CN216476394U - Wire net structure of blocking of jumping storehouse method construction - Google Patents

Wire net structure of blocking of jumping storehouse method construction Download PDF

Info

Publication number
CN216476394U
CN216476394U CN202123353958.3U CN202123353958U CN216476394U CN 216476394 U CN216476394 U CN 216476394U CN 202123353958 U CN202123353958 U CN 202123353958U CN 216476394 U CN216476394 U CN 216476394U
Authority
CN
China
Prior art keywords
fixed steel
baffle
front side
auxiliary frame
upper side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123353958.3U
Other languages
Chinese (zh)
Inventor
刘林
阙兴强
李三才
吴刚
沈如健
方培忆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202123353958.3U priority Critical patent/CN216476394U/en
Application granted granted Critical
Publication of CN216476394U publication Critical patent/CN216476394U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of retaining structures, and discloses a steel wire mesh retaining structure constructed by a skip method, which comprises a fixed steel plate and a baffle plate, wherein the upper side of the fixed steel plate is provided with a plurality of groups of supporting rods at equal intervals, the upper side of the fixed steel plate is uniformly provided with a plurality of groups of grooves matched with the supporting rods, the front side of the baffle plate is provided with a limiting rod, the rear side of the supporting rod is provided with a limiting groove matched with the limiting rod, the front side of the baffle plate is connected with a plurality of groups of limiting blocks at equal intervals, the width of the limiting blocks is matched with the supporting rods, the front side of the plurality of groups of supporting rods is connected with an auxiliary frame, the front sides of the plurality of groups of supporting rods and the upper side of the auxiliary frame are provided with screw holes matched with the baffle plate, the upper side of the fixed steel plate is provided with clamping grooves matched with the baffle plate, the novel scheme can block the baffle plate by arranging the fixed steel plate to be matched with the supporting rods, it itself also can dismantle fast and install, and supplementary baffle is accomplished and is blockked concrete.

Description

Wire net structure of blocking of jumping storehouse method construction
Technical Field
The utility model belongs to the technical field of block the structure, specifically be a wire net structure of blocking of jumping storehouse method construction.
Background
The jumping warehouse method is to divide the building foundation or large area concrete plane mechanism into several areas and to construct according to the principle of 'block planning, partition block construction, layered pouring and integral forming', the mode is the same as that of Chinese checkers, i.e. one section is poured at intervals, and the interval time of two adjacent sections is not less than 7 days, so as to avoid the violent temperature difference and drying action of the initial section of concrete construction, thus the post-pouring zone is not needed.
In the construction process, the concrete intensity level that the different positions of building need pour exists differently, so the concrete of different intensity levels is when pouring, need set up the blocking instrument, prevent the concrete from flowing into the building position of other grade intensity, the present blocking instrument is mostly for assembling together such as wire rope or steel sheet, it is comparatively troublesome at the group in-process, still consider the dismantlement after the equipment finishes simultaneously, need carry out the violence dismantlement to blockking the equipment because of concrete is fixed to finish, so need consider after the violence dismantlement, the phenomenon that unable equipment may appear in the blocking device, for this reason, we propose a wire net blocking structure of jumping the construction of storehouse method.
SUMMERY OF THE UTILITY MODEL
To the above situation, for overcoming prior art's defect, the utility model provides a wire net of jumping storehouse method construction blocks structure, the effectual building construction process that has solved, the concrete intensity level that the different positions of building need be pour exists differently, so the concrete of different intensity levels is when pouring, need set up the instrument of blocking, prevent the building position of other grade intensity of concrete inflow, the current instrument of blocking is the equipment such as wire rope or steel sheet together mostly, it is comparatively troublesome in the group process, still consider the dismantlement after the equipment finishes simultaneously, need carry out the violence dismantlement to blockking the equipment after finishing because of mixing earth is fixed, so need consider the violence and dismantle the back, the problem of the phenomenon of unable equipment can appear in the blocking device.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a wire net of jumping storehouse method construction blocks structure, includes fixed steel sheet and baffle, the upside equidistance of fixed steel sheet is provided with the multiunit bracing piece, multiunit and bracing piece assorted recess have evenly been seted up to the upside of fixed steel sheet, the front side of baffle is provided with the gag lever post, the rear side of bracing piece be provided with gag lever post assorted spacing recess.
Preferably, the front side of baffle is connected with the multiunit stopper of equidistance, the width and the bracing piece phase-match of stopper.
Preferably, the front side of the support rods is connected with an auxiliary frame, and the front side of the support rods and the upper side of the auxiliary frame are provided with screw holes.
Preferably, the upside of fixed steel sheet is seted up with baffle assorted draw-in groove, the upside of fixed steel sheet be connected with bracing piece assorted auxiliary tube.
Preferably, the body of the limiting rod is provided with an installation screw hole, and the upper side of the supporting rod is provided with an installation screw hole.
Preferably, the auxiliary frame is triangular, and screw holes are uniformly formed in the front side of the auxiliary frame and the upper side of the fixed steel plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the baffle can be blocked by arranging the fixed steel plate to be matched with the supporting rods, the baffle can also be rapidly disassembled and assembled, the auxiliary baffle can block concrete, a plurality of groups of supporting rods are inserted into the auxiliary pipe, the supporting rods move downwards to drive the baffle to move downwards, and the supporting rods and the baffle are inserted into the upper side of the fixed steel plate;
2. the left and right positions of the supporting rods are limited by the limiting blocks, the multiple groups of supporting rods are clamped between the multiple groups of limiting blocks, the stability of the baffle is improved, the left and right positions of the supporting rods are limited by the limiting blocks, and the multiple groups of supporting rods are clamped between the multiple groups of limiting blocks, so that the stability of the baffle is improved;
3. set up the installation screw through setting up gag lever post and bracing piece, make gag lever post and bracing piece carry out the high-speed joint, the appearance of auxiliary frame has been seted up the installation screw for triangle-shaped through setting up gag lever post and bracing piece, makes gag lever post and bracing piece carry out the high-speed joint, and the appearance of auxiliary frame is triangle-shaped.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the support rod of the present invention;
fig. 3 is a top view of the present invention.
In the figure: 100. fixing a steel plate; 110. a support bar; 111. an auxiliary tube; 120. an auxiliary frame; 200. a baffle plate; 210. a limiting rod; 220. and a limiting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, a wire mesh blocking structure constructed by a skip method includes a fixed steel plate 100 and a baffle 200, a plurality of sets of support rods 110 are equidistantly disposed on the upper side of the fixed steel plate 100, the support rods 110 are square in shape, a plurality of sets of grooves matched with the support rods 110 are uniformly formed in the upper side of the fixed steel plate 100, a limit rod 210 is disposed on the front side of the baffle 200, a limit groove matched with the limit rod 210 is disposed on the rear side of the support rod 110, concrete and the like are blocked by the baffle 200, and the baffle 200 is blocked by the support rods 110.
Referring to fig. 1-3, a plurality of sets of stoppers 220 are equidistantly connected to the front side of the baffle 200, the stoppers 220 are matched with the support rods 110 in width, the left and right positions of the support rods 110 are limited by the stoppers 220, the plurality of sets of support rods 110 are clamped between the plurality of sets of stoppers 220 to improve the stability of the baffle 200, the front sides of the plurality of sets of support rods 110 are connected with the auxiliary frame 120, screw holes are formed in the front sides of the plurality of sets of support rods 110 and the upper side of the auxiliary frame 120, the support rods 110 are supported by the auxiliary frame 120, when concrete applies pressure to the support rods 110 and the baffle 200, the auxiliary frame 120 assists in fixing the support rods 110 and the baffle 200, clamping grooves matched with the baffle 200 are formed in the upper side of the fixed steel plate 100, the auxiliary pipes 111 matched with the support rods 110 are connected to the upper side of the fixed steel plate 100, and the baffle 200 are conveniently and quickly connected by the clamping grooves, be convenient for fixed steel sheet 100 and bracing piece 110 through setting up auxiliary tube 111 and carry out the high-speed joint, the installation screw has been seted up to the body of gag lever post 210, the installation screw has been seted up to the upside of bracing piece 110, the installation screw has been seted up through setting up gag lever post 210 and bracing piece 110, make gag lever post 210 and bracing piece 110 carry out the high-speed joint, the appearance of auxiliary frame 120 is triangle-shaped, the screw has evenly been seted up with the upside of fixed steel sheet 100 to the front side of auxiliary frame 120, the screw has evenly been seted up with the upside of fixed steel sheet 100 through the front side that sets up auxiliary frame 120, improve the installation stability of auxiliary frame 120.
The working principle is as follows: when the novel scheme is implemented, the baffle plate 200 is inserted into the front side of the support rod 110, the support rod 110 is connected with the baffle plate 200 through bolts, after the baffle plate 200 and the support rod 110 are assembled, a plurality of groups of support rods 110 are inserted into the auxiliary pipe 111, the support rod 110 moves downwards to drive the baffle plate 200 to move downwards, the support rod 110 and the baffle plate 200 are inserted into the upper side of the fixed steel plate 100, the auxiliary frame 120 is arranged on the rear sides of the plurality of groups of support rods 110 and the upper side of the fixed steel plate 100 through bolts to complete the assembly of the device, stone slurry is limited and blocked through the baffle plate 200, the baffle plate 200 is subjected to auxiliary fixing and supporting through the support rod 110, the position of the baffle plate 200 is limited, the auxiliary baffle plate 200 inclines and shakes during the use, the plurality of groups of support rods 110 are limited through the auxiliary frame 120, the support rod 110 is subjected to auxiliary supporting through the auxiliary frame 120, and other devices except the auxiliary frame 120 are convenient to move during the use of the device, the auxiliary frame 120 can be selected to use different shapes to perform auxiliary fixing on the supporting rod 110 according to requirements.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions, and the terms "comprise", "include", or any other variation thereof are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus, and the terms "mount", "connect", or "connect" should be interpreted broadly unless expressly specified or limited to the contrary and may be fixed or removable, or integrally connected; can be mechanically or electrically connected; the two elements may be directly connected or indirectly connected through an intermediate medium, or the two elements may be connected through an intermediate medium, and the specific meaning of the above terms in the present invention can be understood by those skilled in the art through specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a wire net structure of blocking of jumping storehouse method construction which characterized in that: including fixed steel sheet (100) and baffle (200), the upside equidistance of fixed steel sheet (100) is provided with multiunit bracing piece (110), multiunit and bracing piece (110) assorted recess have evenly been seted up to the upside of fixed steel sheet (100), the front side of baffle (200) is provided with gag lever post (210), the rear side of bracing piece (110) be provided with gag lever post (210) assorted spacing recess.
2. The steel wire mesh blocking structure constructed by the skip method according to claim 1, which is characterized in that: the front side of baffle (200) equidistance is connected with multiunit stopper (220), the width and the bracing piece (110) phase-match of stopper (220).
3. The steel wire mesh blocking structure constructed by the skip method according to claim 1, which is characterized in that: the front side of the support rods (110) is connected with an auxiliary frame (120), and the front side of the support rods (110) and the upper side of the auxiliary frame (120) are provided with screw holes.
4. The steel wire mesh blocking structure constructed by the skip method according to claim 1, which is characterized in that: the upside of fixed steel sheet (100) is seted up with baffle (200) assorted draw-in groove, the upside of fixed steel sheet (100) is connected with bracing piece (110) assorted auxiliary tube (111).
5. The steel wire mesh blocking structure constructed by the skip method according to claim 1, which is characterized in that: the body of the limiting rod (210) is provided with an installation screw hole, and the upper side of the supporting rod (110) is provided with an installation screw hole.
6. The steel wire mesh blocking structure constructed by the skip method according to claim 3, which is characterized in that: the auxiliary frame (120) is triangular in shape, and screw holes are uniformly formed in the front side of the auxiliary frame (120) and the upper side of the fixed steel plate (100).
CN202123353958.3U 2021-12-28 2021-12-28 Wire net structure of blocking of jumping storehouse method construction Expired - Fee Related CN216476394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123353958.3U CN216476394U (en) 2021-12-28 2021-12-28 Wire net structure of blocking of jumping storehouse method construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123353958.3U CN216476394U (en) 2021-12-28 2021-12-28 Wire net structure of blocking of jumping storehouse method construction

Publications (1)

Publication Number Publication Date
CN216476394U true CN216476394U (en) 2022-05-10

Family

ID=81429237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123353958.3U Expired - Fee Related CN216476394U (en) 2021-12-28 2021-12-28 Wire net structure of blocking of jumping storehouse method construction

Country Status (1)

Country Link
CN (1) CN216476394U (en)

Similar Documents

Publication Publication Date Title
CN214658892U (en) High-low grade concrete intercepting device
CN216476394U (en) Wire net structure of blocking of jumping storehouse method construction
CN108824961A (en) The mobile enclosing of adjustable assembled
CN211498507U (en) Whole reassembling type protection rack
CN104746521B (en) The application of oversized cross-section slope cushion layer constructing structure
CN214116678U (en) Assembled fetal membrane
CN213979370U (en) Be applied to cushion on building outer wall heat preservation net rack board
CN214942402U (en) Precast beam column mould end board of easy installation dismantlement
CN109235709B (en) Full cast-in-place outer wall structure of building
CN210067441U (en) Integrated cast-in-place concrete for elevator brick wall and door buttress
CN210947661U (en) Installation device of socket type overhanging scaffold
CN108487762B (en) Electronic information engineering communication tower connecting device
CN220225934U (en) Steel-concrete connection structure for constructional engineering
CN214656454U (en) Manhole comb-shaped steel formwork
CN220396766U (en) Utility tunnel inner tube installing support
CN213867874U (en) Reinforced concrete slope protection
CN213296389U (en) Protection reinforced structure of broken rock mass side slope
CN203334291U (en) High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system
CN214785194U (en) Square box mounting and positioning structure
CN218621909U (en) Automatic sliding formwork frame
CN217028127U (en) Turnover type beam column node pouring separator
CN215369949U (en) Middle plate and frame body reserved door type channel
CN210395124U (en) Pylon installation positioner
CN213709890U (en) Large-scale steel structure embedded part in intensive cloth muscle district convenient to installation
CN215717179U (en) Adjustable steel pipe sand bucket supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220510

CF01 Termination of patent right due to non-payment of annual fee