- Prior art keywords
- plate
- connecting plate
- hole
- constructor
- steel structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 33
- 239000010959 steel Substances 0.000 title claims abstract description 33
- 230000007246 mechanism Effects 0.000 claims abstract description 17
- 238000010276 construction Methods 0.000 claims description 3
- 239000004566 building material Substances 0.000 abstract description 18
- 230000008859 change Effects 0.000 abstract description 5
- 230000000694 effects Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000003723 Smelting Methods 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a connecting piece of a steel structure building, which comprises: the adjusting mechanism is arranged on the connecting plate; the adjusting mechanism comprises a sliding groove, the sliding groove is formed in the top of the connecting plate, a sliding block is connected inside the sliding groove in a sliding mode, a positioning plate is fixedly connected to the top of the sliding block, a first through hole is formed in the positioning plate, second through holes are formed in two sides of the connecting plate, and screws are connected to the inner threads of the first through hole and the second through hole in a threaded mode; through adjustment mechanism for the connecting plate uses with the locating plate combination, can be suitable for the building materials of different specifications, avoids constructor to change the connecting piece and need consume the operating efficiency that longer time and influence constructor, thereby promotes constructor's work efficiency, and can reduce constructor's the work load and constructor's intensity of labour.
Description
Technical Field
The utility model relates to the technical field of building materials, in particular to a connecting piece for a steel structure building.
Background
With the improvement of comprehensive national strength and the rapid development of steel yield and steel smelting technology in China, a large number of steel structure buildings are built all over the country, and the steel structure buildings are convenient to assemble, environment-friendly and safe. In the assembly process of the existing steel structure building, for connecting structures at different angles, generally, hoisting equipment is used for butt joint and angle adjustment of steel pipes, and then welding is carried out, the structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and the steel structure is widely applied to the building industry due to the advantages of light weight and high strength of the steel, and is widely applied to the fields of large-scale plants, venues, super-high buildings and the like.
The connecting piece of the existing steel structure building still has some problems in the using process: because the connecting piece of current steel structure building only can use the building materials of single specification, when meetting the different building materials of specification after, constructor need change the connecting piece, changes the connecting piece and expends time, reinforcing work load and intensity of labour to reduce constructor's work efficiency, for this reason, provide a steel structure building's connecting piece.
SUMMERY OF THE UTILITY MODEL
The present invention has been made in an effort to provide a connecting member for a steel structure building, which solves the above-mentioned problems occurring in the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: a connector for a steel structure building, comprising: the adjusting mechanism is arranged on the connecting plate;
the adjusting mechanism comprises a sliding groove, the sliding groove is formed in the top of the connecting plate, a sliding block is connected to the inside of the sliding groove in a sliding mode, a positioning plate is fixedly connected to the top of the sliding block, a first through hole is formed in the positioning plate, second through holes are formed in the two sides of the connecting plate, and a screw rod is connected to the first through hole and the second through hole in a threaded mode.
Through adopting above-mentioned technical scheme, through adjustment mechanism for the connecting plate uses with the locating plate combination, can be suitable for the building materials of different specifications, avoids constructor to change the connecting piece and need consume the operating efficiency that longer time and influence constructor, thereby promotes constructor's work efficiency, and can reduce constructor's work load and constructor's intensity of labour.
Preferably, the first through hole is located in the middle of the positioning plate, and the second through hole is located in the middle of one side of the connecting plate.
Through adopting above-mentioned technical scheme, can reach the effect that the both sides of locating plate can remove simultaneously, promote the fixed effect of locating plate.
Preferably, the adjusting mechanism comprises a limiting groove, the limiting groove is formed in the two sides of the sliding block, a limiting block is connected to the inside of the limiting groove in a sliding mode, and one side of the limiting block is fixedly connected to the sliding groove.
Through adopting above-mentioned technical scheme, stability when reinforcing locating plate removes.
Preferably, a sponge rubber block is arranged between the connecting plate and the positioning plate.
Through adopting above-mentioned technical scheme, the cushioning effect of reinforcing connecting plate to promote the life of connecting plate.
Preferably, a fixing component is installed between the connecting plate and the positioning plate and is located in the middle of the sponge rubber block.
Through adopting above-mentioned technical scheme for fix different specification building materials, promote the fastness of connecting back building materials.
Preferably, the fixing component comprises a fixing plate and two slots, the two slots are respectively arranged on the connecting plate and the positioning plate, the two fixing blocks are connected with the inside of the fixing plate in a sliding mode, and the outside of each fixing block is inserted into the corresponding slot.
Through adopting above-mentioned technical scheme, realize fixed different specifications building materials, the fastness of reinforcing building materials after connecting.
Compared with the prior art, the utility model has the beneficial effects that:
this scheme is through adjustment mechanism for the connecting plate uses with the locating plate combination, can be suitable for the building materials of different specifications, avoids constructor to change the connecting piece and need consume the longer time and influence constructor's work efficiency, thereby promotes constructor's work efficiency, and can reduce constructor's the work load and constructor's intensity of labour.
Drawings
FIG. 1 is a front view of a connector for a steel structure building of the present invention;
FIG. 2 is a side cross-sectional view of a steel structural construction link of the present invention;
FIG. 3 is a schematic structural view of a connecting plate of a connecting member for a steel structural building according to the present invention;
fig. 4 is a schematic view showing an internal sectional structure of a connecting plate of a connecting member for a steel structure building according to the present invention.
In the figure: 1. a connecting plate; 10. a sponge rubber block; 2. an adjustment mechanism; 20. a first through hole; 21. a second through hole; 22. positioning a plate; 23. a screw; 24. a chute; 25. a slider; 26. a limiting block; 27. a limiting groove; 3. a fixing assembly; 30. a fixing plate; 31. a fixed block; 32. and (4) a slot.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution:
a connector for a steel structure building comprising: the device comprises a connecting plate 1 and an adjusting mechanism 2 arranged on the connecting plate 1;
referring to fig. 1-4, the adjusting mechanism 2 includes a sliding chute 24 formed at the top of the connecting plate 1, a sliding block 25 is slidably connected inside the sliding chute 24, a positioning plate 22 is fixedly connected to the top of the sliding block 25, the first through hole 20 is formed inside the positioning plate 22, the second through hole 21 is formed on the connecting plate 1, and the screw rods 23 are threadedly connected inside the first through hole 20 and the second through hole 21; constructor is through using screw rod 23, makes screw rod 23 through the cooperation of first through-hole 20 and second through-hole 21, realizes the function that locating plate 22 removed, through using screw rod 23 to adjust the position of locating plate 22 to be applicable to the building materials of different specifications, avoid constructor to consume more time because of changing, and then promote constructor's work efficiency, and can reduce constructor's work load and constructor's intensity of labour.
Referring to fig. 1-3, a fixing component 3 is installed between the connecting plate 1 and the positioning plate 22, and the fixing component 3 is located in the middle of the sponge rubber block 10; after the locating plate 22 arrived appointed position, use fixed subassembly 3, fix locating plate 22 and connecting plate 1, avoid locating plate 22 the not hard up condition to appear to strengthen the fastness of the fixed building materials of locating plate 22.
Specifically, for example, in order to achieve the effect that both sides of the positioning plate 22 can move simultaneously, the fixing effect of the positioning plate 22 is improved; the first through hole 20 is located at the middle of the positioning plate 22, and the second through hole 21 is located at the middle of one side of the connecting plate 1.
Specifically, for example, to enhance the stability of the positioning plate 22 during movement; adjustment mechanism 2 includes spacing groove 27, and spacing groove 27 sets up in the both sides of slider 25, and the inside sliding connection of spacing groove 27 has stopper 26, and one side fixed connection of stopper 26 is on spout 24.
Specifically, for example, the sponge rubber block 10 is provided between the connecting plate 1 and the positioning plate 22; the damping effect of the connecting plate 1 is enhanced, so that the service life of the connecting plate 1 is prolonged.
Specifically, for example, in order to fix building materials of different specifications, the firmness of the connected building materials is enhanced; the fixing assembly 3 comprises a fixing plate 30 and two slots 32, the two slots 32 are respectively arranged on the connecting plate 1 and the positioning plate 22, the two fixing blocks 31 are slidably connected inside the fixing plate 30, and the outer parts of the fixing blocks 31 are inserted into the slots 32.
According to the technical scheme, the working steps of the scheme are summarized and carded:
firstly, a constructor moves the positioning plate 22 to two sides of the connecting plate 1 by using the screw 23, then the building materials are put into the connecting plate 1, and the screw 23 is reused, so that the screw 23 is matched with the first through hole 20 and the second through hole 21 to realize the function of moving the positioning plate 22, the positioning plate 22 drives the slide block 25 to slide in the chute 24 in the moving process, the position deviation of the positioning plate 22 in moving is avoided, meanwhile, the stability of the positioning plate 22 in moving is further improved by using the combination of the limiting block 26 and the limiting groove 27, the position of the positioning plate 22 is adjusted by using the screw 23, so that the positioning plate is suitable for the building materials with different specifications, the time consumption of constructors due to replacement is avoided, the working efficiency of the constructors is improved, the workload of the constructors and the labor intensity of the constructors can be reduced, after the positioning plate 22 is appointed to move to the appointed position, the fixing plates 30 are used, the fixing blocks 31 are respectively pulled out from the fixing plates 30, and then the fixing blocks 31 are inserted into the slots 32 to enhance the firmness of the positioning plate 22 in fixing the building materials.
To sum up: adjustment mechanism 2 is passed through to this scheme for connecting plate 1 uses with the combination of locating plate 22, can be suitable for the building materials of different specifications, avoids constructor to change the connecting piece and need consume the operating efficiency that longer time and influence constructor, thereby promotes constructor's work efficiency, and can reduce constructor's work load and constructor's intensity of labour.
The parts not involved in the present invention are the same as or can be implemented by the prior art. Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. A connector for a steel structure building, comprising: connecting plate (1) and adjustment mechanism (2), its characterized in that: the adjusting mechanism (2) is arranged on the connecting plate (1);
wherein, adjustment mechanism (2) include spout (24), spout (24) are seted up the top of connecting plate (1), the inside sliding connection of spout (24) has slider (25), top fixedly connected with locating plate (22) of slider (25), first through-hole (20) have been seted up to the inside of locating plate (22), second through-hole (21) have been seted up to the both sides of connecting plate (1), first through-hole (20) with the inside threaded connection of second through-hole (21) has screw rod (23).
2. A connector of a steel structure building according to claim 1, characterized in that: the first through hole (20) is located in the middle of the positioning plate (22), and the second through hole (21) is located in the middle of one side of the connecting plate (1).
3. A connector of a steel structure building according to claim 1, characterized in that: adjustment mechanism (2) include spacing groove (27), spacing groove (27) are seted up the both sides of slider (25), the inside sliding connection of spacing groove (27) has stopper (26), one side fixed connection of stopper (26) is in on spout (24).
4. A connector for steel structure construction according to claim 2, characterized in that: a sponge rubber block (10) is arranged between the connecting plate (1) and the positioning plate (22).
5. A connector of a steel structure building according to claim 4, characterized in that: a fixing component (3) is installed between the connecting plate (1) and the positioning plate (22), and the fixing component (3) is located in the middle of the sponge rubber block (10).
6. A connector for steel structure construction according to claim 5, characterized in that: fixed subassembly (3) are including fixed plate (30) and two slots (32), two slots (32) are seted up respectively connecting plate (1) with on locating plate (22), two inside sliding connection of fixed plate (30) have fixed block (31), insert the outside of fixed block (31) the inside of slot (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123183483.8U CN216379989U (en) | 2021-12-17 | 2021-12-17 | Connecting piece of steel structure building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123183483.8U CN216379989U (en) | 2021-12-17 | 2021-12-17 | Connecting piece of steel structure building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216379989U true CN216379989U (en) | 2022-04-26 |
Family
ID=81236717
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123183483.8U Expired - Fee Related CN216379989U (en) | 2021-12-17 | 2021-12-17 | Connecting piece of steel structure building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216379989U (en) |
-
2021
- 2021-12-17 CN CN202123183483.8U patent/CN216379989U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208023781U (en) | A kind of assembled architecture wall and prefabricated concrete structure | |
CN211473494U (en) | Building structure's reinforcement connecting device | |
CN216379989U (en) | Connecting piece of steel structure building | |
CN203373978U (en) | Reinforced concrete beam web template reinforcing fixture | |
CN209163464U (en) | A kind of building template with self-locking function | |
CN207121993U (en) | The hinged joint that a kind of reinforced concrete frame structure bracing members are reinforced | |
CN210195038U (en) | Steel structure supporting column with good stability | |
CN211945878U (en) | Steel construction hoist and mount complementary unit for construction | |
CN209891396U (en) | Intercolumnar bearing structure for steel construction | |
CN212534546U (en) | Steel structural member with high-hardness I-shaped section | |
CN209308178U (en) | A kind of assembled architecture reinforced concrete member | |
CN209308421U (en) | A kind of template of architectural engineering | |
CN210917962U (en) | Steel bar truss floor support plate framework | |
CN210263394U (en) | Simple and easy erection joint reinforced structure of building steel construction | |
CN208309801U (en) | A kind of steel structure connecting member | |
CN219548386U (en) | Civil building construction post mould fastener convenient to equipment | |
CN212613029U (en) | Connecting device for steel structure construction | |
CN221030663U (en) | Firmly-connected assembled steel structure | |
CN215107320U (en) | Steel structure prefabricated formwork for building | |
CN205571202U (en) | Novel punching press is fixed device | |
CN221123805U (en) | Fastening check out test set | |
CN112523354B (en) | Steel house assembling connecting part | |
CN221193941U (en) | Preassembled building beam structure | |
CN213897468U (en) | Ready-package steel construction based on building energy saving technology | |
CN221095450U (en) | Light partition board clamping structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220426 |
|
CF01 | Termination of patent right due to non-payment of annual fee |