CN216412532U - Punching-free embedded CP III embedded part mark - Google Patents

Punching-free embedded CP III embedded part mark Download PDF

Info

Publication number
CN216412532U
CN216412532U CN202122714219.6U CN202122714219U CN216412532U CN 216412532 U CN216412532 U CN 216412532U CN 202122714219 U CN202122714219 U CN 202122714219U CN 216412532 U CN216412532 U CN 216412532U
Authority
CN
China
Prior art keywords
embedded
hole
iii
installation department
free
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122714219.6U
Other languages
Chinese (zh)
Inventor
张慧
程安文
黄新业
秦宏军
刘红生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN202122714219.6U priority Critical patent/CN216412532U/en
Application granted granted Critical
Publication of CN216412532U publication Critical patent/CN216412532U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a punching-free embedded CP III embedded part mark, which comprises a body, wherein the body is arranged in a grouting hole with internal threads on a shield segment, the body comprises a fixing part and a first mounting part matched with a disassembling tool, the fixing part is provided with external threads matched with the internal threads, the first mounting part is fixedly connected with the fixing part, and an assembling hole for assembling a prism assembly is arranged in the center of the first mounting part in a penetrating manner, so that the problems of high labor input, high equipment input, low work efficiency and the like are solved.

Description

Punching-free embedded CP III embedded part mark
Technical Field
The utility model relates to the field of track construction equipment, in particular to a punching-free embedded CP III embedded part mark.
Background
At present, a subway shield tunnel needs to carry out track control network (CP III) measurement before track laying operation, and CP III measurement marks adopt a mode of drilling and embedding on shield segments, and the embedding mode has the following defects:
1. the labor investment is large, and each group needs 5-6 people;
2. the equipment investment is high, and each group needs equipment such as a generator and a percussion drill;
3. the embedding work efficiency is low, and at most 1.5-2 km tunnels can be embedded in each group one day;
4. drilling can permanently damage the structure of the tube sheet;
5. when drilling, the reinforcing steel bars in the pipe piece can be easily drilled.
Therefore, it is necessary to design a hole-free embedded CP iii embedded mark to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art and provide a punching-free embedded CP III embedded part mark.
The purpose of the utility model is realized by the following technical scheme:
the utility model provides a exempt from to punch and bury formula CP III and bury a mark, includes the body, the body sets up in shield constructs the section of jurisdiction upper band internal screw thread slip casting hole, the body include the fixed part, with assembly and disassembly tools complex first installation department, the fixed part be provided with the external screw thread that the internal thread matches, first installation department with fixed part fixed connection, first installation department center runs through and is provided with the pilot hole that is used for assembling prism subassembly.
Preferably, the first installation part is an inner hexagonal nut, and the disassembling tool is an inner hexagonal wrench.
Preferably, still be supporting with dedicated dismouting middleware, the dismouting middleware is used for cooperating the assembly and disassembly tools installation the body, the one side of dismouting middleware is provided with perpendicularly and is no less than a mounting bar, the another side of dismouting middleware be provided with assembly and disassembly tools complex second installation department, first installation department be provided with the mounting hole that the mounting bar matches.
Preferably, the second installation part is an inner hexagonal nut, and the disassembling tool is an inner hexagonal wrench.
In summary, the utility model includes at least one of the following beneficial technical effects:
1) the investment of labor force and equipment is reduced, and meanwhile, the working efficiency is improved;
2) the permanent damage to the structure of the segment joint in the drilling operation is avoided, and the steel bars drilled into the segment in the drilling operation are also avoided;
3) through adopting dedicated dismouting middleware cooperation assembly and disassembly tools to carry out the dismouting to CP III embedded part sign, when not holding the personnel of dismouting middleware on the spot, just can't carry out the dismouting to CP III embedded part sign, played the effect of theftproof.
Drawings
FIG. 1 is a side elevation view of a CP III insert marker of the present invention;
FIG. 2 is a top view of a CP III embedded part marker of the present invention;
FIG. 3 is a top view of a removable intermediate member in accordance with the present invention;
fig. 4 is a bottom view of the removable intermediate member according to the embodiment of the present invention.
In the figure, 1, a body; 11. a fixed part; 12. a first mounting portion; 13. an assembly hole; 14. mounting holes; 2. disassembling and assembling the middleware; 21. mounting a bar; 22. a second mounting portion.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive effort based on the embodiments of the present invention, are within the scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution:
as shown in fig. 1 and 2, a free-punching embedded CP iii embedded part mark comprises a body 1, as shown in fig. 3 and 4, the mark is further provided with a special dismounting intermediate part 2, the body 1 is installed on a shield segment through the dismounting intermediate part 2 in cooperation with an allen key and is fixedly arranged in a grouting hole with internal threads, the body 1 comprises a fixing part 11 and a first installation part 12, the center of the first installation part 12 is provided with an assembling hole 13 for assembling a prism assembly and two installation holes 14 which are symmetrical about the center through, the fixing part 11 is provided with external threads matched with the internal threads, and the first installation part 12 is fixedly connected with the fixing part 11.
With reference to fig. 4, one surface of the dismounting intermediate member 2 is vertically provided with a mounting bar 21 matched with the mounting hole 14, and with reference to fig. 3, the other surface of the dismounting intermediate member 2 is provided with a second mounting portion 22 matched with the allen key, and the second mounting portion 22 is an inner hexagon nut.
The working principle is as follows:
according to the structural feature of subway shield section of jurisdiction, utilize original injected hole (section of jurisdiction is no longer used after the installation) on the section of jurisdiction, insert the mounting bar 21 of dedicated dismouting middleware 2 in mounting hole 14, adopt interior hexagonal to twist dismouting middleware 2 again, the fixed part that CP III buried a sign is twisted into the injected hole, scribble quick-drying glue on the external screw thread of fixed part 11 during the installation, the sign can not become flexible after having installed, do not lead to the fact any influence to the section of jurisdiction structure, CP III buried a sign fixed back alright assemble CP III related components such as prism in pilot hole 13.
The foregoing is illustrative of the preferred embodiments of this invention, and it is to be understood that the utility model is not limited to the precise form disclosed herein and that various other combinations, modifications, and environments may be resorted to, falling within the scope of the concept as disclosed herein, either as described above or as apparent to those skilled in the relevant art. And that modifications and variations may be effected by those skilled in the art without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (4)

1. The utility model provides a free of perforation buries III embedded marks of CP, includes body (1), its characterized in that: body (1) sets up in shield constructs the section of jurisdiction upper band internal screw thread slip casting hole, body (1) including fixed part (11), with first installation department (12) of assembly and disassembly tools complex, fixed part (11) be provided with the external screw thread that the internal thread matches, first installation department (12) with fixed part (11) fixed connection, first installation department (12) center is run through and is provided with pilot hole (13) that are used for assembling prism subassembly.
2. The hole-free embedded CP iii embedded mark of claim 1, wherein: first installation department (12) are hexagon socket head cap nut, assembly and disassembly tools is hexagon socket head cap spanner.
3. The hole-free embedded CP iii embedded mark of claim 1, wherein: still be supporting with dedicated dismouting middleware (2), dismouting middleware (2) are used for cooperating the assembly and disassembly tools installation body (1), the one side of dismouting middleware (2) is provided with perpendicularly and is no less than one mounting bar (21), the another side of dismouting middleware (2) be provided with assembly and disassembly tools complex second installation department (22), first installation department (12) be provided with mounting hole (14) that mounting bar (21) match.
4. The hole-free embedded CP iii embedded mark of claim 3, wherein: the second installation part (22) is an inner hexagonal nut, and the dismounting tool is an inner hexagonal wrench.
CN202122714219.6U 2021-11-08 2021-11-08 Punching-free embedded CP III embedded part mark Active CN216412532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122714219.6U CN216412532U (en) 2021-11-08 2021-11-08 Punching-free embedded CP III embedded part mark

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122714219.6U CN216412532U (en) 2021-11-08 2021-11-08 Punching-free embedded CP III embedded part mark

Publications (1)

Publication Number Publication Date
CN216412532U true CN216412532U (en) 2022-04-29

Family

ID=81301132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122714219.6U Active CN216412532U (en) 2021-11-08 2021-11-08 Punching-free embedded CP III embedded part mark

Country Status (1)

Country Link
CN (1) CN216412532U (en)

Similar Documents

Publication Publication Date Title
CN216412532U (en) Punching-free embedded CP III embedded part mark
CN201306031Y (en) Inserted type inner flange connecting steel pipe tower
CN205614605U (en) Expandable rock bolt ties installation device
CN205743708U (en) A kind of boring, expansion groove equipment
CN211857970U (en) Mounting structure of subway line signboard
CN205997962U (en) A kind of subframe with guide-localization function and automobile
CN213510457U (en) Drill bit of underground coal mine drilling machine
CN204975422U (en) A lift drilling equipment for install expansion bolts on roof boarding
CN212055417U (en) Expansion screw for car-repairing gecko
JP3147904U (en) Wire clamp clamping jig
CN210975622U (en) Tunnel is with exempting from sign tablet support of drilling
CN210767256U (en) Anchor rod-free embedded channel steel and matched bolt
CN210307654U (en) Quick nail nipping device for construction site
CN208441874U (en) For the lock foot anchoring stock guiding in tunnel and the device of grid steel frame measurement
CN207122478U (en) A kind of repeatable expansion bolt utilized
CN207420512U (en) Circulating sleeve withdrawing device
CN214945401U (en) Mounting and dismounting tool for hinged oil cylinder pin of shield machine
CN210564376U (en) Converter, combination converter and combination drilling tool
CN217195026U (en) Multifunctional combined type special tool for three-type elastic strip
CN212202089U (en) Sleeve for mounting mine underground anchor rod support
LU101126B1 (en) Reaming device for road and bridge construction
CN214833453U (en) Fastening device for construction with stable connectivity
CN219704902U (en) Spanner for expansion joint of suspended ceiling straight plug
CN208669200U (en) Knuckle applied to down-the-hole drill assembling
CN112502629B (en) Straight flute drill bit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant