CN216512508U - Purification engineering is with aseptic operating room gas pipeline hoist and mount system - Google Patents

Purification engineering is with aseptic operating room gas pipeline hoist and mount system Download PDF

Info

Publication number
CN216512508U
CN216512508U CN202122919169.5U CN202122919169U CN216512508U CN 216512508 U CN216512508 U CN 216512508U CN 202122919169 U CN202122919169 U CN 202122919169U CN 216512508 U CN216512508 U CN 216512508U
Authority
CN
China
Prior art keywords
hoisting
suspender
hanging
box
chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122919169.5U
Other languages
Chinese (zh)
Inventor
常曲
岳凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Baifan Environmental Protection Technology Co ltd
Original Assignee
Yunnan Baifan Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Baifan Environmental Protection Technology Co ltd filed Critical Yunnan Baifan Environmental Protection Technology Co ltd
Priority to CN202122919169.5U priority Critical patent/CN216512508U/en
Application granted granted Critical
Publication of CN216512508U publication Critical patent/CN216512508U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Apparatus Associated With Microorganisms And Enzymes (AREA)

Abstract

The utility model relates to a gas pipeline hoisting system for an aseptic operating room for purification engineering, which belongs to the field of engineering installation equipment, wherein a right suspender and a left suspender are arranged on a lifting shaft of the gas pipeline hoisting system for the aseptic operating room for the purification engineering, the right suspender and the left suspender are connected with the lifting shaft through a rotating shaft, the positions of the right suspender and the left suspender can be adjusted through the rotation of the rotating shaft, the right suspender is connected with a right hanging box through a hanging chain and a hanging hook, the top of the right hanging box is provided with a top cover, the right hanging box is a sealed environment after being covered by the top cover and can be used for transporting gas pipelines, the left suspender is connected with a left hanging box through the hanging chain and the hanging hook, the left hanging box is used for transporting the installation equipment, the right hanging box and the left hanging box can be replaced and transported mutually according to transportation requirements, the right hanging box and the left hanging box are connected with the hanging hook through a connecting device, the connecting device can be disassembled according to the installation requirements, the utility model has convenient operation, the practicability is high.

Description

Purification engineering is with aseptic operating room gas pipeline hoist and mount system
Technical Field
The utility model belongs to the field of engineering installation equipment, and particularly relates to a sterile operating room gas pipeline hoisting system for purification engineering.
Background
Hoisting is a general term for the installation and in-place of equipment by a crane or a hoisting mechanism, equipment, workpieces, appliances, materials and the like are hoisted by various hoisting tools in the process of maintenance or repair so as to cause the position of the equipment to change, the hoisting is frequently used in the process of engineering installation, particularly for large-size components, in the process of medical installation, a plurality of components with larger volume need to be transported by hoisting, for example, a gas pipeline of a sterile operating room for purification engineering has larger pipeline volume and needs to be transported by a hoisting system, but the gas pipeline for the purification engineering is different from the pipeline for other engineering, large-area exposure and pollution caused in the transfer engineering are avoided, and meanwhile, the device for installing the pipeline is possibly large in size, probably also need lifting device to transport, current lifting device simple structure, the practicality is not high.
Disclosure of Invention
In order to overcome the problems in the prior art, the utility model discloses an aseptic operating room gas pipeline hoisting system for purification engineering, wherein a right suspender and a left suspender are arranged on a lifting shaft of the aseptic operating room gas pipeline hoisting system for purification engineering, the right suspender and the left suspender are connected with the lifting shaft through a rotating shaft, the positions of the right suspender and the left suspender can be adjusted through the rotation of the rotating shaft, the right suspender is connected with a right hoisting box through a hoisting chain and a hoisting hook, the top of the right hoisting box is provided with a top cover, the right hoisting box is a sealed environment after being covered by the top cover and can be used for transporting a gas pipeline, the left suspender is connected with a left hoisting box through the hoisting chain and the hoisting hook, the left hoisting box is used for transporting and installing equipment, the right hoisting box and the left hoisting box can be replaced and transported mutually according to transportation requirements, the right hoisting box and the left hoisting box are connected with the hoisting hook through a connecting device, the connecting device can be disassembled according to installation requirements, the utility model has convenient operation, the practicability is high.
In order to realize the purpose, the utility model is realized by the following technical scheme:
the sterile operating room gas pipeline hoisting system for the purification engineering mainly comprises a base, universal wheels, a lifting shaft, a right suspender, a rotating shaft, a hanging chain, a lifting hook, a left suspender, a left hanging box, a right hanging box and a connecting device, wherein the base is of a square structure, the universal wheels are arranged at the bottom of the base, the lifting shaft is arranged at the top of the base, the right suspender is arranged at the right side of the lifting shaft, the hanging chain is connected with the right suspender, the lifting hook is connected with the hanging chain, the left suspender is arranged at the left side of the lifting shaft, the left hanging box is connected with the left suspender, the right hanging box is connected with the right suspender, the connecting device is connected with the left hanging box and the right hanging box, the bottom of the left hanging box is provided with a bottom wheel, the side of the left hanging box is provided with a connecting hole, the bottom of the right hanging box is provided with a top cover, the side of the right hanging box is provided with a connecting plate, the connecting hole is arranged on the connecting plate, and the top of the connecting device is provided with a top plate, The top of the top plate is provided with a hanging plate, a hanging hole is formed in the hanging plate, a connector is arranged at the bottom of the top plate, a connecting chain is arranged below the connector, a threaded hole is formed in the top of the connecting chain, and a hook is arranged at the bottom of the connecting chain.
The right suspender is connected with the extension-and-descent shaft through a rotating shaft, the left suspender is connected with the extension-and-descent shaft through a rotating shaft, and the left suspender is communicated with the rotating shaft and is positioned below the right suspender.
And a hanging chain and a hanging hook are connected below the left hanging rod.
The top plate is a circular plate, and the connecting ports are uniformly distributed at the bottom of the top plate.
The connecting port is internally provided with internal threads and is connected with the threaded port,
the connecting chains, the threaded openings and the hooks are integrally formed, and the number of the connecting chains, the threaded openings and the hooks is matched with the number of the connecting openings.
The four sides of the left hanging box are provided with connecting holes, the four sides of the outer side of the right hanging box are provided with connecting plates, and the connecting holes are formed in the connecting plates on the four sides.
The utility model has the beneficial effects that: the gas pipeline hoisting system for the sterile operating room for the purification engineering is characterized in that a right hanging rod and a left hanging rod are arranged on a hoisting shaft of the gas pipeline hoisting system for the sterile operating room, the right hanging rod and the left hanging rod are connected with the hoisting shaft through a rotating shaft, the positions of the right hanging rod and the left hanging rod can be adjusted through rotation of the rotating shaft, the right hanging rod is connected with a right hanging box through a hanging chain and a hanging hook, the top of the right hanging box is provided with a top cover, the right hanging box is in a sealed environment and can be used for transporting a gas pipeline after being covered by the top cover, the left hanging rod is connected with a left hanging box through the hanging chain and the hanging hook, the left hanging box is used for transporting installation equipment, the right hanging box and the left hanging box can be replaced and transported mutually according to transportation requirements, the right hanging box and the left hanging box are connected with the hanging hook through a connecting device, and the connecting device can be disassembled according to the installation requirements.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a left hanging box;
FIG. 3 is a schematic structural view of a right hanging box;
fig. 4 is a schematic structural diagram of the connecting device.
In the figure, 1-base, 2-universal wheel, 3-lifting shaft, 4-right suspender, 5-rotating shaft, 6-hanging chain, 7-lifting hook, 8-left suspender, 9-left hanging box, 10-bottom wheel, 11-connecting hole, 12-right hanging box, 13-top cover, 14-connecting plate, 15-connecting device, 16-top plate, 17-hanging plate, 18-hanging hole, 19-connecting port, 20-threaded port, 21-connecting chain and 22-hook.
Detailed Description
In order to make the above objects, technical solutions and advantages clearer and more clear, the present invention is specifically described below with reference to the accompanying drawings.
As shown in fig. 1-4, the sterile operating room gas pipeline hoisting system for purification engineering mainly comprises a base 1, a universal wheel 2, a lifting shaft 3, a right suspender 4, a rotating shaft 5, a sling chain 6, a lifting hook 7, a left suspender 8, a left suspension box 9, a right suspension box 12 and a connecting device 15, wherein the base 1 is of a square structure, the universal wheel 2 is arranged at the bottom of the base 1, the lifting shaft 3 is arranged at the top of the base 1, the right suspender 4 is arranged at the right side of the lifting shaft 3, the sling chain 6 is connected with the right suspender 4, the lifting hook 7 is connected with the sling chain 6, the left suspender 8 is arranged at the left side of the lifting shaft 3, the sling chain 6 and the lifting hook 7 are connected below the left suspender 8, the right suspender 4 is connected with the lifting shaft 3 through the rotating shaft 5, the left suspender 8 is located below the right suspender 4, the left suspension box 9 is connected with the left suspender 8, the right hanging box 12 is connected with the right hanging rod 4, the connecting device 15 is connected with the left hanging box 9 and the right hanging box 12, a bottom wheel 10 is arranged at the bottom of the left hanging box 9, a connecting hole 11 is arranged on the side surface of the left hanging box 9, a bottom wheel 10 is arranged at the bottom of the right hanging box 12, a top cover 13 is arranged at the top of the right hanging box 12, a connecting plate 17 is arranged on the side surface of the right hanging box 12, a connecting hole 11 is arranged on the connecting plate 17, a top plate 16 is arranged at the top of the connecting device 15, a hanging plate 17 is arranged at the top of the top plate 16, a hanging hole 18 is arranged on the hanging plate 17, a connecting port 19 is arranged at the bottom of the top plate 16, the top plate 16 is a circular plate, the connecting port 19 is uniformly distributed at the bottom of the top plate 16, a connecting chain 21 is arranged below the connecting port 19, a threaded port 20 is arranged at the top of the connecting chain 21, an internal thread is arranged inside of the connecting port 19, the connecting port 19 is connected with the threaded port 20, a hook 22 is arranged at the bottom of the connecting chain 21, the connecting chain 21 is connected with the threaded port 20, Couple 22 integrated into one piece sets up, and the number of connecting chain 21, screw thread mouth 20, couple 22 matches with the quantity of connector 19, the four sides of left hanging box 12 all is provided with connecting hole 11, and the right hanging box 12 outside four sides is provided with connecting plate 14, all is provided with connecting hole 11 on the connecting plate 14 of four sides.
The purification engineering is with aseptic operating room gas pipeline hoist system's that stretches down epaxial being provided with right jib 4 and left jib 8, right jib 4 and left jib 8 are connected with the axle 3 that stretches down through pivot 5, with the adjustable right jib 4 of rotation of passing pivot 5 and the position of left jib 8, right jib 4 is connected with right hanging box 12 through chain sling 6 and lifting hook 7, right hanging box 12 top is provided with top cap 13, right hanging box 12 is a sealed environment behind top cap 13 lid, can be used to transport the gas pipeline, left jib 8 is connected with left hanging box 9 through chain sling 6 and lifting hook 7, left hanging box 9 is used for transporting erection equipment, right hanging box 12 and left hanging box 9 can replace the transportation each other according to the transportation demand, right hanging box 12 and left hanging box 9 are connected with lifting hook 7 through connecting device 15, connecting device 15 can be dismantled according to the installation demand, the top of connecting device 15 is provided with roof 16, The top of the top plate 16 is provided with a hanging plate 17, the hanging plate 17 is provided with a hanging hole 18, the bottom of the top plate 16 is provided with a connecting port 19, a connecting chain 21 is arranged below the connecting port 19, the top of the connecting chain 21 is provided with a threaded port 20, the bottom of the connecting chain 21 is provided with a hook 22, the top plate 16 is a circular plate, the connecting ports 19 are uniformly distributed at the bottom of the top plate 16, internal threads are arranged inside the connecting port 19, the connecting port 19 is connected with the threaded port 20, the connecting chain 21, the threaded port and the hook 22 are integrally formed, the number of the connecting chain 21, the threaded port 20 and the hook 22 is matched with the number of the connecting ports 19, the hook 7 is connected with the hanging hole 18, the connecting chain 21 is connected with the connecting hole 11 through the hook 22, and the number of the connecting chain 21 and the connecting hole 11 can be adjusted according to the weight of the hoisting equipment so as to ensure the stability of the hoisting operation.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the utility model, and that, although the utility model has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the scope of the utility model as defined by the appended claims.

Claims (7)

1. A sterile operating room gas pipeline hoisting system for purification engineering is characterized by mainly comprising a base, universal wheels, a lifting shaft, a right suspender, a rotating shaft, a hoisting chain, a lifting hook, a left suspender, a left hoisting box, a right hoisting box and a connecting device, wherein the base is of a square structure, the universal wheels are arranged at the bottom of the base, the lifting shaft is arranged at the top of the base, the right suspender is arranged at the right side of the lifting shaft, the hoisting chain is connected with the right suspender, the lifting hook is connected with the hoisting chain, the left suspender is arranged at the left side of the lifting shaft, the left hoisting box is connected with the left suspender, the right hoisting box is connected with the right suspender, the connecting device is connected with the left hoisting box and the right hoisting box, the bottom of the left hoisting box is provided with a bottom wheel, the side of the left hoisting box is provided with a connecting hole, the bottom of the right hoisting box is provided with a bottom wheel, the top cover is arranged at the top of the right hoisting box, and the side of the right hoisting box is provided with a connecting plate, the connecting device is characterized in that a connecting hole is formed in the connecting plate, a top plate is arranged at the top of the connecting device, a hanging plate is arranged at the top of the top plate, a hanging hole is formed in the hanging plate, a connecting port is formed in the bottom of the top plate, a connecting chain is arranged below the connecting port, a threaded port is formed in the top of the connecting chain, and a hook is arranged at the bottom of the connecting chain.
2. The system for hoisting the gas pipeline of the sterile operating room for the purification engineering according to claim 1, wherein: the right suspender is connected with the extension-and-descent shaft through a rotating shaft, the left suspender is connected with the extension-and-descent shaft through a rotating shaft, and the left suspender is communicated with the rotating shaft and is positioned below the right suspender.
3. The system for hoisting the gas pipeline of the sterile operating room for the purification engineering according to claim 1, wherein: and a hanging chain and a hanging hook are connected below the left hanging rod.
4. The system for hoisting the gas pipeline of the sterile operating room for the purification engineering according to claim 1, wherein: the top plate is a circular plate, and the connecting ports are uniformly distributed at the bottom of the top plate.
5. The system for hoisting the gas pipeline of the sterile operating room for the purification engineering according to claim 1, wherein: the connector is internally provided with internal threads and is connected with the threaded port.
6. The system for hoisting the gas pipeline of the sterile operating room for the purification engineering according to claim 1, wherein: the connecting chains, the threaded openings and the hooks are integrally formed, and the number of the connecting chains, the threaded openings and the hooks is matched with the number of the connecting openings.
7. The system for hoisting the gas pipeline of the sterile operating room for the purification engineering according to claim 1, wherein: the four sides of the left hanging box are provided with connecting holes, the four sides of the outer side of the right hanging box are provided with connecting plates, and the connecting holes are formed in the connecting plates on the four sides.
CN202122919169.5U 2021-11-25 2021-11-25 Purification engineering is with aseptic operating room gas pipeline hoist and mount system Active CN216512508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122919169.5U CN216512508U (en) 2021-11-25 2021-11-25 Purification engineering is with aseptic operating room gas pipeline hoist and mount system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122919169.5U CN216512508U (en) 2021-11-25 2021-11-25 Purification engineering is with aseptic operating room gas pipeline hoist and mount system

Publications (1)

Publication Number Publication Date
CN216512508U true CN216512508U (en) 2022-05-13

Family

ID=81532071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122919169.5U Active CN216512508U (en) 2021-11-25 2021-11-25 Purification engineering is with aseptic operating room gas pipeline hoist and mount system

Country Status (1)

Country Link
CN (1) CN216512508U (en)

Similar Documents

Publication Publication Date Title
CN205668579U (en) A kind of Portable steel pipe mover
CN216512508U (en) Purification engineering is with aseptic operating room gas pipeline hoist and mount system
CN205603037U (en) Assembly fixture is lifted by crane in major diameter tube bank
CN208812123U (en) A kind of Multifunctional pneumatic power machinery handgrip
CN108748100B (en) Special tire grabbing device of new energy automobile
CN202785238U (en) Large nut hoisting tool
CN207211918U (en) Internally lifting pole
CN207618916U (en) A kind of multi-functional hanging device of Architectural Equipment
CN206940291U (en) A kind of Minitype swing machine carried for material
CN108390291A (en) A kind of outdoor voltage transformer maintenance special hoisting bar
CN201980882U (en) Simple electric hoist on offshore platform
CN216918477U (en) Electromechanical pipeline installation lift
CN212687325U (en) Hanging head mounting rack
CN208308231U (en) A kind of suspender for the handling of fork truck driving unit
CN211594270U (en) Rotatory grabbing device is used to high-order hacking machine
CN206952631U (en) A kind of miniature lifting machine
CN102384693B (en) Installation method of baffle plate in large-size heat exchanger
CN203295073U (en) Crane capable of accurately positioning sprayer
CN206717402U (en) A kind of hydraulic means
CN205294613U (en) General type hoisting accessory of wind -powered electricity generation gear box planetary gear
CN207932898U (en) A kind of novel integral box house side wall suspender
CN216190296U (en) Novel graphite drum hoist and mount frock
CN204154102U (en) A kind of big gear ring of rotary kiln latch plate Special tool for correcting
CN212503646U (en) Hoisting tool for large flange production
CN218426800U (en) Temperature and pressure reducing device convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant