Process tool for building prefabricated cabin unit on ship to enter cabin Download PDFInfo
- Publication number
- CN216468361U CN216468361U CN202122183873.9U CN202122183873U CN216468361U CN 216468361 U CN216468361 U CN 216468361U CN 202122183873 U CN202122183873 U CN 202122183873U CN 216468361 U CN216468361 U CN 216468361U
- Authority
- CN
- China
- Prior art keywords
- cabin
- platform
- prefabricated cabin
- cabin unit
- ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
The utility model provides a prefabricated cabin unit cabin entering process tool for a ship, wherein a prefabricated cabin unit cabin entering channel is arranged on a built outer plate of the ship and comprises a prefabricated cabin unit transferring movable platform, a ship outer plate connecting and fixing platform and a transferring trolley, the ship outer plate connecting and fixing platform and the lower edge of the prefabricated cabin unit cabin entering channel are arranged in a flush mode, the ship outer plate connecting and fixing platform comprises a platform base, connecting blocks are symmetrically arranged at one end, far away from the prefabricated cabin unit cabin entering channel, of the platform base, a ship outer plate reinforcing eye plate is arranged on the ship outer plate below the prefabricated cabin unit cabin entering channel and connected with the platform base through hinge bolts, an outer plate pull code is arranged on the ship outer plate above the prefabricated cabin unit cabin entering channel, and the outer plate pull code is connected with the connecting blocks through steel wire ropes. The process tool for building the prefabricated cabin unit into the ship provided by the utility model can ensure that the prefabricated cabin unit is transferred from a wharf to the interior of the cabin and is stable in position and free from damage.
Description
Technical Field
The utility model belongs to the technical field of ship cabin unit construction, and particularly relates to a cabin entering process tool for a prefabricated cabin unit built on a ship.
Background
For ro-ro passenger ships, the superstructure area contains a large number of cabin units, which can amount to 200 or more. For such a large number of cabin units, how to shorten the dock occupation time and how to transfer the cabin units into the dock need to be comprehensively considered. Therefore, the utility model aims to improve the cabin entering efficiency of the prefabricated cabin units, reduce the time of occupying wharfs, improve the storage safety of the cabin units, and further ensure the stable and damage-free falling position of the cabin units during cabin entering.
SUMMERY OF THE UTILITY MODEL
Aiming at the technical problem, the utility model provides a process tool for building a prefabricated cabin unit on a ship to enter a cabin, which ensures that the prefabricated cabin unit is transferred from a wharf to the interior of the cabin and is stable in placement and free from damage.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a build prefabricated cabin unit and advance cabin technology frock on boats and ships, be equipped with prefabricated cabin unit and advance cabin passageway on the planking of boats and ships, including prefabricated cabin unit transportation movable platform, boats and ships planking connection fixed platform and transport the dolly, the lower edge parallel and level that fixed platform and prefabricated cabin unit advanced cabin passageway are connected to the planking of boats and ships, and boats and ships planking connection fixed platform includes the platform base it advances cabin passageway one end symmetry and is equipped with the connecting block to keep away from prefabricated cabin unit on the platform base be equipped with hull planking reinforcing eye plate on the planking of prefabricated cabin unit income cabin passageway below, hull planking reinforcing eye plate passes through the hinge bolt and is connected with the platform base, is equipped with the planking at the planking that prefabricated cabin unit advances cabin passageway top and draws the sign indicating number, the planking draws the sign indicating number to pass through wire rope and is connected with the connecting block.
Furthermore, the prefabricated cabin unit transferring movable platform comprises a three-dimensional platform frame, the three-dimensional platform frame comprises a top frame, a bottom frame and connecting columns for connecting four corners of the top frame and the bottom frame, fixing rings are arranged at the four corners inside the three-dimensional platform frame, and the fixing rings are connected with the four corners of the upper end of the prefabricated cabin unit through fixing ropes; and an extension platform extends outwards from one end of the bottom frame and is hinged with the bottom frame.
Furthermore, movable guard rails are arranged on the left side and the right side of the three-dimensional platform frame, and the height of each movable guard rail is smaller than that of each connecting column.
Furthermore, a lifting rod is arranged on the transfer trolley.
Furthermore, one end of the hinge bolt is locked through double nuts at the end.
According to the process tool for building the prefabricated cabin unit into the cabin on the ship, the prefabricated cabin unit transferring movable platform is arranged into a solid frame, so that the prefabricated cabin unit can be protected from being damaged in the transferring process, and in order to design the left side and the right side of the prefabricated cabin unit transferring movable platform into movable protective railings, the prefabricated cabin unit can be conveniently operated in the movable platform; the ship outer plate connecting and fixing platform is rotatably connected with a ship outer plate, and the outer plate pull codes are arranged and connected with the ship outer plate connecting and fixing platform through steel wire ropes, so that the ship outer plate connecting and fixing platform can be folded; be equipped with the lifter on transporting the dolly, transport the cabin unit and to planking fixed platform after, extend cabin unit both sides respectively to the dolly is transported to four parts, rise simultaneously with the lifter on the dolly of four parts, lift up the cabin unit.
The process tool for the prefabricated cabin unit to enter the cabin is applied to the whole project of the prefabricated cabin unit entering the cabin of a passenger rolling ship, a prefabricated cabin unit entering channel process hole is made in the outer hull plate in advance), a prefabricated cabin unit entering hoisting platform is connected with the outer hull plate, after the prefabricated cabin unit is transported to a wharf, the prefabricated cabin unit is hoisted to a prefabricated cabin unit transferring movable platform, the prefabricated cabin unit transferring movable platform is hoisted to the prefabricated cabin unit transferring movable platform by virtue of a wharf crane, a transferring trolley is extended to the bottom of the prefabricated cabin unit, the cabin unit is hoisted by virtue of a hoisting rod, and finally the cabin unit is transferred to a designated cabin by virtue of the transferring trolley, so that the whole cabin unit entering process is completed.
Drawings
Fig. 1 is a side view of a prefabricated cabin unit transferring movable platform and a prefabricated cabin unit in the embodiment of the utility model when the prefabricated cabin unit is transferred to a ship outer plate connecting and fixing platform;
FIG. 2 is a side view of a prefabricated cabin unit according to an embodiment of the present invention in a state of being moved to a prefabricated cabin unit transfer platform;
FIG. 3 is a top view of the connecting and fixing platform for the outer plate of the ship according to the embodiment of the utility model;
FIG. 4 is a view taken along line A-A of FIG. 3;
fig. 5 is a state diagram of the transfer trolley according to the embodiment of the utility model when transferring the prefabricated cabin units.
The ship comprises 2-a ship outer plate connecting and fixing platform, 3-a transfer trolley, 4-a ship outer plate, 5-a prefabricated cabin unit, 6-a hull outer plate reinforcing eye plate, 7-a hinge bolt, 8-an outer plate puller, 9-a steel wire rope, 11-a three-dimensional platform frame, 12-a fixing ring, 13-a fixing rope, 111-a top frame, 112-a bottom frame, 113-a connecting column, 114-a movable protective guard, 115-an extending platform, 21-a platform bottom, 22-a connecting block and 31-a lifting rod.
Detailed Description
The utility model is further described with reference to the following figures and specific embodiments.
As shown in fig. 1-5, a prefabricated cabin unit entering process tool for a ship is provided, wherein a prefabricated cabin unit entering channel is arranged on a ship outer plate 4 and comprises a prefabricated cabin unit transferring movable platform, a ship outer plate connecting and fixing platform 2 and a transferring trolley 3, and the ship outer plate 4 connecting and fixing platform 2 is arranged in parallel with the lower edge of the prefabricated cabin unit entering channel; the prefabricated cabin unit transferring movable platform comprises a three-dimensional platform frame 11, wherein the three-dimensional platform frame 11 comprises a top frame 111, a bottom frame 112 and connecting columns 113 for connecting four corners of the top frame 111 and the bottom frame 112, fixing rings 12 are arranged at the four corners inside the three-dimensional platform frame 11, the fixing rings 12 are connected with four corners of the upper end of a prefabricated cabin unit 5 through fixing ropes 13, an extending platform 115 extends outwards from one end of the bottom frame 112, and the extending platform 115 is hinged to the bottom frame 112; movable guard rails 114 are arranged on the left side and the right side of the three-dimensional platform frame 11, and the height of each movable guard rail 114 is smaller than that of the connecting column 113; the ship outer plate connecting and fixing platform 2 comprises a platform base 21, wherein connecting blocks 22 are symmetrically arranged at one end, far away from a prefabricated cabin unit cabin inlet channel 4, of the platform base 21, a ship outer plate reinforcing eye plate 6 is arranged on a ship outer plate 4 below the prefabricated cabin unit cabin inlet channel, the ship outer plate reinforcing eye plate 6 is connected with the platform base 21 through a hinge bolt 7, one end of the hinge bolt 7 is locked through double nuts at the end, an outer plate zipper 8 is arranged on the ship outer plate 4 above the prefabricated cabin unit cabin inlet channel, and the outer plate zipper 8 is connected with the connecting blocks 22 through a steel wire rope 9; a lifting rod 31 is arranged on the transfer trolley 3.
According to the traditional cabin unit installation process, firstly, process holes are formed in 9-13 layers of decks in advance, then the whole cabin unit is hoisted to the cabin, so that the overall efficiency of cabin entering protection, transportation, positioning and the like of the single cabin unit is not high, and the cabin unit is easily damaged due to long-distance hoisting. Adopt the frock of this patent, can ensure that 200 a plurality of cabin units shorten the pier occupation time and transport into the cabin time, improved the security that the cabin unit advances, further ensured the cabin unit steady when advancing the cabin process, the damage is not.
The above is only a preferred embodiment of the present invention, and the scope of the present invention is not limited to the above-described embodiments, and any simple modification, equivalent change and modification of the above embodiments according to the technical essence of the present invention should be regarded as the scope of the present invention to those skilled in the art.
Claims (5)
1. The utility model provides a build prefabricated cabin unit and advance cabin technology frock on boats and ships, be equipped with prefabricated cabin unit and advance cabin passageway on the boats and ships planking, its characterized in that transports movable platform, boats and ships planking connection fixed platform and transports the dolly including prefabricated cabin unit, the lower edge parallel and level that fixed platform and prefabricated cabin unit advance cabin passageway are connected to the boats and ships planking, and boats and ships planking connection fixed platform includes the platform base it advances cabin passageway one end symmetry to keep away from prefabricated cabin unit on the platform base is equipped with the connecting block be equipped with the planking on the boats and ships planking of prefabricated cabin unit below advancing cabin passageway and strengthen the eye plate, the eye plate is strengthened to the hull planking passes through the hinge bolt and is connected with the platform base, is equipped with the planking on the boats and ships planking of prefabricated cabin unit entering cabin passageway top and draws the sign indicating number, the planking draws the sign indicating number to pass through wire rope and is connected with the connecting block.
2. The tooling for the prefabricated cabin unit entering cabin of the ship according to claim 1, wherein the movable platform for transporting the prefabricated cabin unit comprises a three-dimensional platform frame, the three-dimensional platform frame comprises a top frame, a bottom frame and connecting columns for connecting four corners of the top frame and the bottom frame, fixing rings are arranged at four corners inside the three-dimensional platform frame, and the fixing rings are connected with four corners of the upper end of the prefabricated cabin unit through fixing ropes; and an extension platform extends outwards from one end of the bottom frame and is hinged with the bottom frame.
3. The tooling for the process of building the prefabricated cabin unit into the cabin on the ship according to claim 2, wherein movable guard rails are arranged on the left side and the right side of the three-dimensional platform frame, and the height of each movable guard rail is smaller than that of each connecting column.
4. The tooling for the process of entering the cabin of the prefabricated cabin unit built on the ship as claimed in claim 1,
and a lifting rod is arranged on the transfer trolley.
5. The tooling for the process of entering the cabin of the prefabricated cabin unit built on the ship as claimed in claim 1, wherein one end of the hinge bolt is locked by double nuts at the end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122183873.9U CN216468361U (en) | 2021-09-10 | 2021-09-10 | Process tool for building prefabricated cabin unit on ship to enter cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122183873.9U CN216468361U (en) | 2021-09-10 | 2021-09-10 | Process tool for building prefabricated cabin unit on ship to enter cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216468361U true CN216468361U (en) | 2022-05-10 |
Family
ID=81436015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122183873.9U Active CN216468361U (en) | 2021-09-10 | 2021-09-10 | Process tool for building prefabricated cabin unit on ship to enter cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216468361U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115158594A (en) * | 2022-08-18 | 2022-10-11 | 上海外高桥造船有限公司 | Stern entry platform and mounting method thereof |
-
2021
- 2021-09-10 CN CN202122183873.9U patent/CN216468361U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115158594A (en) * | 2022-08-18 | 2022-10-11 | 上海外高桥造船有限公司 | Stern entry platform and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6802684B2 (en) | Container tranfer terminal system and method | |
CN216468361U (en) | Process tool for building prefabricated cabin unit on ship to enter cabin | |
KR100770737B1 (en) | A water level transport of a land dryness vessel and launching process | |
KR100718928B1 (en) | Giga-block method using many sea-cranes | |
CN203866772U (en) | Multipurpose shipping dock capable of being adapted to tidal level change | |
WO2008026849A1 (en) | Securing method for freight container | |
US2440307A (en) | Ship hold | |
WO2014015385A1 (en) | Ship with internal laterally moveable platform and floor. | |
EP0821107A1 (en) | System and procedure to transfer a load from a cargo barge to a substructure | |
CN108495783B (en) | Method for transferring standardized containers between container ship and dock | |
EP4273084A1 (en) | Mobile boat hoist equipped with retractable side members | |
CN101020540A (en) | Container loading and unloading process | |
CN108583778B (en) | Protective hoisting method for carrying important equipment on ship | |
CN107244383B (en) | Ship body structure of multipurpose ship | |
CN202765875U (en) | Oversized rail gauge crane transportation equipment | |
CN108792645A (en) | A kind of ship dock container handling system | |
CN107323619A (en) | A kind of extra large land conveyer method of Large-diameter Steel cylinder | |
WO2013042898A2 (en) | Apparatus and method for loading and unloading vehicles transported by container ship | |
CN203111446U (en) | Storeship fender platform for floating production storage and offloading vessel | |
CN202322079U (en) | Novel large-hoisting-capacity stationary portal crane | |
CN115783186B (en) | Marine underwater article salvage frame | |
CN204847999U (en) | Dual -purpose portal crane for transporting ship | |
CN107672756B (en) | Sliding device | |
CN201301033Y (en) | Hoisting pallet of generator | |
WO2020049285A1 (en) | Vehicle for hatch cover storage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||