CN216479309U - Pipe clamping opening combined structure with high use stability - Google Patents

Pipe clamping opening combined structure with high use stability Download PDF

Info

Publication number
CN216479309U
CN216479309U CN202122656831.2U CN202122656831U CN216479309U CN 216479309 U CN216479309 U CN 216479309U CN 202122656831 U CN202122656831 U CN 202122656831U CN 216479309 U CN216479309 U CN 216479309U
Authority
CN
China
Prior art keywords
arc
connecting rod
clamp
arc clamp
dwang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122656831.2U
Other languages
Chinese (zh)
Inventor
郭宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yingkou Liaohe Pipe Fittings Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122656831.2U priority Critical patent/CN216479309U/en
Application granted granted Critical
Publication of CN216479309U publication Critical patent/CN216479309U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a pipe clamp opening combined structure with high use stability, which comprises an inner side supporting rod, wherein a first arc-shaped clamp is arranged at the upper end position of the inner side supporting rod, a second arc-shaped clamp is arranged at the upper part position of the first arc-shaped clamp, side mounting holes are formed in the two sides of the first arc-shaped clamp and the second arc-shaped clamp, side bolts are arranged in the side mounting holes, side circular mounting plates are arranged at the two ends of the first arc-shaped clamp and the second arc-shaped clamp, a first rotating rod is arranged at one end of the first arc-shaped clamp, and a second rotating rod is arranged at the other end of the first arc-shaped clamp. The utility model relates to a pipe clamping opening combined structure with high use stability, belonging to the field of pipes.

Description

Pipe clamping opening combined structure with high use stability
Technical Field
The utility model relates to the field of combined structures, in particular to a pipe clamping opening combined structure with high use stability.
Background
The pipe is at the in-process that uses, and some pipe clamp mouth integrated configuration often need be used, and pipe clamp mouth integrated configuration mainly installs fixedly through two curved clamps through bolt structure to the pipe, uses fairly simple and conveniently, but in the use that uses, because bolt structure is not hard up easily, leads to pipe clamp mouth integrated configuration's stability not high, and also not very convenient in the installation.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a pipe clamping opening combined structure with high use stability, which can effectively solve the problems in the background technology.
In order to realize the purpose, the utility model adopts the technical scheme that:
a pipe clamp mouth combined structure with high use stability comprises an inner side support rod, wherein a first arc-shaped clamp is arranged at the upper end position of the inner side support rod, a second arc-shaped clamp is arranged at the upper part position of the first arc-shaped clamp, side mounting holes are formed in the two side positions of the first arc-shaped clamp and the second arc-shaped clamp, side bolts are arranged in the side mounting holes, two ends of the first arc-shaped clamp and the second arc-shaped clamp are respectively provided with a side circular mounting plate, one end of the first arc-shaped clamp is provided with a first rotating rod, the other end of the first arc-shaped clamp is provided with a second rotating rod, one end of the second arc-shaped clamp is provided with a third rotating rod, the other end of the second arc-shaped clamp is provided with a fourth fixing rod, a first lower connecting rod is arranged on the first rotating rod, and a first accommodating pipe body is arranged on the first lower connecting rod, the storage tube is characterized in that a first internal connecting rod is arranged in the storage tube body, a second lower connecting rod is arranged on the second rotating rod, a second storage tube body is arranged on the second lower connecting rod, and a second internal connecting rod is arranged in the second storage tube body.
Preferably, the position that corresponds a dwang, No. two dwangs and No. three dwangs on the circular mounting panel in side is provided with the through-hole, the both ends position of a dwang, No. two dwangs and No. three dwangs is provided with side baffle.
Preferably, an inner side mounting plate is arranged at the bottom of the inner side support rod, and an inner side mounting hole is formed in the inner side mounting plate.
Preferably, the lower extreme position of an inside connecting rod is provided with an inside baffle, be provided with a spring in the top position that is located an inside baffle on an inside connecting rod, and a spring movable mounting take in the pipe body No. one, the upper end and the dwang movable mounting No. three of an inside connecting rod.
Preferably, the lower extreme position of No. two inside connecting rods is provided with No. two inside baffles equally, the top position that is located No. two inside baffles in No. two inside connecting rods is provided with No. two springs, No. two springs same movable mounting are in No. two accomodate the pipe body, the upper end position of No. two inside connecting rods is provided with the couple.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the first arc-shaped clamp and the second arc-shaped clamp are fixed on two sides through the first storage pipe body and the second storage pipe body, and the auxiliary side bolt structure is fixed together, so that the structures of the first arc-shaped clamp and the second arc-shaped clamp are more stable, the possibility of loosening is reduced, and through the structure, after the first storage pipe body and the second storage pipe body are primarily fixed, the clamps do not need to be manually supported during installation of side bolts, and the structure is more convenient.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic cross-sectional view of a first receiving tube of the present invention;
fig. 4 is a schematic cross-sectional view of a second receiving tube of the present invention.
In the figure: 1. an inner side support bar; 2. an inner side mounting plate; 3. an inner side mounting hole; 4. a first arc-shaped hoop; 5. a second arc-shaped hoop; 6. a side mounting hole; 7. a side bolt; 8. a side circular mounting plate; 9. a side baffle; 10. a first rotating rod; 11. a second rotating rod; 12. a third rotating rod; 13. a fourth fixing rod; 14. a first receiving pipe body; 15. a second accommodating tube body; 16. a first lower connecting rod; 17. a first internal connecting rod; 18. an inner baffle; 19. a first spring; 20. a second lower connecting rod; 21. a second internal connecting rod; 22. a second internal baffle; 23. a second spring; 24. and (4) hanging hooks.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
As shown in figures 1-4, a pipe clamp mouth combined structure with high use stability comprises an inner side support rod 1, a first arc clamp 4 is arranged at the upper end of the inner side support rod 1, a second arc clamp 5 is arranged at the upper part of the first arc clamp 4, side mounting holes 6 are arranged at two sides of the first arc clamp 4 and the second arc clamp 5, side bolts 7 are arranged in the side mounting holes 6, side circular mounting plates 8 are arranged at two ends of the first arc clamp 4 and the second arc clamp 5, a first rotating rod 10 is arranged at one end of the first arc clamp 4, a second rotating rod 11 is arranged at the other end of the first arc clamp 4, a third rotating rod 12 is arranged at one end of the second arc clamp 5, a fourth fixing rod 13 is arranged at the other end of the second arc clamp 5, and a first lower connecting rod 16 is arranged on the first rotating rod 10, no. one is provided with storage tube body 14 on lower part connecting rod 16, is provided with internal connecting rod 17 in No. one storage tube body 14, is provided with No. two lower part connecting rods 20 on No. two dwang 11, is provided with No. two storage tube bodies 15 on No. two lower part connecting rods 20, is provided with No. two internal connecting rod 21 in No. two storage tube bodies 15.
In this embodiment, in order to facilitate installation of a rotating rod 10, a rotating rod 11 and a rotating rod 12, through holes are formed in positions corresponding to the rotating rod 10, the rotating rod 11 and the rotating rod 12 on the circular side mounting plate 8, and side baffles 9 are arranged at two end positions of the rotating rod 10, the rotating rod 11 and the rotating rod 12.
In this embodiment, for the convenience of supporting arc clamp 4 and No. two arc clamps 5, the bottom position of inboard bracing piece 1 is provided with inboard mounting panel 2, is provided with inboard mounting hole 3 on the inboard mounting panel 2.
In this embodiment, in order to facilitate installation of the first internal connecting rod 17, the lower end of the first internal connecting rod 17 is provided with the first internal baffle 18, the first internal connecting rod 17 is provided with the first spring 19 above the first internal baffle 18, the first spring 19 is movably installed in the first accommodating tube 14, and the upper end of the first internal connecting rod 17 and the third rotating rod 12 are movably installed.
In addition, No. two inside connecting rods 21's lower extreme position is provided with No. two inside baffle 22 similarly, and No. two inside connecting rods 21 is provided with No. two springs 23 in the position that is located No. two inside baffle 22's top position, and No. two springs 23 are the same movable mounting in No. two storage tube body 15, and No. two inside connecting rods 21's upper end position is provided with couple 24, for the convenience of No. two inside connecting rods 21.
It should be noted that the utility model is a pipe clamping mouth combined structure with high use stability, a pipe is placed in a first arc-shaped clamping hoop 4, then a second arc-shaped clamping hoop 5 is pulled, a first internal connecting rod 17 is pulled, the first internal connecting rod 17 moves outwards, a first spring 19 is compressed by a moving first internal baffle 18, the second arc-shaped clamping hoop 5 is covered on the pipe, a second internal connecting rod 21 is pulled outwards, a second internal baffle 22 moves outwards synchronously, a hook 24 moves outwards, the hook 24 is installed on a fourth fixing rod 13, the second arc-shaped clamping hoop 5 and the first arc-shaped clamping hoop 4 are fixed to each other preliminarily through structures such as the hook 24, the structure assists a subsequent side bolt 7 structure to fix the structures of the first arc-shaped clamping hoop 4 and the second arc-shaped clamping hoop 5 together, and the fixing structure is more stable, reduce not hard up possibility of producing, and after couple 24 tentatively fixed an arc clamp 4 and No. two arc clamps 5, during installation side bolt 7, do not need manual fixed an arc clamp 4 or and No. two arc clamps 5, it is more convenient to install.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. While only the preferred embodiment of the present invention has been illustrated and described in detail, it should be understood that the utility model is not limited thereto, but is capable of numerous changes, modifications, substitutions and alterations all falling within the scope of the appended claims without departing from the spirit and scope of the present invention as set forth herein. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides an use high pipe of steadiness and press from both sides a mouthful integrated configuration which characterized in that: comprises an inner side support rod (1), wherein a first arc clamp (4) is arranged at the upper end position of the inner side support rod (1), a second arc clamp (5) is arranged at the upper part position of the first arc clamp (4), side mounting holes (6) are formed in the two side positions of the first arc clamp (4) and the second arc clamp (5), a side bolt (7) is arranged in each side mounting hole (6), side circular mounting plates (8) are arranged at the two ends of the first arc clamp (4) and the second arc clamp (5), a first rotating rod (10) is arranged at one end of the first arc clamp (4), a second rotating rod (11) is arranged at the other end of the first arc clamp (4), a third rotating rod (12) is arranged at one end of the second arc clamp (5), and a fourth fixing rod (13) is arranged at the other end of the second arc clamp (5), be provided with lower part connecting rod (16) No. one on dwang (10), be provided with on lower part connecting rod (16) and accomodate body (14) No. one, be provided with inside connecting rod (17) No. one in accomodating body (14), be provided with No. two lower part connecting rods (20) on No. two dwang (11), be provided with No. two on No. two lower part connecting rods (20) and accomodate body (15), be provided with No. two inside connecting rods (21) in No. two accomodating body (15).
2. A pipe clamp assembly of claim 1, wherein said assembly further comprises: the position that corresponds a dwang (10), No. two dwangs (11) and No. three dwang (12) on circular mounting panel (8) in side is provided with the through-hole, the both ends position of a dwang (10), No. two dwangs (11) and No. three dwang (12) is provided with side shield (9).
3. A pipe clamp assembly with high stability in use according to claim 2, wherein: the bottom position of inboard bracing piece (1) is provided with inboard mounting panel (2), be provided with inboard mounting hole (3) on inboard mounting panel (2).
4. A pipe clamp assembly with high stability in use according to claim 3, wherein: the lower extreme position of an inside connecting rod (17) is provided with inside baffle (18) No. one, inside connecting rod (17) are gone up and are being provided with spring (19) in the top position that is located inside baffle (18) No. one, and spring (19) movable mounting take in body (14) No. one, the upper end and No. three dwang (12) movable mounting of inside connecting rod (17).
5. A pipe clamp mouth composite structure with high use stability according to claim 4, wherein: the lower extreme position of No. two inside connecting rod (21) is provided with No. two inside board (22) equally, the top position that is located No. two inside board (22) in No. two inside connecting rod (21) is provided with No. two spring (23), No. two same movable mounting of spring (23) is in No. two storage tube body (15), the upper end position of No. two inside connecting rod (21) is provided with couple (24).
CN202122656831.2U 2021-11-02 2021-11-02 Pipe clamping opening combined structure with high use stability Active CN216479309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122656831.2U CN216479309U (en) 2021-11-02 2021-11-02 Pipe clamping opening combined structure with high use stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122656831.2U CN216479309U (en) 2021-11-02 2021-11-02 Pipe clamping opening combined structure with high use stability

