CN216410158U - Monitoring device for building foundation settlement - Google Patents

Monitoring device for building foundation settlement Download PDF

Info

Publication number
CN216410158U
CN216410158U CN202122968170.7U CN202122968170U CN216410158U CN 216410158 U CN216410158 U CN 216410158U CN 202122968170 U CN202122968170 U CN 202122968170U CN 216410158 U CN216410158 U CN 216410158U
Authority
CN
China
Prior art keywords
mounting box
fixedly connected
monitoring device
sides
building foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122968170.7U
Other languages
Chinese (zh)
Inventor
谢佳佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Ruihong Construction Group Co ltd
Original Assignee
Guangxi Ruihong Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Ruihong Construction Group Co ltd filed Critical Guangxi Ruihong Construction Group Co ltd
Priority to CN202122968170.7U priority Critical patent/CN216410158U/en
Application granted granted Critical
Publication of CN216410158U publication Critical patent/CN216410158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)
  • Photometry And Measurement Of Optical Pulse Characteristics (AREA)

Abstract

The utility model relates to the technical field of monitoring devices and discloses a monitoring device for building foundation settlement, which comprises a mounting plate, wherein the top of the mounting plate is fixedly connected with a connecting cylinder, the inner surface of the connecting cylinder is slidably connected with an adjusting rod, the middle part of the connecting cylinder is in threaded connection with a top bolt, the top end of the adjusting rod is fixedly connected with a mounting box, the left side of the mounting box is fixedly connected with an alarm, the right side of the mounting box is fixedly connected with a storage battery, a PLC (programmable logic controller) is arranged in the mounting box, the rear side of the mounting box is provided with heat dissipation holes, two ends of the inner bottom wall of the mounting box are both fixedly connected with a fan, and two inner walls of two sides of the mounting box are both provided with two heat dissipation mechanisms. According to the utility model, through the structure that the fan, the connecting groove, the ventilating pipe and the exhaust pipe are arranged in the mounting box, the heat dissipation effect on the PLC and the infrared distance meter can be realized, and the service lives of the PLC and the infrared distance meter are prolonged.

Description

Monitoring device for building foundation settlement
Technical Field
The utility model relates to the technical field of monitoring devices, in particular to a monitoring device for building foundation settlement.
Background
With the development of science and technology, the basic level monitoring method for monitoring the settlement of the building foundation is upgraded to the monitoring by advanced instruments.
The monitoring device for building foundation settlement disclosed in the chinese granted utility model patent application publication CN213714298U, some monitoring devices on the market at present:
(1) in the process of detecting the parts, the heat dissipation function of the internal parts is not realized, so that the service life of the parts is easily shortened;
(2) after the device is installed, sometimes the detection devices have a little difference in distance, which causes errors in detection data, but the current device is inconvenient to adjust the height.
We therefore propose a monitoring device for the settlement of a building foundation in order to solve the problems set out above.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In view of the above-mentioned shortcomings in the prior art, the present invention provides a monitoring device for building foundation settlement, which solves the problems of the existing monitoring devices for building foundation settlement in the market, which have no function of dissipating heat from the internal parts thereof and are inconvenient for height adjustment.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme:
a monitoring device for building foundation settlement comprises a mounting plate, wherein a connecting cylinder is fixedly connected to the top of the mounting plate, an adjusting rod is slidably connected to the inner surface of the connecting cylinder, a top bolt is connected to the middle of the connecting cylinder in a threaded manner, a mounting box is fixedly connected to the top end of the adjusting rod, an alarm is fixedly connected to the left side of the mounting box, a storage battery is fixedly connected to the right side of the mounting box, a PLC (programmable logic controller) is arranged inside the mounting box, heat dissipation holes are formed in the rear side of the mounting box, fans are fixedly connected to two ends of the inner bottom wall of the mounting box, two heat dissipation mechanisms are arranged on the inner walls of two sides of the mounting box respectively, each heat dissipation mechanism is composed of a connecting groove, a ventilation pipe and an exhaust pipe, and the two connecting grooves are formed in the inner walls of two sides of the mounting box respectively;
the equal fixedly connected with backup pad of both sides inner wall of mounting box, the spacing groove has been seted up at the top of backup pad, the internal surface swing joint in spacing groove has the stopper, the inside of mounting box is provided with infrared range finder.
Preferably, both sides of the infrared distance measuring instrument are movably connected with the inner walls of the two sides of the mounting box respectively.
Preferably, the two sides of the PLC controller are fixedly connected with the inner walls of the two sides of the PLC controller respectively, and the PLC controller is located above the infrared distance measuring instrument.
Preferably, the bottom of infrared distance measuring instrument contacts with the top of backup pad and is connected, the top of stopper and infrared distance measuring instrument's bottom fixed connection.
Furthermore, the inner surfaces of the heat dissipation holes are fixedly connected with a protective net, and the rear side of the protective net is flush with the rear side of the mounting box.
Furthermore, the air outlet of the fan is fixedly connected with the right end of the ventilation pipe, the left end of the ventilation pipe is located inside the connecting groove, and the middle of the ventilation pipe is fixedly connected with the left end of the exhaust pipe.
(III) advantageous effects
Compared with the prior art, the utility model has the beneficial effects that:
(1) through the structure that is provided with the connecting cylinder on the mounting panel, adjusts pole and back bolt, can adjust infrared distance meter's height, make infrared distance meter measuring data more accurate.
(2) Through the structure that is provided with fan, spread groove, ventilation pipe and exhaust pipe in the mounting box inside, can play radiating effect to the good infrared rangefinder of PLC controller, improve PLC controller and infrared rangefinder's life.
Drawings
FIG. 1 is a schematic front view of the monitoring device for building foundation settlement according to the present invention;
fig. 2 is a schematic view of the internal structure of the mounting box of the monitoring device for building foundation settlement of the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 2 of the monitoring device for settlement of foundation of the building of the present invention;
fig. 4 is a schematic perspective view of a support plate of the monitoring device for building foundation settlement according to the present invention.
In the figure: 1. mounting a plate; 2. a connecting cylinder; 3. adjusting a rod; 4. jacking and bolting; 5. mounting a box; 6. an alarm; 7. a storage battery; 8. a PLC controller; 9. heat dissipation holes; 10. a protective net; 11. a fan; 12. a heat dissipation mechanism; 1201. connecting grooves; 1202. a vent pipe; 1203. an exhaust duct; 13. a support plate; 14. a limiting groove; 15. a limiting block; 16. an infrared range finder.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a monitoring device for settlement of a building foundation; the device comprises a mounting plate 1, wherein a connecting cylinder 2 is fixedly connected to the top of the mounting plate 1, an adjusting rod 3 is slidably connected to the inner surface of the connecting cylinder 2, a top bolt 4 is in threaded connection with the middle of the connecting cylinder 2, the left end of the top bolt 4 is in contact connection with the inner surface of the adjusting rod 3, the adjusting rod 3 is fixed, a mounting box 5 is fixedly connected to the top end of the adjusting rod 3, a flashing lamp is fixedly connected to the right side of the mounting box 5, an alarm 6 is fixedly connected to the left side of the mounting box 5, a storage battery 7 is fixedly connected to the right side of the mounting box 5, a PLC (programmable logic controller) 8 is arranged in the mounting box 5, the flashing lamp, the alarm 6 and the storage battery 7 are electrically connected with the PLC 8 through wires, heat dissipation holes 9 are formed in the rear side of the mounting box 5, fans 11 are fixedly connected to two ends of the inner bottom wall of the mounting box 5, and two heat dissipation mechanisms 12 are arranged on the inner walls of two sides of the mounting box 5, the heat dissipation mechanism 12 is composed of connecting slots 1201, a ventilation pipe 1202 and an exhaust pipe 1203, wherein the two connecting slots 1201 are respectively arranged on the inner walls of the two sides of the mounting box 5;
the inner walls of two sides of the mounting box 5 are fixedly connected with supporting plates 13, the top of each supporting plate 13 is provided with a limiting groove 14, the inner surface of each limiting groove 14 is movably connected with a limiting block 15, an infrared distance meter 16 is arranged inside the mounting box 5, and the infrared distance meter 16 is electrically connected with the PLC 8;
as a preferred technical scheme of the utility model: two sides of the infrared range finder 16 are respectively movably connected with the inner walls of two sides of the mounting box 5;
as a preferred technical scheme of the utility model: two sides of the PLC controller 8 are respectively fixedly connected with the inner walls of two sides of the PLC controller 8, and the PLC controller 8 is positioned above the infrared distance measuring instrument 16;
as a preferred technical scheme of the utility model: the bottom of the infrared distance meter 16 is in contact connection with the top of the supporting plate 13, and the top of the limiting block 15 is fixedly connected with the bottom of the infrared distance meter 16;
as a preferred technical scheme of the utility model: the inner surfaces of the heat dissipation holes 9 are fixedly connected with a protective net 10, and the rear side of the protective net 10 is flush with the rear side of the mounting box 5;
as a preferred technical scheme of the utility model: the air outlet of the fan 11 is fixedly connected with the right end of the ventilation pipe 1202, the left end of the ventilation pipe 1202 is located inside the connecting groove 1201, and the middle of the ventilation pipe 1202 is fixedly connected with the left end of the exhaust pipe 1203.
The working principle of the embodiment is as follows: when the device is used, the fan 11 is started, the fan 11 blows air to the ventilation pipe 1202, then the air is exhausted from the exhaust pipe 1203, the PLC 8 and the infrared distance meter 16 are blown, and the heat dissipation effect is achieved.
Although the present invention has been described in detail with reference to the foregoing embodiments, it should be noted that, in the present invention, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," "fixed," and the like are to be construed broadly, and for example, may be fixedly connected or detachably connected; or indirectly through an intermediary. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations; it will be apparent to those skilled in the art that modifications and equivalents may be made in the embodiments and/or portions thereof without departing from the spirit and scope of the present invention.

Claims (6)

1. The monitoring device for the settlement of the building foundation comprises a mounting plate (1) and is characterized in that a connecting cylinder (2) is fixedly connected to the top of the mounting plate (1), a top bolt (4) is connected to the middle of the connecting cylinder (2) in a threaded manner, an adjusting rod (3) is connected to the inner surface of the connecting cylinder (2) in a sliding manner, a mounting box (5) is fixedly connected to the top end of the adjusting rod (3), an alarm (6) is fixedly connected to the left side of the mounting box (5), a storage battery (7) is fixedly connected to the right side of the mounting box (5), a PLC (programmable logic controller) is arranged inside the mounting box (5), heat dissipation holes (9) are formed in the rear side of the mounting box (5), fans (11) are fixedly connected to the two ends of the inner bottom wall of the mounting box (5), two heat dissipation mechanisms (12) are arranged on the inner walls of the two sides of the mounting box (5), the heat dissipation mechanism (12) is composed of connecting grooves (1201), a ventilation pipe (1202) and an exhaust pipe (1203), and the two connecting grooves (1201) are respectively arranged on the inner walls of the two sides of the mounting box (5);
the equal fixedly connected with backup pad (13) of both sides inner wall of mounting box (5), spacing groove (14) have been seted up at the top of backup pad (13), the internal surface swing joint of spacing groove (14) has stopper (15), the inside of mounting box (5) is provided with infrared range finder (16).
2. The building foundation settlement monitoring device of claim 1, wherein both sides of the infrared distance meter (16) are movably connected to inner walls of both sides of the mounting box (5), respectively.
3. The building foundation settlement monitoring device as claimed in claim 1, wherein both sides of the PLC controller (8) are fixedly connected to inner walls of both sides of the PLC controller (8), respectively, and the PLC controller (8) is located above the infrared distance meter (16).
4. The building foundation settlement monitoring device as claimed in claim 1, wherein the bottom of the infrared distance meter (16) is in contact connection with the top of the support plate (13), and the top of the limiting block (15) is fixedly connected with the bottom of the infrared distance meter (16).
5. The building foundation settlement monitoring device according to claim 1, wherein a protective screen (10) is fixedly connected to the inner surface of the heat dissipation hole (9), and the rear side of the protective screen (10) is flush with the rear side of the mounting box (5).
6. The building foundation settlement monitoring device as claimed in claim 1, wherein the air outlet of the fan (11) is fixedly connected with the right end of the ventilation pipe (1202), the left end of the ventilation pipe (1202) is located inside the connecting groove (1201), and the middle of the ventilation pipe (1202) is fixedly connected with the left end of the exhaust pipe (1203).
CN202122968170.7U 2021-11-30 2021-11-30 Monitoring device for building foundation settlement Active CN216410158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122968170.7U CN216410158U (en) 2021-11-30 2021-11-30 Monitoring device for building foundation settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122968170.7U CN216410158U (en) 2021-11-30 2021-11-30 Monitoring device for building foundation settlement

Publications (1)

Publication Number Publication Date
CN216410158U true CN216410158U (en) 2022-04-29

Family

ID=81305324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122968170.7U Active CN216410158U (en) 2021-11-30 2021-11-30 Monitoring device for building foundation settlement

Country Status (1)

Country Link
CN (1) CN216410158U (en)

Similar Documents

Publication Publication Date Title
CN201629920U (en) Electric control cabinet
CN106600895B (en) Old building of endangering deforms automatic alarm device
CN216410158U (en) Monitoring device for building foundation settlement
CN203929753U (en) A kind of accurate outdoor environment monitor
CN207799064U (en) A kind of architectural design special measurement device
CN213363882U (en) Monitoring device based on thing networking
CN211857408U (en) Heat dissipation device for big data server
CN212541264U (en) Heat radiator for computer power module
CN210053021U (en) Outdoor firm box switch board of type
CN210219107U (en) Multipurpose electric power monitoring instrument mounting rack
CN204272583U (en) The good portable of a kind of thermal diffusivity exchanges rack
CN210688823U (en) Low-temperature heat pump evaporator
CN218941241U (en) Intelligent gateway based on Internet of things
CN219958165U (en) Cloud server device with integration of three networks
CN217332857U (en) Engineering project manages and uses measuring device
CN219514372U (en) Computer peripheral installation equipment
CN220754118U (en) Protection machanism and nonmetal electric-energy metering box
CN215921917U (en) Intelligent automobile alternating-current charging stake
CN217770264U (en) Internet of things gateway supporting wired and wireless transmission modes
CN220439013U (en) Explosion-proof audible and visual alarm
CN220418573U (en) Anti-interference type liquid level detection alarm device
CN214380947U (en) Gateway equipment applied to Internet of things
CN216146629U (en) Management system based on public municipal administration and building facility health monitoring
CN216958191U (en) Valve-controlled sealed colloid storage battery
CN214381759U (en) Novel AGC clothes closet structure of generator set

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant