CN2164419Y - Cathode furnace chamber structure for aluminium electrolysis trough - Google Patents

Cathode furnace chamber structure for aluminium electrolysis trough Download PDF

Info

Publication number
CN2164419Y
CN2164419Y CN 93219596 CN93219596U CN2164419Y CN 2164419 Y CN2164419 Y CN 2164419Y CN 93219596 CN93219596 CN 93219596 CN 93219596 U CN93219596 U CN 93219596U CN 2164419 Y CN2164419 Y CN 2164419Y
Authority
CN
China
Prior art keywords
cathode
square steel
utility
model
chamber structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93219596
Other languages
Chinese (zh)
Inventor
田永
郭纪宪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN ALUMINIUM SMELTERY
Original Assignee
YUNNAN ALUMINIUM SMELTERY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN ALUMINIUM SMELTERY filed Critical YUNNAN ALUMINIUM SMELTERY
Priority to CN 93219596 priority Critical patent/CN2164419Y/en
Application granted granted Critical
Publication of CN2164419Y publication Critical patent/CN2164419Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model relates to a cathode furnace chamber structure for an aluminium electrolysis trough. The utility model is characterized in that the included angle of an artificial extending leg (2) and a furnace chamber is 5 DEG-8 DEG, and the cathode square steel of a cleaning rod is two sections of square steels (3, 4) between which a buffer belt is arranged. The utility model can furthest protect the weak point of a cathode combining part, prolong the etched and corroded time of the weak point, increase the heat insulating time and form an alumina precipitating and stagnating zone, forming a furnace side as soon as possible and reducing the excessive precipitation of the furnace bottom, the two-section type square steel can prevent a cathode from being early damaged and extend the service life of the cathode, and the utility model has material saving.

Description

Cathode furnace chamber structure for aluminium electrolysis trough
The utility model relates to metallurgical equipment, specifically the aluminium electrolytic cell cathode chamber structure.
The structure of aluminium electrolytic cell cathode burner hearth is the partly crucial of aluminium cell, and its quality directly influences the output of electrolysis of aluminum.The aluminum cell hearth structure of using has two defectives to life at present, the first manually stretch one's legs and the plain sole piece of negative electrode charcoal, the end joint portion between sticking with paste the weakest, it is the impaired breach of electric tank cathode, it two is that poker square steel temperature distortion amount in the plain sole piece of charcoal is big, has quickened the early damage of negative electrode burner hearth.
The purpose of this utility model provides a kind of deficiency that can overcome in the above-mentioned existing aluminium electrolytic cell cathode chamber structure, improves the aluminium electrolytic cell cathode chamber structure of the output of electrolysis of aluminum effectively.
The technical solution of the utility model is: the aluminium electrolytic cell cathode chamber structure, comprise the furnace wall, manually stretch one's legs, the negative electrode square steel and the anode of poker, mainly done following improvement: the angle that changes into the furnace wall of will manually stretching one's legs is 5 °~8 °, the negative electrode square steel of poker changes two sections square steel into, and a buffer strip is left in the centre.
Fig. 1 is the part sectioned view of aluminium electrolytic cell cathode chamber structure
Fig. 2 is the layout synoptic diagram of negative electrode square steel
Description of drawings: the 1-furnace wall, 2-manually stretches one's legs, 3-negative electrode square steel, 4-negative electrode square steel, 5-anode.
Cathode furnace chamber structure for aluminium electrolysis trough of the present utility model has following characteristics: 1) can protect to greatest extent the weak spot of thresold joint portion and prolong the time that this place is subjected to etch, corrosion; 2) increase temperature retention time; 3) can form a precipitation of alumina stagnant area, form as early as possible stove nation and reduce too much bearth precipitation; 4) the two-part square steel can prevent the early damage of negative electrode, prolongs its life-span; 5) economical with materials.
Embodiment of the present utility model is: as shown in Figure 1, comprise furnace wall 1, manually stretch one's legs, on the basis of the chamber structure of the negative electrode square steel of poker and anode 5, manually stretch one's legs 2 with the angle of furnace wall be 5 °~8 °, the negative electrode square steel of poker changes two sections square steel 3,4 into, a buffer strip is left in the centre, and being uneven in length of two sections negative electrode square steel 3,4, both sides are arranged alternately, as shown in Figure 2.

Claims (2)

1, a kind of aluminium electrolytic cell cathode chamber structure, comprise the furnace wall, manually stretch one's legs, the negative electrode square steel and the anode of poker, the angle of (2) and furnace wall of it is characterized in that manually stretching one's legs is 5 °~8 °, and the negative electrode square steel of poker is two sections square steel (3,4), and a buffer strip is left in the centre.
2, chamber structure according to claim 1 it is characterized in that being uneven in length of two sections negative electrode square steel (3,4), and both sides is arranged alternately.
CN 93219596 1993-07-21 1993-07-21 Cathode furnace chamber structure for aluminium electrolysis trough Expired - Fee Related CN2164419Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93219596 CN2164419Y (en) 1993-07-21 1993-07-21 Cathode furnace chamber structure for aluminium electrolysis trough

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93219596 CN2164419Y (en) 1993-07-21 1993-07-21 Cathode furnace chamber structure for aluminium electrolysis trough

Publications (1)

Publication Number Publication Date
CN2164419Y true CN2164419Y (en) 1994-05-11

Family

ID=33798946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93219596 Expired - Fee Related CN2164419Y (en) 1993-07-21 1993-07-21 Cathode furnace chamber structure for aluminium electrolysis trough

Country Status (1)

Country Link
CN (1) CN2164419Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100383286C (en) * 2004-08-12 2008-04-23 贵阳铝镁设计研究院 Process for mfg. premelting anode aluminium electrolytic tank
CN102925926A (en) * 2011-08-10 2013-02-13 贵阳铝镁设计研究院有限公司 Step type paste bundling cathode structure
CN103060848A (en) * 2012-12-19 2013-04-24 中南大学 Aluminum electrolytic tank with artificial hearth

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100383286C (en) * 2004-08-12 2008-04-23 贵阳铝镁设计研究院 Process for mfg. premelting anode aluminium electrolytic tank
CN102925926A (en) * 2011-08-10 2013-02-13 贵阳铝镁设计研究院有限公司 Step type paste bundling cathode structure
CN103060848A (en) * 2012-12-19 2013-04-24 中南大学 Aluminum electrolytic tank with artificial hearth
CN103060848B (en) * 2012-12-19 2015-02-18 中南大学 Aluminum electrolytic tank with artificial hearth

Similar Documents

Publication Publication Date Title
AU2011204685B2 (en) Cathode with protrusion structure for aluminum electrolytic cell
CN2164419Y (en) Cathode furnace chamber structure for aluminium electrolysis trough
CN2851285Y (en) Bottom-grooved prebaked anode
CN2452143Y (en) Grids for valve control sealing lead-acid battery
CN110306207A (en) A kind of energy-efficient after baking starting method of specially-shaped cathode aluminum electrolytic tank
CN209726787U (en) A kind of gas-fired crucible furnace
CN209292443U (en) Electroslag furnace under protective Ar gas furnace charge bar and collector ring deashing blow device and electroslag furnace
CN201751430U (en) Novel special-shaped carbon block used for side part of aluminum electrolytic tank
CN217757540U (en) Energy-saving steel-making furnace
CN208884000U (en) A kind of electrolgtic aluminium carbon anode electric installation
CN2745941Y (en) Metal lithium electrolytic tank
CN2461931Y (en) Long service energy saving type copper cooling wall for blast furnace
CN219956068U (en) Electrode position adjusting device of electric arc furnace
CN2661707Y (en) Flexible joint device for scorched particles roasting of aluminium cell
CN2062336U (en) Aluminium electrolyser with combined sin and sic material as isde lining brick
CN220062554U (en) Full-closed type nickel iron ore heating furnace
CN215638715U (en) Upper furnace body of electric arc furnace
CN203625492U (en) Prebaked anode carbon block group capable of effectively reducing runout and liable to form lateral furnace wall
CN221055524U (en) Heat treatment salt bath furnace
CN219368352U (en) Novel crucible structure for intermediate frequency furnace
CN2254893Y (en) Thermal zinc plating bath
CN220246290U (en) Crust breaking hammer for aluminum electrolysis cell
CN212673829U (en) Blast heating device for glass processing smelting furnace
Thomas Improvement of Anode Baking in Open Furnaces.(Retroactive Coverage)
CN1300379C (en) Process for producing cathode charcoal block through cascade graphitising furnaces and construction thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee