CN216476471U - High-altitude structure body installation device for factory building construction - Google Patents

High-altitude structure body installation device for factory building construction Download PDF

Info

Publication number
CN216476471U
CN216476471U CN202123239143.2U CN202123239143U CN216476471U CN 216476471 U CN216476471 U CN 216476471U CN 202123239143 U CN202123239143 U CN 202123239143U CN 216476471 U CN216476471 U CN 216476471U
Authority
CN
China
Prior art keywords
rope
building construction
factory building
install
installation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123239143.2U
Other languages
Chinese (zh)
Inventor
王永亮
程津超
吴宪
张耀明
王林杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Installation Engineering Co ltd
Original Assignee
Tianjin Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Installation Engineering Co ltd filed Critical Tianjin Installation Engineering Co ltd
Priority to CN202123239143.2U priority Critical patent/CN216476471U/en
Application granted granted Critical
Publication of CN216476471U publication Critical patent/CN216476471U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to a building technical field especially relates to a factory building construction is with high altitude structure installation device, a serial communication port, include: the main part mechanism, supporting mechanism, motion and stop gear, main part mechanism include the box, connecting plate and roof, and the roof is installed at the box top, and the connecting plate is installed to box upper portion four corners department, and supporting mechanism is installed on roof both sides upper portion, and supporting mechanism includes the back shaft, mounting hole and support ring, and the support ring is installed at the back shaft top, and the inside mounting hole that is equipped with of support ring, motion are installed to the back shaft inboard, and motion includes a rope section of thick bamboo and shell, and the shell is installed on a rope section of thick bamboo right side, and stop gear is installed in the rope section of thick bamboo outside, the utility model discloses a two rope installations, a rope is spacing usefulness, and a rope is for removing, when guaranteeing support intensity, also can guarantee the device and remove safely in the high altitude.

