CN216408362U - Construction engineering construction detection device - Google Patents
Construction engineering construction detection device Download PDFInfo
- Publication number
- CN216408362U CN216408362U CN202123274788.XU CN202123274788U CN216408362U CN 216408362 U CN216408362 U CN 216408362U CN 202123274788 U CN202123274788 U CN 202123274788U CN 216408362 U CN216408362 U CN 216408362U
- Authority
- CN
- China
- Prior art keywords
- detector
- groove
- detection
- construction
- detection device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
The utility model discloses a construction engineering construction detection device, which relates to the technical field of construction engineering and comprises a detector, wherein an air inlet is arranged on one side of the detector, a detection groove is formed in the detector, a detection element is fixedly arranged in the detection groove, a cavity is formed in the detector and positioned on the outer side of the detection groove, a plurality of guide plates are arranged in the cavity, air inlet pipes are fixedly connected to the tops of the detection groove and the cavity, and one ends of the two air inlet pipes extend to the inside of the air inlet. The utility model has the beneficial effects that: this construction engineering detection device that is under construction through the hidden screw that the inside setting of detector, utilizes the inside gear of detector and the meshing between a plurality of tooth, drives the displacement of screw, and in the same way, under the effect of the meshing between transmission connection and the bevel gear between the inside sprocket of backup pad, messenger's gear and sprocket rotate simultaneously, trigger the rotation of screw, install the detector automatically.
Description
Technical Field
The utility model relates to the technical field of construction engineering, in particular to a construction engineering construction detection device.
Background
The construction project refers to the general name of various buildings and engineering facilities providing material and technical foundations for human life and production, is an organized, purposeful and large-scale economic activity of human beings, and gradually improves the quality requirements of the construction project along with the continuous expansion of the scale of the construction project in China.
The application of the engineering quality detection ensures the improvement of the construction quality of the construction engineering through the quality management of engineering construction materials, design paper, the construction process and each link, and has an important effect.
The dust can be caused to fly upward and the air pollution can be caused in the construction process, so that a corresponding air quality detector needs to be installed, the air quality of a construction site is strictly controlled, the existing detection equipment is complex to install, tools need to be used, and the efficiency is low.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a construction engineering construction detection device, which solves the problems in the background technology.
In order to achieve the purpose, the utility model is realized by the following technical scheme: a construction engineering construction detection device comprises a detector, wherein an air inlet is arranged at one side of the detector, a detection groove is arranged in the detector, a detection element is fixedly arranged in the detection groove, a cavity is arranged inside the detector and outside the detection groove, a plurality of guide plates are arranged inside the cavity, the top parts of the detection groove and the cavity are both fixedly connected with air inlet pipes, one ends of the two air inlet pipes extend to the inner part of the air inlet, the bottom of the detector is fixedly provided with a fan, a containing groove is arranged inside the detector and at one side of the detection groove, the inside of detector just is located and accomodates the corresponding both sides in groove and all has seted up the spout, the inside sliding connection of spout has the slider, two fixedly connected with backup pad between the slider, one side of backup pad is rotated and is connected with two screws.
Preferably, the inside of slider rotates and is connected with first gear, the inside one side fixed mounting of slider has the motor, the output and the first gear fixed connection of motor.
Preferably, the inside of detector and the bottom that is located two spouts have all seted up the spacing groove, the internally mounted of spacing groove has a plurality of teeth, and is a plurality of the tooth all meshes with first gear.
Preferably, the inside of detector just is located the bottom of detecting the groove and has seted up the filter-tank, the inside fixed mounting of filter-tank has the filter screen, the equal fixedly connected with blast pipe in top and the bottom of filter-tank, and the one end of a plurality of blast pipes respectively with the inside of detecting groove and cavity and the input fixed connection of fan.
Preferably, a first groove is formed in the supporting plate, two chain wheels are rotatably connected to the inside of the first groove, a chain is meshed to the outer sides of the two chain wheels, and the two chain wheels are fixedly connected with two screws respectively.
Preferably, a second groove is formed in the supporting plate and located inside the first groove, two adjacent sides inside the second groove are respectively connected with a first bevel gear and a second bevel gear in a rotating mode, and the first bevel gear and the second bevel gear are meshed.
Preferably, the second groove and the first bevel gear are fixedly connected with one of the chain wheels and the two first gears respectively.
The utility model provides a construction engineering construction detection device, which has the following beneficial effects:
1. this construction engineering detection device that is under construction through the hidden screw that the inside setting of detector, utilizes the inside gear of detector and the meshing between a plurality of tooth, drives the displacement of screw, and in the same way, under the effect of the meshing between transmission connection and the bevel gear between the inside sprocket of backup pad, messenger's gear and sprocket rotate simultaneously, trigger the rotation of screw, install the detector automatically.
2. This construction engineering detection device that is under construction, the intake pipe that sets up through the detector inside cooperatees with the fan, with inside external air respectively leading-in to detecting groove and cavity, when detecting the air, utilize the inside guide plate of cavity, make the air current at the inside even circulation of cavity, dispel the heat to detecting element, increase the life of detector.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a partial schematic view of the present invention;
FIG. 3 is an enlarged view taken at A of FIG. 2 in accordance with the present invention;
fig. 4 is a side view of the present invention.
In the figure: 1. a detector; 2. an air inlet; 3. a detection tank; 4. detecting an original; 5. a cavity; 6. an air inlet pipe; 7. a fan; 8. a receiving groove; 9. a chute; 10. a slider; 11. a support plate; 12. a screw; 13. a filter screen; 14. a first gear; 15. a motor; 16. a limiting groove; 17. teeth; 18. a first groove; 19. a sprocket; 20. a chain; 21. a second groove; 22. a first bevel gear; 23. a second bevel gear; 24. a filter tank; 25. a baffle.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a construction engineering construction detection device comprises a detector 1, an air inlet 2 is installed on one side of the detector 1, a detection groove 3 is formed in the detector 1, a detection element 4 is fixedly installed in the detection groove 3, the quality of air is detected, a cavity 5 is formed in the detector 1 and located on the outer side of the detection groove 3, a plurality of guide plates 25 are installed in the cavity 5, air is guided to uniformly circulate in the cavity 5 and is dissipated heat of the detection element 4, air inlet pipes 6 are fixedly connected to the tops of the detection groove 3 and the cavity 5, one ends of the two air inlet pipes 6 extend into the air inlet 2, a fan 7 is fixedly installed at the bottom of the detector 1, a filter groove 24 is formed in the detector 1 and located at the bottom of the detection groove 3, a filter screen 13 is fixedly installed in the filter groove 24 and is used for filtering and discharging the filtered air, prevent dust particles from accumulating inside the fan 7 and influencing the operation of the fan 7, exhaust pipes are fixedly connected to the top and the bottom of the filter tank 24, and one end of each exhaust pipe is respectively fixedly connected with the inside of the detection tank 3 and the cavity 5 and the input end of the fan 7, under the action of the fan 7, the inside of the detection tank 3 and the cavity 5 generates suction force to suck outside air into the detection tank 3 and the cavity 5, a containing groove 8 is arranged inside the detector 1 and on one side of the detection tank 3, sliding grooves 9 are arranged inside the detector 1 and on two sides corresponding to the containing groove 8, sliding blocks 10 are connected inside the sliding grooves 9 in a sliding manner, a supporting plate 11 is fixedly connected between the two sliding blocks 10, two screws 12 are rotatably connected to one side of the supporting plate 11, a first gear 14 is rotatably connected to the inside of the sliding block 10, and a motor 15 is fixedly installed on one side inside the sliding block 10, the output end of the motor 15 is fixedly connected with the first gear 14, power is provided for the rotation of the first gear 14, the inside of the detector 1 and the bottoms of the two sliding grooves 9 are both provided with a limiting groove 16, the inside of the limiting groove 16 is provided with a plurality of teeth 17, the plurality of teeth 17 are all meshed with the first gear 14, the first gear 14 rotates and simultaneously drives the screw 12 to move by utilizing the meshing between the plurality of teeth 17, the inside of the supporting plate 11 is provided with a first groove 18, the inside of the first groove 18 is rotatably connected with two chain wheels 19, the outer sides of the two chain wheels 19 are meshed with a chain 20, the two chain wheels 19 are respectively and fixedly connected with two screws 12, the two chain wheels 19 are in transmission connection through the chain 20, the inside of the supporting plate 11 and the inside of the first groove 18 are provided with a second groove 21, the adjacent two sides of the inside of the second groove 21 are respectively and rotatably connected with a first bevel gear 22 and a second bevel gear 23, the first bevel gear 22 and the second bevel gear 23 are meshed, the second groove 21 and the first bevel gear 22 are fixedly connected with one chain wheel 19 and two first gears 14 respectively, the first bevel gear 22 is linked with the chain wheel 19 by means of meshing between the second groove 21 and the first bevel gear 22, the screw 12 is pushed to displace, meanwhile, rotation of the screw 12 is triggered, and manpower is replaced for installing the detector 1.
To sum up, the construction engineering construction detection device, when in use, after the detector 1 is fixed at a designated position, since the two corresponding sides of the receiving groove 8 inside the detector 1 are both provided with the sliding grooves 9, the sliding blocks 10 are connected inside the sliding grooves 9 in a sliding manner, the first gear 14 inside the sliding blocks 10 is engaged with the plurality of teeth 17 at the bottom of the sliding blocks 10, so that the first gear 14 rotates to drive the screw 12 to extend out from the receiving groove 8, similarly, under the action of the transmission connection between the two chain wheels 19 inside the supporting plate 11 and the engagement between the first bevel gear 22 and the second bevel gear 23, the first gear 14 and the chain wheels 19 rotate simultaneously to trigger the rotation of the screw 12, the screw 12 is embedded into the wall, thereby the detector 1 is installed, at the moment, the fan 7 is started, the outside air enters the detecting groove 3 and the cavity 5 through the air inlet 2 at one side of the detector 1, when the air is stirred, the operation of the detection element 4 is radiated, and the airflow enters the inside of the filter tank 24 and is discharged after being filtered by the filter screen 13.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.
Claims (7)
1. The utility model provides a construction engineering construction detection device, includes detector (1), its characterized in that: the air inlet (2) is installed on one side of the detector (1), the detection groove (3) is formed in the detector (1), the detection original (4) is fixedly installed in the detection groove (3), the cavity (5) is formed in the detector (1) and located on the outer side of the detection groove (3), a plurality of guide plates (25) are installed in the cavity (5), air inlet pipes (6) are fixedly connected to the tops of the detection groove (3) and the cavity (5), one ends of the two air inlet pipes (6) extend into the air inlet (2), a fan (7) is fixedly installed at the bottom of the detector (1), the accommodating groove (8) is formed in one side, located in the detection groove (3), of the detector (1), and sliding grooves (9) are formed in the two sides, corresponding to the accommodating groove (8), of the detector (1), the inside sliding connection of spout (9) has slider (10), two fixedly connected with backup pad (11) between slider (10), one side of backup pad (11) is rotated and is connected with two screws (12).
2. The construction engineering construction detection device according to claim 1, characterized in that: the inside rotation of slider (10) is connected with first gear (14), inside one side fixed mounting of slider (10) has motor (15), the output and first gear (14) fixed connection of motor (15).
3. The construction engineering construction detection device according to claim 2, characterized in that: the inside of detector (1) and the bottom that is located two spout (9) have all seted up spacing groove (16), the internally mounted of spacing groove (16) has a plurality of teeth (17), and is a plurality of teeth (17) all mesh with first gear (14).
4. The construction engineering construction detection device according to claim 1, characterized in that: the inside of detector (1) and the bottom that is located detection groove (3) have seted up filter-tank (24), the inside fixed mounting of filter-tank (24) has filter screen (13), the equal fixedly connected with blast pipe in top and the bottom of filter-tank (24), and the one end of a plurality of blast pipes respectively with the inside of detecting groove (3) and cavity (5) and the input fixed connection of fan (7).
5. The construction engineering construction detection device according to claim 1, characterized in that: first recess (18) have been seted up to the inside of backup pad (11), the inside rotation of first recess (18) is connected with two sprocket (19), two the outside meshing of sprocket (19) has chain (20), two sprocket (19) have two screw (12) fixed connection respectively.
6. The construction engineering construction detection device according to claim 5, characterized in that: a second groove (21) is formed in the supporting plate (11) and located inside the first groove (18), two adjacent sides inside the second groove (21) are respectively connected with a first bevel gear (22) and a second bevel gear (23) in a rotating mode, and the first bevel gear (22) is meshed with the second bevel gear (23).
7. The construction engineering construction detection device according to claim 6, characterized in that: the second groove (21) and the first bevel gear (22) are fixedly connected with one chain wheel (19) and the two first gears (14) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123274788.XU CN216408362U (en) | 2021-12-23 | 2021-12-23 | Construction engineering construction detection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123274788.XU CN216408362U (en) | 2021-12-23 | 2021-12-23 | Construction engineering construction detection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216408362U true CN216408362U (en) | 2022-04-29 |
Family
ID=81284353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123274788.XU Active CN216408362U (en) | 2021-12-23 | 2021-12-23 | Construction engineering construction detection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216408362U (en) |
-
2021
- 2021-12-23 CN CN202123274788.XU patent/CN216408362U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212806008U (en) | High-efficient supply-air outlet with self-cleaning function | |
CN211537092U (en) | Building engineering environment monitoring device | |
CN112065487A (en) | Ventilation protection mechanism of ventilation equipment for mine construction | |
CN113203145A (en) | Lithium cell toilet uses safe exhaust system | |
CN216408362U (en) | Construction engineering construction detection device | |
CN211373279U (en) | Hot stove smoke and dust collection device in high-efficient type ore deposit | |
CN212155205U (en) | Tunnel construction ventilation unit | |
CN215939338U (en) | Convenient clear exhaust treatment device | |
CN213492623U (en) | Aircraft tail gas purification device for aerospace | |
CN210568913U (en) | Energy-saving clean workshop system | |
CN213077807U (en) | Smoke dust collecting device | |
CN211152469U (en) | Communication box cooling and dedusting auxiliary device | |
CN210340340U (en) | Structure of carbon-supported purification combustion tower | |
CN210218151U (en) | Oil field pressure boost water injection device | |
CN207177009U (en) | One kind builds energy-efficient photovoltaic glass curtain wall | |
CN213790536U (en) | Dust removal device for purification engineering | |
CN215966764U (en) | Reflow soldering equipment with good stability | |
CN216613898U (en) | Clean electric furnace lifting device with smoke collection function | |
CN220111888U (en) | Civil engineering dust collection device | |
CN216718123U (en) | A dustproof dust fall intellectual detection system equipment for wisdom building construction | |
CN214799198U (en) | Heat dissipation device for vibration motor of artificial quartz stone press | |
CN219550742U (en) | Energy-conserving ventilation structure of green architectural design | |
CN213885208U (en) | Energy-saving device is drawn forth to hydraulic and hydroelectric engineering's waste water | |
CN217110430U (en) | Intermediate frequency electric furnace is used in well lid production | |
CN219797404U (en) | Gene amplification laboratory trades wind equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |