CN216442780U - Steel chisel locating component and net cage frame equipment applying same - Google Patents

Steel chisel locating component and net cage frame equipment applying same Download PDF

Info

Publication number
CN216442780U
CN216442780U CN202120745476.3U CN202120745476U CN216442780U CN 216442780 U CN216442780 U CN 216442780U CN 202120745476 U CN202120745476 U CN 202120745476U CN 216442780 U CN216442780 U CN 216442780U
Authority
CN
China
Prior art keywords
steel
positioning
positioning assembly
frame
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120745476.3U
Other languages
Chinese (zh)
Inventor
张志洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Youke Intelligent Equipment Zhejiang Co ltd
Original Assignee
Youke Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Youke Intelligent Equipment Co ltd filed Critical Youke Intelligent Equipment Co ltd
Priority to CN202120745476.3U priority Critical patent/CN216442780U/en
Application granted granted Critical
Publication of CN216442780U publication Critical patent/CN216442780U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a steel chisel positioning assembly and a net cage frame device applying the positioning assembly, wherein the steel chisel frame, the positioning assembly and the net cage frame bearing the steel chisel frame are arranged on the steel chisel frame, the positioning assembly is used for installing steel chisels and comprises at least one group of positioning mechanisms, and the positioning mechanisms comprise a plurality of groups of guide hole structures arranged at equal intervals and positioning hole structures positioned below the guide hole structures; the fixing beam is arranged on the net cage frame, so that the applicability of the device is improved, and the firmness of steel chisel fixing is improved.

