CN216469931U - Modular vertical tank assembly - Google Patents

Modular vertical tank assembly Download PDF

Info

Publication number
CN216469931U
CN216469931U CN202122866510.5U CN202122866510U CN216469931U CN 216469931 U CN216469931 U CN 216469931U CN 202122866510 U CN202122866510 U CN 202122866510U CN 216469931 U CN216469931 U CN 216469931U
Authority
CN
China
Prior art keywords
pipeline group
pipe
vertical
tanks
connecting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122866510.5U
Other languages
Chinese (zh)
Inventor
张兵
王宝财
马君林
张鑫
徐鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Shengdao Communications Construction Technology Co ltd
Original Assignee
Shenyang Shengdao Communications Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Shengdao Communications Construction Technology Co ltd filed Critical Shenyang Shengdao Communications Construction Technology Co ltd
Priority to CN202122866510.5U priority Critical patent/CN216469931U/en
Application granted granted Critical
Publication of CN216469931U publication Critical patent/CN216469931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model relates to a modular vertical tank assembly, comprising: the vertical tanks are arranged at intervals in a rectangular shape and are assembled by a bottom plate, a plurality of wall plates and a tank cap; the first pipeline group comprises a first feeding pipe and a first discharging pipe, the first feeding pipe is respectively connected with all the vertical tanks, and the first discharging pipe is correspondingly connected with all the vertical tanks; the second pipeline group is arranged in a crossed manner with the first pipeline group and comprises a second feeding pipe and a second discharging pipe, the second feeding pipe is respectively connected with all the vertical tanks, and the second discharging pipe is correspondingly connected with all the vertical tanks; the platform sets up in the interval region of a plurality of jars that found, and upright jar, first pipeline group, second pipeline group and platform are modular design, and just stand and be assembled connection structure between jar, first pipeline group, second pipeline group and the platform. Therefore, excessive transportation resources are not occupied, the transportation cost can be reduced, and the installation period can be shortened.

Description

Modular vertical tank assembly
Technical Field
The utility model relates to asphalt storage equipment, in particular to a modular vertical tank assembly.
Background
In pitch storage equipment, mostly including horizontal jar of cylinder pitch and the horizontal jar of cuboid pitch, the horizontal jar of cylinder pitch is bulky, and a transport vechicle can only transport a horizontal jar of cylinder pitch, and super wide superelevation cost of transportation is big. A cuboid pitch horizontal tank platform truck can only transport one, and the cost of transportation is high, and in addition, external pump valve installation period is long, installs extravagant material repeatedly.
Therefore, there is a need to provide a new modular tank erection assembly to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a modularized vertical tank assembly, which can solve the problems of large occupied transportation resources and long installation period of the vertical tank assembly.
In order to achieve the purpose, the utility model adopts the following technical scheme: a modular riser assembly, comprising: the vertical tanks are arranged at intervals in a rectangular shape and are assembled by a bottom plate, a plurality of wall plates and tank caps; the first pipeline group comprises a first feeding pipe and a first discharging pipe, the first feeding pipe is respectively connected with all the vertical tanks, and the first discharging pipe is correspondingly connected with all the vertical tanks; the second pipeline group is arranged in a crossed manner with the first pipeline group and comprises a second feeding pipe and a second discharging pipe, the second feeding pipe is respectively connected with all the vertical tanks, and the second discharging pipe is correspondingly connected with all the vertical tanks; the platform, set up in a plurality of interval regions of founding the jar, found jar, first pipeline group, second pipeline group and platform are modular design, just for assembled connection structure between founding jar, first pipeline group, second pipeline group and the platform.
Further, a pump assembly disposed on the first tubing set is also included.
Further, the first pipeline group comprises a first connecting pipe, and the first feeding pipe is connected to the vertical tank through the first connecting pipe; the first discharge pipe is connected to the vertical tank through the first connecting pipe.
Furthermore, a valve is arranged on the first connecting pipe.
Further, the second pipeline group also comprises a second connecting pipe, and a second feeding pipe is connected to the vertical tank through the second connecting pipe; the second discharging pipe is connected to the vertical tank through the second connecting pipe.
Furthermore, each second connecting pipe is provided with a valve.
Compared with the prior art, the utility model integrates the vertical tanks, the first pipeline group, the pump assembly, the second pipeline group and the platform, performs modular design, can increase the number of the vertical tanks according to requirements, can add a stirring function, only needs to correspondingly connect the pipeline groups with the vertical tanks, pre-installs valves on the pipeline groups, has long construction period caused by independently installing external pump valves, wastes materials due to repeated installation and the like. And the vertical tank, the first pipeline group, the pump assembly, the second pipeline group and the platform are of an assembly structure, so that excessive transportation resources are not occupied, and the transportation cost can be reduced.
Drawings
FIG. 1 is a top view of a modular canister assembly of the present invention;
FIG. 2 is a top view of the structure removal platform of FIG. 1;
figure 3 is a side view of the modular riser package of the present invention.
Fig. 4 is a front view of the platform of the present invention.
Detailed Description
Referring to fig. 1 to 4, the utility model provides a modular vertical tank assembly 100 for storing asphalt, which comprises a vertical tank 1, a first pipeline group 2, a pump assembly 3, a second pipeline group 4 and a platform 5, wherein the vertical tank 1, the first pipeline group 2, the pump assembly 3, the second pipeline group 4 and the platform 5 are in modular design, the whole set of equipment has an independent oil inlet and outlet function, the platform 5 is installed firstly during installation, and then the vertical tank 1 and the pipeline group are installed, so that the stability of the whole equipment can be ensured, the safety of personnel can be ensured, and the whole equipment can be matched for use only by being connected with an external pipeline after being installed. In addition, the vertical tank 1, the pipeline group and the platform 5 are of an assembly type connecting structure, are convenient to disassemble and assemble, can be transported in batches during transportation, and have the advantage of convenient transportation.
Found jar 1 and be a plurality of, be the rectangle interval and arrange, every founds jar 1 and is formed by bottom plate, a plurality of wallboard and jar cap equipment, founds jar 1 and is the assembled, can dismantle the blocking when the transportation to in the transportation. Specifically, the flange edge of bottom plate is connected with the base of a plurality of wallboards, and the side of adjacent wallboard is connected, and the bottom plate encloses into the storage tank body with a plurality of wallboards, and the tank cap lid is in the upper end of storage tank body. In the present embodiment, the number of the stand tanks 1 is four.
First pipeline group 2 is used for carrying pitch to each in founding jar 1, the quantity of founding jar 1 is one at least, first pipeline group 2 includes first inlet pipe 21, first discharging pipe 22 and first connecting pipe 23, first inlet pipe 21 is connected respectively through first connecting pipe 23 and is found jar 1, first discharging pipe 22 corresponds respectively through first connecting pipe 23 and connects whole founding jar 1, first inlet pipe 21 all has one end with first discharging pipe 22 and is the free end, be used for being connected with other pipelines, thereby it is convenient. In the present embodiment, the number of the first pipe group 2 is one, the number of the first connection pipes 23 is four, one of the first feed pipes 21 is connected to two adjacent upright tanks 1 through the first connection pipe 23, and the other of the first feed pipes 21 is connected to two other adjacent upright tanks 1 through the first connection pipe 23. The first feed pipe 21, the first discharge pipe 22, and the first connection pipe 23 may be a single pipe or may be a plurality of pipes connected by flanges.
Specifically, the extending direction of the first connecting pipe 23 is perpendicular to the extending direction of the first feeding pipe 21, and the first feeding pipe 21 is connected to two adjacent upright tanks 1 at one position thereof through the first connecting pipe 23, and preferably, both ends of the first connecting pipe 23 are respectively connected to two adjacent upright tanks 1. The other position of the first feeding pipe 21 is connected with two adjacent upright tanks 1 through another first connecting pipe 23, and preferably, both ends of the first connecting pipe 23 are also respectively connected with two adjacent upright tanks 1.
The extending direction of the first connecting pipe 23 is perpendicular to the extending direction of the first discharging pipe 22, and the first discharging pipe 22 is connected to two adjacent vertical tanks 1 through the first connecting pipe 23 at one position, and preferably, two ends of the first connecting pipe 23 are respectively connected to two adjacent vertical tanks 1. The other point of the first discharge pipe 22 is connected to two adjacent vertical tanks 1 via another first connection pipe 23, preferably, both ends of the first connection pipe 23 are also connected to two adjacent vertical tanks 1, respectively. Each first connection pipe 23 is provided with a valve 231 at a position close to the vertical tank 1 to control the flow of asphalt out of or into the interior of the vertical tank 1.
A pump assembly 3 is provided on the first tubing set 2 to drive the flow of bitumen.
The second pipeline group 4 is used for transmitting hot oil, the second pipeline group 4 and the first pipeline group 2 are arranged in a crossed mode, the second pipeline group 4 comprises a second feeding pipe 41, a second discharging pipe 42 and a second connecting pipe 43, the second feeding pipe 41 is connected with the vertical tank 1 through the second connecting pipe 43, and the second discharging pipe 42 is correspondingly connected with the vertical tank 1 through the second connecting pipe 43. In the present embodiment, the number of the second connection pipes 43 is four. One of the second feeding pipes 41 is connected with two adjacent vertical tanks 1 through second connecting pipes 43, and the other of the second feeding pipes 41 is connected with the other two adjacent vertical tanks 1 through second connecting pipes 43. One of the second discharging pipes 42 is connected to two adjacent vertical tanks 1 through a second connecting pipe 43, and the other of the second discharging pipes 42 is connected to the other two adjacent vertical tanks 1 through a second connecting pipe 43. Each second connecting pipe 43 is provided with a valve 232 at a position near the vertical tank 1 to control the flow of the thermal oil out of or into the interior of the vertical tank 1. The second feed pipe 41, the second discharge pipe 42, and the second connection pipe 43 may be a single pipe or may be a plurality of pipes connected by flanges.
The platform 5 is disposed in a partitioned area of the plurality of vertical tanks 1, and the platform 5 includes a ladder 51 and a platform 52 for workers to maintain and observe.
This patent application carries out a whole through will founding jar 1, first pipeline group 2, pump package spare 3, second pipeline group 4 and platform 5, carries out the modularized design, and the quantity of founding jar 1 can increase as required, also can add stirring function, only needs to correspond the connection with the pipeline group and found jar 1, and the valve on the pipeline group has carried out the preinstallation, installs the long period that external pump valve led to the fact alone, installs extravagant material scheduling problem repeatedly. And the vertical tank 1, the first pipeline group 2, the pump assembly 3, the second pipeline group 4 and the platform 5 are of an assembly type structure, so that excessive transportation resources are not occupied, and the transportation cost can be reduced.
The above embodiments are only used for illustrating the present invention and not for limiting the technical solutions described in the present invention, and the understanding of the present specification should be based on the technical personnel in the technical field, such as the directional descriptions of "front", "back", "left", "right", "upper", "lower", etc., although the present specification has described the present invention in detail with reference to the above embodiments, the ordinary skilled in the art should understand that the technical personnel in the technical field can still make modifications or equivalent substitutions on the present invention, and all the technical solutions and modifications thereof without departing from the spirit and scope of the present invention should be covered in the claims of the present invention.

Claims (6)

1. A modular canister assembly, comprising:
the vertical tanks are arranged at intervals in a rectangular shape and are assembled by a bottom plate, a plurality of wall plates and tank caps;
the first pipeline group comprises a first feeding pipe and a first discharging pipe, the first feeding pipe is respectively connected with all the vertical tanks, and the first discharging pipe is correspondingly connected with all the vertical tanks;
the second pipeline group is arranged in a crossed manner with the first pipeline group and comprises a second feeding pipe and a second discharging pipe, the second feeding pipe is respectively connected with all the vertical tanks, and the second discharging pipe is correspondingly connected with all the vertical tanks;
the platform, set up in a plurality of interval regions of founding the jar, found jar, first pipeline group, second pipeline group and platform are modular design, just for assembled connection structure between founding jar, first pipeline group, second pipeline group and the platform.
2. The modular canister assembly of claim 1, wherein: also included is a pump assembly disposed on the first tubing set.
3. The modular canister assembly of claim 1, wherein: the first pipeline group comprises a first connecting pipe, and the first feeding pipe is connected to the vertical tank through the first connecting pipe; the first discharge pipe is connected to the vertical tank through the first connecting pipe.
4. The modular canister assembly of claim 3, wherein: and a valve is arranged on the first connecting pipe.
5. The modular canister assembly of claim 1, wherein: the second pipeline group also comprises a second connecting pipe, and a second feeding pipe is connected to the vertical tank through the second connecting pipe; the second discharging pipe is connected to the vertical tank through the second connecting pipe.
6. The modular canister assembly of claim 5, wherein: and each second connecting pipe is provided with a valve.
CN202122866510.5U 2021-11-22 2021-11-22 Modular vertical tank assembly Active CN216469931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122866510.5U CN216469931U (en) 2021-11-22 2021-11-22 Modular vertical tank assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122866510.5U CN216469931U (en) 2021-11-22 2021-11-22 Modular vertical tank assembly

Publications (1)

Publication Number Publication Date
CN216469931U true CN216469931U (en) 2022-05-10

Family

ID=81398464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122866510.5U Active CN216469931U (en) 2021-11-22 2021-11-22 Modular vertical tank assembly

Country Status (1)

Country Link
CN (1) CN216469931U (en)

Similar Documents

Publication Publication Date Title
CN202324346U (en) Concrete pumping and lifting construction device in concrete column pipe of steel pipe
CN216469931U (en) Modular vertical tank assembly
CN202324646U (en) Pipeline check device for concrete pumping and jacking construction in steel-pipe concrete column pipe
CN103523412B (en) Powder material tank and mixing plant
CN111963129A (en) Continuous sand adding device for fracturing construction
CN209081449U (en) Modular treatment tank
EP2738508B1 (en) Modular tank
CN213504015U (en) A bin body structure for immersive ready-mix commodity concrete production plant
CN211894526U (en) Tank deck bearing structure and storage jar
CN201442719U (en) Round storage bin structure
US3288321A (en) Storage of petroleum products
CN202346203U (en) Steel-structure closed type coal storage bunker
CN100999283A (en) Cement storage warehouse
CN221973477U (en) Vertical well cementation liquid supply tank
CN220885551U (en) Antibacterial equipment applied to grain storage bin
CN207275231U (en) A kind of VX flowmeters installation frame
CN216334173U (en) Special module transport tank for oilfield fracturing sand
CN220221184U (en) Anti-toppling structure and intelligent filling machine conveying mechanism
CN205442089U (en) Feed switching mouthful
CN214166031U (en) Combined split type cement bin
CN102642681A (en) Detachable combination open liquid jar and methods of mounting and dismounting thereof
CN211395373U (en) Bridge bearing support pre-compaction adjusting device
AU2014202482A1 (en) A containerised modular cooling tower assembly
CN217995453U (en) Pin-connected panel powder storage jar structure
CN203211212U (en) Water oil tank and vehicle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Liaoning Lifan Network Technology Co.,Ltd.

Assignor: SHENYANG SHENGDAO COMMUNICATIONS CONSTRUCTION TECHNOLOGY CO.,LTD.

Contract record no.: X2023980044123

Denomination of utility model: Modular Vertical Tank Assembly

Granted publication date: 20220510

License type: Common License

Record date: 20231024

Assignee: Liaoning Tuopu Artificial Intelligence Technology Research and Development Co.,Ltd.

Assignor: SHENYANG SHENGDAO COMMUNICATIONS CONSTRUCTION TECHNOLOGY CO.,LTD.

Contract record no.: X2023980044122

Denomination of utility model: Modular Vertical Tank Assembly

Granted publication date: 20220510

License type: Common License

Record date: 20231023