixedly installed at a middle position of a left end of the first floating plate (407), a guide block (410) is fixedly installed at a left end of the first guide rod (409), a sliding groove (3) is formed in a right end of the marker post main body (1), the sliding groove (3) is arranged in the vertical direction, and the guide block (410) is slidably connected with the sliding groove (3).
8. The marker post structure for the hydraulic engineering surveying and mapping according to claim 1, wherein scale marks (5) are arranged at the right end of the marker post body (1), and the scale marks (5) are arranged in the vertical direction.
CN202123186632.6U 2021-12-17 2021-12-17 Marker post structure for hydraulic engineering survey and drawing Active CN216523973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123186632.6U CN216523973U (en) 2021-12-17 2021-12-17 Marker post structure for hydraulic engineering survey and drawing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123186632.6U CN216523973U (en) 2021-12-17 2021-12-17 Marker post structure for hydraulic engineering survey and drawing

Publications (1)

Publication Number Publication Date
CN216523973U true CN216523973U (en) 2022-05-13

Family

ID=81500860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123186632.6U Active CN216523973U (en) 2021-12-17 2021-12-17 Marker post structure for hydraulic engineering survey and drawing

Country Status (1)

Country Link
CN (1) CN216523973U (en)

Similar Documents

Publication Publication Date Title
CN216523973U (en) Marker post structure for hydraulic engineering survey and drawing
CN218238976U (en) Hydrogeology measuring device
CN212623155U (en) Multifunctional hydrological monitoring instrument
CN211401346U (en) Multi-functional water level measurement chi for hydraulic engineering
CN213180230U (en) Intelligent information monitoring device that flood prevention was used
CN212007449U (en) Water conservancy flood prevention buoy
CN213336369U (en) Water conservancy water and electricity water level sighting rod
CN217877892U (en) Water level mark post
CN210664644U (en) Water environment measuring scale
CN221147775U (en) Water conservancy water and electricity water level mark post
CN219368861U (en) Water conservancy water and electricity water level mark post
CN219474598U (en) Steel trestle safety monitoring device
CN216246699U (en) Water level early warning device for water conservancy project construction survey
CN220304528U (en) Slope subsides on-line monitoring device for room is built
CN215413928U (en) Multifunctional artificial water gauge
CN221147777U (en) Water level monitoring device
CN220085565U (en) Auxiliary fixing device for bar code paste of level gauge
CN218767369U (en) Evaporation monitoring equipment realized by pressure sensor
CN213515907U (en) Water level monitoring device for hydraulic engineering
CN216385909U (en) Water level marker post for water conservancy and hydropower
CN219956539U (en) Self-luminous marker post for measurement
CN219244751U (en) Water level mark post with solar energy
CN213067811U (en) Automatic monitoring device for unattended hydropower station
CN219624860U (en) Detachable floating movable water gauge
CN213779173U (en) Water level alarm device for hydraulic engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant