CN216426748U - Crane tube structure easy and convenient to install - Google Patents

Crane tube structure easy and convenient to install Download PDF

Info

Publication number
CN216426748U
CN216426748U CN202123138876.7U CN202123138876U CN216426748U CN 216426748 U CN216426748 U CN 216426748U CN 202123138876 U CN202123138876 U CN 202123138876U CN 216426748 U CN216426748 U CN 216426748U
Authority
CN
China
Prior art keywords
oil filling
external member
filling riser
sliding groove
easy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123138876.7U
Other languages
Chinese (zh)
Inventor
陈建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Aidu Science & Technology Co ltd
Original Assignee
Hubei Aidu Science & Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Aidu Science & Technology Co ltd filed Critical Hubei Aidu Science & Technology Co ltd
Priority to CN202123138876.7U priority Critical patent/CN216426748U/en
Application granted granted Critical
Publication of CN216426748U publication Critical patent/CN216426748U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

The utility model discloses an easy and simple to handle's oil filling riser structure relates to oil filling riser technical field, including stand body and oil filling riser body, the top cover of stand body is equipped with connects the external member, the regulation chamber has been seted up to the inside of stand body, the inside of adjusting the chamber is provided with and is used for connecting the spacing stop gear of external member, the outer fixed surface of connecting the external member is connected with the reinforcement, the one end fixed connection of connecting the external member in the surface of oil filling riser body is kept away from to the reinforcement. It sets up through the cooperation between connecting external member, reinforcement, stop gear and the supplementary fixture, installs in supplementary fixture inside in advance through the oil filling riser body to utilize supplementary fixture to assist the centre gripping to the oil filling riser body, still carry on spacingly through stop gear to connecting the external member, make and connect the external member to support the oil filling riser body through the reinforcement spacing, realized swiftly installing the purpose on the stand body with the oil filling riser body.

Description

Crane tube structure easy and convenient to install
Technical Field
The utility model relates to a crane pipe technical field specifically is a crane pipe structure of simple installation.
Background
The crane pipe is a special device in the process of loading and unloading fluid in petrochemical industry, also called fluid loading and unloading arm, and it adopts rotary joint, rigid pipeline and elbow joint to connect them together so as to implement the movable device for transferring liquid medium between train, automobile tank car and trestle storage and transportation pipeline, and can replace old-fashioned hose connection, and has the characteristics of high safety, flexibility and long service life.
At present, there is a loading and unloading oil filling riser on the market, patent number: CN212609536U, it utilizes stand, inlet pipe, inner arm rotary joint and rotary drive mechanism, avoids the stand to produce the restriction to the rotation of inner arm, increases the angle that the inner arm can rotate relative to the inlet pipe.
However, in actual use, most of the crane pipes are mounted on the upright posts through a plurality of bolts, and when the crane pipes are mounted and dismounted, the bolts need to be screwed on or taken off, so that the operation is complicated, and the dismounting efficiency is low; therefore, the crane pipe structure which is simple and convenient to install is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a crane pipe structure which is simple and convenient to install in order to make up the defects of the prior art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides an easy and simple to handle's oil filling riser structure, includes stand body and oil filling riser body, the top cover of stand body is equipped with connects the external member, the regulation chamber has been seted up to the inside of stand body, the inside in regulation chamber is provided with and is used for connecting the spacing stop gear of external member, the outer fixed surface who connects the external member is connected with the reinforcement, the one end fixed connection who connects the external member is kept away from to the reinforcement in the surface of oil filling riser body, be provided with on the stand body and be used for assisting spacing supplementary fixture to the oil filling riser body.
Furthermore, stop gear includes first spout, second spout and first guide bar, first spout is seted up in the upper surface of stand body, the second spout is seted up in the upper surface of connecting the external member, the equal fixed connection in the inner wall in regulation chamber in both ends of first guide bar, the surface sliding connection of first guide bar has two movable blocks, the top of two movable blocks runs through the inside of first spout and second spout in proper order and extends to the top of connecting the external member.
Furthermore, the outer surface of the first guide rod is sleeved with a first spring, and two ends of the first spring are fixedly connected with one side face, close to the two moving blocks, of the two moving blocks respectively.
Furthermore, slots are formed in two sides of the inner wall of the second sliding groove, inserting blocks are inserted into the slots, and one side face, close to each other, of each inserting block is fixedly connected with one side face, far away from each moving block, of each inserting block.
Furthermore, a push rod is arranged above the connecting sleeve, the upper surfaces of the two moving blocks are hinged to hinge rods, and the hinge rods are hinged to each other through the push rod.
Further, supplementary fixture includes concave type piece, the third spout has been seted up to the inner wall of concave type piece, the inside sliding connection of third spout has two grip blocks, two the arc wall has all been seted up to the side that the grip block is close to each other.
Further, supplementary fixture still includes the second guide bar, the both ends of second guide bar all with the inner wall fixed connection of third spout, two the grip block all with second guide bar sliding connection, the surface cover of second guide bar is equipped with the second spring, the both ends of second spring respectively with two grip block side fixed connection that are close to each other.
Further, the bottom surface fixedly connected with mounting panel of stand body, the mounting hole that the equidistance was arranged is seted up to the inside of mounting panel.
Compared with the prior art, this simple installation's oil filling riser structure possesses following beneficial effect:
1. the utility model discloses a connect the cooperation setting between external member, reinforcement, stop gear and the supplementary fixture, through the oil filling riser body preinstall inside supplementary fixture to utilize supplementary fixture to assist the centre gripping to the oil filling riser body, still carry on spacingly through stop gear to connecting the external member, make and connect the external member to support the oil filling riser body through the reinforcement spacing, realized swiftly installing the purpose on the stand body with the oil filling riser body, possess the advantage of dismantling convenience, easy operation.
2. The utility model discloses a cooperation setting between hinge bar, push rod, movable block, slot and the inserted block promotes the hinge bar through the push rod and rotates on the movable block, can make two movable blocks carry out the motion of being close to each other or keeping away from each other, conveniently carries out quick assembly disassembly to connecting the external member, makes the movable block promote the inside that the inserted block inserted the slot, can consolidate the stability of connecting the external member on the stand body, and then can promote the stability of oil filling riser body.
Drawings
Fig. 1 is a perspective view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A in FIG. 1 according to the present invention;
fig. 3 is a top view of the present invention;
FIG. 4 is a cross-sectional view taken along line B-B of FIG. 3 according to the present invention;
fig. 5 is an enlarged schematic view of the structure at C in fig. 4 according to the present invention.
In the figure: the device comprises a vertical column body 1, a crane pipe body 2, a mounting plate 3, a mounting hole 4, a connecting kit 5, a reinforcing member 6, a limiting mechanism 7, a first sliding groove 71, a second sliding groove 72, a first guide rod 73, a first spring 74, a moving block 75, a slot 76, an inserting block 77, a hinged rod 78, a push rod 79, an auxiliary clamping mechanism 8, a concave block 81, a third sliding groove 82, a clamping plate 83, a second guide rod 84, a second spring 85 and an adjusting cavity 9.
Detailed Description
The principles and features of the present invention will be described with reference to the drawings, which are provided for illustration only and are not intended to limit the scope of the invention.
This embodiment provides a simple installation's oil filling riser structure, and this simple installation's oil filling riser structure is arranged in realizing the swift dismouting to the oil filling riser in fluid loading and unloading, connects external member 5, reinforcement 6, stop gear 7 and supplementary fixture 8 through the design, has realized the purpose of swiftly installing oil filling riser body 2 on stand body 1, possesses the advantage of dismantling convenience, easy operation.
Referring to fig. 1-5, a loading arm structure with simple installation comprises a column body 1 and a loading arm body 2, wherein the bottom surface of the column body 1 is fixedly connected with an installation plate 3, and installation holes 4 which are arranged equidistantly are arranged in the installation plate 3.
Can punch subaerial to utilize expansion bolts to install in the inside in mounting hole 4 and hole, and then can carry on spacingly to mounting panel 3, realized the fixed purpose of stand body 1 installation.
The top cover of stand body 1 is equipped with connects external member 5, and regulation chamber 9 has been seted up to the inside of stand body 1, and the inside of adjusting chamber 9 is provided with and is used for connecting 5 spacing stop gear 7 of external member.
The limiting mechanism 7 comprises a first sliding groove 71, a second sliding groove 72 and a first guide rod 73, the first sliding groove 71 is formed in the upper surface of the upright post body 1, the second sliding groove 72 is formed in the upper surface of the connecting sleeve piece 5, two ends of the first guide rod 73 are fixedly connected to the inner wall of the adjusting cavity 9, two moving blocks 75 are connected to the outer surface of the first guide rod 73 in a sliding mode, and the top ends of the two moving blocks 75 penetrate through the inside of the first sliding groove 71 and the inside of the second sliding groove 72 in sequence and extend to the upper portion of the connecting sleeve piece 5.
The first sliding groove 71 and the second sliding groove 72 are the same in shape and length, so that a user can push the moving block 75 to slide in the first sliding groove 71 and the second sliding groove 72, and guide and limit the moving block 75 under the action of the first guide rod 73, and the moving stability of the moving block 75 is improved.
The outer surface of the first guide rod 73 is sleeved with a first spring 74, two ends of the first spring 74 are fixedly connected with one side face of each of the two moving blocks 75, which is close to each other, and the two moving blocks 75 can be pushed to be away from each other by the aid of elastic force of the first spring 74.
Slots 76 are formed in two sides of the inner wall of the second sliding groove 72, inserting blocks 77 are inserted into the two slots 76, and one side face, close to each other, of each inserting block 77 is fixedly connected with one side face, far away from each moving block 75, of each moving block.
Under the action of the elastic force of the first spring 74, the moving block 75 can be pushed to move inside the first sliding groove 71 and the second sliding groove 72, so that the moving block 75 can push the insertion block 77 to be inserted into the insertion groove 76, and the stability of the connecting kit 5 on the upright post body 1 can be further enhanced.
The push rods 79 are arranged above the connecting kit 5, the upper surfaces of the two moving blocks 75 are hinged to the hinge rods 78, the two hinge rods 78 are hinged through the push rods 79, the hinge rods 78 can be pushed to rotate on the moving blocks 75 through the push rods 79, and then the two moving blocks 75 can be far away from each other or move close to each other.
The outer fixed surface who connects external member 5 is connected with reinforcement 6, and 6 one end fixed connection that keep away from of reinforcement 5 in the surface of oil filling riser body 2 are provided with on the stand body 1 and are used for supplementary spacing supplementary fixture 8 to oil filling riser body 2.
Supplementary fixture 8 includes concave type piece 81, and third spout 82 has been seted up to the inner wall of concave type piece 81, and the inside sliding connection of third spout 82 has two grip blocks 83, and the arc wall has all been seted up to the side that two grip blocks 83 are close to each other.
The one end that the grip block 83 kept away from the third spout 82 has still seted up the chute, can make the grip block 83 contact with the loading arm body 2 through the chute earlier to make the loading arm body 2 promote the grip block 83 and slide in the third spout 82, fix on the grip block 83 in the arc wall until the loading arm body 2.
Supplementary fixture 8 still includes second guide bar 84, the both ends of second guide bar 84 all with the inner wall fixed connection of third spout 82, two grip blocks 83 all with second guide bar 84 sliding connection, the surface cover of second guide bar 84 is equipped with second spring 85, the both ends of second spring 85 respectively with the mutual side fixed connection who is close to of two grip blocks 83.
Can carry on spacingly and the direction to grip block 83 through second guide bar 84 for grip block 83 can only carry out parallel translation, and under the effect of connecting external member 5, can drag two grip blocks 83, applys the power that is close to each other to two grip blocks 83 all the time.
The working principle is as follows: firstly, one end of the loading arm body 2 is inserted into the crack between the two clamping plates 83, under the action of the inclined groove, the loading arm body 2 is moved to the arc-shaped grooves on the two clamping plates 83, so that the clamping plates 83 can stretch the second spring 85 when moving on the second guide rod 84, under the action of the self elastic force of the second spring 85, the clamping plates 83 can firmly clamp the loading arm body 2, then the connecting sleeve 5 can be sleeved on the top end of the upright post body 1 by pulling the loading arm body 2 upwards, the push rod 79 passes through the second sliding groove 72 and appears above the connecting sleeve 5, finally, the push rod 79 is released, the two moving blocks 75 are far away from each other under the action of the first spring 74, and the moving block 75 drives the inserting block 77 to be inserted into the inserting groove 76, thereby realizing the purpose of quickly installing the loading arm body 2 on the upright post body 1, has the advantages of convenient disassembly and simple operation.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (8)

