CN216446613U - Assembled steel construction factory building structure - Google Patents

Assembled steel construction factory building structure Download PDF

Info

Publication number
CN216446613U
CN216446613U CN202123347247.5U CN202123347247U CN216446613U CN 216446613 U CN216446613 U CN 216446613U CN 202123347247 U CN202123347247 U CN 202123347247U CN 216446613 U CN216446613 U CN 216446613U
Authority
CN
China
Prior art keywords
arc
roof
factory building
base
longeron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123347247.5U
Other languages
Chinese (zh)
Inventor
薛武奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Chuangtianji Industrial Development Co ltd
Original Assignee
Shaanxi Chuangtianji Industrial Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Chuangtianji Industrial Development Co ltd filed Critical Shaanxi Chuangtianji Industrial Development Co ltd
Priority to CN202123347247.5U priority Critical patent/CN216446613U/en
Application granted granted Critical
Publication of CN216446613U publication Critical patent/CN216446613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses an assembled steel structure factory building structure which comprises a base and a roof, wherein the roof is arranged above the base through a plurality of groups of vertical supports; the roof comprises an arc roof board and two lateral horizontal connecting plates, and a rainwater tank is arranged on the lateral horizontal connecting plates along the length direction of the lateral horizontal connecting plates; a plurality of diagonal draw bars are detachably connected between the lower end of the upright post and the base; the bottom of the arc roof panel is provided with a plurality of arc back arrises, and the crossbeam is provided with a plurality of hydraulic cylinders that are used for supporting the arc back arrises. The utility model has reasonable structural design and higher stability, can effectively avoid roof collapse in rainy and snowy weather, is convenient to install and disassemble, can effectively solve the problems that the traditional reinforced concrete factory building needs to build a template, has complicated construction process and longer construction period, and can realize the turnover use of the steel structure factory building structure.

Description

Assembled steel construction factory building structure
Technical Field
The utility model belongs to the technical field of assembly type building construction, and particularly relates to an assembly type steel structure factory building structure.
Background
With the progress and development of society, a light steel structure frame system with the characteristics of green, environmental protection, energy conservation, industrialization and recycling, namely green building, plays an increasingly important role in building layout, and a steel structure is widely applied to buildings such as industrial plants, gymnasiums and the like.
At present, a traditional factory building is generally of a reinforced concrete structure, when the construction of the factory building structure is carried out, a support frame and a support template need to be built, the maintenance time is long, the template needs to be disassembled and assembled, the construction process is complicated, and the construction period is long.
SUMMERY OF THE UTILITY MODEL
The technical problem to be solved by the utility model is to provide an assembled steel structure factory building structure aiming at the defects in the prior art, the assembled steel structure factory building structure is reasonable in structural design and high in stability, the installation reliability of a roof can be effectively improved, the roof is prevented from collapsing in rainy and snowy weather, the assembled steel structure factory building structure is convenient to install and disassemble, the problems that a template needs to be built in a traditional reinforced concrete factory building, the construction process is complicated, and the construction period is long can be effectively solved, and meanwhile, the steel structure factory building structure can be recycled.
In order to solve the technical problems, the utility model adopts the technical scheme that: the utility model provides an assembled steel construction factory building structure which characterized in that: the roof comprises a base and a roof detachably arranged above the base through a plurality of groups of vertical supports, wherein two sides of the roof are respectively provided with a longitudinal beam, each group of vertical supports comprises two upright columns symmetrically arranged on two sides of the base, two upright columns in the same group of vertical supports are respectively supported at the bottoms of the two longitudinal beams, and a cross beam is connected between the two upright columns in the same group of vertical supports;
the roof comprises an arc-shaped roof board and two lateral horizontal connecting plates symmetrically arranged on two sides of the arc-shaped roof board, and rain troughs are arranged on the lateral horizontal connecting plates along the length direction of the lateral horizontal connecting plates;
the base is provided with a plurality of positioning holes for positioning the stand column, and a plurality of diagonal draw bars are detachably connected between the lower end of the stand column and the base;
the bottom of arc roof boarding is provided with a plurality of arc back of the body stupefied, the stupefied quantity of arc back of the body equals and the one-to-one with the quantity of crossbeam, the stupefied both ends of arc back of the body are connected respectively on two longerons, the stupefied both ends of arc back of the body are provided with an otic placode that is used for being connected with the longeron respectively, pass through bolted connection between otic placode and the longeron, be provided with a plurality of pneumatic cylinders that are used for supporting arc back of the body on the crossbeam.
Foretell assembled steel construction factory building structure, its characterized in that: the base is a cubic base, and a plurality of anchoring parts are arranged at the bottom of the base.
Foretell assembled steel construction factory building structure, its characterized in that: the two sides of the arc-shaped roof plate are respectively flush with the inner sides of the two longitudinal beams, the rainwater tank is positioned on the outer sides of the longitudinal beams, and the rainwater tank is an arc-shaped tank arranged on the horizontal connecting plate on the side part;
the lower end face of the lateral horizontal connecting plate is arranged close to the upper end face of the longitudinal beam, and the section between the rainwater tank and the arc-shaped roof panel on the upper end face of the lateral horizontal connecting plate gradually inclines downwards from inside to outside.
Foretell assembled steel construction factory building structure, its characterized in that: the utility model discloses a roof beam, including the stand, the top of stand is provided with a longeron mounting panel that supplies the longeron installation, the one end of longeron mounting panel is equal and level mutually with one side of longeron, the other end of longeron mounting panel extends to the inboard of longeron, be connected with the slant stiffening rib between the other end bottom of longeron mounting panel and the longeron, bolted connection between longeron and the longeron mounting panel.
Foretell assembled steel construction factory building structure, its characterized in that: one side of stand is provided with the steel corbel that supplies the crossbeam installation, install respectively on two steel corbels at the both ends of crossbeam, all through bolted connection between steel corbel and the stand and between steel corbel and the crossbeam.
Foretell assembled steel construction factory building structure, its characterized in that: the steel bracket comprises a vertical mounting plate and a horizontal mounting plate, wherein the vertical mounting plate is mounted on one side of the upright post through bolts, the horizontal mounting plate is welded on one side of the vertical mounting plate, and a plurality of stiffening plates are arranged between the bottom of the horizontal mounting plate and the vertical mounting plate;
one end of the cross beam is arranged at the top of the horizontal mounting plate, and the end face of one end of the cross beam is arranged to be clung to the vertical mounting plate.
Foretell assembled steel construction factory building structure, its characterized in that: the lower end of the upright post is provided with a plurality of first hinge seats for the hinged installation of the diagonal draw bars, the upper ends of the diagonal draw bars are hinged on the first hinge seats through bolts, and the number of the first hinge seats is equal to that of the diagonal draw bars and corresponds to that of the diagonal draw bars one by one;
the outer lane equipartition of every locating hole is equipped with the articulated seat of a plurality of seconds on the base, the lower extreme of oblique pull rod passes through the bolt and articulates on the articulated seat of second, the articulated seat quantity of second equals the quantity and the one-to-one of first articulated seat.
Foretell assembled steel construction factory building structure, its characterized in that: the lug plate and the arc back edge are integrally formed, the arc back edge is positioned below one side of the arc back edge, and the lug plate is arranged close to the inner side of the longitudinal beam.
Foretell assembled steel construction factory building structure, its characterized in that: the cylinder body of the hydraulic cylinder is fixed on the cross beam through a bolt, and the piston rod end of the hydraulic cylinder is supported at the bottom of the arc-shaped back ridge.
Compared with the prior art, the utility model has the following advantages:
1. according to the utility model, the roof is detachably arranged above the base through the plurality of groups of vertical supports, so that the whole steel structure factory building structure is convenient to install and disassemble, the problems that a template needs to be built in a traditional reinforced concrete factory building, the construction process is complicated, and the construction period is long can be effectively solved, and the turnover use of the steel structure factory building structure can be realized.
2. According to the utility model, the plurality of arc-shaped back edges are arranged at the bottom of the arc-shaped roof panel, and the plurality of hydraulic cylinders for supporting the arc-shaped back edges are arranged on the cross beam, so that the mounting reliability of the roof can be effectively improved, and the roof can be prevented from collapsing in rainy and snowy weather.
3. According to the utility model, the plurality of diagonal draw bars are connected between the lower end of the stand column and the base, so that the stand column and the base can be fixed, the verticality of the stand column can be ensured, and the possibility of inclination of the stand column is reduced.
In conclusion, the roof structure is reasonable in structural design and high in stability, can effectively improve the installation reliability of the roof, avoids the roof from collapsing in rainy and snowy weather, is convenient to install and disassemble, can effectively solve the problems that a traditional reinforced concrete factory building needs to build a template, is complicated in construction process and long in construction period, and can realize the turnover use of a steel structure factory building structure.
The technical solution of the present invention is further described in detail by the accompanying drawings and embodiments.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a left side view of fig. 1.
Description of reference numerals:
1-a base; 2-roof; 2-1-arc roof boarding;
2-lateral horizontal connecting plates; 2-3-rain gutter; 3, longitudinal beams;
4, a column; 5, a cross beam; 6, arc-shaped back edges;
6-1-ear plate; 7, a hydraulic cylinder; 8, diagonal draw bars;
9-oblique stiffeners; 10-steel corbel; 10-1-a vertical mounting plate;
10-2-horizontal mounting plate; 10-3-a stiffening plate; 11-a first articulated seat;
12-a second articulated seat; 13-longitudinal beam mounting plate.
Detailed Description
As shown in fig. 1 and 2, the utility model comprises a base 1 and a roof 2 detachably mounted above the base 1 through a plurality of groups of vertical supports, wherein two sides of the roof 2 are respectively provided with a longitudinal beam 3, each group of vertical supports comprises two upright columns 4 symmetrically arranged at two sides of the base 1, two upright columns 4 in the same group of vertical supports are respectively supported at the bottoms of the two longitudinal beams 3, and a cross beam 5 is connected between the two upright columns 4 in the same group of vertical supports;
the roof 2 comprises an arc roof board 2-1 and two lateral horizontal connecting boards 2-2 symmetrically arranged on two sides of the arc roof board 2-1, and rainwater grooves 2-3 are arranged on the lateral horizontal connecting boards 2-2 along the length direction;
a plurality of positioning holes for positioning the stand column 4 are formed in the base 1, and a plurality of diagonal draw bars 8 are detachably connected between the lower end of the stand column 4 and the base 1;
the arc roof boarding 2-1's bottom is provided with the stupefied 6 of a plurality of arc backs, the quantity of the stupefied 6 of arc back is equal and the one-to-one with the quantity of crossbeam 5, the both ends of the stupefied 6 of arc back are connected respectively on two longerons 3, the both ends of the stupefied 6 of arc back are provided with an otic placode 6-1 that is used for being connected with longeron 3 respectively, pass through bolted connection between otic placode 6-1 and the longeron 3, be provided with a plurality of pneumatic cylinders 7 that are used for supporting the stupefied 6 of arc back on the cross beam 5.
During the in-service use, install 2 detachable on roof in the top of base 1 through multiunit vertical braces, the installation and the dismantlement of the whole steel construction factory building structure of being convenient for can effectively solve traditional reinforced concrete factory building and need build the template, the work progress is loaded down with trivial details, the longer problem of construction period, can also realize steel construction factory building structure's turnover use simultaneously.
It should be noted that, through setting up roof 2 into the arc, can effectively improve steel construction factory building structure's aesthetic property, can effectively carry out the roof drainage simultaneously, realize the wholeness on roof, the assembly of being convenient for avoids stress concentration phenomenon.
During specific implementation, a plurality of downpipes are arranged at the bottom of the rain grooves 2-3, and the rain grooves 2-3 are respectively arranged on two sides of the arc roof panel 2-1, so that rainwater on the roof can be intensively discharged in rainy days, and the rainwater on the roof is prevented from directly falling from eaves to cause ground rainwater deposition.
During the in-service use, through having seted up a plurality of locating holes on base 1, can improve the assembly efficiency and the assembly precision of stand 4, the colleague can guarantee stand 4 and base 1's wholeness, guarantees the structural strength of whole factory building structure.
It should be noted that, the plurality of arc-shaped back edges 6 are arranged at the bottom of the arc-shaped roof panel 2-1, and the plurality of hydraulic cylinders 7 for supporting the arc-shaped back edges 6 are arranged on the cross beam 5, so that the installation reliability of the roof 2 can be effectively improved, and the roof 2 is prevented from collapsing in rainy and snowy weather.
During the in-service use, through being connected a plurality of oblique pull rods 8 between the lower extreme of stand 4 and base 1, can fix stand 4 and base 1, can also guarantee the straightness that hangs down of stand 4 simultaneously, reduce the possibility that stand 4 takes place to incline.
In this embodiment, the base 1 is a cubic base, and a plurality of anchoring members are arranged at the bottom of the base 1.
During the in-service use, through a plurality of anchor assembly with base 1 anchor subaerial, be convenient for control the inside terrestrial planarization and the levelness of factory building.
In the embodiment, two sides of the arc roof panel 2-1 are respectively flush with the inner sides of the two longitudinal beams 3, the rain gutter 2-3 is positioned on the outer side of the longitudinal beams 3, and the rain gutter 2-3 is an arc groove formed in the horizontal connecting plate 2-2 on the side part;
the lower end face of the lateral horizontal connecting plate 2-2 is closely attached to the upper end face of the longitudinal beam 3, and the section, located between the rain gutter 2-3 and the arc roof panel 2-1, on the upper end face of the lateral horizontal connecting plate 2-2 gradually inclines downwards from inside to outside.
During actual use, the rain gutter 2-3 is provided with a plurality of prototype water falling holes for installing the water falling pipe along the length direction.
In specific implementation, a section, which is positioned between the rainwater tank 2-3 and the arc roof panel 2-1, on the upper end face of the lateral horizontal connecting plate 2-2 is gradually inclined downwards from inside to outside to form a drainage slope, and the slope of the drainage slope is between 5 degrees and 15 degrees; the arrangement of the drainage skin is convenient for rainwater on the roof to be collected into the two rainwater grooves 2-3.
In this embodiment, the top of the upright column 4 is provided with a longitudinal beam mounting plate 13 for mounting the longitudinal beam 3, one end of the longitudinal beam mounting plate 13 is flush with one side of the longitudinal beam 3, the other end of the longitudinal beam mounting plate 13 extends to the inner side of the longitudinal beam 3, an oblique stiffening rib 9 is connected between the bottom of the other end of the longitudinal beam mounting plate 13 and the longitudinal beam 3, and the longitudinal beam 3 and the longitudinal beam mounting plate 13 are connected through bolts.
During actual use, the longitudinal beam mounting plate 13 is a steel plate, the longitudinal beam 3, the upright post 4 and the cross beam 5 are all i-shaped steel, the longitudinal beam mounting plate 13 is welded and fixed at the upper end of the upright post 4, the oblique stiffening rib 9 is a reinforcing steel bar, and two ends of the oblique stiffening rib 9 are respectively welded on the longitudinal beam mounting plate 13 and the upright post 4.
In this embodiment, one side of stand 4 is provided with the steel corbel 10 that supplies crossbeam 5 to install, install respectively on two steel corbels 10 at the both ends of crossbeam 5, all through bolted connection between steel corbel 10 and the stand 4 and between steel corbel 10 and the crossbeam 5.
In the embodiment, the steel corbel 10 comprises a vertical mounting plate 10-1 mounted on one side of the upright post 4 through bolts and a horizontal mounting plate 10-2 welded on one side of the vertical mounting plate 10-1, wherein a plurality of stiffening plates 10-3 are arranged between the bottom of the horizontal mounting plate 10-2 and the vertical mounting plate 10-1;
one end of the cross beam 5 is arranged at the top of the horizontal mounting plate 10-2, and the end face of one end of the cross beam 5 is closely attached to the vertical mounting plate 10-1.
When the vertical type reinforcing plate is used practically, the vertical mounting plate 10-1 is arranged close to one side of the upright post 4, the horizontal mounting plate 10-2 is welded in the middle of the vertical mounting plate 10-1, the width of the horizontal mounting plate 10-2 is equal to that of the vertical mounting plate 10-1, the reinforcing plates 10-3 are trapezoidal plates and are perpendicular to the vertical mounting plate 10-1 and the horizontal mounting plate 10-2, the number of the reinforcing plates 10-3 is multiple, and the plurality of reinforcing plates 10-3 are arranged side by side.
In this embodiment, the lower end of the upright column 4 is provided with a plurality of first hinge seats 11 for the diagonal draw bars 8 to be hinged, the upper ends of the diagonal draw bars 8 are hinged on the first hinge seats 11 through bolts, and the number of the first hinge seats 11 is equal to that of the diagonal draw bars 8 and corresponds to one another;
the outer lane equipartition of every locating hole is equipped with a plurality of articulated seats of second 12 on the base 1, the lower extreme of oblique pull rod 8 passes through the bolt and articulates on articulated seat of second 12, the articulated seat of second 12 quantity equals the quantity and the one-to-one of first articulated seat 11.
In actual use, the first hinge seat 11 and the second hinge seat 12 have the same structure, the first hinge seat 11 and the second hinge seat 12 are both groove-shaped members, and one end of the diagonal draw bar 8 is positioned in a groove of the first hinge seat 11 or the second hinge seat 12;
the circular through-hole that supplies the bolt to pass is all seted up on the both sides cell wall of the articulated seat of both ends, first articulated seat 11 and the articulated seat 12 of second of diagonal draw bar 8, fixes the both ends of diagonal draw bar 8 with the articulated seat 12 of first articulated seat 11 and second respectively through the bolt, is convenient for install and dismantle.
In this embodiment, the ear plate 6-1 and the arc-shaped back edge 6 are integrally formed, the arc-shaped back edge 6 is located below one side of the arc-shaped back edge 6, and the ear plate 6-1 is closely attached to the inner side of the longitudinal beam 3.
In practical use, the two ear plates 6-1 and the arc-shaped back edge 6 form a C shape, so that the arc-shaped back edge 6 and the longitudinal beam 3 are fixed conveniently.
In this embodiment, the cylinder body of the hydraulic cylinder 7 is fixed on the cross beam 5 by bolts, and the piston rod end of the hydraulic cylinder 7 is supported at the bottom of the arc-shaped back ridge 6.
During the in-service use, the setting of pneumatic cylinder 7 can be applicable to the support on multiple shape roof, and application scope is extensive.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and all simple modifications, changes and equivalent structural changes made to the above embodiment according to the technical spirit of the present invention still fall within the protection scope of the technical solution of the present invention.