Description

High-altitude structure body installation device for factory building construction
Technical Field
The utility model relates to a building technical field especially relates to a factory building construction is with high altitude structure installation device.
Background
In recent years, with the vigorous development of economic markets in China, the number of flow production lines of factory workshops is increased, the scale of light steel industrial factory buildings is continuously enlarged, and door type light steel frames are widely adopted. Along with the continuous promotion of factory building height, the degree of difficulty of the installation construction of high altitude structure is also bigger and bigger.
Therefore, the high-altitude structure body mounting device for the factory building construction is provided, double-rope mounting is adopted, one rope is used for limiting, the other rope is used for moving, and the high-altitude structure body mounting device can be guaranteed to safely move in the high altitude while the supporting strength is guaranteed.
SUMMERY OF THE UTILITY MODEL
In order to overcome prior art's not enough, the utility model aims to provide a factory building construction is with high altitude structure installation device adopts two rope installations, and a rope is spacing usefulness, and a rope is for removing usefulness, when guaranteeing to support intensity, also can guarantee the device and remove safely in the high altitude.
The utility model discloses a following technical scheme realizes: the utility model provides a factory building construction is with high altitude structure installation device which characterized in that includes: main part mechanism, supporting mechanism, motion and stop gear, main part mechanism include box, connecting plate and roof, the box top install the roof, box upper portion four corners department install the connecting plate, roof both sides upper portion install supporting mechanism, supporting mechanism include back shaft, mounting hole and support ring, back shaft top install the support ring, the inside mounting hole that is equipped with of support ring, the back shaft inboard install motion, motion include rope section of thick bamboo and shell, rope section of thick bamboo right side install the shell, the rope section of thick bamboo outside install stop gear.
Further, the main body mechanism further comprises air holes and a grid plate, the grid plate is installed on the outer side of the box body, and the air holes are formed in the two sides of the grid plate.
Further, the supporting mechanism further comprises a fixing shaft and a fixing cross shaft, supporting shafts are mounted on the upper portions of the two sides of the top plate, the fixing shaft is mounted on the outer side of the top plate, the supporting shaft is mounted on the upper portion of the fixing shaft, and the fixing cross shaft is mounted in the middle of the supporting shaft.
Further, the motion mechanism still include tensile rope, ropewinder and driving motor, a rope section of thick bamboo install inside the mounting hole, the inside right part of shell install driving motor, driving motor left side install the ropewinder, the ropewinder outside install tensile rope.
Further, stop gear still include fixing base, bracing piece, spacing pipe and spacing hole, the rope drum outside install the fixing base, fixing base upper portion install the bracing piece, bracing piece upper portion install spacing pipe, spacing intraductal spacing hole that is equipped with.
Furthermore, the fixing seat is connected with the rope drum in an installing mode through welding.
Furthermore, the fixed shaft is connected with the top plate through a bolt.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model provides a factory building construction is with high altitude structure installation device, the utility model discloses an air vent and grid tray of installation can make the device meet when strong wind blows in the high altitude, reduce lifting surface area to reduce the influence that the device received wind-force, guarantee the stability of device.
2. The utility model provides a factory building construction is with high altitude structure installation device, the utility model discloses a driving motor of installation can drive the serving ware and receive and release the action for tensile rope drives the removal of whole device, and convenient to use installs simply.
3. The utility model provides a factory building construction is with high altitude structure installation device, the utility model discloses a spacing hole that is equipped with in spacing intraductal can make the rope penetrate, when the device removes, can provide the accurate direction of removal for the device, guarantees the accuracy that the device removed
Drawings
FIG. 1 is a front view of the installation device of high-altitude structure for factory building construction of the present invention;
FIG. 2 is a front view of the installation device of high altitude structure for factory building construction of the present invention;
fig. 3 is a right side view of the utility model of a high altitude structure installation device for factory building construction.
In the figure: 1. a main body mechanism; 2. a support mechanism; 3. a motion mechanism; 4. a limiting mechanism; 101. a box body; 102. a vent hole; 103. a grid plate; 104. a connecting plate; 105. a top plate; 201. a fixed shaft; 202. a support shaft; 203. fixing the cross shaft; 204. mounting holes; 205. a support ring; 301. stretching the rope; 302. a rope drum; 303. a housing; 304. a rope winder; 305. a drive motor; 401. a fixed seat; 402. a support bar; 403. A limiting pipe; 404. and a limiting hole.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that the embodiments or technical features described below can be arbitrarily combined to form a new embodiment without conflict.
As shown in fig. 1 to 3, a high-altitude structure installation device for factory building construction is characterized by comprising: main body mechanism 1, supporting mechanism 2, motion 3 and stop gear 4, main body mechanism 1 includes box 101, connecting plate 104 and roof 105, roof 105 is installed at the box 101 top, connecting plate 104 is installed to box 101 upper portion four corners department, supporting mechanism 2 is installed on roof 105 both sides upper portion, supporting mechanism 2 includes back shaft 202, mounting hole 204 and support ring 205, support ring 205 is installed at back shaft 202 top, the inside mounting hole 204 that is equipped with of support ring 205, motion 3 is installed to back shaft 202 inboard, motion 3 includes rope reel 302 and shell 303, shell 303 is installed on rope reel 302 right side, stop gear 4 is installed in the rope reel 302 outside.
Main body mechanism 1 still includes air vent 102 and grid plate 103, grid plate 103 is installed in the box 101 outside, grid plate 103 both sides are equipped with air vent 102, air vent 102 and grid plate 103 through the installation, can make the device meet when strong wind blows in the high altitude, reduce the lifting surface area, thereby reduce the influence that the device received wind-force, guarantee the stability of device, supporting mechanism 2 still includes fixed axle 201 and fixed cross axle 203, back shaft 202 is installed on roof 105 both sides upper portion, fixed axle 201 is installed in the roof 105 outside, back shaft 202 is installed on fixed axle 201 upper portion, back shaft 202 mid-mounting has fixed cross axle 203.
The motion mechanism 3 further comprises a stretching rope 301, a rope winder 304 and a driving motor 305, the rope drum 302 is installed inside the installation hole 204, the driving motor 305 is installed at the right part inside the shell 303, the specific model of the driving motor 305 used by the utility model is 80ST-M01330LBX, the power is 400w, the voltage is 220V, the rotating speed is 3000r/min, the rope winder 304 is installed at the left side of the driving motor 305, the stretching rope 301 is installed at the outer side of the rope winder 304, the rope winder 304 can be driven to perform retraction through the installed driving motor 305, so that the stretching rope 301 drives the whole device to move, the use is convenient, the installation is simple, the limiting mechanism 4 further comprises a fixed seat 401, a supporting rod 402, a limiting pipe 403 and a limiting hole 404, the fixed seat 401 is installed at the outer side of the rope drum 302, the supporting rod 402 is installed at the upper part of the fixed seat 401, the limiting pipe 403 is installed at the upper part of the supporting rod 402, the limiting hole 404 is arranged in the limiting pipe 403, through spacing hole 404 that is equipped with in spacing pipe 403, can make the rope penetrate, when the device removed, can provide the accurate direction of removal for the device, guarantee the accuracy that the device removed, fixing base 401 is through welding and rope section of thick bamboo 302 erection joint, and fixed axle 201 passes through bolt and roof 105 erection joint.
As shown in fig. 1 to 3, in the present embodiment, a top plate 105 is installed on the top of a box 101 in a main body mechanism 1, a connecting plate 104 is installed on four corners of the upper portion of the box 101, supporting mechanisms 2 are installed on the upper portions of two sides of the top plate 105, a supporting ring 205 is installed on the top of a supporting shaft 202 in the supporting mechanism 2, an installation hole 204 is formed in the supporting ring 205, a movement mechanism 3 is installed on the inner side of the supporting shaft 202, a housing 303 is installed on the right side of a rope drum 302 in the movement mechanism 3, a limiting mechanism 4 is installed on the outer side of the rope drum 302, a grid plate 103 is installed on the outer side of the box 101, air holes 102 are formed on two sides of the grid plate 103, supporting shafts 202 are installed on the upper portions of two sides of the top plate 105, a fixed shaft 201 is installed on the outer side of the top plate 105, a supporting shaft 202 is installed on the upper portion of the fixed shaft 202, a fixed cross shaft 203 is installed in the middle portion of the rope drum 302, a driving motor 305 is installed on the right portion in the housing 303, rope winder 304 is installed on driving motor 305 left side, and tensile rope 301 is installed to the rope winder 304 outside, and fixing base 401 is installed in the rope drum 302 outside, and bracing piece 402 is installed on fixing base 401 upper portion, and spacing pipe 403 is installed on bracing piece 402 upper portion, is equipped with spacing hole 404 in the spacing pipe 403, and fixing base 401 is through welding and rope drum 302 erection joint, and fixed axle 201 passes through bolt and roof 105 erection joint.
It should be understood that although the present description refers to embodiments, not every embodiment contains only a single technical solution, and such description is for clarity only, and those skilled in the art should take the description as a whole, and the technical solutions in the embodiments may be appropriately combined to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a factory building construction is with high altitude structure installation device which characterized in that includes: the rope support mechanism comprises a main body mechanism (1), a supporting mechanism (2), a moving mechanism (3) and a limiting mechanism (4), wherein the main body mechanism (1) comprises a box body (101), a connecting plate (104) and a top plate (105), the top plate (105) is installed at the top of the box body (101), the connecting plate (104) is installed at four corners of the upper portion of the box body (101), the supporting mechanism (2) is installed on the upper portions of two sides of the top plate (105), the supporting mechanism (2) comprises a supporting shaft (202), a mounting hole (204) and a supporting ring (205), the supporting ring (205) is installed at the top of the supporting shaft (202), the mounting hole (204) is formed in the inside of the supporting ring (205), the moving mechanism (3) is installed on the inner side of the supporting shaft (202), the moving mechanism (3) comprises a rope drum (302) and a shell (303), the shell (303) is installed on the right side of the rope drum (302), and a limiting mechanism (4) is arranged on the outer side of the rope drum (302).
2. The high-altitude structure installation device for factory building construction according to claim 1, characterized in that: the main body mechanism (1) further comprises vent holes (102) and a grid plate (103), the grid plate (103) is installed on the outer side of the box body (101), and the vent holes (102) are formed in the two sides of the grid plate (103).
3. The high-altitude structure installation device for factory building construction according to claim 1, characterized in that: supporting mechanism (2) still include fixed axle (201) and fixed cross axle (203), roof (105) both sides upper portion install back shaft (202), roof (105) outside install fixed axle (201), fixed axle (201) upper portion install back shaft (202), back shaft (202) mid-mounting fixed cross axle (203).
4. The high-altitude structure installation device for factory building construction according to claim 1, characterized in that: motion (3) still include tensile rope (301), ropewinder (304) and driving motor (305), rope reel (302) install inside mounting hole (204), the inside right part of shell (303) install driving motor (305), driving motor (305) left side install ropewinder (304), ropewinder (304) outside install tensile rope (301).
5. The high-altitude structure installation device for factory building construction according to claim 1, characterized in that: stop gear (4) still include fixing base (401), bracing piece (402), spacing pipe (403) and spacing hole (404), rope drum (302) outside install fixing base (401), fixing base (401) upper portion install bracing piece (402), bracing piece (402) upper portion install spacing pipe (403), spacing pipe (403) in be equipped with spacing hole (404).
6. The high-altitude structure installation device for factory building construction according to claim 5, characterized in that: the fixing seat (401) is connected with the rope drum (302) in an installing mode through welding.
7. The high-altitude structure installation device for factory building construction according to claim 3, characterized in that: the fixed shaft (201) is connected with the top plate (105) through a bolt.
CN202123239143.2U 2021-12-21 2021-12-21 High-altitude structure body installation device for factory building construction Active CN216476471U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123239143.2U CN216476471U (en) 2021-12-21 2021-12-21 High-altitude structure body installation device for factory building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123239143.2U CN216476471U (en) 2021-12-21 2021-12-21 High-altitude structure body installation device for factory building construction

