Quick cooling device is used in building steel pipe processing
Technical Field
The utility model relates to the technical field of building steel pipes, in particular to a quick cooling device for processing a building steel pipe.
Background
The construction steel pipe has a hollow section, the length of which is much longer than the diameter or the perimeter, and is divided into round, square, rectangular and special-shaped steel pipes according to the section shape, and divided into carbon structural steel pipes, low alloy structural steel pipes, alloy steel pipes and composite steel pipes according to the material, and divided into steel pipes for conveying pipelines, engineering structures, thermal equipment, petrochemical industry, machine manufacturing, geological drilling, high pressure equipment, and the like according to the production process, and divided into seamless steel pipes and welded steel pipes according to the production process, wherein the seamless steel pipes are divided into hot rolling and cold rolling, the welded steel pipes are divided into straight welded steel pipes and spiral welded steel pipes, the steel pipes are not only used for conveying fluid and powdery solids, exchanging heat energy, manufacturing mechanical parts and containers, but also are economic steel, and the steel pipes are used for manufacturing building structure racks, pillars and mechanical supports, so that the weight can be reduced, and the industrial mechanized construction can be realized, the steel pipe is used for manufacturing the highway bridge, so that steel can be saved, construction is simplified, the area of a coating layer can be greatly reduced, investment and maintenance cost are saved, and after the building steel pipe is machined, the steel pipe needs to be quickly cooled, so that a quick cooling device for machining the building steel pipe is needed.
Traditional quick cooling device is used in building steel pipe processing, the water after cooling most often can not be concentrated when using and collect to can't carry out the recycle to the water after using, lead to probably wasting a large amount of water resources.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a rapid cooling device for processing a building steel pipe, which aims to solve the problems that the traditional rapid cooling device for processing a building steel pipe in the background art can not collect cooled water in a centralized way and can not recycle the used water, so that a great deal of water resources can be wasted.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a quick cooling device is used in building steel pipe processing, includes the cooler bin, the internally mounted of cooler bin has clearance mechanism, the top of cooler bin is installed and is retrieved the mechanism, the internally mounted of cooler bin has fixed establishment.
Preferably, clearance mechanism includes first spout, first slider and clearance case, first spout is all seted up in cooler bin inner wall both sides, the internally mounted of first spout has first slider, the inboard welding of first slider has the clearance case, through the setting of first spout, first slider and clearance case, and the water of having cooled off the steel pipe can get into inside the clearance case when using, can retrieve water, retrieves the back that finishes, and the inside impurity that contains the aquatic of clearance case can be with the outside pulling of clearance case, and the clearance case drives first slider and slides on first spout and takes out, clears up the impurity of inside.
Preferably, retrieve the mechanism and include water tank, water pipe and shower nozzle, the water tank welding is at the cooling tank top, the bottom of water tank is connected with the water pipe, the bottom of water pipe is linked together with the top of shower nozzle, through the setting of water tank, water pipe and shower nozzle, the inside water of water tank sprays the steel pipe that the below was placed through water pipe and shower nozzle when using, makes it carry out water-cooling work, can let it reach quick cooling action.
Preferably, retrieve the mechanism and still include connecting pipe, water pump and hose, the connecting pipe is connected in water tank outer wall one side, the water pump is installed to the one end of connecting pipe, the other end of water pump is connected with the hose, through the setting of connecting pipe, water pump and hose, starts the water pump and drives the water of clearing up incasement portion when using, flows into the inside recovery of water tank in hose and the connecting pipe, makes it can reach the effect of water economy resource.
Preferably, the fixing mechanism comprises a second sliding groove, a second sliding block, a sliding plate and a filter screen, the second sliding groove is formed in two sides of the inner wall of the cooling box, the second sliding block is installed inside the second sliding groove, the sliding plate is welded on the inner side of the second sliding block, the filter screen is installed on the inner wall of the sliding plate, the sliding plate is pulled towards one side when the fixing mechanism is used through the arrangement of the second sliding groove, the second sliding block is driven by the sliding plate to slide on the second sliding groove and be drawn out to the outside, and the steel pipe is placed above the fixing mechanism conveniently.
Preferably, constitute detachable construction through the screw between the outer wall of filter screen and the inner wall of sliding plate, and the filter screen is latticed structure, through the setting of filter screen, installs the filter screen to the sliding plate inner wall when using and fixes, is convenient for flow the water of cooling steel pipe in the clearance case of below through the filter screen.
Preferably, fixed establishment still includes fixed block, cardboard and cushion, the fixed block welding is at the top of filter screen, the top welding of fixed block has the cardboard, the cushion is installed at the top of cardboard, through the setting of fixed block, cardboard and cushion, installs the cushion and fixes the cardboard top when using, is convenient for play the guard action to the steel pipe of placing above.
(III) advantageous effects
Compared with the prior art, the utility model provides a rapid cooling device for building steel pipe processing, which has the following beneficial effects:
1. this quick cooling device is used in building steel pipe processing, through the water tank, the water pipe, the shower nozzle, the connecting pipe, the setting of water pump and hose, the inside water of water tank is sprayed the steel pipe that the below was placed through water pipe and shower nozzle when using, makes it carry out water-cooling work, can let it reach quick cooling action, activates the water pump again and drives the water of clearing incasement portion, flows into the inside recovery of water tank in hose and the connecting pipe, makes it can reach the effect of water economy resource.
2. This quick cooling device is used in building steel pipe processing, through the second spout, the second slider, the sliding plate, the filter screen, the fixed block, the setting of cardboard and cushion, install the filter screen sliding plate inner wall and fix, be convenient for pass through the cleaning box of filter screen inflow below with the water of cooling steel pipe, stimulate the sliding plate to one side when using, the sliding plate drives the second slider and slides on the second spout and takes out to the outside, be convenient for place the steel pipe in the top, install the cushion again and fix the cardboard top, be convenient for play the guard action to the steel pipe of placing in the top.
3. This quick cooling device is used in building steel pipe processing through the setting of first spout, first slider and clearance case, and the water of having cooled off the steel pipe when using can get into clearance incasement portion, can retrieve water, retrieves the back that finishes, and clearance incasement portion contains the impurity of aquatic, can outwards stimulate the clearance case, and the clearance case drives first slider and takes out on first spout, clears up the impurity of inside.
Drawings
FIG. 1 is a schematic front sectional view of the present invention;
FIG. 2 is a schematic structural diagram of the front view of the present invention;
FIG. 3 is a schematic top view of the present invention;
fig. 4 is a schematic structural diagram of the fixing mechanism of the present invention.
In the figure: 1. a cooling tank; 2. a cleaning mechanism; 201. a first chute; 202. a first slider; 203. cleaning the box; 3. a recovery mechanism; 301. a water tank; 302. a water pipe; 303. a spray head; 304. a connecting pipe; 305. a water pump; 306. a hose; 4. a fixing mechanism; 401. a second chute; 402. a second slider; 403. a sliding plate; 404. filtering with a screen; 405. a fixed block; 406. clamping a plate; 407. a soft cushion.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, a rapid cooling device for processing a building steel pipe comprises a cooling box 1, a cleaning mechanism 2 is installed inside the cooling box 1, the cleaning mechanism 2 comprises a first sliding chute 201, a first sliding block 202 and a cleaning box 203, the first sliding chute 201 is arranged on both sides of the inner wall of the cooling box 1, the first sliding block 202 is installed inside the first sliding chute 201, the cleaning box 203 is welded on the inner side of the first sliding block 202, water which has cooled the steel pipe during use enters the cleaning box 203 through the arrangement of the first sliding chute 201, the first sliding block 202 and the cleaning box 203, the water can be recovered, after recovery, the cleaning box 203 contains impurities in the water, the cleaning box 203 can be pulled outwards, the cleaning box 203 drives the first sliding block 202 to slide and draw out on the first sliding chute 201 to clean the impurities in the cleaning box, a recovery mechanism 3 is installed on the top of the cooling box 1, the recovery mechanism 3 comprises a water tank 301, a water pipe 302 and a spray head 303, the water tank 301 is welded on the top of the cooling tank 1, the bottom of the water tank 301 is connected with the water pipe 302, the bottom of the water pipe 302 is communicated with the top of the spray head 303, through the arrangement of the water tank 301, the water pipe 302 and the spray head 303, when in use, water in the water tank 301 is sprayed to a steel pipe placed below through the water pipe 302 and the spray head 303 to enable the steel pipe to carry out water cooling work, so that the quick cooling effect can be achieved, the recovery mechanism 3 further comprises a connecting pipe 304, a water pump 305 and a hose 306, the connecting pipe 304 is connected to one side of the outer wall of the water tank 301, one end of the connecting pipe 304 is provided with the water pump 305, the other end of the water pump 305 is connected with the hose 306, through the arrangement of the connecting pipe 304, the water pump 305 and the hose 306, when in use, the water in the cleaning tank 203 is driven by the water pump 305 to flow into the water tank 301 from the hose 306 and the connecting pipe 304 for recovery, so that the effect of saving water resources can be achieved, a fixing mechanism 4 is installed inside the cooling box 1, the fixing mechanism 4 comprises a second chute 401, a second sliding block 402, a sliding plate 403 and a filter screen 404, the second chute 401 is arranged on two sides of the inner wall of the cooling box 1, the second sliding block 402 is installed inside the second chute 401, the sliding plate 403 is welded on the inner side of the second sliding block 402, the filter screen 404 is installed on the inner wall of the sliding plate 403, through the arrangement of the second chute 401, the second sliding block 402 and the sliding plate 403, when in use, the sliding plate 403 is pulled to one side, the sliding plate 403 drives the second sliding block 402 to slide and be drawn out to the outside on the second chute 401, so that a steel pipe can be placed above, a detachable structure is formed between the outer wall of the filter screen 404 and the inner wall of the sliding plate 403 through screws, the filter screen 404 is in a grid structure, and through the arrangement of the filter screen 404, the filter screen 404 is installed on the inner wall of the sliding plate 403 to be fixed when in use, in being convenient for flow into the cleaning box 203 of below through filter screen 404 with the water of cooling steel pipe, fixed establishment 4 still includes fixed block 405, cardboard 406 and cushion 407, fixed block 405 welds the top at filter screen 404, the top welding of fixed block 405 has cardboard 406, cushion 407 is installed at the top of cardboard 406, through fixed block 405, cardboard 406 and cushion 407's setting, install cushion 407 to cardboard 406 top when using and fix, be convenient for play the guard action to the steel pipe of placing above.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
Before the device is used, an external power supply is connected, when the device is used, the sliding plate 403 is pulled to one side, the sliding plate 403 drives the second sliding block 402 to slide and draw out on the second sliding groove 401 to the outside, a steel pipe is placed above the sliding plate, the cushion 407 is installed on the top of the clamping plate 406 to be fixed, the steel pipe placed above the sliding plate is protected, water in the water tank 301 is sprayed to the steel pipe placed below the sliding plate through the water pipe 302 and the spray head 303 to carry out water cooling operation, the steel pipe can achieve a rapid cooling effect, a water pump 305 is started to drive water in the cleaning tank 203 to flow into the water tank 301 from the hose 306 and the connecting pipe 304 to be recovered, the water can achieve a water resource saving effect, when the device is used, the water after cooling the steel pipe enters the cleaning tank 203 to be recovered, after the water is recovered, impurities in the cleaning tank 203 are contained in the water, the cleaning box 203 can be pulled outwards, the cleaning box 203 drives the first sliding block 202 to slide and draw out on the first sliding groove 201, and impurities in the cleaning box are cleaned, wherein the water pump 305 is PW-175 EAH.
To sum up, this quick cooling device is used in building steel pipe processing, through water tank 301, water pipe 302, shower nozzle 303, connecting pipe 304, the setting of water pump 305 and hose 306, the inside water of water tank 301 sprays the steel pipe that the below was placed through water pipe 302 and shower nozzle 303 when using, make it carry out water-cooling work, can let it reach quick cooling effect, it drives the inside water of clearance case 203 to start water pump 305 again, it retrieves to flow into water tank 301 inside from hose 306 and connecting pipe 304, make it can reach the effect of water economy resource.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.