1. The utility model provides a simple installation's oil filling riser structure, includes stand body (1) and oil filling riser body (2), its characterized in that: the top cover of stand body (1) is equipped with connects external member (5), regulation chamber (9) have been seted up to the inside of stand body (1), the inside of adjusting chamber (9) is provided with and is used for connecting spacing stop gear (7) of external member (5), the external fixed surface who connects external member (5) is connected with reinforcement (6), the one end fixed connection of connecting external member (5) is kept away from in reinforcement (6) in the surface of oil filling riser body (2), be provided with on stand body (1) and be used for assisting spacing supplementary fixture (8) to oil filling riser body (2).
2. An easy-to-install crane pipe structure according to claim 1, wherein: the limiting mechanism (7) comprises a first sliding groove (71), a second sliding groove (72) and a first guide rod (73), the first sliding groove (71) is formed in the upper surface of the upright post body (1), the second sliding groove (72) is formed in the upper surface of the connecting sleeve piece (5), two ends of the first guide rod (73) are fixedly connected to the inner wall of the adjusting cavity (9), two moving blocks (75) are connected to the outer surface of the first guide rod (73) in a sliding mode, and the top ends of the two moving blocks (75) sequentially penetrate through the inside of the first sliding groove (71) and the inside of the second sliding groove (72) and extend to the upper portion of the connecting sleeve piece (5).
3. An easy-to-install crane pipe structure according to claim 2, wherein: the outer surface of the first guide rod (73) is sleeved with a first spring (74), and two ends of the first spring (74) are fixedly connected with one side face, close to each other, of the two moving blocks (75) respectively.
4. An easy-to-install crane pipe structure according to claim 2, wherein: slots (76) are formed in two sides of the inner wall of the second sliding groove (72), inserting blocks (77) are inserted into the slots (76), and one side face, close to each other, of each inserting block (77) is fixedly connected with one side face, far away from each moving block (75), of each moving block.
5. An easy-to-install crane pipe structure according to claim 2, wherein: push rods (79) are arranged above the connecting suite (5), the upper surfaces of the two moving blocks (75) are hinged to hinge rods (78), and the hinge rods (78) are hinged through the push rods (79).
6. An easy-to-install crane pipe structure according to claim 1, wherein: supplementary fixture (8) are including concave type piece (81), third spout (82) have been seted up to the inner wall of concave type piece (81), the inside sliding connection of third spout (82) has two grip blocks (83), two the arc wall has all been seted up to the side that grip block (83) are close to each other.
7. An easy-to-install crane pipe structure as claimed in claim 6, wherein: supplementary fixture (8) still includes second guide bar (84), the both ends of second guide bar (84) all with the inner wall fixed connection of third spout (82), two grip block (83) all with second guide bar (84) sliding connection, the surface cover of second guide bar (84) is equipped with second spring (85), a side fixed connection that the both ends of second spring (85) are close to each other with two grip blocks (83) respectively.
8. An easy-to-install crane pipe structure according to claim 1, wherein: the bottom surface fixedly connected with mounting panel (3) of stand body (1), mounting hole (4) that the equidistance was arranged are seted up to the inside of mounting panel (3).
CN202123138876.7U 2021-12-14 2021-12-14 Crane tube structure easy and convenient to install Active CN216426748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123138876.7U CN216426748U (en) 2021-12-14 2021-12-14 Crane tube structure easy and convenient to install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123138876.7U CN216426748U (en) 2021-12-14 2021-12-14 Crane tube structure easy and convenient to install

Publications (1)

Publication Number Publication Date
CN216426748U true CN216426748U (en) 2022-05-03

Family

ID=81318412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123138876.7U Active CN216426748U (en) 2021-12-14 2021-12-14 Crane tube structure easy and convenient to install

Country Status (1)

Country Link
CN (1) CN216426748U (en)

Similar Documents

Publication Publication Date Title
CN218776022U (en) Large-diameter pipeline fitting assembly device
CN216426748U (en) Crane tube structure easy and convenient to install
CN216330068U (en) Automatic flanging equipment for lining oil pipe
CN213776576U (en) Device for assisting in pipeline connection
CN206889921U (en) High-pressure rubber pipe Quick Connect Kit
CN219994680U (en) Connection structure for flowmeter
CN219365976U (en) Integrated clamp for oilfield operation
CN111852357A (en) Turnover vehicle-mounted well workover automation operation equipment
CN201026562Y (en) Sucker rod hydraulic loader
CN216344303U (en) Water conservancy water and electricity construction fastening processing apparatus
CN214870107U (en) Universal dismounting device of coupler
CN208981990U (en) The washing pipe assembly of top-driving well drilling device
CN219975712U (en) Explosion-proof petroleum pipeline coupling convenient to maintain
CN221112916U (en) Pipe connecting piece installation device
CN219530006U (en) Handheld quick clamping device for oil pipe
CN220975345U (en) Ton bucket pull rod
CN220463671U (en) Cylinder dismantling machine for suspension upright post
CN216692588U (en) Pipeline coupling piece for pressurizing tap water pipeline
CN221524764U (en) Top drive casing running device
CN219011301U (en) Backstop device of jacking section
CN212553489U (en) Vertical positioning mechanism is managed in stainless steel side
CN218311767U (en) Construction steel bar positioning structure
CN215928777U (en) Novel H-shaped pipe fitting
CN218543425U (en) Pipeline positioning device
CN218612650U (en) Adjustable base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant