Water supply and drainage pipeline joint with leak protection detection structure
Technical Field
The utility model relates to the technical field of drainage pipelines, in particular to a water supply and drainage pipeline joint with a leakage-proof detection structure.
Background
The drainage pipe refers to a system consisting of a pipe channel for collecting and discharging sewage, wastewater and rainwater and accessory facilities thereof. Including main pipes, branch pipes and pipes leading to the treatment plant, whether built on streets or anywhere else, as long as the pipes are functioning as drains, should be counted as drains.
Drainage pipe is in installation during the operation, and the staff need carry out the butt joint installation through corresponding pipe joint, learns a municipal administration water supply and drainage pipe connection structure through retrieval patent CN207228282U, including first water supply and drainage pipe, second water supply and drainage pipe and connecting piece, equal fixed mounting has the connecting piece on first water supply and drainage pipe and the second water supply and drainage pipe's one end, through connecting piece fixed connection between first water supply and drainage pipe and the second water supply and drainage pipe, the connecting piece includes the socket that connects mutually with second water supply and drainage pipe, the outside of socket is connected with the socket platform.
However, the existing drainage pipeline joint has the following problems:
(1) the existing pipeline joint has single overall operation performance, leakage at the pipeline joint is easy to occur during long-time operation, the position of the pipeline joint cannot be better detected, water supply and drainage operation of a pipeline is affected, and the practical performance of the pipeline joint is reduced;
(2) the existing pipeline joint cannot compensate in time if the leakage condition occurs during operation, so that the pipeline joint is probably in the leakage condition before rush repair, the practicability of the pipeline joint is reduced, the application range of the traditional pipeline joint is low, and the use in multiple environments cannot be better met.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to a joint of a water supply and drainage pipeline with a leak-proof detection structure, so as to solve the problems of the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a water supply and drainage pipe connects with leak protection detects structure, includes main pipe, leak protection installation cavity and vice pipe, its characterized in that: install the main duct that runs through in the leak protection installation cavity, install the second butt joint board on the main duct in the leak protection installation cavity, the interface is installed to the end of main duct, the leak detection bottle of intercommunication is installed to the bottom of leak protection installation cavity, the ponding chamber is installed through crossing the water cavity in the bottom of leaking the detection bottle, leak detection bottle is installed through the installation mouth in the top of leak protection installation cavity, and leak detection bottle's internally mounted has the gasbag of being connected with the installation mouth, the auxiliary duct is installed through first butt joint board in one side of leak protection installation cavity, the butt joint with the auxiliary duct intercommunication is installed to the inboard of first butt joint board, the outside of butt joint is equipped with the spacing groove, and installs rubber seal in the spacing groove.
Preferably, the leakage-proof mounting cavity is connected with the second butt joint plate through a bolt structure, and the bolt structure is composed of a nut and a stud.
Preferably, a waterproof sleeve is installed on the leakproof installation cavity on the outer side of the main guide pipe, and a rubber waterproof sleeve is installed on the inner side of the waterproof sleeve.
Preferably, a third butt-joint plate is installed on one side of the leakage-proof installation cavity, and the third butt-joint plate is installed with the first butt-joint plate through a bolt piece.
Preferably, the leakage-proof installation cavity and the water leakage detection bottle are installed in a butt joint mode through a sealing joint, and an air overflow port is installed at the top of the water accumulation cavity.
Compared with the prior art, the utility model has the beneficial effects that: this water supply and drainage pipeline joint design with leak protection detects structure is reasonable, has following advantage:
(1) the main guide pipe and the installation part of the butt joint on the auxiliary guide pipe are installed through the leakage-proof installation cavity, so that the joint not only realizes the detection of leakage, but also can ensure that the leakage does not overflow after the leakage occurs, the joint realizes two butt joint isolation effects, the integral sealing effect and the isolation effect of the joint are ensured, and the practicability of the joint is improved;
(2) the pipeline joint can be butted and installed through the matching of the water passing cavity and the water accumulation cavity by the water leakage detection bottle, meanwhile, the joint can be detected, so that a worker can conveniently confirm whether the joint leaks water, the detection mode is simple in structure and low in cost, meanwhile, the assistance of external equipment and media is not needed, the worker can visually judge the joint only through a visual inspection mode, and the practicability is obvious;
(3) the pipeline joint can be butted and installed through the matching of the installation nozzle and the air bag of the air leakage detection bottle, normal water supply and drainage operation of the pipeline joint is guaranteed, whether air leakage occurs at the joint can be detected, the effect of the pipeline joint not only meets daily water supply and drainage operation, but also is convenient for acting the joint in the corresponding liquid and gas field, the effect of multipurpose joint is realized, the functionality of the joint is improved, and the whole application range is enlarged.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the internal structure of the present invention;
FIG. 3 is a first partial structural schematic diagram of the present invention;
fig. 4 is a second partial structural diagram of the present invention.
In the figure: 1. a main duct; 2. a rubber waterproof sleeve; 3. a leakage-proof mounting cavity; 4. a water leakage detection bottle; 401. a water passing cavity; 402. a water accumulation cavity; 5. a first butt plate; 6. a secondary conduit; 601. a bolt member; 602. a butt joint; 603. a rubber seal ring; 604. a limiting groove; 7. a waterproof sleeve; 8. a bolt structure; 9. a rubber sealing gasket; 10. a second butt joint plate; 11. a leak detection bottle; 1101. an air bag; 1102. installing a nozzle; 12. a butt joint port; 13. and a third butt plate.
Detailed Description
Referring to fig. 1-4, an embodiment of the present invention is shown: a water supply and drainage pipeline joint with a leakage-proof detection structure comprises a main pipeline 1, a leakage-proof installation cavity 3 and an auxiliary pipeline 6;
concretely, install the main duct 1 that runs through in the leak protection installation cavity 3, install waterproof sleeve 7 on the leak protection installation cavity 3 in the main duct 1 outside, and waterproof rubber external member 2 is installed to the inboard of waterproof sleeve 7, waterproof rubber external member 2 has increased the laminating nature and the parcel nature of waterproof sleeve 7 with main duct 1, avoid the condition that water reveals to appear, install second butt joint board 10 on the main duct 1 in the leak protection installation cavity 3, install through bolted construction 8 erection joint between leak protection installation cavity 3 and the second butt joint board 10, and bolted construction 8 is constituteed through nut and double-screw bolt respectively, guarantee leakproofness and fastness after the installation like this, main duct 1's end installs interface 12, leak detection bottle 4 of intercommunication is installed to the bottom of leak detection bottle 3, the bottom of leak detection bottle 4 installs ponding chamber 402 through ponding chamber 401, leak detection bottle 4 makes the pipe joint not only can dock through the cooperation of ponding chamber 401 and ponding chamber 402 and install the pipe joint The detection mode is simple in structure and low in cost, does not need the assistance of external equipment and media, and is directly and visually judged by workers only through visual inspection, so that the practicability is remarkable, and the water leakage detection bottle is made of transparent plastic materials and is convenient for the workers to observe;
specifically, the leakproof mounting cavity 3 and the water leakage detection bottle 4 are installed in a butt joint mode through a sealing joint, the top of the water accumulation cavity 402 is provided with an air overflow port, the situation that the leakproof mounting cavity 3 cannot flow down into the water leakage detection bottle 4 due to the fact that the interiors of the water accumulation cavity 402 and the water leakage detection bottle 4 are completely in a sealing state due to air pressure is avoided, balance of internal air pressure can be well guaranteed, the top of the leakproof mounting cavity 3 is provided with the air leakage detection bottle 11 through the mounting nozzle 1102, the air bag 1101 connected with the mounting nozzle 1102 is installed inside the air leakage detection bottle 11, the pipeline joint can be installed in a butt joint mode through the matching of the mounting nozzle 1102 and the air bag 1101, normal water supply and drainage operation of the pipeline joint can be guaranteed, whether air leakage exists at the joint can be detected, the effect of the pipeline joint meets daily water supply and drainage operation, and meanwhile the joint can be conveniently acted in the corresponding liquid and air fields, the multi-purpose effect of the joint is realized, the functionality of the joint is improved, the whole application range is enlarged, the air leakage detection bottle is made of transparent plastic materials and is convenient for workers to observe, one side of the leakage-proof installation cavity 3 is provided with the auxiliary conduit 6 through the first butt joint plate 5, one side of the leakage-proof installation cavity 3 is provided with the third butt joint plate 13, the third butt joint plate 13 is installed with the first butt joint plate 5 through the bolt part 601, a rubber gasket is also arranged between the third butt joint plate 13 and the first butt joint plate 5 to ensure the sealing effect after installation, the inner side of the first butt joint plate 5 is provided with the butt joint 602 communicated with the auxiliary conduit 6, the outer side of the butt joint 602 is provided with the limiting groove 604, the rubber sealing ring 603 is installed in the limiting groove 604, the main conduit realizes the detection leakage through the installation parts of the butt joint 602 on the leakage-proof installation cavity 3 and the auxiliary conduit 6, and the condition that the leakage does not overflow after the leakage occurs can be ensured, so that the joint realizes two butt joint isolation effects, the overall sealing effect and the isolation effect of the joint are ensured, and the practicability of the joint is improved.
The working principle is as follows: during the use, when the installation needs to be ensured, the water leakage detection bottle 4 is located at the lower part of the leakage-proof installation cavity 3, the air leakage detection bottle 11 is located at the upper part of the leakage-proof installation cavity 3, water supply and drainage operations are carried out on the main pipes 1 and 6, water is subjected to water passing operation in a butted state through the butt joint port 12 and the butt joint 602, during the period, if leakage occurs, the water can overflow from the position between the butt joint port 12 and the butt joint 602, the overflowed water can enter the water leakage detection bottle 4, then the water in the water leakage detection bottle 4 can enter the water accumulation cavity 402, after the water enters the water accumulation cavity 402, the situation that the leakage occurs at the joint is indicated, a worker can be connected to be used in other liquid and gas fields, when the leakage occurs, the air pressure can increase along with the increase, and the air bag 1101 in the air leakage detection bottle 11 can be influenced by the air pressure to expand along with the expansion, and the detection of the leakage is indicated.