CN216516792U - Novel scaffold frame of encorbelmenting device - Google Patents

Novel scaffold frame of encorbelmenting device Download PDF

Info

Publication number
CN216516792U
CN216516792U CN202122767938.4U CN202122767938U CN216516792U CN 216516792 U CN216516792 U CN 216516792U CN 202122767938 U CN202122767938 U CN 202122767938U CN 216516792 U CN216516792 U CN 216516792U
Authority
CN
China
Prior art keywords
shaped steel
steel
fixed
connecting ring
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122767938.4U
Other languages
Chinese (zh)
Inventor
康后主
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Zhubang Hongsheng Construction Technology Co ltd
Original Assignee
Hunan Zhubang Hongsheng Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Zhubang Hongsheng Construction Technology Co ltd filed Critical Hunan Zhubang Hongsheng Construction Technology Co ltd
Priority to CN202122767938.4U priority Critical patent/CN216516792U/en
Application granted granted Critical
Publication of CN216516792U publication Critical patent/CN216516792U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

A novel overhanging scaffold device relates to the technical field of overhanging scaffolds, a wall body pre-embeds three plastic sleeves when pouring, three wire columns penetrate into the three plastic sleeves, the wire columns are fixed through wire caps, a supporting mechanism is convenient to install, a base is installed on two wire columns below, I-shaped steel can be installed, the I-shaped steel can rotate along the base and is convenient to adjust, the I-shaped steel is rotated, a top column rotates along a fixed block, a pressing block on the fixed block is pressed in the base, the top column is fixed through the fixed wire caps, the adjusted I-shaped steel can be fixed, the I-shaped steel is limited, and the phenomenon that the upper steel pipe is easy to deviate when being installed is avoided; according to the utility model, the adjusted I-shaped steel is fixed, so that the I-shaped steel is limited, the phenomenon that the upper steel pipe is easy to deviate when being installed is avoided, and the stability of the cantilever scaffold is not influenced.

Description

Novel scaffold frame of encorbelmenting device
Technical Field
The utility model relates to the technical field of overhanging scaffolds, in particular to a novel overhanging scaffold device.
Background
The scaffold frame of encorbelmenting utilizes the structure of encorbelmenting that the building structure edge outwards stretched out to come the supporting outer scaffold frame, and for convenient use, adjustable is adopted more to current I-steel, and current adjustable I-steel is fixed through the rigidity between the steel pipe after rotatory, and then forms the adjustable scaffold frame of encorbelmenting, can not carry on spacingly when nevertheless adjusting the I-steel like this, easily takes place the skew when making its top steel pipe installation, influences the steadiness of scaffold frame of encorbelmenting.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects in the background art, the utility model provides a novel overhanging scaffold device, and the utility model fixes the adjusted I-shaped steel, so that the I-shaped steel is limited, the phenomenon that the upper steel pipe is easy to deviate when being installed is avoided, and the stability of the overhanging scaffold is not influenced.
In order to realize the purpose of the utility model, the utility model adopts the following technical scheme:
the utility model provides a novel scaffold frame device of encorbelmenting, includes the wall body main part, the inside of wall body main part is equipped with three installation mechanism, is equipped with supporting mechanism on two installation mechanisms in the below, and supporting mechanism's side is equipped with stop gear, and supporting mechanism's upper surface passes through the reinforcing mechanism and connects the installation mechanism in the top, and supporting mechanism's upper surface is equipped with steel pipe fixed establishment.
The installation mechanism comprises screw columns, plastic sleeves and screw caps, the three plastic sleeves are embedded in the wall body main body, the screw columns are arranged in the three plastic sleeves in a penetrating mode, and the screw caps are in threaded connection with the side faces of the three screw columns on the two sides of the wall body main body.
The supporting mechanism comprises a base and I-shaped steel, the base is arranged on the two wire columns below the supporting mechanism, and the I-shaped steel is hinged to the side wall inside the base.
Stop gear includes fixed block, fixed screw cap, fore-set post and briquetting, both sides all are equipped with the fixed block around the I-steel, run through on two fixed blocks and be equipped with the fore-set post, and the left and right sides that is located the fixed block has the fixed screw cap at the side threaded connection of fore-set post, and the left end of two fore-sets all articulates there is the briquetting, and the briquetting is pressed in the inside of base.
The reinforcing mechanism comprises a first connecting ring, a telescopic pull rod and a second connecting ring, the first connecting ring is arranged on the upper surface of the I-shaped steel, the second connecting ring is arranged at the right end of the upper wire column, and the first connecting ring and the second connecting ring are connected through the telescopic pull rod.
The steel pipe fixing mechanism comprises U-shaped clamping blocks, a fixing sleeve and a steel pipe, the two U-shaped clamping blocks are clamped on the I-shaped steel, the fixing sleeves are arranged on the upper surfaces of the two U-shaped clamping blocks in a fixed mode, and the steel pipe is sleeved inside the two fixing sleeves.
Due to the adoption of the technical scheme, the utility model has the following beneficial effects:
according to the novel cantilever scaffold device, the I-shaped steel is rotated, the ejection column is rotated along the fixing block, the pressing block on the fixing block is pressed in the base, the ejection column is fixed through the fixing screw cap, the adjusted I-shaped steel can be fixed, the I-shaped steel is limited, the problem that the upper steel pipe is prone to offset when being installed is avoided, and the stability of the cantilever scaffold is not affected.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is an enlarged view of the structure at the point A of the present invention;
1. a wall body; 2. an installation mechanism; 21. silk poles; 22. a plastic sleeve; 23. a screw cap; 3. a limiting mechanism; 31. a fixed block; 32. fixing the screw cap; 33. a top pillar; 34. briquetting; 4. a support mechanism; 41. a base; 42. i-shaped steel; 5. a steel pipe fixing mechanism; 51. a U-shaped fixture block; 52. fixing the sleeve; 53. a steel pipe; 6. a reinforcement mechanism; 61. a connecting ring I; 62. a telescopic pull rod; 63. and a second connecting ring.
Detailed Description
The present invention will be explained in detail by the following examples, which are disclosed for the purpose of protecting all technical improvements within the scope of the present invention.
Combine accompanying figure 1~2 a novel scaffold device that encorbelments, including wall body 1, wall body 1's inside is equipped with three installation mechanism 2, is equipped with supporting mechanism 4 on two installation mechanism 2 in the below, and supporting mechanism 4's side is equipped with stop gear 3, and supporting mechanism 4's upper surface passes through reinforcing mechanism 6 and connects installation mechanism 2 in the top, and supporting mechanism 4's upper surface is equipped with steel pipe fixed establishment 5.
Installation mechanism 2 includes silk post 21, plastic sleeve 22 and silk cap 23, the inside pre-buried three plastic sleeve 22 that has of wall body main part 1, three plastic sleeve 22's inside is run through and all is equipped with silk post 21, the side threaded connection who is located wall body main part 1 in three silk post 21 has silk cap 23, wall body main part 1 is pre-buried three plastic sleeve 22 when pouring, three silk post 21 penetrates three plastic sleeve 22's inside, and fix silk post 21 through silk cap 23, be convenient for install supporting mechanism 4.
The supporting mechanism 4 comprises a base 41 and I-shaped steel 42, the base 41 is arranged on the two lower wire columns 21, the I-shaped steel 42 is hinged to the inner side wall of the base 41, the base 41 is arranged on the two lower wire columns 21, the I-shaped steel 42 can be installed, and the I-shaped steel 42 can rotate along the base 41 and is convenient to adjust.
Stop gear 3 includes fixed block 31, fixed screw cap 32, fore-set 33 and briquetting 34, both sides all are equipped with fixed block 31 around the I-steel 42, run through on two fixed blocks 31 and be equipped with fore-set 33, the side threaded connection that is located the left and right sides of fixed block 31 at fore-set 33 has fixed screw cap 32, the left end of two fore-set 33 all articulates there is briquetting 34, and briquetting 34 presses in the inside of base 41, rotate I-steel 42, and make fore-set 33 rotate along fixed block 31, make briquetting 34 on the fixed block 31 press in the inside of base 41, and fix fore-set 33 through fixed screw cap 32, can fix the I-steel after adjusting, and then carry on spacingly to the I-steel, easily take place the skew when avoiding the installation of top steel pipe, do not influence the steadiness of encorbelment scaffold.
The reinforcing mechanism 6 comprises a first connecting ring 61, a telescopic pull rod 62 and a second connecting ring 63, the first connecting ring 61 is arranged on the upper surface of the I-shaped steel 42, the second connecting ring 63 is arranged at the right end of the upper wire column 21, the first connecting ring 61 and the second connecting ring 63 are connected through the telescopic pull rod 62, the first connecting ring 61 on the upper wire column 21 and the first connecting ring 61 on the I-shaped steel 42 are connected through the telescopic pull rod 62, the wall body main body 1, the I-shaped steel 42 and the telescopic pull rod 62 can form a triangle, and the I-shaped steel 42 is reinforced.
The steel pipe fixing mechanism 5 comprises U-shaped fixture blocks 51, fixing sleeves 52 and steel pipes 53, the two U-shaped fixture blocks 51 are clamped on the I-beam 42, the fixing sleeves 52 are arranged on the upper surfaces of the two U-shaped fixture blocks 51 in a fixed mode, the steel pipes 53 are sleeved inside the two fixing sleeves 52, the U-shaped fixture blocks 51 are clamped on the I-beam 42, the steel pipes 53 extend into the fixing sleeves 52 on the I-beam 42, the steel pipes 53 can be fixed, and sliding during installation is avoided.
When the novel cantilever scaffold device is used, three plastic sleeves 22 are pre-embedded when a wall body main body 1 is poured, three wire columns 21 penetrate into the three plastic sleeves 22 and are fixed through screw caps 23, a supporting mechanism 4 is convenient to install, a base 41 is installed on two lower wire columns 21 and can install I-shaped steel 42, the I-shaped steel 42 can rotate along the base 41 and is convenient to adjust, the I-shaped steel 42 is rotated, a top column 33 rotates along a fixing block 31, a pressing block 34 on the fixing block 31 is pressed in the base 41 and is fixed on the top column 33 through a fixing screw cap 32, the adjusted I-shaped steel can be fixed, the I-shaped steel is limited, the phenomenon that the upper steel pipe is easy to deviate when being installed is avoided, the stability of the cantilever scaffold is not influenced, a connecting ring 61 on the upper wire column 21 is connected with a connecting ring 61 on the I-shaped steel 42 through a telescopic pull rod 62, the wall body 1, the I-shaped steel 42 and the telescopic pull rod 62 can form a triangle, the I-shaped steel 42 is reinforced, the U-shaped fixture block 51 is clamped on the I-shaped steel 42, the steel pipe 53 extends into the fixing sleeve 52 on the I-shaped steel 42, the steel pipe 53 can be fixed, and the steel pipe is prevented from sliding off during installation.
While the utility model has been particularly shown and described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (6)

1. The utility model provides a novel scaffold frame of encorbelmenting device, includes wall body (1), characterized by: the wall body is characterized in that three mounting mechanisms (2) are arranged inside the wall body main body (1), supporting mechanisms (4) are arranged on the two mounting mechanisms (2) below, limiting mechanisms (3) are arranged on the side faces of the supporting mechanisms (4), the upper surfaces of the supporting mechanisms (4) are connected with the mounting mechanisms (2) above through reinforcing mechanisms (6), and steel pipe fixing mechanisms (5) are arranged on the upper surfaces of the supporting mechanisms (4).
2. The new cantilever scaffold device as claimed in claim 1, wherein: the installation mechanism (2) comprises screw columns (21), plastic sleeves (22) and screw caps (23), three plastic sleeves (22) are embedded in the wall body main body (1), the screw columns (21) penetrate through the three plastic sleeves (22), and the screw caps (23) are connected to the two sides of the wall body main body (1) in a threaded mode on the side faces of the three screw columns (21).
3. The new cantilever scaffold device as claimed in claim 2, wherein: the supporting mechanism (4) comprises a base (41) and I-shaped steel (42), the base (41) is arranged on the two wire columns (21) below, and the I-shaped steel (42) is hinged to the side wall inside the base (41).
4. A new cantilever scaffold device according to claim 3, characterized in that: stop gear (3) are including fixed block (31), jackscrew cap (32), fore-and-aft post (33) and briquetting (34), both sides all are equipped with fixed block (31) around I-steel (42), run through on two fixed blocks (31) and are equipped with fore-and-aft post (33), are located the left and right sides of fixed block (31) and have jackscrew cap (32) at the side threaded connection of fore-and-aft post (33), and the left end of two fore-and-aft posts (33) all articulates there is briquetting (34), and briquetting (34) press in the inside of base (41).
5. A new cantilever scaffold device according to claim 3, characterized in that: the reinforcing mechanism (6) comprises a first connecting ring (61), a telescopic pull rod (62) and a second connecting ring (63), the first connecting ring (61) is arranged on the upper surface of the I-shaped steel (42), the second connecting ring (63) is arranged at the right end of the wire column (21) above the I-shaped steel, and the first connecting ring (61) and the second connecting ring (63) are connected through the telescopic pull rod (62).
6. A new cantilever scaffold device according to claim 3, characterized in that: the steel pipe fixing mechanism (5) comprises U-shaped fixture blocks (51), fixing sleeves (52) and steel pipes (53), the two U-shaped fixture blocks (51) are clamped on the I-shaped steel (42), the fixing sleeves (52) are arranged on the upper surfaces of the two U-shaped fixture blocks (51) in a fixed mode, and the steel pipes (53) are sleeved inside the two fixing sleeves (52).
CN202122767938.4U 2021-11-12 2021-11-12 Novel scaffold frame of encorbelmenting device Active CN216516792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122767938.4U CN216516792U (en) 2021-11-12 2021-11-12 Novel scaffold frame of encorbelmenting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122767938.4U CN216516792U (en) 2021-11-12 2021-11-12 Novel scaffold frame of encorbelmenting device