Claims (9)

1. The utility model provides an assembled steel construction factory building structure which characterized in that: the roof structure comprises a base (1) and a roof (2) detachably mounted above the base (1) through a plurality of groups of vertical supporting pieces, wherein two longitudinal beams (3) are respectively arranged on two sides of the roof (2), each group of vertical supporting pieces comprises two upright columns (4) symmetrically arranged on two sides of the base (1), two upright columns (4) in the same group of vertical supporting pieces are respectively supported at the bottoms of the two longitudinal beams (3), and a cross beam (5) is connected between the two upright columns (4) in the same group of vertical supporting pieces;
the roof (2) comprises an arc roof board (2-1) and two lateral horizontal connecting plates (2-2) symmetrically arranged on two sides of the arc roof board (2-1), and rain troughs (2-3) are arranged on the lateral horizontal connecting plates (2-2) along the length direction of the lateral horizontal connecting plates;
a plurality of positioning holes for positioning the upright posts (4) are formed in the base (1), and a plurality of diagonal draw bars (8) are detachably connected between the lower ends of the upright posts (4) and the base (1);
the arc roof boarding (2-1) the bottom be provided with the stupefied (6) of a plurality of arcs back of the body, the quantity of the stupefied (6) of the arc back of the body and the quantity of crossbeam (5) equal and one-to-one, the both ends of the stupefied (6) of the arc back of the body are connected respectively on two longerons (3), the both ends of the stupefied (6) of the arc back of the body are provided with an otic placode (6-1) that is used for being connected with longeron (3) respectively, pass through bolted connection between otic placode (6-1) and longeron (3), be provided with a plurality of pneumatic cylinders (7) that are used for supporting stupefied (6) of the arc back of the body on the crossbeam (5).
2. An assembled steel structure factory building structure according to claim 1, wherein: the base (1) is a cubic base, and a plurality of anchoring pieces are arranged at the bottom of the base (1).
3. An assembled steel structure factory building structure according to claim 1, wherein: the two sides of the arc roof board (2-1) are respectively flush with the inner sides of the two longitudinal beams (3), the rain gutter (2-3) is positioned on the outer side of the longitudinal beams (3), and the rain gutter (2-3) is an arc groove formed in the horizontal connecting board (2-2) on the side part;
the lower end faces of the lateral horizontal connecting plates (2-2) are arranged to be tightly attached to the upper end faces of the longitudinal beams (3), and the sections, located between the rainwater troughs (2-3) and the arc roof panels (2-1), on the upper end faces of the lateral horizontal connecting plates (2-2) are gradually inclined downwards from inside to outside.
4. An assembled steel structure factory building structure according to claim 1, wherein: the top of stand (4) is provided with longeron mounting panel (13) that a confession longeron (3) was installed, the one end of longeron mounting panel (13) is level with one side of longeron (3) mutually, the other end of longeron mounting panel (13) extends to the inboard of longeron (3), be connected with slant stiffening rib (9) between the other end bottom of longeron mounting panel (13) and longeron (3), bolted connection between longeron (3) and longeron mounting panel (13).
5. An assembled steel structure factory building structure according to claim 1, wherein: one side of stand (4) is provided with steel corbel (10) that supplies crossbeam (5) to install, install respectively on two steel corbels (10) at the both ends of crossbeam (5), all through bolted connection between steel corbel (10) and stand (4) and between steel corbel (10) and crossbeam (5).
6. An assembled steel structural factory building structure according to claim 5, wherein: the steel corbel (10) comprises a vertical mounting plate (10-1) arranged on one side of the upright post (4) through bolts and a horizontal mounting plate (10-2) welded on one side of the vertical mounting plate (10-1), and a plurality of stiffening plates (10-3) are arranged between the bottom of the horizontal mounting plate (10-2) and the vertical mounting plate (10-1);
one end of the cross beam (5) is arranged at the top of the horizontal mounting plate (10-2), and the end face of one end of the cross beam (5) is closely attached to the vertical mounting plate (10-1) to be arranged.
7. An assembled steel structure factory building structure according to claim 1, wherein: the lower end of the upright post (4) is provided with a plurality of first hinge seats (11) for the diagonal draw bars (8) to be hinged and installed, the upper ends of the diagonal draw bars (8) are hinged on the first hinge seats (11) through bolts, and the number of the first hinge seats (11) is equal to that of the diagonal draw bars (8) and corresponds to that of the diagonal draw bars one by one;
the outer lane equipartition of every locating hole is equipped with articulated seat of a plurality of seconds (12) on base (1), the lower extreme of oblique pull rod (8) passes through the bolt and articulates on articulated seat of second (12), the articulated seat of second (12) quantity equals the quantity and the one-to-one of first articulated seat (11).
8. An assembled steel structure factory building structure according to claim 1, wherein: the ear plate (6-1) and the arc-shaped back edge (6) are integrally formed, the arc-shaped back edge (6) is located below one side of the arc-shaped back edge (6), and the ear plate (6-1) is closely attached to the inner side of the longitudinal beam (3) and arranged.
9. An assembled steel structure factory building structure according to claim 1, wherein: the cylinder body of the hydraulic cylinder (7) is fixed on the cross beam (5) through a bolt, and the piston rod end of the hydraulic cylinder (7) is supported at the bottom of the arc-shaped back ridge (6).
CN202123347247.5U 2021-12-28 2021-12-28 Assembled steel construction factory building structure Active CN216446613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123347247.5U CN216446613U (en) 2021-12-28 2021-12-28 Assembled steel construction factory building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123347247.5U CN216446613U (en) 2021-12-28 2021-12-28 Assembled steel construction factory building structure

Publications (1)

Publication Number Publication Date
CN216446613U true CN216446613U (en) 2022-05-06

Family

ID=81377469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123347247.5U Active CN216446613U (en) 2021-12-28 2021-12-28 Assembled steel construction factory building structure

Country Status (1)

Country Link
CN (1) CN216446613U (en)

Similar Documents

Publication Publication Date Title
CN112609980A (en) Construction method of post-cast strip back-jacking aluminum alloy single-column
CN114673196B (en) Zero-touch construction process for isolation layer of underground water plant
CN216446613U (en) Assembled steel construction factory building structure
CN110656701B (en) Assembled steel construction building
CN217975378U (en) Cast-in-place board template strutting arrangement of simple beam assembled
CN212201451U (en) Assembled heat-insulation type steel bar processing factory
CN212771977U (en) Simple broken line falsework connection structure of cast-in-situ variable-section beam body
CN212478675U (en) Convenient ann tears assembled steel construction reinforcing bar processing protection canopy open
CN221193742U (en) Archaize building wood rafter flies and concrete connection structure
CN212801233U (en) Be used for bridge construction modularization pin-connected panel ladder cage
CN111519949A (en) Convenient ann tears assembled steel construction reinforcing bar processing protection canopy open
CN111827119A (en) Connecting structure of cast-in-situ variable cross-section beam body formwork and construction method thereof
CN215330423U (en) Building steel structure with anti-seismic performance
CN215369949U (en) Middle plate and frame body reserved door type channel
CN218581266U (en) Door type modularization assembly type steel bar processing shed
CN215717474U (en) Assembled escape way protection shed for construction
CN215368967U (en) Temporary reinforcing steel bar processing shed
CN218714867U (en) Foundation-free assembly jig frame of large-span prestressed arch dry coal shed
CN214741465U (en) Novel mounting and dismounting walkway plate bracket
CN216196897U (en) Can have enough to meet need carwash groove protection canopy
CN216894456U (en) Inverted trapezoidal movable working trolley for construction of secondary structure of large shield tunnel
CN216551595U (en) Pier stud reinforcement is as industry platform
CN219793672U (en) Integral hoisting type operation platform for installing rectangular high pier steel bars
CN218563165U (en) Processing area protection shed convenient and fast to mount and dismount and capable of being turned over
CN213978632U (en) Fish-bellied beam and dripping eave integrated template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A prefabricated steel structure factory building structure

Granted publication date: 20220506

Pledgee: Bank of China Limited Xi'an High tech Development Zone Sub branch

Pledgor: Shaanxi Chuangtianji Industrial Development Co.,Ltd.

Registration number: Y2024980010893

PE01 Entry into force of the registration of the contract for pledge of patent right