CN216516863U - High stability is convenient for installation formula building die carrier - Google Patents
High stability is convenient for installation formula building die carrier Download PDFInfo
- Publication number
- CN216516863U CN216516863U CN202122910005.6U CN202122910005U CN216516863U CN 216516863 U CN216516863 U CN 216516863U CN 202122910005 U CN202122910005 U CN 202122910005U CN 216516863 U CN216516863 U CN 216516863U
- Authority
- CN
- China
- Prior art keywords
- base
- groove
- screw
- high stability
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to the technical field of building engineering, in particular to a high-stability and convenient-to-mount building formwork which comprises a base, wherein one side of the base is connected with a reinforcing disc, the other side of the base is connected with a first mounting screw, the base is connected with a supporting rod through the first mounting screw, the top of the supporting rod is provided with a first clamping groove, a limiting block is connected inside the first clamping groove, one end of the limiting block is connected with a supporting plate, one side of the supporting rod is provided with a second clamping groove, a reinforcing rod is connected inside the second clamping groove, and one end of the reinforcing rod is provided with a mounting groove.
Description
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a high-stability and convenient-to-mount construction formwork.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirement, so that the concrete structure and the components are formed according to the specified position and geometric dimension, the correct position of the concrete structure and the components is kept, and the self weight of the building formwork and the external load acting on the building formwork are borne.
There are the following problems:
the formwork frame of prior art needs the hand of people to support and installs when installing the use, and it is very inconvenient to install like this, can consume a large amount of manpower and material resources, and the stable effect of building the formwork is poor moreover, has certain potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art, and provides a building formwork which is high in stability and convenient to install.
In order to achieve the purpose, the utility model adopts the following technical scheme: the utility model provides a high stability is convenient for installation formula building die carrier, includes the base, base one side is connected with the reinforcement dish, the base opposite side is connected with first installation screw, the base is connected with the bracing piece through first installation screw, the bracing piece top is provided with first draw-in groove, first draw-in groove internal connection has the stopper, stopper one end is connected with the backup pad, bracing piece one side is provided with the second draw-in groove, second draw-in groove internal connection has the anchor strut, anchor strut one end is provided with the mounting groove, the anchor strut other end is connected with the installation head, backup pad one end is connected with second installation screw, anchor strut one side is connected with strutting arrangement, strutting arrangement one side is connected with the fixed screw, strutting arrangement has the gusset plate through fixed screw connection.
As a further description of the above technical solution:
the welding of base one side has the reinforcement dish, the reinforcement dish has two and symmetry setting, base opposite side screw thread has first installation screw.
As a further description of the above technical solution:
the base has the bracing piece through first installation screw joint, first draw-in groove has been seted up at the bracing piece top.
As a further description of the above technical solution:
the inside joint of first draw-in groove has the stopper, stopper one end welding has the backup pad, the second draw-in groove has been seted up to bracing piece one side.
As a further description of the above technical solution:
the inside joint of second draw-in groove has the anchor strut, the mounting groove has been seted up to anchor strut one end, the welding of the anchor strut other end has the installation head.
As a further description of the above technical solution:
one end of the supporting plate is in threaded connection with a second mounting screw, the second mounting screw is provided with a plurality of screws, and a supporting device is welded on one side of the reinforcing rod.
As a further description of the above technical solution:
one side of the supporting device is in threaded connection with a fixing screw, and the supporting device is clamped with a reinforcing plate through the fixing screw.
The utility model has the following beneficial effects: this high stability installation formula building die carrier of being convenient for through setting up draw-in groove, mounting groove, installation head and installation screw for this building die carrier simple structure is also convenient very much when installing or dismantling it, through setting up anchor strut, reinforcing plate and strutting arrangement, makes this building die carrier structure firm, thereby improves this building die carrier's stability.
Drawings
FIG. 1 is a schematic three-dimensional structure of a high-stability easy-to-install type construction formwork according to the present invention;
fig. 2 is a schematic plan view of a high-stability easy-to-install construction formwork according to the present invention;
FIG. 3 is a schematic view of a support rod of a high stability and easy installation type construction formwork according to the present invention;
fig. 4 is a schematic view of a reinforcing rod of a high-stability easy-to-install type construction formwork according to the present invention.
Illustration of the drawings:
1. a base; 2. reinforcing the disc; 3. a first mounting screw; 4. a support bar; 5. a first card slot; 6. a limiting block; 7. a support plate; 8. a second card slot; 9. a reinforcing rod; 10. mounting grooves; 11. a mounting head; 12. a second mounting screw; 13. a support device; 14. a reinforcing plate; 15. and fixing the screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, one embodiment of the present invention is provided: the utility model provides a high stability is convenient for installation formula building die carrier, including base 1, 1 one side of base is connected with reinforcement dish 2, 1 opposite side of base is connected with first installation screw 3, base 1 is connected with bracing piece 4 through first installation screw 3, 4 tops of bracing piece are provided with first draw-in groove 5, 5 internal connection of first draw-in groove has stopper 6, 6 one end of stopper is connected with backup pad 7, 4 one side of bracing piece is provided with second draw-in groove 8, 8 internal connection of second draw-in groove have anchor strut 9, anchor strut 9 one end is provided with mounting groove 10, the anchor strut 9 other end is connected with installation head 11, 7 one end of backup pad is connected with second installation screw 12, anchor strut 9 one side is connected with strutting arrangement 13, strutting arrangement 13 one side is connected with fixed screw 15, strutting arrangement 13 is connected with gusset plate 14 through fixed screw 15.
One side of the base 1 is welded with two reinforcing plates 2, the two reinforcing plates 2 are symmetrically arranged, the other side of the base 1 is threaded with a first mounting screw 3, and the reinforcing plates 2 can improve the stability of the building formwork; the base 1 is clamped with a support rod 4 through a first mounting screw 3, the top of the support rod 4 is provided with a first clamping groove 5, and the support rod 4 can play a role in stabilizing and supporting; a limiting block 6 is clamped in the first clamping groove 5, a supporting plate 7 is welded at one end of the limiting block 6, a second clamping groove 8 is formed in one side of the supporting rod 4, and the limiting block 6 can be installed by the first clamping groove 5; a reinforcing rod 9 is clamped inside the second clamping groove 8, a mounting groove 10 is formed in one end of the reinforcing rod 9, an installing head 11 is welded to the other end of the reinforcing rod 9, the reinforcing rod 9 can be clamped in the second clamping groove 8, and the installing head 11 can be clamped in the mounting groove 10; one end of the supporting plate 7 is in threaded connection with a plurality of second mounting screws 12, a supporting device 13 is welded on one side of the reinforcing rod 9, and the second mounting screws 12 can be screwed to mount and fix the reinforcing rod 9; one side of the supporting device 13 is in threaded connection with a fixing screw 15, the supporting device 13 is clamped with a reinforcing plate 14 through the fixing screw 15, and the supporting device 13 can improve the stabilizing effect of the building formwork.
The working principle and the process are as follows: when this building die carrier uses, twist earlier and move first installation screw 3 and install base 1 and bracing piece 4, then install backup pad 7 through first draw-in groove 5, inject anchor strut 9 inside second draw-in groove 8 at last, insert installation head 11 inside mounting groove 10 again, and install fixedly through second installation screw 12 to it, set up a plurality of anchor struts 9 simultaneously, consolidate and coil 2 and strutting arrangement 13, make this building die carrier structure firm, thereby improve this building die carrier's stability.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the utility model.
Claims (7)
1. The utility model provides a high stability is installation formula building die carrier of being convenient for, includes base (1), its characterized in that: one side of the base (1) is connected with a reinforcing disc (2), the other side of the base (1) is connected with a first mounting screw (3), the base (1) is connected with a supporting rod (4) through the first mounting screw (3), a first clamping groove (5) is formed in the top of the supporting rod (4), a limiting block (6) is connected inside the first clamping groove (5), one end of the limiting block (6) is connected with a supporting plate (7), a second clamping groove (8) is formed in one side of the supporting rod (4), a reinforcing rod (9) is connected inside the second clamping groove (8), a mounting groove (10) is formed in one end of the reinforcing rod (9), a mounting head (11) is connected to the other end of the reinforcing rod (9), a second mounting screw (12) is connected to one end of the supporting plate (7), and a supporting device (13) is connected to one side of the reinforcing rod (9), one side of the supporting device (13) is connected with a fixing screw (15), and the supporting device (13) is connected with a reinforcing plate (14) through the fixing screw (15).
2. A high stability easy to install construction formwork as claimed in claim 1 wherein: the welding of base (1) one side has reinforced dish (2), reinforced dish (2) have two and the symmetry setting, base (1) opposite side screw thread has first installation screw (3).
3. A high stability easy to install construction formwork as claimed in claim 1 wherein: the base (1) is connected with a supporting rod (4) through a first mounting screw (3) in a clamping mode, and a first clamping groove (5) is formed in the top of the supporting rod (4).
4. A high stability easy to install construction formwork as claimed in claim 1 wherein: the inside joint of first draw-in groove (5) has stopper (6), stopper (6) one end welding has backup pad (7), second draw-in groove (8) have been seted up to bracing piece (4) one side.
5. A high stability easy to install construction formwork as claimed in claim 1 wherein: the inside joint of second draw-in groove (8) has anchor strut (9), mounting groove (10) have been seted up to anchor strut (9) one end, the welding of anchor strut (9) other end has installation head (11).
6. A high stability easy to install construction formwork as claimed in claim 1 wherein: one end of the supporting plate (7) is in threaded connection with a second mounting screw (12), the second mounting screw (12) is provided with a plurality of screws, and a supporting device (13) is welded on one side of the reinforcing rod (9).
7. A high stability easy to install construction formwork as claimed in claim 1 wherein: one side of the supporting device (13) is in threaded connection with a fixing screw (15), and the supporting device (13) is connected with a reinforcing plate (14) through the fixing screw (15) in a clamping mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122910005.6U CN216516863U (en) | 2021-11-25 | 2021-11-25 | High stability is convenient for installation formula building die carrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122910005.6U CN216516863U (en) | 2021-11-25 | 2021-11-25 | High stability is convenient for installation formula building die carrier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216516863U true CN216516863U (en) | 2022-05-13 |
Family
ID=81533565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122910005.6U Active CN216516863U (en) | 2021-11-25 | 2021-11-25 | High stability is convenient for installation formula building die carrier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216516863U (en) |
-
2021
- 2021-11-25 CN CN202122910005.6U patent/CN216516863U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216305383U (en) | Template for assembly type building construction | |
CN216516863U (en) | High stability is convenient for installation formula building die carrier | |
CN211816942U (en) | Simple and easy erection joint reinforced structure of building steel construction | |
CN208981645U (en) | A kind of building structure wind-brace column | |
CN214996326U (en) | Stiff shaped steel post installation adjustable bracing fixing device | |
CN210289315U (en) | Iron tower installation is with connection structure convenient to equipment | |
CN210659270U (en) | Building engineering construction template supporting construction | |
CN215670883U (en) | Bowl buckle type steel pipe supporting system for full hall frame | |
CN219638407U (en) | Template fixing support | |
CN220790562U (en) | Scaffold auxiliary installation fixer | |
CN218061428U (en) | Hanging mould support for building | |
CN216390343U (en) | Floor bridge device | |
CN214531879U (en) | Concrete pouring building template for building construction | |
CN216974356U (en) | Bearing pile connecting structure | |
CN216810522U (en) | Supporting construction that engineering curtain was used | |
CN214089502U (en) | Town road bridge simple beam construction structures | |
CN213143859U (en) | Civil engineering frame reinforcing apparatus | |
CN214942404U (en) | T beam formwork | |
CN218815220U (en) | Fixing support for building engineering template | |
CN219794596U (en) | Triangular supporting device for shear wall outer cantilever frame | |
CN216239903U (en) | Damaged house structure reinforcing apparatus | |
CN211817792U (en) | Building templates connects steelframe for civil engineering | |
CN208563127U (en) | Platoon rigging scaffold | |
CN211949230U (en) | Deviation prevention device for steel bar formwork | |
CN215717202U (en) | Building templates support frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221228 Address after: 529000 first floor, No. 4, Lane 7, tanbian middle lane street, ChaoLian, Pengjiang district, Jiangmen City, Guangdong Province, self compiled 01 Patentee after: Guangdong Hengfeng Engineering Construction Co.,Ltd. Address before: 529500 floors 2-4, No. 11, Yuanxi Second Road, Dongcheng Town, Yangdong District, Yangjiang City, Guangdong Province (residence declaration) Patentee before: Guangdong Zhuye Construction Co.,Ltd. |