Publications (1)

Publication Number Publication Date
CN216516792U true CN216516792U (en) 2022-05-13

Family

ID=81529036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122767938.4U Active CN216516792U (en) 2021-11-12 2021-11-12 Novel scaffold frame of encorbelmenting device

Country Status (1)

Country Link
CN (1) CN216516792U (en)

Similar Documents

Publication Publication Date Title
CN104912191B (en) Assembled concrete fabricated column splicing device and use method of splicing device
CN216516792U (en) Novel scaffold frame of encorbelmenting device
CN210195335U (en) Civil construction support frame
CN216076412U (en) Steel stand straightness deviation of hanging down handles part
CN208310189U (en) A kind of aluminum alloy mould plate support connection system
CN207847086U (en) A kind of tall and big beam form support frame
CN211113293U (en) Guardrail reflection of light stand preformed groove positioning fixture
CN211817995U (en) Novel sleeve fixing device
CN216810987U (en) Building aluminum mould template support of adjustable installation
CN112072581A (en) Pipeline erecting device for assembled wall
CN216381505U (en) Portable cable tunnel inner formword supporting tool
CN221001924U (en) Scaffold wall connecting piece
CN219691090U (en) Auxiliary tool for formwork support of stairway on construction site
CN213927641U (en) A bearing structure for reinforcement for building engineering
CN215107495U (en) Fixing device for tubular embedded part in cast-in-place beam plate
CN217949742U (en) Flexible quick-change positioning mechanism of pouring system
CN219671016U (en) Road bridge template fixing pair pull rod
CN219792294U (en) Tower crane base mounting structure
CN220791251U (en) Positioning fixture for embedded water stop steel plate
CN213205038U (en) Building reinforced structure
CN218148489U (en) Circular equipment foundation template device
CN214942738U (en) Supporting mechanism of hanging beam under aluminum mould
CN211922336U (en) Highway bridge pile foundation reinforcing apparatus of easy to assemble laminating
CN220100602U (en) Adjusting device for scaffold adjustable bracket
CN214089866U (en) Adjustable steel reinforcement cage transfers supplementary fixed stay construction platform device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Longxin Construction Technology Co.,Ltd.

Assignor: Hunan Zhubang Hongsheng Construction Technology Co.,Ltd.

Contract record no.: X2023980044453

Denomination of utility model: A New Type of Suspended Scaffolding Device