Publications (1)

Publication Number Publication Date
CN216479309U true CN216479309U (en) 2022-05-10

Family

ID=81444303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122656831.2U Active CN216479309U (en) 2021-11-02 2021-11-02 Pipe clamping opening combined structure with high use stability

Country Status (1)

Country Link
CN (1) CN216479309U (en)

Similar Documents

Publication Publication Date Title
CN216479309U (en) Pipe clamping opening combined structure with high use stability
CN218326581U (en) Locking device for pipe fitting hoisting elevator
CN214579349U (en) A gallows suitable for multiple pipe diameter
CN211030469U (en) Test water-reducing agent and concrete adaptability's plain bumper clamping device for examination mould
CN209509246U (en) A kind of attachment device of glass partition
CN218229386U (en) Adjustable detachable fixing device for ship air pipe
CN216976041U (en) Auxiliary support for pipeline optimization
CN204967181U (en) Auto -lock stores pylon
CN210249114U (en) Simple table and chair integrated device
CN220622981U (en) Adjustable pump line attaches wall mount
CN205437624U (en) Catalyst converter assembly welding jig for automobile exhaust
CN219735288U (en) Boiler outer wall fixing device
CN217317771U (en) Quick positioning and adjusting tool for balance elbow of tracked vehicle
CN218241559U (en) Voltage transformer convenient to maintain installation stability
CN216633200U (en) Car pipe fitting pipe end clamp welded fastening device
CN217380788U (en) Hinged type mounting frame for wind power generation tower and with outwards extending support
CN215850968U (en) Passenger train headlamp installation sectional shelf-unit
CN212815829U (en) Bottled water support convenient to adjust
CN216685715U (en) Self-locking tarpaulin supporting rod device
CN219832352U (en) Amorphous transformer mounting base
CN217762411U (en) Pipe gallery supporting and hanging frame for urban underground pipeline comprehensive pipe gallery
CN215568475U (en) A pipeline safety fixed equipment for oil gas collection engineering
CN214618673U (en) Single-span photographic camera mounting bracket
CN220805987U (en) Full-coverage type welding device for corrugated pipe
CN218324181U (en) Integrated communication tower supported by three legs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231115

Address after: 115006 Nie Jia Cun, Liushu Town, Laobian District, Yingkou City, Liaoning Province

Patentee after: YINGKOU LIAOHE PIPE FITTINGS Co.,Ltd.

Address before: 110000 4-6-2, 16-3, zhongxuetang Road, Dadong District, Shenyang City, Liaoning Province

Patentee before: Guo Hong