Description

Steel chisel locating component and net cage frame equipment applying same
Technical Field
The utility model relates to aerated concrete plate production equipment, in particular to a steel chisel positioning assembly and a net cage frame device applying the same.
Background
At present, evaporate and press the bulk building material that aerated concrete panel made with aerated concrete as the main material, in order to guarantee panel intensity, must bury reinforcing bar net skeleton underground wherein, present manufacture factory all adopts and inserts brazing type rack cable suspension device and arrange the location to the rack in the mould, when arranging the location to the rack, generally lean on artifical the measurement, it is accurate low, the error is big, the drill rod is fixed not hard up, influence whole rack fastness, it wastes time, it is hard to do all, how to make the rack fix a position when arranging the location fast, the drill rod is fixed more firm, become the technological problem that is difficult to solve for a long time.
The utility model of Chinese patent application CN201721287853.3 discloses an autoclaved aerated concrete plate net cage hanging frame device, wherein supporting legs are arranged at four corners of a saddle frame, at least two saddles which are parallel to each other are arranged between cross beams at two ends of the saddle frame, square grooves at two ends of the saddles are mutually clamped with the cross beams at two ends of the saddle frame, holes are reserved in the middle parts of end surfaces at two ends of the saddles, positioning bolts are arranged in the reserved holes, the saddles are fixed on the saddle frame through the positioning bolts at two ends, positioning holes are uniformly distributed on the saddles, and steel rods are arranged in the positioning holes; when the utility model is used, the drill bit of the drill rod is inserted into the positioning holes of the H-shaped positioning sheets at the two sides of the steel bar net rack to be fixed, the drill rod is rotated to clamp the positioning short rod at the upper end of the drill rod into the positioning hole of the pommel horse, the handle is pressed by hand to shorten the spring, the drill rod drives the steel bar net rack to move downwards, and the drill rod handle is rotated to withdraw the positioning short rod from the positioning hole of the pommel horse.
However, the distance between the positioning holes of the saddle in the technical scheme is only one specification, and the applicability of the equipment is not high.
SUMMERY OF THE UTILITY MODEL
One of the purposes of the utility model is to provide a drill steel positioning assembly aiming at the defects in the prior art, wherein a plurality of groups of positioning mechanisms with different guide hole structure intervals are arranged on a drill steel frame, and a positioning hole structure is arranged right below the guide hole structure, so that the applicability of the device is improved, and the firmness of the drill steel fixation is improved.
In order to achieve the purpose, the utility model provides the following technical scheme:
a drill steel positioning assembly comprising:
a drill rod frame;
the positioning assembly is arranged on the drill rod frame and used for installing a drill rod and comprises at least one group of positioning mechanisms, and each positioning mechanism comprises a plurality of groups of guide hole structures arranged at equal intervals and positioning hole structures located right below the guide hole structures.
As an improvement, the steel chisel frame comprises a vertical plate which is transversely arranged, an upper transverse plate and a lower transverse plate which are respectively and fixedly arranged on the upper side and the lower side of the vertical plate, and side plates which are positioned on the left side and the right side of the vertical plate.
As an improvement, two ends of the steel chisel frame in the length direction are provided with sliding seats which can be arranged on the cylinder mould frame in a sliding mode, and stop screws are rotatably arranged on the sliding seats.
As an improvement, the guide hole structure comprises a round hole a formed in the upper transverse plate and an elongated slot located on one side of the round hole a and communicated with the round hole a.
As an improvement, the positioning hole structure comprises a round hole b which is arranged on the lower transverse plate and is opposite to the round hole a.
As an improvement, the positioning assembly further comprises a steel plate ruler b positioned on the upper transverse plate.
The utility model also aims to overcome the defects in the prior art and provides the net cage equipment applying the steel chisel positioning assembly, and the deflection of the net cage is reduced by arranging the fixing beam on the net cage.
In order to achieve the purpose, the utility model provides the following technical scheme:
the aerated concrete net cage frame equipment comprises any one steel chisel positioning assembly and a net cage frame for bearing the steel chisel frame, wherein a fixed beam is arranged on the net cage frame, and the deflection of the net cage frame is increased by the fixed beam.
As an improvement, the fixed beam is arranged along the width direction of the net cage, and the fixed beam is positioned in the middle of the length direction of the net cage.
As an improvement, the net cage frame comprises two groups of positioning rods and a steel plate ruler a arranged on the side surface of the net cage frame.
As an improvement, reinforcing rods are arranged at four corners of the net cage frame.
The utility model has the beneficial effects that:
(1) according to the utility model, the drill rod frame is provided with a plurality of groups of positioning mechanisms with different guide hole structure intervals, the applicability of the device is improved, and the positioning of the drill rod can be rapidly completed by matching with the steel plate ruler a positioned on the drill rod frame;
(2) according to the utility model, the positioning hole structure is correspondingly arranged right below the guide hole structure, and the round hole a and the round hole b are matched to fix the steel chisel, so that the stability and firmness of steel chisel fixation are improved;
(3) according to the utility model, the steel plate ruler a is arranged on the side surface of the cylinder mould frame, so that the position of the steel chisel frame can be conveniently and rapidly adjusted, and the adjusting efficiency of the steel chisel is improved.
In conclusion, the utility model has the advantages of simple structure, ingenious design, high steel chisel adjusting efficiency and the like.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view of FIG. 1 at B;
FIG. 3 is a top view of a drill steel frame structure;
FIG. 4 is an enlarged view of FIG. 3 at C;
FIG. 5 is a schematic view of a cage structure;
fig. 6 is an enlarged view of a portion a in fig. 5.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Example one
As shown in fig. 1 to 4, a drill steel positioning assembly 10 includes:
a steel chisel frame 2;
the positioning assembly 3 is arranged on the drill rod frame 2, the positioning assembly 3 is used for installing a drill rod and comprises at least one group of positioning mechanisms 31, and the positioning mechanisms 31 comprise a plurality of groups of guide hole structures 32 arranged at equal intervals and positioning hole structures 33 positioned below the guide hole structures 32.
Further, the drill steel frame 2 includes a vertical plate 21 disposed horizontally, an upper horizontal plate 220 and a lower horizontal plate 221 fixedly mounted on the upper and lower sides of the vertical plate 21, respectively, and side plates 23 located on the left and right sides of the vertical plate 21.
Furthermore, the two ends of the drill rod frame 2 in the length direction are provided with sliding seats 41 which can be slidably arranged on the cylinder mould frame, and stop screws 42 are rotatably arranged on the sliding seats 41.
Further, the guiding hole structure 32 includes the circular hole a321 opened on the upper transverse plate 220 and an elongated slot 322 located at one side of the circular hole a321 and communicated with the circular hole a 321.
It should be noted that the elongated slot 322 can quickly position the drill steel.
As shown in fig. 5 and 6, the round holes a321 in different positioning mechanisms 31 are spaced at M, N, L, S, where M is 25mm, N is 120mm, L is 180mm, and S is 240mm, according to the national standard.
Further, the positioning hole structure 33 includes a circular hole b331 formed in the lower cross plate 221 and facing the circular hole a 321.
The round hole a321 is matched with the round hole b331 to fix the drill steel more firmly.
Further, the positioning assembly 3 further includes a steel plate ruler b34 located on the upper cross plate 220.
It should be noted that the steel plate rule b34 enables a worker to quickly position the corresponding positioning mechanism 31.
Example two
As shown in fig. 5 and 6, the aerated concrete cylinder mould frame equipment comprises any one of the steel chisel positioning assemblies and a cylinder mould frame 1 for bearing a steel chisel frame 2, wherein a fixed beam 13 is arranged on the cylinder mould frame 1, and the fixed beam 13 reduces the deflection of the cylinder mould frame 1.
It should be noted that the net cage 1 is provided in a frame shape
Further, the fixed beam 13 is disposed along the width direction of the net cage 1, and the fixed beam 13 is located at the middle position of the net cage 1 in the length direction.
It should be noted that the fixed beams 13 may be provided in multiple sets.
Further, the cylinder mould 1 comprises two groups of positioning rods 11 and a steel plate ruler a12 arranged on the side surface of the cylinder mould 1.
It should be noted that the steel plate ruler a12 can be matched with the stop screw 42 to realize the quick positioning of the steel bar frame 2 on the net cage frame 1.
Further, reinforcing rods 14 are arranged at four corners of the net cage 1.
It should be noted that the reinforcing bars 14 increase the structural strength of the net cage 1.
Working procedure
According to the utility model, the steel chisel frame 2 is arranged on the net cage frame 1 through a fixing component 4, the positioning components 31 with different intervals of the guide hole structures 32 are arranged on the steel chisel frame 2, the corresponding positioning hole structures 33 are arranged right below the guide hole structures 32, and the steel chisel is positioned and fixed through the guide hole structures 32 and the positioning hole structures 33.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. A drill steel positioning assembly (10), comprising:
a steel chisel frame (2);
the positioning assembly (3) is arranged on the steel chisel frame (2), the positioning assembly (3) is used for installing steel chisels and comprises at least one group of positioning mechanisms (31), and each positioning mechanism (31) comprises a plurality of groups of guide hole structures (32) arranged at equal intervals and positioning hole structures (33) located right below the guide hole structures (32).
2. A drill steel positioning assembly as claimed in claim 1, wherein the drill steel frame (2) comprises a transversely disposed riser (21), upper (220) and lower (221) transverse plates fixedly mounted to the riser (21) on respective upper and lower sides thereof, and side plates (23) located on respective left and right sides of the riser (21).
3. A drill steel positioning assembly according to claim 2, wherein the guide hole means (32) comprises a circular hole a (321) formed in the upper cross plate (220) and an elongated slot (322) located on the side of the circular hole a (321) and communicating with the circular hole a (321).
4. A drill steel positioning assembly according to claim 3, wherein the positioning hole structure (33) comprises a circular hole b (331) formed in the lower cross plate (221) and opposite to the circular hole a (321).
5. A drill steel positioning assembly according to claim 2, characterized in that the positioning assembly (3) further comprises a steel rule b (34) located in the upper cross plate (220).
6. A drill rod positioning assembly according to claim 1, wherein the drill rod holder (2) is provided with sliding seats (41) slidably mounted on the cylinder mould frame at both ends in the length direction, and stop screws (42) are rotatably mounted on the sliding seats (41).
7. An aerated concrete net cage device, which is characterized by comprising the steel chisel positioning assembly as set forth in any one of claims 1 to 6, and further comprising a net cage (1) for bearing the steel chisel frame (2), wherein the net cage (1) is provided with a fixed beam (13), and the fixed beam (13) is used for reducing the deflection of the net cage (1).
8. An aerated concrete cage system according to claim 7 wherein the fixed beams (13) are located along the width of the cage (1) and the fixed beams (13) are located at an intermediate position along the length of the cage (1).
9. An aerated concrete cage system according to claim 7 wherein the cage (1) includes two sets of locator bars (11) and steel plate footage a (12) mounted to the sides of the cage (1).
10. An aerated concrete cage system according to claim 7 wherein reinforcement bars (14) are provided at the four corners of the cage (1).
CN202120745476.3U 2021-04-13 2021-04-13 Steel chisel locating component and net cage frame equipment applying same Active CN216442780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120745476.3U CN216442780U (en) 2021-04-13 2021-04-13 Steel chisel locating component and net cage frame equipment applying same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120745476.3U CN216442780U (en) 2021-04-13 2021-04-13 Steel chisel locating component and net cage frame equipment applying same

Publications (1)

Publication Number Publication Date
CN216442780U true CN216442780U (en) 2022-05-06

Family

ID=81347456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120745476.3U Active CN216442780U (en) 2021-04-13 2021-04-13 Steel chisel locating component and net cage frame equipment applying same

Country Status (1)

Country Link
CN (1) CN216442780U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116277446A (en) * 2022-11-15 2023-06-23 长兴奥宇塑业有限公司 Connecting assembly, networking structure and using method of autoclaved aerated concrete slab net cage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116277446A (en) * 2022-11-15 2023-06-23 长兴奥宇塑业有限公司 Connecting assembly, networking structure and using method of autoclaved aerated concrete slab net cage
CN116277446B (en) * 2022-11-15 2024-04-26 长兴奥宇塑业有限公司 Connecting assembly, networking structure and using method of autoclaved aerated concrete slab net cage

Similar Documents

Publication Publication Date Title
CN216442780U (en) Steel chisel locating component and net cage frame equipment applying same
CN108568895B (en) Fixing device of intelligent building beam column manufacturing equipment
CN213710365U (en) Connecting and locking device for building template
CN212946297U (en) Welding and positioning device for stud on steel reinforced concrete column
CN212652616U (en) Reinforcement cage binding tool
CN215948879U (en) Concrete form convenient to splice for building construction
CN214364454U (en) Concrete bar planting stirrup
CN210563472U (en) Steel bar positioning structure based on construction of building main body structure
CN211691463U (en) Jacking for building
CN219196827U (en) Reinforcing mechanism for frame beam
CN215479257U (en) Superimposed sheet positioning tool
CN216239018U (en) Connecting piece and rigid combination system of filler wall and beam slab in frame structure
CN220515477U (en) Drilling device for steel structural member
CN218059936U (en) Device for adjusting reserved large-diameter U-shaped steel bar space of toothed plate
CN217585548U (en) Caliper assembly for adjusting steel bar spacing
CN218592218U (en) Ladder muscle mold processing
CN214539037U (en) Composite steel plate shearing test device
CN217602133U (en) Auxiliary welding device for wall column positioning reinforcing steel bars
CN218864924U (en) Die type adjustable arbitrary angle and length positioning caliper for assembling unit body
CN215670142U (en) T-shaped steel structure connecting piece
CN216446532U (en) Sectional type leveling die frame for installing guardrail reinforcing steel bars
CN109443328B (en) Prestressed pipeline coordinate positioning ruler and use method thereof
CN217290222U (en) Prefabricated assembled box channel steel reinforcement framework regularization ligature bed-jig
CN218301272U (en) Photovoltaic support with layer board structure
CN220483866U (en) Spliced construction site is with reinforcing bar piling up ridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 313100 No. 4-1 Puchang Avenue, Xiaopu Town, Changxing County, Huzhou City, Zhejiang Province

Patentee after: Youke Intelligent Equipment (Zhejiang) Co.,Ltd.

Address before: 313100 No. 4-1 Puchang Avenue, Xiaopu Town, Changxing County, Huzhou City, Zhejiang Province

Patentee before: Youke Intelligent Equipment Co.,Ltd.