Publications (1)

Publication Number Publication Date
CN216476471U true CN216476471U (en) 2022-05-10

Family

ID=81425012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123239143.2U Active CN216476471U (en) 2021-12-21 2021-12-21 High-altitude structure body installation device for factory building construction

Country Status (1)

Country Link
CN (1) CN216476471U (en)

Similar Documents

Publication Publication Date Title
CN212315361U (en) Hoisting equipment for maintenance of wind power engine room
CN216476471U (en) High-altitude structure body installation device for factory building construction
CN207162024U (en) A kind of bridge monitoring equipment used suitable for bad weather
CN114909623A (en) Intelligent lifting mounting bracket for tunnel lamp
CN215546563U (en) Motor inner core installation frock
CN214584728U (en) Wisdom building site construction environmental monitoring system
CN215107051U (en) Horizontal balance lifting appliance for installing unit type curtain wall
CN210418899U (en) Wind generating set becomes oar reduction gear hoist
CN210398725U (en) Solar energy lighthouse lifting equipment for navigation
CN111697915B (en) Energy-saving building capable of fully utilizing solar energy
CN212898795U (en) Wind power generation steel structure with ladder stand
CN212271341U (en) Detachable photovoltaic curtain wall
CN210512211U (en) A outer wall suspended support for photovoltaic module
CN109944739B (en) Installation method of externally-hung vertical axis wind power generation equipment
CN217153986U (en) Intelligent lifting mounting bracket for tunnel lamp
CN210260984U (en) Power lifting mechanism for automatic lead screw mounting machine
CN219000157U (en) Automatic cleaning device of miniature intelligent glass curtain wall
CN214298986U (en) Be used for supplementary hoisting device of building door and window construction
CN210637759U (en) Energy-saving self-priming pump
CN221141038U (en) Automobile overhauling frame
CN215109577U (en) Energy-saving high-efficiency large industrial ceiling fan
CN219051739U (en) Automatic spraying equipment for outer wall of wind power tower
CN211976372U (en) Video surveillance camera support
CN219754192U (en) Telegraph pole convenient for wire erection
CN215711340U (en) Wipe window machine swift formula to rise device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant